I N T E R G E R G O A L P R O G R A M M I N G
13.04.14Nurse Scheduling-IGP
NURSE SCHEDULING
Prepared by-
Sowmiyan Morri
Swapnil Soni
DoMS, IISc
Course-
Applied Operations Research
Instructor-
Prof M Mathirajan
1
2
Index
 Introduction to Nurse Scheduling
 Scheduling problem
 Motivation to adopt OR technique
 Research and Literature work
 Literature Review
 The Paper
 The Paper
 Parameters
 Problem Statement
 Problem Formulation
 Notations & Decision Variables
 Constraints
 Objective Function
13.04.14Nurse Scheduling-IGP
 Programming in LINGO (Optimization tool)
 Result
 Conclusion
 Achievements
 The way forward
 Applications
 Pilot Study at Health Centre, IISc
 Parameters
 Constraints
 Result
 References
3
Introduction to Nurse Scheduling
13.04.14Nurse Scheduling-IGP
Motivation for applying Operations Research for Nurse Scheduling
Cyclical Nurse Schedule
Constraints
Hospitals requirement
Nurses’ preferences
Conventional Register
Question on:
•Tedious
•Time
•Accuracy
•Fairness
Mathematical Modeling
Advantages on:
•Tedious
•Time
•Accuracy
•Fairness
Prescriptive Model
Cause Response
Variables of 1st order Linear
Variables with Binary values Integer
Constraints with priorities Goal
Liner Integer Goal Programming
Operations Research
4
Literature Review
13.04.14Nurse Scheduling-IGP
Authors Reference Literature Limitations
Arthur &
Ravindran
Arthur, J. L., & Ravindran,
A., A Multiple Objective Nurse
Scheduling
Model, IIE Transactions,
13(1), pp. 55-60, 1981
Research on modelling Nurse
Scheduling using goal
programming has been studied
which focused on two phases:
•Phase 1 is to assign the working
days and days off for each nurse
while
•Phase 2 is to assign the shift
types of their working days
•Small set of
constraints
•Limited problem
dimensions with the
size of nurses is 4
Musa &
Saxena
Musa, A. A., & Saxena, U.,
Scheduling Nurses Using
Goal-Programming
Techniques, IIE Transactions,
16(3), pp. 216 – 221, 1984
Used a 0-1 goal programming that
applied to one unit of a hospital
with the considerations of the
hospital policies and nurses’
preferences
•2 week planning
period
•1 one single shift
Ozkarahan
& Bailey
Ozkarahan, I. & Bailey, J.E.,
Goal Programming Model
Subsystem of A
Flexible Nurse Scheduling
Support System, IIE
Transactions, 20(3), pp.
306-316, 1988.
Nurse scheduling modelling
showed the
flexibility of goal programming in
handling various goals which
fulfilled the hospital’s objectives
and the nurses’ preferences.
•Small set of
constraints
5 13.04.14Nurse Scheduling-IGP
Authors Reference Literature Limitations
Azaiez &
Al Sharif
Berrada, I., Ferland, J. A., &
Michelon, P., A Multi-objective
Approach to
Nurse Scheduling with Both Hard
and Soft Constraints, Socio-
Economic
Planning Sciences, 30(3), pp. 183-
193, 1996
Used the 0-1 goal programming
approach with the considerations
of hospital’s objectives as hard
constraints and the nurses’
preferences as soft constraints to
develop the schedules
•No cyclic
scheduling
Harvey
and
Kiragu
Harvey, H.M., & Kiragu, M., Cyclic
and Non-cyclic Scheduling of 12 h
Shift Nurses by Network
Programming, European Journal of
Operational
Research, 104, pp. 582-592, 1998
Presented a mathematical model
for cyclic and non-cyclic
scheduling of 12
hours shift nurses. The model is
quite flexible and can
accommodate a variety
of constraints
• With small
requirements
which are not
appropriate to
embed in real
situations
Chan and
Weil
Chan, P. & Weil, G., Cyclical Staff
Scheduling Using Constraint Logic
Programming, Lecture Notes on
Computer Sciences 2079, pp. 159-
175,
2001
Use of work cycles with various
constraints to produce
timetables of up to 150 people
•Small set of
constraints
Literature Review
6
The Paper
13.04.14Nurse Scheduling-IGP
Author From
Ruzzakiah Jenal
School of Information Technology, Faculty of Science and Information
Technology,
Universiti Kebangsaan Malaysia, Selangor, Malaysia
Wan Rosmanira Ismail
School of Mathematical Sciences, Faculty of Science and Technology,
Universiti Kebangsaan Malaysia, Selangor, Malaysia
Liong Choong Yeun
Ahmed Oughalime
Published By LPPM ITB, ISSN: 1978-3043
Accepted for Publication April 13th, 2011
7
The Paper -Parameters
13.04.14Nurse Scheduling-IGP
Number of Nurses 18
Number of Days 21
Number of Shifts: 3 (Morning, Evening & Night)
Number of Decision Variables 18 X 21 X 4 (3 shifts+1 Off) = 1512
Type of Decision Variables Binary (0-1)
Parameters:
One Ward 18 nurses 3 Shifts
Morning Shift
At least 4
nurses
Evening Shift
At least 4 nurses
Night Shift
Exactly 3 nurses
7:00 am-2:00pm
2:00pm-9:00pm
9:00pm-7:00am
8 13.04.14Nurse Scheduling-IGP
Problem Statement
Objective:
Cyclic Nurse Scheduling:
To allot shifts to each Nurse for each day thereby generating a schedule of working days
and days off for each nurse in a ward of a hospital.
Physical Constraints:
(A) Hard Constraint
Meeting management objectives
(B) Soft constraints
Satisfaction of employees(Nurses), work/life balance
Logical Constraints:
(C) Cyclic Scheduling
A cyclic schedule consists of a set of work patterns which is rotated among a group of workers over a set of
scheduling horizon. At the end of the scheduling horizon each worker would have completed each pattern
exactly once.
Advantages:
• Fairness among nurses
•Considers nurses preferences
•Lead to maximizing satisfaction
•Help Nurses to provide Quality of services
“The right employees at the right time
and at the right cost while achieving a
high level of employee job satisfaction”
9
Problem Statement
13.04.14Nurse Scheduling-IGP
Morning Shift
?=0,1
Nurse
Demand
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Days
1 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4
2 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4
3 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4
4 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4
5 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4
6 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4
7 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4
8 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4
9 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4
10 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4
11 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4
12 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4
13 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4
14 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4
15 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4
16 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4
17 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4
18 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4
19 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4
20 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4
21 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4
Total Shift ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ?
Similarly for:
Evening, Day & Off Shift
This Excel sheet is linked with LINGO to feed the inputs for ‘Data Sets’ &
‘Attributes’ and get output for all ‘Decision Variables’
10 13.04.14Nurse Scheduling-IGP
Constraints
• Hard Constraints (Management)
• Soft Constraints (Nurse Specific)
Hard
Constraints
• Each unit is covered by 3 shifts for 24 hours a day and 7 days a week.
• Minimum staff level requirement must be satisfied.
• Each nurse works at most one shift a day.
• Avoid any isolated days patterns of “off-on-off”.
• Each nurse must have three days off after having three consecutive night shifts.
• Each nurse works between 12 to 14 days per schedule.
• Each nurse works not more than 6 consecutive days.
• Evening shift constitutes at least 25% of total workload.
• Morning shift constitutes at least 30% of total workload.
Soft
Constraints
• Avoid working in an evening shift followed by a morning shift or a nightshift the next day.
• Avoid working in a morning shift followed by an evening shift or a night shift the next day.
• Each nurse has at least one day off in one weekend.
• All nurses have the same amount of total workload.
Problem Formulation-Constraints Description
Hard Constraints-Must be satisfied
Soft Constraint-May be violated
Goal
Programming
11
Notations
The following notations are used to specify the model:
 n = number of days in the schedule (n = 21)
 m = number of nurses available for the unit of interest (m = 18)
 i = index for days, i = 1…n
 k = index for nurses, k = 1…m
 Pi = staff requirement for morning shift of day i, i = 1…n
 Ti = staff requirement for evening shift of day i, i = 1…n
 Mi = staff requirement for night shift of day i, i = 1…n
13.04.14Nurse Scheduling-IGP
Problem Formulation- Notation & Decision Variables
Decision Variables
12
Hard Constraints:
 Set 1: Minimum staff level requirement must be satisfied:
 For Morning shift (Where Pi=4)
 For Evening shift (Where Ti=4)
 For Night shift (Where Mi=3)
 Set 2: Each nurse works only one shift a day:
13.04.14Nurse Scheduling-IGP
Problem Formulation-Constraints
….“n” equations
….“n” equations
….“n” equations
….“n*m” equations
13
Hard Constraints:
 Set 3: Avoid any isolated days patterns of “off-on-off” :
13.04.14Nurse Scheduling-IGP
Problem Formulation-Constraints (continued..)
….“(n-2)*m” equations
Day1 Day2 Day3
Off On Off
C1 X2/Y2/Z2 C3 Sum
Unacceptable
1 1 1 3
Acceptable
0 0 0 0
0 0 1 1
0 1 0 1
0 1 1 2
1 0 0 1
1 0 1 2
1 1 0 2
Yes
No
14
Hard Constraints:
 Set 4: Each nurse works 3 consecutive days of night shift and followed by 3 days
off. Each nurse will be assigned to their night shifts and off days as follow:
13.04.1414Nurse Scheduling-IGP
Problem Formulation-Constraints (continued..)
….“m” equations
15
Hard Constraints:
 Set 5: Each nurse works between 12 to 14 days per schedule:
13.04.14Nurse Scheduling-IGP
Problem Formulation-Constraints (continued..)
….“2*m” equations
For each Nurse total Sum of all working
shift should lie between 12 & 14
16
Hard Constraints:
 Set 6: Each nurse works not more than 6 consecutive days:
 Each Nurse has to have at least 1 “Off” in 7 consecutive days
13.04.14Nurse Scheduling-IGP
Problem Formulation-Constraints (continued..)
Cases for 7 Consecutive days for Kth Nurse
Case-
1
Case-
2
Case-
3
Case-
4
Case-
5
Case-
6
Case-
7
Case-
8
Case-
9
Case-
10
Case-
11
Case-
12
Case-
13
Case-
14
Case-
15
Case-
16
Case-
17
Case-
18
Case-
19
Case-
20
Case-
21
Days
1 K K+1 K+1 K+1 K+1 K+1 K+1
2 K K K+1 K+1 K+1 K+1 K+1
3 K K K K+1 K+1 K+1 K+1
4 K K K K K+1 K+1 K+1
5 K K K K K K+1 K+1
6 K K K K K K K+1
7 K K K K K K K
8 K K K K K K K
9 K K K K K K K
10 K K K K K K K
11 K K K K K K K
12 K K K K K K K
13 K K K K K K K
14 K K K K K K K
15 K K K K K K K
16 K K K K K K K
17 K K K K K K K
18 K K K K K K K
19 K K K K K K K
20 K K K K K K K
21 K K K K K K K
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
Due to Cyclic
constraint, Nurse “K”
has to take position of
“K+1” in each next cycle
17
 Set 6: Each nurse works not more than 6 consecutive days
 For 1st 15 Days, 18 Nurses (in following eq “i” can take maximum of 15 value)
 For next 6 days, 17 Nurses (in following eq “k” can take maximum of 17 value)
 For next 6 days, 18th Nurses
13.04.1417Nurse Scheduling-IGP 13.04.1417Nurse Scheduling-IGP
6
….“(n-6)*m” equations
Problem Formulation-Constraints (continued..)
….“6*(m-1)” equations
….6 equations
18
 Set 7: Evening shift constitutes at least 25% of total workload:
 Sum of all Evening shifts for a nurse >=25% of Total worked shifts
 Set 8: Morning shift constitutes at least 30% of total workload:
o Sum of all Morning shifts for a nurse >=30% of Total worked shifts
13.04.14Nurse Scheduling-IGP
Problem Formulation-Constraints (continued..)
0.25* ….“m” equations
0.30* ….“m” equations
19
Soft Constraints:
 Soft constraints are arising out of Nurses’ preferences so these can be treated as Goals for our Integer
Liner Programming.
 The deviation for each goal are christened:
 ρ : Positive Deviation
 η : Negative Deviation
 Set 1: Avoid working in an evening shift followed by a morning shift or a night
shift the next day:
13.04.14Nurse Scheduling-IGP
Day1 Day2
Evening Morning/Night
Y1 X2/Z2 Sum
Unacceptable
1 1 2
Acceptable
0 0 0
0 1 1
1 0 1
Yes No
Problem Formulation-Constraints (continued..)
20
 Set 1: Avoid working in an evening shift followed by a morning shift or a night
shift the next day:
 For 1st 20 Days, 18 Nurses (in following eq “i” can take maximum of 20 value)
 For 21st & 1st days, 17 Nurses (in following eq “k” can take maximum of 17 value)
 For 21st & 1st days, 18th & 1st Nurses
13.04.14Nurse Scheduling-IGP 13.04.14Nurse Scheduling-IGP
….“(n-1)*m” equations
Problem Formulation-Constraints (continued..)
….“(m-1)” equations
….1 equation
Goal-1: Minimize
=
=
=
21
 Set 2: Avoid working in an Morning shift followed by a Evening shift or a night
shift the next day:
 For 1st 20 Days, 18 Nurses (in following eq “i” can take maximum of 20 value)
 For 21st & 1st days, 17 Nurses (in following eq “k” can take maximum of 17 value)
 For 21st & 1st days, 18th & 1st Nurses
13.04.14Nurse Scheduling-IGP 13.04.14Nurse Scheduling-IGP
….“(n-1)*m” equations
Problem Formulation-Constraints (continued..)
….“(m-1)” equations
….1 equation
Goal-2: Minimize
=
=
=
22
 Set 3: Each nurse has at least one weekend off:
 Sum of above heighted weekends >=1 (for each Nurse)
13.04.14Nurse Scheduling-IGP
Problem Formulation-Constraints (continued..)
Nurse
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Days
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
Each Nurse has to have at least one
Off here out of highlighted 3
weekends
….“m” equations
Goal-3: Minimize
=
23
 Set 4: All nurses have the same amount of total workload:
 In Hard Constraint Set-5, it has been seen that Management preference for total work
load should be between 12 & 14.
 But Nurses prefer to have equal work load.
 Thus trade off is to have work load of 13 for each nurse.
Sum of all shifts for each Nurse = 13
13.04.14Nurse Scheduling-IGP
Problem Formulation-Constraints (continued..)
….“m” equations
Goal-4: Minimize
Binary Constraints:
For each nurse and for each shift (Morning, Evening, Night, Off), value can be
either 1 or 0.
24 13.04.14Nurse Scheduling-IGP
Problem Formulation-Objective Function:
Preemptive Goal Programming for this model:
Subject to:
• Hard constraints
• Soft constraints
• Binary Constraints
• Non-negativity constraints
25
Programming in LINGO
13.04.14Nurse Scheduling-IGP
Defining Sets
Import & Export of
Data with Excel
26
Program Execution
13.04.14Nurse Scheduling-IGP
27
Time Line Analysis
13.04.14Nurse Scheduling-IGP
1 2 3 4 5 6 7 8
No of Nurses 5 6 7 8 9 10 11 12
Time to Solve (min) 16 19 81 134 212 901 1498 3980
0
500
1000
1500
2000
2500
3000
3500
4000
4500
Timetosolve(inMinutes)
No. of Variables Vs Time to solve
(for 21 Days)
Exponential
increase in
time to solve
the problem
w.r.t. No. of
Nurses
28
Result-Optimal Solution
13.04.14Nurse Scheduling-IGP
OVERALL SCHEDULE
Nurse Total
Nurses in
Morning
Shift
Total
Nurses in
Evening
Shift
Total
Nurses in
Night Shift
Total
Nurses
in all
Shifts1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Days
1 N OFF OFF OFF E E N OFF M E E M N OFF M M OFF OFF 4 4 3 11
2 N OFF M OFF E E N OFF E E OFF OFF N OFF M M M OFF 4 4 3 11
3 N OFF M OFF E OFF N OFF OFF E M OFF N OFF E E M M 4 4 3 11
4 OFF E E E OFF N OFF M M OFF E N OFF M OFF OFF M N 4 4 3 11
5 OFF E E E M N OFF E M M OFF N OFF M OFF OFF OFF N 4 4 3 11
6 OFF E E OFF M N OFF E OFF M OFF N OFF M E OFF M N 4 4 3 11
7 E E OFF M N OFF OFF E M OFF N OFF M M E OFF N OFF 4 4 3 11
8 E E M M N OFF OFF OFF M OFF N OFF E E E M N OFF 4 5 3 12
9 OFF E E M N OFF M M OFF OFF N OFF E E OFF M N OFF 4 4 3 11
10 E OFF E N OFF OFF M M E N OFF M OFF OFF M N OFF E 4 4 3 11
11 E M OFF N OFF OFF E M E N OFF M OFF E M N OFF E 4 5 3 12
12 OFF M OFF N OFF M E M OFF N OFF M E E OFF N OFF E 4 4 3 11
13 OFF M N OFF M M OFF E N OFF M E E OFF N OFF OFF E 4 4 3 11
14 OFF M N OFF M E E E N OFF M OFF OFF M N OFF OFF E 4 4 3 11
15 E OFF N OFF OFF E E OFF N OFF M E M M N OFF M OFF 4 4 3 11
16 E N OFF E M OFF OFF N OFF M E E M N OFF M E OFF 4 5 3 12
17 OFF N OFF E M M OFF N OFF E OFF E OFF N OFF M E M 4 4 3 11
18 M N OFF OFF E M M N OFF E M OFF OFF N OFF E OFF E 4 4 3 11
19 N OFF OFF M OFF M N OFF M E E OFF N OFF M E E OFF 4 4 3 11
20 N OFF E M OFF OFF N OFF E OFF E M N OFF M OFF E M 4 4 3 11
21 N OFF E E OFF M N OFF OFF M OFF M N OFF OFF E E M 4 4 3 11
Total Morning Shifts 1 4 3 5 6 6 3 5 6 4 5 6 3 6 6 6 5 4
Total Evening Shifts 6 6 7 5 4 4 4 5 4 6 5 4 4 4 4 4 5 6
Total Night Shifts 6 3 3 3 3 3 6 3 3 3 3 3 6 3 3 3 3 3
Total Off's 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
Total Working Days 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13
Hard Constraints
1) Demand is met
2) Each nurse
works at most one
shift a day
3) Avoid any isolated days
patterns of “off-on-off”.
4) Each nurse must
have three days off
after having three
consecutive night
5) Each nurse
works between 12
to 14 days per
schedule.
6) Each nurse works
not more than 6
consecutive days
7) Evening shift
constitutes at least 25%
of total workload
Soft Constraints
1) Avoid working in an evening shift
followed by a morning shift or a
nightshift the next day
3) Each nurse has at
least one day off in one
weekend.
4) All nurses have the
same amount of total
workload
29
Conclusion
Achievements
 The developed model with various constraints and goals using the 0-1 goal programming
technique gives the optimum solution that showed both the hard constraints and soft
constraints are satisfied.
 The pattern will be rotated among the nurses and each nurse will be working according to
each schedule’s pattern. After completing 18 schedules, then each nurse will revisit the
starting schedule.
 Cyclical nurse scheduling rotates equally through the desirable and undesirable work
stretches among the nurses and requires relatively less scheduling effort of the head nurse.
 The schedule satisfies the factors of completeness and continuity. While the fairness factor is
dealt with since the schedule’s pattern is going to rotate among the nurses.
 All nurses will have the opportunity to work with the satisfactory and unsatisfactory
schedule’s patterns.
 With this cyclical scheduling, it gives nurses more control over their work life because they
know the type of shift schedule in the future which should have a positive effect on their job
satisfaction.
13.04.14Nurse Scheduling-IGP
30
The way forward
 New schedule will only need to be produced when changes occur in its average daily staff
requirements.
 For further research, one of possible work is to embed the model into user friendly software that
would be easy to use and reliable.
 The model also should be extended to account for other important scheduling aspects such as
requested day off in order to being acceptable to all parties.
Applications
 Transportation
 Call centres
 Health care
 Emergency services
 Civic services and utilities
 Venue management
 Financial services
 Hospitality and tourism
 Manufacturing
13.04.14Nurse Scheduling-IGP
Conclusion (continued..)
HEALTH CENTRE, IIS c
13.04.14Nurse Scheduling-IGP
PILOT STUDY- NURSE SCHEDULING
31
Photo courtesy: Ms. D. Choudhary
32
Pilot Study at Health Centre IISc
13.04.14Nurse Scheduling-IGP
Number of Nurses 11
Number of Days 14 (2 Weeks)
Number of Shifts: 3 (Morning, Day & Night)
Number of Decision Variables 11 X 14 X 4 (3 shifts+1 Off) = 616
Type of Decision Variables Binary (0-1)
Health Centre 11 nurses 3 Shifts
Morning Shift
At least 5
nurses
Evening Shift
At least 2 nurses
Night Shift
Exactly 1 nurses
6:00 am-1:00pm
1:00pm-8:00pm
8:00pm-6:00am
33 13.04.14Nurse Scheduling-IGP
Constraints
• Hard Constraints (Management)
• Soft Constraints (Nurse Specific)
Hard
Constraints
• Each unit is covered by 3 shifts for 24 hours a day and 7 days a week.
• Minimum staff level requirement must be satisfied.
• Each nurse works at most one shift a day.
• Each nurse works not more than 6 consecutive days.
• Each nurse can’t have more than 3 holidays fortnightly.
Soft
Constraints
• Avoid working in Night shift followed by Morning shift or Evening shift of the next day.
• Each nurse has at least one day off in one weekend. (could not be met)
Problem Formulation-Constraints Description
Hard Constraints-Must be satisfied
Soft Constraint-May be violated
Goal
Programming
34
Execution & Result
13.04.14Nurse Scheduling-IGP
OVERALL SCHEDULE PROPOSED FOR HEALTH CENTRE, IISc
Nurses Total
Nurses in
Morning
Shift
Total
Nurses in
Evening
Shift
Total
Nurses in
Night Shift
Total
Nurses
in all
Shifts1 2 3 4 5 6 7 8 9 10 11
Days
1 E E M M M N M E M E E 5 5 1 11
2 E M E E M N M E E M M 5 5 1 11
3 M N M E OFF OFF OFF M M M E 5 2 1 8
4 M N OFF E M E M OFF OFF M M 5 2 1 8
5 M OFF E E M E E N M M M 5 4 1 10
6 OFF E M OFF E M M N M M OFF 5 2 1 8
7 OFF M M E OFF M E N M OFF M 5 2 1 8
8 M M OFF N E OFF M OFF M M E 5 2 1 8
9 E M M OFF M E OFF N OFF M M 5 2 1 8
10 M N M E M E M OFF M E OFF 5 3 1 9
11 N OFF M M E M E M E OFF M 5 3 1 9
12 N E M M OFF M OFF E M M M 6 2 1 9
13 OFF N E OFF M E M M E M M 5 3 1 9
14 M OFF OFF M M E M M OFF E N 5 2 1 8
Total Morning Shifts 6 4 8 4 8 4 8 4 8 9 8
Total Evening Shifts 3 3 3 6 3 6 3 3 3 3 3
Total Night Shifts 2 4 0 1 0 2 0 4 0 0 1
Total Off's 3 3 3 3 3 2 3 3 3 2 2
Total Working Days 11 11 11 11 11 12 11 11 11 12 12
Hard Constraints
1) Demand is met
2) Each nurse works at
most one shift a day
3) Each nurse works not more
than 6 consecutive days
4) Each nurse can’t have more
than 3 holidays fortnightly
Soft Constraints
1) Avoid working in Night shift followed by
Morning shift or Evening shift of the next day
35 13.04.14Nurse Scheduling-IGP
Websites
 www.lindo.com
 www.journal.itb.ac.id
Research Papers
 A Cyclic Nurse Schedule using Goal Programming By Ruzzakiah Jenal et.al.
 A Multiple Objective Nurse Scheduling Model By Arthur & Ravidran
 Scheduling Nurses Using Goal-Programming Techniques By Musa & Saxena
 Goal Programming Model Subsystem of A Flexible Nurse Scheduling Support System By
Ozkarahan & Bailey
Books
 An Introduction to Management Science By Anderson Sweeney Williams
Tools used
 Microsoft Encarta (Encyclopedia for offline references)
 Microsoft Excel (Data embedding)
 Industrial LINGO (Linear Integer Programming)
References
13.04.14Nurse Scheduling-IGP 36
Thank you!
They said it….
“There’s a fundamental distinction between strategy and operational effectiveness”
(Michael Porter)
Leanings….
• Practical application of Operations Research
• Optimization Software- LINGO and its limitations
• Literature Review of Research Paper

More Related Content

What's hot

Safe patient handling, Reuban Daniel. C
Safe patient handling, Reuban Daniel. CSafe patient handling, Reuban Daniel. C
Safe patient handling, Reuban Daniel. Cohscmcvellore
 
Nursing Care Plans and Clinical Pathways:
Nursing Care Plans and Clinical Pathways: Nursing Care Plans and Clinical Pathways:
Nursing Care Plans and Clinical Pathways: IHNA Australia
 
Staffing,estmn,scheduling
Staffing,estmn,schedulingStaffing,estmn,scheduling
Staffing,estmn,schedulingligi xavier
 
Planning Nursing Administration
Planning Nursing AdministrationPlanning Nursing Administration
Planning Nursing AdministrationMiya Rayo
 
Public relations.pptx
Public relations.pptxPublic relations.pptx
Public relations.pptxRameeThj
 
Doctors order sheet
Doctors order sheetDoctors order sheet
Doctors order sheetyusufrawash
 
Functions of Administration and Management
Functions of  Administration and ManagementFunctions of  Administration and Management
Functions of Administration and ManagementKailash Nagar
 
Dr. Maheswari Ganesan planning in Nursing Management
Dr. Maheswari Ganesan   planning in Nursing ManagementDr. Maheswari Ganesan   planning in Nursing Management
Dr. Maheswari Ganesan planning in Nursing Managementmaheswarirajamanicka
 
Early warning scores in hospital for nurse
Early warning scores in hospital for nurseEarly warning scores in hospital for nurse
Early warning scores in hospital for nurseDEEPARANI
 
2012 NATIONAL NURSING CORE COMPETENCY STANDARDS
2012 NATIONAL NURSING CORE COMPETENCY STANDARDS2012 NATIONAL NURSING CORE COMPETENCY STANDARDS
2012 NATIONAL NURSING CORE COMPETENCY STANDARDSHanna Olvido
 

What's hot (20)

Safe patient handling, Reuban Daniel. C
Safe patient handling, Reuban Daniel. CSafe patient handling, Reuban Daniel. C
Safe patient handling, Reuban Daniel. C
 
Nursing Leadership and Management
Nursing Leadership and ManagementNursing Leadership and Management
Nursing Leadership and Management
 
Head nurse job description
Head nurse job descriptionHead nurse job description
Head nurse job description
 
Nursing Care Plans and Clinical Pathways:
Nursing Care Plans and Clinical Pathways: Nursing Care Plans and Clinical Pathways:
Nursing Care Plans and Clinical Pathways:
 
Staffing,estmn,scheduling
Staffing,estmn,schedulingStaffing,estmn,scheduling
Staffing,estmn,scheduling
 
Planning Nursing Administration
Planning Nursing AdministrationPlanning Nursing Administration
Planning Nursing Administration
 
Public relations.pptx
Public relations.pptxPublic relations.pptx
Public relations.pptx
 
Organizing nursing services
Organizing nursing servicesOrganizing nursing services
Organizing nursing services
 
Doctors order sheet
Doctors order sheetDoctors order sheet
Doctors order sheet
 
Staffing- Nursing Management
Staffing- Nursing ManagementStaffing- Nursing Management
Staffing- Nursing Management
 
Functions of Administration and Management
Functions of  Administration and ManagementFunctions of  Administration and Management
Functions of Administration and Management
 
Ward management
Ward managementWard management
Ward management
 
Dr. Maheswari Ganesan planning in Nursing Management
Dr. Maheswari Ganesan   planning in Nursing ManagementDr. Maheswari Ganesan   planning in Nursing Management
Dr. Maheswari Ganesan planning in Nursing Management
 
Early warning scores in hospital for nurse
Early warning scores in hospital for nurseEarly warning scores in hospital for nurse
Early warning scores in hospital for nurse
 
2012 NATIONAL NURSING CORE COMPETENCY STANDARDS
2012 NATIONAL NURSING CORE COMPETENCY STANDARDS2012 NATIONAL NURSING CORE COMPETENCY STANDARDS
2012 NATIONAL NURSING CORE COMPETENCY STANDARDS
 
dutyroaster.pptx
dutyroaster.pptxdutyroaster.pptx
dutyroaster.pptx
 
Estimating of nursing staff requirement
Estimating of nursing staff requirementEstimating of nursing staff requirement
Estimating of nursing staff requirement
 
Initial assessment
Initial assessmentInitial assessment
Initial assessment
 
Safe Patient Handling
Safe Patient HandlingSafe Patient Handling
Safe Patient Handling
 
Staffing & schedule
Staffing & scheduleStaffing & schedule
Staffing & schedule
 

Similar to Nurse schedule goal programming (Cyclical)

Dynamic decision model for cyclical employee Scheduling
Dynamic decision model for cyclical employee SchedulingDynamic decision model for cyclical employee Scheduling
Dynamic decision model for cyclical employee SchedulingSwapnil Soni
 
Continuous Nursing Education(CNE), Role Of Nurse Informatics: Strategies to S...
Continuous Nursing Education(CNE), Role Of Nurse Informatics: Strategies to S...Continuous Nursing Education(CNE), Role Of Nurse Informatics: Strategies to S...
Continuous Nursing Education(CNE), Role Of Nurse Informatics: Strategies to S...nisaiims
 
8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And Scheduling8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And SchedulingRicky Smith CMRP, CMRT
 
Nurse Rostering Problem - A comparison between Constraint Programming on CHOC...
Nurse Rostering Problem - A comparison between Constraint Programming on CHOC...Nurse Rostering Problem - A comparison between Constraint Programming on CHOC...
Nurse Rostering Problem - A comparison between Constraint Programming on CHOC...Chhaily MOUN
 
Final Rural Nurse Residency Looping Expereince.dunlop ppt
Final Rural Nurse Residency Looping Expereince.dunlop pptFinal Rural Nurse Residency Looping Expereince.dunlop ppt
Final Rural Nurse Residency Looping Expereince.dunlop pptArla Dunlop
 
Position Strategy_CHC_2015
Position Strategy_CHC_2015Position Strategy_CHC_2015
Position Strategy_CHC_2015Andor Fuhrer
 
Elective Care Conference: using the IST capacity and demand tool
Elective Care Conference: using the IST capacity and demand toolElective Care Conference: using the IST capacity and demand tool
Elective Care Conference: using the IST capacity and demand toolNHS Improvement
 
Kick-off Meeting of the Advisory Group for the OECD Guidelines for Measuring ...
Kick-off Meeting of the Advisory Group for the OECD Guidelines for Measuring ...Kick-off Meeting of the Advisory Group for the OECD Guidelines for Measuring ...
Kick-off Meeting of the Advisory Group for the OECD Guidelines for Measuring ...StatsCommunications
 
Effective Management of the Clinical Workforce - National Rostering Conferenc...
Effective Management of the Clinical Workforce - National Rostering Conferenc...Effective Management of the Clinical Workforce - National Rostering Conferenc...
Effective Management of the Clinical Workforce - National Rostering Conferenc...Skillsforhealth
 
Training Workers for Improving Performance in Crowdsourcing Microtasks
Training Workers for Improving Performance in Crowdsourcing MicrotasksTraining Workers for Improving Performance in Crowdsourcing Microtasks
Training Workers for Improving Performance in Crowdsourcing MicrotasksUjwal Gadiraju
 
Computer-generated rounding report increases workflow efficiency
Computer-generated rounding report increases workflow efficiencyComputer-generated rounding report increases workflow efficiency
Computer-generated rounding report increases workflow efficiencyHealth Informatics New Zealand
 
Scheduling and Staffing in Management.pptx
Scheduling and Staffing in Management.pptxScheduling and Staffing in Management.pptx
Scheduling and Staffing in Management.pptxSoniakhan739990
 

Similar to Nurse schedule goal programming (Cyclical) (20)

Dynamic decision model for cyclical employee Scheduling
Dynamic decision model for cyclical employee SchedulingDynamic decision model for cyclical employee Scheduling
Dynamic decision model for cyclical employee Scheduling
 
Scheduling elaine kemp
Scheduling    elaine kempScheduling    elaine kemp
Scheduling elaine kemp
 
Continuous Nursing Education(CNE), Role Of Nurse Informatics: Strategies to S...
Continuous Nursing Education(CNE), Role Of Nurse Informatics: Strategies to S...Continuous Nursing Education(CNE), Role Of Nurse Informatics: Strategies to S...
Continuous Nursing Education(CNE), Role Of Nurse Informatics: Strategies to S...
 
8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And Scheduling8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And Scheduling
 
Nurse Rostering Problem - A comparison between Constraint Programming on CHOC...
Nurse Rostering Problem - A comparison between Constraint Programming on CHOC...Nurse Rostering Problem - A comparison between Constraint Programming on CHOC...
Nurse Rostering Problem - A comparison between Constraint Programming on CHOC...
 
Final Rural Nurse Residency Looping Expereince.dunlop ppt
Final Rural Nurse Residency Looping Expereince.dunlop pptFinal Rural Nurse Residency Looping Expereince.dunlop ppt
Final Rural Nurse Residency Looping Expereince.dunlop ppt
 
Staffing and scheduling
Staffing and schedulingStaffing and scheduling
Staffing and scheduling
 
Size mix
Size mixSize mix
Size mix
 
Position Strategy_CHC_2015
Position Strategy_CHC_2015Position Strategy_CHC_2015
Position Strategy_CHC_2015
 
Elective Care Conference: using the IST capacity and demand tool
Elective Care Conference: using the IST capacity and demand toolElective Care Conference: using the IST capacity and demand tool
Elective Care Conference: using the IST capacity and demand tool
 
Kick-off Meeting of the Advisory Group for the OECD Guidelines for Measuring ...
Kick-off Meeting of the Advisory Group for the OECD Guidelines for Measuring ...Kick-off Meeting of the Advisory Group for the OECD Guidelines for Measuring ...
Kick-off Meeting of the Advisory Group for the OECD Guidelines for Measuring ...
 
Effective Management of the Clinical Workforce - National Rostering Conferenc...
Effective Management of the Clinical Workforce - National Rostering Conferenc...Effective Management of the Clinical Workforce - National Rostering Conferenc...
Effective Management of the Clinical Workforce - National Rostering Conferenc...
 
Redesigning the A&E Value Stream
Redesigning the A&E Value Stream Redesigning the A&E Value Stream
Redesigning the A&E Value Stream
 
Training Workers for Improving Performance in Crowdsourcing Microtasks
Training Workers for Improving Performance in Crowdsourcing MicrotasksTraining Workers for Improving Performance in Crowdsourcing Microtasks
Training Workers for Improving Performance in Crowdsourcing Microtasks
 
G. Edrosolo CNL Poster2
G. Edrosolo CNL Poster2G. Edrosolo CNL Poster2
G. Edrosolo CNL Poster2
 
Staffing
StaffingStaffing
Staffing
 
Staffing and Budgetting
Staffing and BudgettingStaffing and Budgetting
Staffing and Budgetting
 
Computer-generated rounding report increases workflow efficiency
Computer-generated rounding report increases workflow efficiencyComputer-generated rounding report increases workflow efficiency
Computer-generated rounding report increases workflow efficiency
 
staffing
staffingstaffing
staffing
 
Scheduling and Staffing in Management.pptx
Scheduling and Staffing in Management.pptxScheduling and Staffing in Management.pptx
Scheduling and Staffing in Management.pptx
 

More from Swapnil Soni

State of economy - economic survey of India 2013-14
State of economy - economic survey of India 2013-14State of economy - economic survey of India 2013-14
State of economy - economic survey of India 2013-14Swapnil Soni
 
Data mining- Association Analysis -market basket
Data mining- Association Analysis -market basketData mining- Association Analysis -market basket
Data mining- Association Analysis -market basketSwapnil Soni
 
Virgin mobiles pricing for the very first time
Virgin mobiles  pricing for the very first timeVirgin mobiles  pricing for the very first time
Virgin mobiles pricing for the very first timeSwapnil Soni
 
Marketing SBI SMS unhappy
Marketing  SBI SMS unhappyMarketing  SBI SMS unhappy
Marketing SBI SMS unhappySwapnil Soni
 
Trade policy (Indian Context)
Trade policy (Indian Context)Trade policy (Indian Context)
Trade policy (Indian Context)Swapnil Soni
 
Merchandising & Marketing
Merchandising & Marketing  Merchandising & Marketing
Merchandising & Marketing Swapnil Soni
 
Technological innovations for sustainability
Technological innovations for sustainabilityTechnological innovations for sustainability
Technological innovations for sustainabilitySwapnil Soni
 

More from Swapnil Soni (8)

State of economy - economic survey of India 2013-14
State of economy - economic survey of India 2013-14State of economy - economic survey of India 2013-14
State of economy - economic survey of India 2013-14
 
Data mining- Association Analysis -market basket
Data mining- Association Analysis -market basketData mining- Association Analysis -market basket
Data mining- Association Analysis -market basket
 
Virgin mobiles pricing for the very first time
Virgin mobiles  pricing for the very first timeVirgin mobiles  pricing for the very first time
Virgin mobiles pricing for the very first time
 
Marketing SBI SMS unhappy
Marketing  SBI SMS unhappyMarketing  SBI SMS unhappy
Marketing SBI SMS unhappy
 
Trade policy (Indian Context)
Trade policy (Indian Context)Trade policy (Indian Context)
Trade policy (Indian Context)
 
Merchandising & Marketing
Merchandising & Marketing  Merchandising & Marketing
Merchandising & Marketing
 
Public spending
Public spendingPublic spending
Public spending
 
Technological innovations for sustainability
Technological innovations for sustainabilityTechnological innovations for sustainability
Technological innovations for sustainability
 

Recently uploaded

Call Girls In Dwarka 9654467111 Escorts Service
Call Girls In Dwarka 9654467111 Escorts ServiceCall Girls In Dwarka 9654467111 Escorts Service
Call Girls In Dwarka 9654467111 Escorts ServiceSapana Sha
 
Heart Disease Classification Report: A Data Analysis Project
Heart Disease Classification Report: A Data Analysis ProjectHeart Disease Classification Report: A Data Analysis Project
Heart Disease Classification Report: A Data Analysis ProjectBoston Institute of Analytics
 
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)jennyeacort
 
Generative AI for Social Good at Open Data Science East 2024
Generative AI for Social Good at Open Data Science East 2024Generative AI for Social Good at Open Data Science East 2024
Generative AI for Social Good at Open Data Science East 2024Colleen Farrelly
 
RS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝Delhi
RS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝DelhiRS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝Delhi
RS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝Delhijennyeacort
 
Biometric Authentication: The Evolution, Applications, Benefits and Challenge...
Biometric Authentication: The Evolution, Applications, Benefits and Challenge...Biometric Authentication: The Evolution, Applications, Benefits and Challenge...
Biometric Authentication: The Evolution, Applications, Benefits and Challenge...GQ Research
 
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort servicejennyeacort
 
Predictive Analysis for Loan Default Presentation : Data Analysis Project PPT
Predictive Analysis for Loan Default  Presentation : Data Analysis Project PPTPredictive Analysis for Loan Default  Presentation : Data Analysis Project PPT
Predictive Analysis for Loan Default Presentation : Data Analysis Project PPTBoston Institute of Analytics
 
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
Easter Eggs From Star Wars and in cars 1 and 2
Easter Eggs From Star Wars and in cars 1 and 2Easter Eggs From Star Wars and in cars 1 and 2
Easter Eggs From Star Wars and in cars 1 and 217djon017
 
Student profile product demonstration on grades, ability, well-being and mind...
Student profile product demonstration on grades, ability, well-being and mind...Student profile product demonstration on grades, ability, well-being and mind...
Student profile product demonstration on grades, ability, well-being and mind...Seán Kennedy
 
NLP Project PPT: Flipkart Product Reviews through NLP Data Science.pptx
NLP Project PPT: Flipkart Product Reviews through NLP Data Science.pptxNLP Project PPT: Flipkart Product Reviews through NLP Data Science.pptx
NLP Project PPT: Flipkart Product Reviews through NLP Data Science.pptxBoston Institute of Analytics
 
While-For-loop in python used in college
While-For-loop in python used in collegeWhile-For-loop in python used in college
While-For-loop in python used in collegessuser7a7cd61
 
Predicting Salary Using Data Science: A Comprehensive Analysis.pdf
Predicting Salary Using Data Science: A Comprehensive Analysis.pdfPredicting Salary Using Data Science: A Comprehensive Analysis.pdf
Predicting Salary Using Data Science: A Comprehensive Analysis.pdfBoston Institute of Analytics
 
NO1 Certified Black Magic Specialist Expert Amil baba in Lahore Islamabad Raw...
NO1 Certified Black Magic Specialist Expert Amil baba in Lahore Islamabad Raw...NO1 Certified Black Magic Specialist Expert Amil baba in Lahore Islamabad Raw...
NO1 Certified Black Magic Specialist Expert Amil baba in Lahore Islamabad Raw...Amil Baba Dawood bangali
 
RadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfRadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfgstagge
 
Learn How Data Science Changes Our World
Learn How Data Science Changes Our WorldLearn How Data Science Changes Our World
Learn How Data Science Changes Our WorldEduminds Learning
 
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...dajasot375
 

Recently uploaded (20)

Call Girls In Dwarka 9654467111 Escorts Service
Call Girls In Dwarka 9654467111 Escorts ServiceCall Girls In Dwarka 9654467111 Escorts Service
Call Girls In Dwarka 9654467111 Escorts Service
 
Heart Disease Classification Report: A Data Analysis Project
Heart Disease Classification Report: A Data Analysis ProjectHeart Disease Classification Report: A Data Analysis Project
Heart Disease Classification Report: A Data Analysis Project
 
Call Girls in Saket 99530🔝 56974 Escort Service
Call Girls in Saket 99530🔝 56974 Escort ServiceCall Girls in Saket 99530🔝 56974 Escort Service
Call Girls in Saket 99530🔝 56974 Escort Service
 
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
 
Generative AI for Social Good at Open Data Science East 2024
Generative AI for Social Good at Open Data Science East 2024Generative AI for Social Good at Open Data Science East 2024
Generative AI for Social Good at Open Data Science East 2024
 
RS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝Delhi
RS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝DelhiRS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝Delhi
RS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝Delhi
 
Biometric Authentication: The Evolution, Applications, Benefits and Challenge...
Biometric Authentication: The Evolution, Applications, Benefits and Challenge...Biometric Authentication: The Evolution, Applications, Benefits and Challenge...
Biometric Authentication: The Evolution, Applications, Benefits and Challenge...
 
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
 
Predictive Analysis for Loan Default Presentation : Data Analysis Project PPT
Predictive Analysis for Loan Default  Presentation : Data Analysis Project PPTPredictive Analysis for Loan Default  Presentation : Data Analysis Project PPT
Predictive Analysis for Loan Default Presentation : Data Analysis Project PPT
 
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
Easter Eggs From Star Wars and in cars 1 and 2
Easter Eggs From Star Wars and in cars 1 and 2Easter Eggs From Star Wars and in cars 1 and 2
Easter Eggs From Star Wars and in cars 1 and 2
 
Student profile product demonstration on grades, ability, well-being and mind...
Student profile product demonstration on grades, ability, well-being and mind...Student profile product demonstration on grades, ability, well-being and mind...
Student profile product demonstration on grades, ability, well-being and mind...
 
NLP Project PPT: Flipkart Product Reviews through NLP Data Science.pptx
NLP Project PPT: Flipkart Product Reviews through NLP Data Science.pptxNLP Project PPT: Flipkart Product Reviews through NLP Data Science.pptx
NLP Project PPT: Flipkart Product Reviews through NLP Data Science.pptx
 
While-For-loop in python used in college
While-For-loop in python used in collegeWhile-For-loop in python used in college
While-For-loop in python used in college
 
Deep Generative Learning for All - The Gen AI Hype (Spring 2024)
Deep Generative Learning for All - The Gen AI Hype (Spring 2024)Deep Generative Learning for All - The Gen AI Hype (Spring 2024)
Deep Generative Learning for All - The Gen AI Hype (Spring 2024)
 
Predicting Salary Using Data Science: A Comprehensive Analysis.pdf
Predicting Salary Using Data Science: A Comprehensive Analysis.pdfPredicting Salary Using Data Science: A Comprehensive Analysis.pdf
Predicting Salary Using Data Science: A Comprehensive Analysis.pdf
 
NO1 Certified Black Magic Specialist Expert Amil baba in Lahore Islamabad Raw...
NO1 Certified Black Magic Specialist Expert Amil baba in Lahore Islamabad Raw...NO1 Certified Black Magic Specialist Expert Amil baba in Lahore Islamabad Raw...
NO1 Certified Black Magic Specialist Expert Amil baba in Lahore Islamabad Raw...
 
RadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfRadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdf
 
Learn How Data Science Changes Our World
Learn How Data Science Changes Our WorldLearn How Data Science Changes Our World
Learn How Data Science Changes Our World
 
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
 

Nurse schedule goal programming (Cyclical)

  • 1. I N T E R G E R G O A L P R O G R A M M I N G 13.04.14Nurse Scheduling-IGP NURSE SCHEDULING Prepared by- Sowmiyan Morri Swapnil Soni DoMS, IISc Course- Applied Operations Research Instructor- Prof M Mathirajan 1
  • 2. 2 Index  Introduction to Nurse Scheduling  Scheduling problem  Motivation to adopt OR technique  Research and Literature work  Literature Review  The Paper  The Paper  Parameters  Problem Statement  Problem Formulation  Notations & Decision Variables  Constraints  Objective Function 13.04.14Nurse Scheduling-IGP  Programming in LINGO (Optimization tool)  Result  Conclusion  Achievements  The way forward  Applications  Pilot Study at Health Centre, IISc  Parameters  Constraints  Result  References
  • 3. 3 Introduction to Nurse Scheduling 13.04.14Nurse Scheduling-IGP Motivation for applying Operations Research for Nurse Scheduling Cyclical Nurse Schedule Constraints Hospitals requirement Nurses’ preferences Conventional Register Question on: •Tedious •Time •Accuracy •Fairness Mathematical Modeling Advantages on: •Tedious •Time •Accuracy •Fairness Prescriptive Model Cause Response Variables of 1st order Linear Variables with Binary values Integer Constraints with priorities Goal Liner Integer Goal Programming Operations Research
  • 4. 4 Literature Review 13.04.14Nurse Scheduling-IGP Authors Reference Literature Limitations Arthur & Ravindran Arthur, J. L., & Ravindran, A., A Multiple Objective Nurse Scheduling Model, IIE Transactions, 13(1), pp. 55-60, 1981 Research on modelling Nurse Scheduling using goal programming has been studied which focused on two phases: •Phase 1 is to assign the working days and days off for each nurse while •Phase 2 is to assign the shift types of their working days •Small set of constraints •Limited problem dimensions with the size of nurses is 4 Musa & Saxena Musa, A. A., & Saxena, U., Scheduling Nurses Using Goal-Programming Techniques, IIE Transactions, 16(3), pp. 216 – 221, 1984 Used a 0-1 goal programming that applied to one unit of a hospital with the considerations of the hospital policies and nurses’ preferences •2 week planning period •1 one single shift Ozkarahan & Bailey Ozkarahan, I. & Bailey, J.E., Goal Programming Model Subsystem of A Flexible Nurse Scheduling Support System, IIE Transactions, 20(3), pp. 306-316, 1988. Nurse scheduling modelling showed the flexibility of goal programming in handling various goals which fulfilled the hospital’s objectives and the nurses’ preferences. •Small set of constraints
  • 5. 5 13.04.14Nurse Scheduling-IGP Authors Reference Literature Limitations Azaiez & Al Sharif Berrada, I., Ferland, J. A., & Michelon, P., A Multi-objective Approach to Nurse Scheduling with Both Hard and Soft Constraints, Socio- Economic Planning Sciences, 30(3), pp. 183- 193, 1996 Used the 0-1 goal programming approach with the considerations of hospital’s objectives as hard constraints and the nurses’ preferences as soft constraints to develop the schedules •No cyclic scheduling Harvey and Kiragu Harvey, H.M., & Kiragu, M., Cyclic and Non-cyclic Scheduling of 12 h Shift Nurses by Network Programming, European Journal of Operational Research, 104, pp. 582-592, 1998 Presented a mathematical model for cyclic and non-cyclic scheduling of 12 hours shift nurses. The model is quite flexible and can accommodate a variety of constraints • With small requirements which are not appropriate to embed in real situations Chan and Weil Chan, P. & Weil, G., Cyclical Staff Scheduling Using Constraint Logic Programming, Lecture Notes on Computer Sciences 2079, pp. 159- 175, 2001 Use of work cycles with various constraints to produce timetables of up to 150 people •Small set of constraints Literature Review
  • 6. 6 The Paper 13.04.14Nurse Scheduling-IGP Author From Ruzzakiah Jenal School of Information Technology, Faculty of Science and Information Technology, Universiti Kebangsaan Malaysia, Selangor, Malaysia Wan Rosmanira Ismail School of Mathematical Sciences, Faculty of Science and Technology, Universiti Kebangsaan Malaysia, Selangor, Malaysia Liong Choong Yeun Ahmed Oughalime Published By LPPM ITB, ISSN: 1978-3043 Accepted for Publication April 13th, 2011
  • 7. 7 The Paper -Parameters 13.04.14Nurse Scheduling-IGP Number of Nurses 18 Number of Days 21 Number of Shifts: 3 (Morning, Evening & Night) Number of Decision Variables 18 X 21 X 4 (3 shifts+1 Off) = 1512 Type of Decision Variables Binary (0-1) Parameters: One Ward 18 nurses 3 Shifts Morning Shift At least 4 nurses Evening Shift At least 4 nurses Night Shift Exactly 3 nurses 7:00 am-2:00pm 2:00pm-9:00pm 9:00pm-7:00am
  • 8. 8 13.04.14Nurse Scheduling-IGP Problem Statement Objective: Cyclic Nurse Scheduling: To allot shifts to each Nurse for each day thereby generating a schedule of working days and days off for each nurse in a ward of a hospital. Physical Constraints: (A) Hard Constraint Meeting management objectives (B) Soft constraints Satisfaction of employees(Nurses), work/life balance Logical Constraints: (C) Cyclic Scheduling A cyclic schedule consists of a set of work patterns which is rotated among a group of workers over a set of scheduling horizon. At the end of the scheduling horizon each worker would have completed each pattern exactly once. Advantages: • Fairness among nurses •Considers nurses preferences •Lead to maximizing satisfaction •Help Nurses to provide Quality of services “The right employees at the right time and at the right cost while achieving a high level of employee job satisfaction”
  • 9. 9 Problem Statement 13.04.14Nurse Scheduling-IGP Morning Shift ?=0,1 Nurse Demand 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Days 1 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4 2 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4 3 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4 4 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4 5 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4 6 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4 7 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4 8 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4 9 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4 10 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4 11 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4 12 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4 13 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4 14 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4 15 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4 16 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4 17 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4 18 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4 19 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4 20 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4 21 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 4 Total Shift ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? Similarly for: Evening, Day & Off Shift This Excel sheet is linked with LINGO to feed the inputs for ‘Data Sets’ & ‘Attributes’ and get output for all ‘Decision Variables’
  • 10. 10 13.04.14Nurse Scheduling-IGP Constraints • Hard Constraints (Management) • Soft Constraints (Nurse Specific) Hard Constraints • Each unit is covered by 3 shifts for 24 hours a day and 7 days a week. • Minimum staff level requirement must be satisfied. • Each nurse works at most one shift a day. • Avoid any isolated days patterns of “off-on-off”. • Each nurse must have three days off after having three consecutive night shifts. • Each nurse works between 12 to 14 days per schedule. • Each nurse works not more than 6 consecutive days. • Evening shift constitutes at least 25% of total workload. • Morning shift constitutes at least 30% of total workload. Soft Constraints • Avoid working in an evening shift followed by a morning shift or a nightshift the next day. • Avoid working in a morning shift followed by an evening shift or a night shift the next day. • Each nurse has at least one day off in one weekend. • All nurses have the same amount of total workload. Problem Formulation-Constraints Description Hard Constraints-Must be satisfied Soft Constraint-May be violated Goal Programming
  • 11. 11 Notations The following notations are used to specify the model:  n = number of days in the schedule (n = 21)  m = number of nurses available for the unit of interest (m = 18)  i = index for days, i = 1…n  k = index for nurses, k = 1…m  Pi = staff requirement for morning shift of day i, i = 1…n  Ti = staff requirement for evening shift of day i, i = 1…n  Mi = staff requirement for night shift of day i, i = 1…n 13.04.14Nurse Scheduling-IGP Problem Formulation- Notation & Decision Variables Decision Variables
  • 12. 12 Hard Constraints:  Set 1: Minimum staff level requirement must be satisfied:  For Morning shift (Where Pi=4)  For Evening shift (Where Ti=4)  For Night shift (Where Mi=3)  Set 2: Each nurse works only one shift a day: 13.04.14Nurse Scheduling-IGP Problem Formulation-Constraints ….“n” equations ….“n” equations ….“n” equations ….“n*m” equations
  • 13. 13 Hard Constraints:  Set 3: Avoid any isolated days patterns of “off-on-off” : 13.04.14Nurse Scheduling-IGP Problem Formulation-Constraints (continued..) ….“(n-2)*m” equations Day1 Day2 Day3 Off On Off C1 X2/Y2/Z2 C3 Sum Unacceptable 1 1 1 3 Acceptable 0 0 0 0 0 0 1 1 0 1 0 1 0 1 1 2 1 0 0 1 1 0 1 2 1 1 0 2 Yes No
  • 14. 14 Hard Constraints:  Set 4: Each nurse works 3 consecutive days of night shift and followed by 3 days off. Each nurse will be assigned to their night shifts and off days as follow: 13.04.1414Nurse Scheduling-IGP Problem Formulation-Constraints (continued..) ….“m” equations
  • 15. 15 Hard Constraints:  Set 5: Each nurse works between 12 to 14 days per schedule: 13.04.14Nurse Scheduling-IGP Problem Formulation-Constraints (continued..) ….“2*m” equations For each Nurse total Sum of all working shift should lie between 12 & 14
  • 16. 16 Hard Constraints:  Set 6: Each nurse works not more than 6 consecutive days:  Each Nurse has to have at least 1 “Off” in 7 consecutive days 13.04.14Nurse Scheduling-IGP Problem Formulation-Constraints (continued..) Cases for 7 Consecutive days for Kth Nurse Case- 1 Case- 2 Case- 3 Case- 4 Case- 5 Case- 6 Case- 7 Case- 8 Case- 9 Case- 10 Case- 11 Case- 12 Case- 13 Case- 14 Case- 15 Case- 16 Case- 17 Case- 18 Case- 19 Case- 20 Case- 21 Days 1 K K+1 K+1 K+1 K+1 K+1 K+1 2 K K K+1 K+1 K+1 K+1 K+1 3 K K K K+1 K+1 K+1 K+1 4 K K K K K+1 K+1 K+1 5 K K K K K K+1 K+1 6 K K K K K K K+1 7 K K K K K K K 8 K K K K K K K 9 K K K K K K K 10 K K K K K K K 11 K K K K K K K 12 K K K K K K K 13 K K K K K K K 14 K K K K K K K 15 K K K K K K K 16 K K K K K K K 17 K K K K K K K 18 K K K K K K K 19 K K K K K K K 20 K K K K K K K 21 K K K K K K K 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 Due to Cyclic constraint, Nurse “K” has to take position of “K+1” in each next cycle
  • 17. 17  Set 6: Each nurse works not more than 6 consecutive days  For 1st 15 Days, 18 Nurses (in following eq “i” can take maximum of 15 value)  For next 6 days, 17 Nurses (in following eq “k” can take maximum of 17 value)  For next 6 days, 18th Nurses 13.04.1417Nurse Scheduling-IGP 13.04.1417Nurse Scheduling-IGP 6 ….“(n-6)*m” equations Problem Formulation-Constraints (continued..) ….“6*(m-1)” equations ….6 equations
  • 18. 18  Set 7: Evening shift constitutes at least 25% of total workload:  Sum of all Evening shifts for a nurse >=25% of Total worked shifts  Set 8: Morning shift constitutes at least 30% of total workload: o Sum of all Morning shifts for a nurse >=30% of Total worked shifts 13.04.14Nurse Scheduling-IGP Problem Formulation-Constraints (continued..) 0.25* ….“m” equations 0.30* ….“m” equations
  • 19. 19 Soft Constraints:  Soft constraints are arising out of Nurses’ preferences so these can be treated as Goals for our Integer Liner Programming.  The deviation for each goal are christened:  ρ : Positive Deviation  η : Negative Deviation  Set 1: Avoid working in an evening shift followed by a morning shift or a night shift the next day: 13.04.14Nurse Scheduling-IGP Day1 Day2 Evening Morning/Night Y1 X2/Z2 Sum Unacceptable 1 1 2 Acceptable 0 0 0 0 1 1 1 0 1 Yes No Problem Formulation-Constraints (continued..)
  • 20. 20  Set 1: Avoid working in an evening shift followed by a morning shift or a night shift the next day:  For 1st 20 Days, 18 Nurses (in following eq “i” can take maximum of 20 value)  For 21st & 1st days, 17 Nurses (in following eq “k” can take maximum of 17 value)  For 21st & 1st days, 18th & 1st Nurses 13.04.14Nurse Scheduling-IGP 13.04.14Nurse Scheduling-IGP ….“(n-1)*m” equations Problem Formulation-Constraints (continued..) ….“(m-1)” equations ….1 equation Goal-1: Minimize = = =
  • 21. 21  Set 2: Avoid working in an Morning shift followed by a Evening shift or a night shift the next day:  For 1st 20 Days, 18 Nurses (in following eq “i” can take maximum of 20 value)  For 21st & 1st days, 17 Nurses (in following eq “k” can take maximum of 17 value)  For 21st & 1st days, 18th & 1st Nurses 13.04.14Nurse Scheduling-IGP 13.04.14Nurse Scheduling-IGP ….“(n-1)*m” equations Problem Formulation-Constraints (continued..) ….“(m-1)” equations ….1 equation Goal-2: Minimize = = =
  • 22. 22  Set 3: Each nurse has at least one weekend off:  Sum of above heighted weekends >=1 (for each Nurse) 13.04.14Nurse Scheduling-IGP Problem Formulation-Constraints (continued..) Nurse 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Days 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Each Nurse has to have at least one Off here out of highlighted 3 weekends ….“m” equations Goal-3: Minimize =
  • 23. 23  Set 4: All nurses have the same amount of total workload:  In Hard Constraint Set-5, it has been seen that Management preference for total work load should be between 12 & 14.  But Nurses prefer to have equal work load.  Thus trade off is to have work load of 13 for each nurse. Sum of all shifts for each Nurse = 13 13.04.14Nurse Scheduling-IGP Problem Formulation-Constraints (continued..) ….“m” equations Goal-4: Minimize Binary Constraints: For each nurse and for each shift (Morning, Evening, Night, Off), value can be either 1 or 0.
  • 24. 24 13.04.14Nurse Scheduling-IGP Problem Formulation-Objective Function: Preemptive Goal Programming for this model: Subject to: • Hard constraints • Soft constraints • Binary Constraints • Non-negativity constraints
  • 25. 25 Programming in LINGO 13.04.14Nurse Scheduling-IGP Defining Sets Import & Export of Data with Excel
  • 27. 27 Time Line Analysis 13.04.14Nurse Scheduling-IGP 1 2 3 4 5 6 7 8 No of Nurses 5 6 7 8 9 10 11 12 Time to Solve (min) 16 19 81 134 212 901 1498 3980 0 500 1000 1500 2000 2500 3000 3500 4000 4500 Timetosolve(inMinutes) No. of Variables Vs Time to solve (for 21 Days) Exponential increase in time to solve the problem w.r.t. No. of Nurses
  • 28. 28 Result-Optimal Solution 13.04.14Nurse Scheduling-IGP OVERALL SCHEDULE Nurse Total Nurses in Morning Shift Total Nurses in Evening Shift Total Nurses in Night Shift Total Nurses in all Shifts1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Days 1 N OFF OFF OFF E E N OFF M E E M N OFF M M OFF OFF 4 4 3 11 2 N OFF M OFF E E N OFF E E OFF OFF N OFF M M M OFF 4 4 3 11 3 N OFF M OFF E OFF N OFF OFF E M OFF N OFF E E M M 4 4 3 11 4 OFF E E E OFF N OFF M M OFF E N OFF M OFF OFF M N 4 4 3 11 5 OFF E E E M N OFF E M M OFF N OFF M OFF OFF OFF N 4 4 3 11 6 OFF E E OFF M N OFF E OFF M OFF N OFF M E OFF M N 4 4 3 11 7 E E OFF M N OFF OFF E M OFF N OFF M M E OFF N OFF 4 4 3 11 8 E E M M N OFF OFF OFF M OFF N OFF E E E M N OFF 4 5 3 12 9 OFF E E M N OFF M M OFF OFF N OFF E E OFF M N OFF 4 4 3 11 10 E OFF E N OFF OFF M M E N OFF M OFF OFF M N OFF E 4 4 3 11 11 E M OFF N OFF OFF E M E N OFF M OFF E M N OFF E 4 5 3 12 12 OFF M OFF N OFF M E M OFF N OFF M E E OFF N OFF E 4 4 3 11 13 OFF M N OFF M M OFF E N OFF M E E OFF N OFF OFF E 4 4 3 11 14 OFF M N OFF M E E E N OFF M OFF OFF M N OFF OFF E 4 4 3 11 15 E OFF N OFF OFF E E OFF N OFF M E M M N OFF M OFF 4 4 3 11 16 E N OFF E M OFF OFF N OFF M E E M N OFF M E OFF 4 5 3 12 17 OFF N OFF E M M OFF N OFF E OFF E OFF N OFF M E M 4 4 3 11 18 M N OFF OFF E M M N OFF E M OFF OFF N OFF E OFF E 4 4 3 11 19 N OFF OFF M OFF M N OFF M E E OFF N OFF M E E OFF 4 4 3 11 20 N OFF E M OFF OFF N OFF E OFF E M N OFF M OFF E M 4 4 3 11 21 N OFF E E OFF M N OFF OFF M OFF M N OFF OFF E E M 4 4 3 11 Total Morning Shifts 1 4 3 5 6 6 3 5 6 4 5 6 3 6 6 6 5 4 Total Evening Shifts 6 6 7 5 4 4 4 5 4 6 5 4 4 4 4 4 5 6 Total Night Shifts 6 3 3 3 3 3 6 3 3 3 3 3 6 3 3 3 3 3 Total Off's 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 Total Working Days 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 Hard Constraints 1) Demand is met 2) Each nurse works at most one shift a day 3) Avoid any isolated days patterns of “off-on-off”. 4) Each nurse must have three days off after having three consecutive night 5) Each nurse works between 12 to 14 days per schedule. 6) Each nurse works not more than 6 consecutive days 7) Evening shift constitutes at least 25% of total workload Soft Constraints 1) Avoid working in an evening shift followed by a morning shift or a nightshift the next day 3) Each nurse has at least one day off in one weekend. 4) All nurses have the same amount of total workload
  • 29. 29 Conclusion Achievements  The developed model with various constraints and goals using the 0-1 goal programming technique gives the optimum solution that showed both the hard constraints and soft constraints are satisfied.  The pattern will be rotated among the nurses and each nurse will be working according to each schedule’s pattern. After completing 18 schedules, then each nurse will revisit the starting schedule.  Cyclical nurse scheduling rotates equally through the desirable and undesirable work stretches among the nurses and requires relatively less scheduling effort of the head nurse.  The schedule satisfies the factors of completeness and continuity. While the fairness factor is dealt with since the schedule’s pattern is going to rotate among the nurses.  All nurses will have the opportunity to work with the satisfactory and unsatisfactory schedule’s patterns.  With this cyclical scheduling, it gives nurses more control over their work life because they know the type of shift schedule in the future which should have a positive effect on their job satisfaction. 13.04.14Nurse Scheduling-IGP
  • 30. 30 The way forward  New schedule will only need to be produced when changes occur in its average daily staff requirements.  For further research, one of possible work is to embed the model into user friendly software that would be easy to use and reliable.  The model also should be extended to account for other important scheduling aspects such as requested day off in order to being acceptable to all parties. Applications  Transportation  Call centres  Health care  Emergency services  Civic services and utilities  Venue management  Financial services  Hospitality and tourism  Manufacturing 13.04.14Nurse Scheduling-IGP Conclusion (continued..)
  • 31. HEALTH CENTRE, IIS c 13.04.14Nurse Scheduling-IGP PILOT STUDY- NURSE SCHEDULING 31 Photo courtesy: Ms. D. Choudhary
  • 32. 32 Pilot Study at Health Centre IISc 13.04.14Nurse Scheduling-IGP Number of Nurses 11 Number of Days 14 (2 Weeks) Number of Shifts: 3 (Morning, Day & Night) Number of Decision Variables 11 X 14 X 4 (3 shifts+1 Off) = 616 Type of Decision Variables Binary (0-1) Health Centre 11 nurses 3 Shifts Morning Shift At least 5 nurses Evening Shift At least 2 nurses Night Shift Exactly 1 nurses 6:00 am-1:00pm 1:00pm-8:00pm 8:00pm-6:00am
  • 33. 33 13.04.14Nurse Scheduling-IGP Constraints • Hard Constraints (Management) • Soft Constraints (Nurse Specific) Hard Constraints • Each unit is covered by 3 shifts for 24 hours a day and 7 days a week. • Minimum staff level requirement must be satisfied. • Each nurse works at most one shift a day. • Each nurse works not more than 6 consecutive days. • Each nurse can’t have more than 3 holidays fortnightly. Soft Constraints • Avoid working in Night shift followed by Morning shift or Evening shift of the next day. • Each nurse has at least one day off in one weekend. (could not be met) Problem Formulation-Constraints Description Hard Constraints-Must be satisfied Soft Constraint-May be violated Goal Programming
  • 34. 34 Execution & Result 13.04.14Nurse Scheduling-IGP OVERALL SCHEDULE PROPOSED FOR HEALTH CENTRE, IISc Nurses Total Nurses in Morning Shift Total Nurses in Evening Shift Total Nurses in Night Shift Total Nurses in all Shifts1 2 3 4 5 6 7 8 9 10 11 Days 1 E E M M M N M E M E E 5 5 1 11 2 E M E E M N M E E M M 5 5 1 11 3 M N M E OFF OFF OFF M M M E 5 2 1 8 4 M N OFF E M E M OFF OFF M M 5 2 1 8 5 M OFF E E M E E N M M M 5 4 1 10 6 OFF E M OFF E M M N M M OFF 5 2 1 8 7 OFF M M E OFF M E N M OFF M 5 2 1 8 8 M M OFF N E OFF M OFF M M E 5 2 1 8 9 E M M OFF M E OFF N OFF M M 5 2 1 8 10 M N M E M E M OFF M E OFF 5 3 1 9 11 N OFF M M E M E M E OFF M 5 3 1 9 12 N E M M OFF M OFF E M M M 6 2 1 9 13 OFF N E OFF M E M M E M M 5 3 1 9 14 M OFF OFF M M E M M OFF E N 5 2 1 8 Total Morning Shifts 6 4 8 4 8 4 8 4 8 9 8 Total Evening Shifts 3 3 3 6 3 6 3 3 3 3 3 Total Night Shifts 2 4 0 1 0 2 0 4 0 0 1 Total Off's 3 3 3 3 3 2 3 3 3 2 2 Total Working Days 11 11 11 11 11 12 11 11 11 12 12 Hard Constraints 1) Demand is met 2) Each nurse works at most one shift a day 3) Each nurse works not more than 6 consecutive days 4) Each nurse can’t have more than 3 holidays fortnightly Soft Constraints 1) Avoid working in Night shift followed by Morning shift or Evening shift of the next day
  • 35. 35 13.04.14Nurse Scheduling-IGP Websites  www.lindo.com  www.journal.itb.ac.id Research Papers  A Cyclic Nurse Schedule using Goal Programming By Ruzzakiah Jenal et.al.  A Multiple Objective Nurse Scheduling Model By Arthur & Ravidran  Scheduling Nurses Using Goal-Programming Techniques By Musa & Saxena  Goal Programming Model Subsystem of A Flexible Nurse Scheduling Support System By Ozkarahan & Bailey Books  An Introduction to Management Science By Anderson Sweeney Williams Tools used  Microsoft Encarta (Encyclopedia for offline references)  Microsoft Excel (Data embedding)  Industrial LINGO (Linear Integer Programming) References
  • 36. 13.04.14Nurse Scheduling-IGP 36 Thank you! They said it…. “There’s a fundamental distinction between strategy and operational effectiveness” (Michael Porter) Leanings…. • Practical application of Operations Research • Optimization Software- LINGO and its limitations • Literature Review of Research Paper