RATE ANALYSIS OF 
CONSTRUCTION 
MATERIALS
2 | P a g e 
 Muhammad Bilal Waseem (2012-CV-150) 
 Tariq Ali Soomro (2012-CV-131) 
 Shahbaz Khan (2012-CV-157) 
 Syed...
3 | P a g e 
ACKNOWLEDGEMENT 
The group effort and ability of team work made it possible for us to 
complete the task whic...
4 | P a g e 
INDEX 
S# DESCRIPTION PAGE 
EXCAVATION AND FORMWORK 1-2 
1 EXCAVATION AND FORMWORK 2 
CEMENT,BLOCKS,SAND,CRUS...
EXCAVATION AND FORMWORK
6 | P a g e 
EXCAVATION AND FORMWORK 
S # DESCRIPTION UNIT COST DEALER 
1 EXCAVATION Sq. Yd 60-70 AYAZ ALI AND BROTHERS 
Q...
CEMENT, BLOCKS, SAND,CRUSH AND STEEL 
7 | P a g e
8 | P a g e 
CEMENT 
S NO ITEM MAKER UNIT COST DEALER 
1 OPC LUCKY BAG(50 KG) 525 
FALCON BAG(50 KG) 535 
POWER BAG(50 KG)...
9 | P a g e 
BLOCKS 
S NO SIZE(inches) UNIT COST DEALER 
1 3x8x12 1 PIECE 15 
2 4x8x12 1 PIECE 16.5 
3 5x8x12 1 PIECE 18.5...
10 | P a g e 
SAND AND CRUSH 
S NO ITEM UNIT COST DEALER 
1 COARSE DUMPER(450 ftᶟ) 14500 
2 FINE DUMPER(450 ftᶟ) 12500 
3 ...
11 | P a g e 
STEEL 
S NO DIA OF BAR TYPE UNIT COST DEALER 
TWISTED SHIP PLATES 
1 3/8 TONNES 85500 
2 1/2 TONNES 86000 
3...
12 | P a g e 
SANITARY FITTINGS AND TILES
13 | P a g e 
SANITARY FITTINGS 
S NO ITEM MAKER UNIT COST DEALER 
1 
SANITARY SET 
Super asia 
Per set 3000 
Gold star Pe...
14 | P a g e 
S NO ITEM MAKER UNIT COST DEALER 
1 PIPES(20 Ft) 
3/4” DIA (cold) PAK ARAB PER PIECE 400 
3/4” DIA(hot) PAK ...
15 | P a g e 
COMMODE 
S NO SHADE MAKER SIZE COST DEALER 
1 LIGHT LUCKY CERAMICS LARGE 3600 
2 LIGHT DAIMOND LARGE 4500 
3...
16 | P a g e 
WC 
S NO SHADE MAKER SIZE COST DEALER 
1 LIGHT LUCKY CERAMIC LARGE 1000 
DARK LARGE 1400 
2 LIGHT MASTER LAR...
17 | P a g e 
TILES 
S NO ITEM MAKER UNIT COST DEALER 
MARBLE 
FLOOR 
1 16x16 KAMRAN m² 550 
2 16x16 SONEX m² 750 
3 16x16...
18 | P a g e 
ELECTRICAL FITTINGS
19 | P a g e 
S NO ITEM MAKER UNIT COST DEALER 
1 MAIN SWITCH MILLAT PER PIECE 260 
2 DOUBLE BREAKER MILLAT PER PIECE 200 ...
20 | P a g e 
S NO ITEM MAKER UNIT COST DEALER 
1 3-29 PAKISTAN CABLES PER COIL 1700 
ASHFAQ CABLES PER COIL 880 
FAYAZ CA...
21 | P a g e 
PAINTS
22 | P a g e 
PAINTS 
S NO ITEM MAKER UNIT COST DEALER 
1 OIL PAINT BERGER 1 GALLON 1300 
BELTA 1 GALLON 1050 
ICI 1 GALLO...
23 | P a g e 
S NO ITEM MAKER UNIT COST DEALER 
11 OIL PAINT NELSON 1 GALLON 1750 
GOBI 1 GALLON 1950 
ICI 1 GALLON 1750 
...
24 | P a g e 
DOORS, WINDOWS AND WARDROBE
25 | P a g e 
DOORS AND WINDOWS 
S NO ITEM SIZE UNIT COST DEALER 
1 DOORS 
SKIN DOOR 3’x7’ Sq.Ft 2520 
SKIN DOOR(CAL) 3’x7...
S NO ITEM SIZE UNIT COST DEALER 
11 DOORS 
26 | P a g e 
SKIN DOOR 3’x7’ Sq.Ft 2200 
SKIN DOOR(CAL) 3’x7’ Sq.Ft 3900 
SKIN...
27 | P a g e 
LABOUR
28 | P a g e 
LABOUR 
S NO ITEM UNIT COST CONTACT 
1 MASON SHAFIQ AHMAD, SOHRAB 
GOTH, 
0332-2584475 
SKILLED PER DAY 1200...
Upcoming SlideShare
Loading in …5
×

Rate Analysis Assignment 2014

Quantity Surveying and Costing
Rate Analysis Assignment (Karachi - Pakistan)
November 2014

Related Books

Free with a 30 day trial from Scribd

See all
  • Be the first to comment

Rate Analysis Assignment 2014

  1. 1. Batch 2012 RATE ANALYSIS OF CONSTRUCTION MATERIALS
  2. 2. 2 | P a g e  Muhammad Bilal Waseem (2012-CV-150)  Tariq Ali Soomro (2012-CV-131)  Shahbaz Khan (2012-CV-157)  Syed Muhammad Atif (2012-CV-169)  Abdullah Dal (2012-CV-158)  Azhar Ali Khurshadi (2012-CV-112)  Jan Muhammad Solangi (2012-CV-092)
  3. 3. 3 | P a g e ACKNOWLEDGEMENT The group effort and ability of team work made it possible for us to complete the task which was given to us and we all thanks Almighty Allah for helping us through all this process. PROFESSOR SYED FARAZ JAFRI is teacher as well as a inspiration for all of the students. With his effort and encouragement we finally completed our work and also it proved to be informative. We are thankful to our sir for conveying us such a job which helped us in accepting all technical terms, estimating the cost of a project and computing the amount and rate of material used in project. It also boost our confidence level and motivated us towards field work analysis.
  4. 4. 4 | P a g e INDEX S# DESCRIPTION PAGE EXCAVATION AND FORMWORK 1-2 1 EXCAVATION AND FORMWORK 2 CEMENT,BLOCKS,SAND,CRUSH AND STEEL 3-7 2 CEMENT 4 3 BLOCKS 5 4 SAND AND CRUSH 6 5 STEEL 7 SANITARY FITTINGS 8-15 6 SANITARY FITTING 9 7 PIPE FITTINGS 10-11 8 COMMODE 12 9 WC 13 10 BASIN 14 11 TILES 15 ELECTRICAL FITTINGS 16-18 12 ACCESSORIES AND FITTING 17 13 WIRES AND CABLES 18 PAINTS 19-21 14 PAINTS 20-21 DOORS, WINDOWS AND WARDROBE 22-24 15 DOORS ,WINDOWS AND WARDROBE 23-24 STEEL WORKS 25-26 16 MAIN GATE 26 LABOUR 27-28 17 MASON, PAINTER, PLUMBER,ELECTRICIAN 28
  5. 5. EXCAVATION AND FORMWORK
  6. 6. 6 | P a g e EXCAVATION AND FORMWORK S # DESCRIPTION UNIT COST DEALER 1 EXCAVATION Sq. Yd 60-70 AYAZ ALI AND BROTHERS QAYUMABAD CHOWRANGI KARACHI 0311-8972233 2 FORMWORK OLD PLANKS Sq. Ft 22 NEW PLANKS Sq. Ft 30 3 EXCAVATION Sq. Yd 55-70 ISMAIL & SONS GIZRI DHA , KARACHI 0333-8929992 4 FORMWORK OLD PLANKS Sq. Ft 23 NEW PLANKS Sq. Ft 35 5 EXCAVATION Sq. Yd 65-75 BASHIR BROTHERS ORANGI TOWN , KARACHI 0343-2087869 6 FORMWORK OLD PLANKS Sq. Ft 21 NEW PLANKS Sq. Ft 33
  7. 7. CEMENT, BLOCKS, SAND,CRUSH AND STEEL 7 | P a g e
  8. 8. 8 | P a g e CEMENT S NO ITEM MAKER UNIT COST DEALER 1 OPC LUCKY BAG(50 KG) 525 FALCON BAG(50 KG) 535 POWER BAG(50 KG) 510 2 SULPHATE RESISTING LUCKY BAG(50 KG) 545 FALCON BAG(50 KG) 560 POWER BAG(50 KG) 490 3 WHITE CEMENT KOHAT BAG(40 KG) 850 MAPLE BAG(40 KG) 790 4 OPC LUCKY BAG(50 KG) 530 FALCON BAG(50 KG) 545 POWER BAG(50 KG) 510 5 SULPHATE RESISTING LUCKY BAG(50 KG) 550 FALCON BAG(50 KG) 540 POWER BAG(50 KG) 550 6 WHITE CEMENT KOHAT BAG(40 KG) 860 MAPLE BAG(40 KG) 800 7 OPC LUCKY BAG(50 KG) 525 FALCON BAG(50 KG) 540 POWER BAG(50 KG) 505 8 SULPHATE RESISTING LUCKY BAG(50 KG) 560 FALCON BAG(50 KG) 550 POWER BAG(50 KG) 545 9 WHITE CEMENT KOHAT BAG(40 KG) 850 MAPLE BAG(40 KG) 805
  9. 9. 9 | P a g e BLOCKS S NO SIZE(inches) UNIT COST DEALER 1 3x8x12 1 PIECE 15 2 4x8x12 1 PIECE 16.5 3 5x8x12 1 PIECE 18.5 4 6x8x12 1 PIECE 20 5 3x8x12 1 PIECE 16 6 4x8x12 1 PIECE 17 7 5x8x12 1 PIECE 19 8 6x8x12 1 PIECE 21 9 3x8x12 1 PIECE 15.5 10 4x8x12 1 PIECE 16.5 11 5x8x12 1 PIECE 18 12 6x8x12 1 PIECE 23
  10. 10. 10 | P a g e SAND AND CRUSH S NO ITEM UNIT COST DEALER 1 COARSE DUMPER(450 ftᶟ) 14500 2 FINE DUMPER(450 ftᶟ) 12500 3 COARSE DUMPER(450 ftᶟ) 14000 4 FINE DUMPER(450 ftᶟ) 13000 5 COARSE DUMPER(450 ftᶟ) 14000 6 FINE DUMPER(450 ftᶟ) 13500
  11. 11. 11 | P a g e STEEL S NO DIA OF BAR TYPE UNIT COST DEALER TWISTED SHIP PLATES 1 3/8 TONNES 85500 2 1/2 TONNES 86000 3 4/8 TONNES 84500 PLAIN SHIP PLATES 4 2/8 TONNES 82000 TWISTED SHIP PLATES 5 3/8 TONNES 86000 6 1/2 TONNES 83000 7 5/8 TONNES 82500 PLAIN SHIP PLATES 8 2/8 TONNES 81000
  12. 12. 12 | P a g e SANITARY FITTINGS AND TILES
  13. 13. 13 | P a g e SANITARY FITTINGS S NO ITEM MAKER UNIT COST DEALER 1 SANITARY SET Super asia Per set 3000 Gold star Per set 15000 shalimar PER SET 30000 2 SANITARY FITTNG PER SET 5000 PER SET 6000 3 SANITARY SET Super asia PER SET 5200 Golden star PER SET 3500 shalimar PER SET 7000 4 SANITARY FITTNG CLIMAX PER SET 6700 MASTER PER SET 9000 5 SANITARY SET super asia PER SET 5500 Golden star PER SET 8000 shalimar PER SET 8500 6 SANITARY FITTNG CLIMAX PER SET 6800 MASTER PER SET 9200
  14. 14. 14 | P a g e S NO ITEM MAKER UNIT COST DEALER 1 PIPES(20 Ft) 3/4” DIA (cold) PAK ARAB PER PIECE 400 3/4” DIA(hot) PAK ARAB PER PIECE 1200 3”DIA PAK ARAB PER PIECE 1350 2 TEE 1” DIA PAK ARAB PER PIECE 45 2” DIA PAK ARAB PER PIECE 60 3”DIA PAK ARAB PER PIECE 100 3 ELBOW 1” DIA PAK ARAB PER PIECE 45 2” DIA PAK ARAB PER PIECE 60 3”DIA PAK ARAB PER PIECE 90 4 UNION 1” DIA PAK ARAB PER PIECE 90 2” DIA PAK ARAB PER PIECE 290 5 VALVE 1” PAK ARAB PER PIECE 130 1.5” PAK ARAB PER PIECE 200 2” PAK ARAB PER PIECE 360 6 PIPES(20 Ft) 1/2” DIA PPR PER PIECE 320 3/4” DIA PPR PER PIECE 455 1”DIA PPR PER PIECE 550 7 TEE 1” DIA PPR PER PIECE 40 2” DIA PPR PER PIECE 55 3”DIA PPR PER PIECE 90 8 ELBOW 1” DIA PPR PER PIECE 40 2” DIA PPR PER PIECE 55 3”DIA PPR PER PIECE 80 9 UNION 1” DIA PPR PER PIECE 90 2” DIA PPR PER PIECE 290 10 VALVE 1” PPR PER PIECE 120 1.5” PPR PER PIECE 200 2” PPR PER PIECE 350
  15. 15. 15 | P a g e COMMODE S NO SHADE MAKER SIZE COST DEALER 1 LIGHT LUCKY CERAMICS LARGE 3600 2 LIGHT DAIMOND LARGE 4500 3 LIGHT KARAM LARGE 5500 4 LIGHT LUCKY CERMAICS LARGE 4000 5 LIGHT DAIMOND LARGE 8500 6 LIGHT KARAM LARGE 7500 7 LIGHT LUCKY CERMAICS LARGE 4200 8 LIGHT DAIMOND LARGE 8600 9 LIGHT KARAM LARGE 7300
  16. 16. 16 | P a g e WC S NO SHADE MAKER SIZE COST DEALER 1 LIGHT LUCKY CERAMIC LARGE 1000 DARK LARGE 1400 2 LIGHT MASTER LARGE 3000 DARK LARGE 3500 3 LIGHT AL KARAM LARGE 2000 DARK LARGE 2200 4 LIGHT LUCKY CERAMIC LARGE 1050 DARK LARGE 1350 5 LIGHT MASTER LARGE 2600 DARK LARGE 2900 6 LIGHT AL KARAM LARGE 1850 DARK LARGE 2150 7 LIGHT LUCKY CERAMIC LARGE 1150 DARK LARGE 1350 8 LIGHT MASTER LARGE 2700 DARK LARGE 3100 9 LIGHT AL KARAM LARGE 1950 DARK LARGE 2200
  17. 17. 17 | P a g e TILES S NO ITEM MAKER UNIT COST DEALER MARBLE FLOOR 1 16x16 KAMRAN m² 550 2 16x16 SONEX m² 750 3 16x16 ALKARAM m² 900 WALL 4 8x12 KAMRAN m² 550 5 8x12 SONEX m² 600 6 8x12 ALKARAM m² 720 FLOOR 7 16x16 KAMRAN m² 620 8 16x16 SONEX m² 780 9 16x16 ALKARAM m² 610 WALL 10 8x12 KAMRAN m² 560 11 8x12 SONIX m² 620 12 8x12 ALKARAM m² 610 FLOOR 7 16x16 KAMRAN m² 550 8 16x16 SONEX m² 820 9 16x16 ALKARAM m² 550 WALL 10 8x12 KAMRAN m² 580 11 8x12 SONIX m² 630 12 8x12 ALKARAM m² 620 S NO ITEM MAKER UNIT COST DEALER FLOOR 1 MARBLE SUNY GREEN Sq.ft 160 2 MARBLE CHECKU Sq.ft 130 3 MARBLE CANA BROWN Sq.ft 250 4 MARBLE GRANITE Sq.ft 1200
  18. 18. 18 | P a g e ELECTRICAL FITTINGS
  19. 19. 19 | P a g e S NO ITEM MAKER UNIT COST DEALER 1 MAIN SWITCH MILLAT PER PIECE 260 2 DOUBLE BREAKER MILLAT PER PIECE 200 3 DB(12X15) MILLAT PER PIECE 950 4 BREAKER MILLAT PER PIECE 280 5 SWITCH SHEET MILLAT PER PIECE 90 6 MULTIPOWER SWITCH MILLAT PER PIECE 90 7 POWER BOARD MILLAT PER PIECE 180 8 SWITCH SHEET MILLAT PER PIECE 30 9 DIMMER MILLAT PER PIECE 80 10 SWITCH MILLAT PER PIECE 15 11 SOCKET MILLAT PER PIECE 20 12 CHANNEL FITTING MILLAT PER Ft 5.5 13 MAIN SWITCH MILLAT PER PIECE 280 14 DOUBLE BREAKER MILLAT PER PIECE 240 15 DB(12X15) MILLAT PER PIECE 980 16 BREAKER MILLAT PER PIECE 250 17 SWITCH SHEET MILLAT PER PIECE 120 18 MULTIPOWER SWITCH MILLAT PER PIECE 100 19 POWER BOARD MILLAT PER PIECE 190 20 SWITCH SHEET MILLAT PER PIECE 40 21 DIMMER MILLAT PER PIECE 80 22 SWITCH MILLAT PER PIECE 15 23 SOCKET MILLAT PER PIECE 20 24 CHANNEL FITTING MILLAT PER Ft 6 25 MAIN SWITCH MILLAT PER PIECE 285 26 DOUBLE BREAKER MILLAT PER PIECE 240 27 DB(12X15) MILLAT PER PIECE 980 28 BREAKER MILLAT PER PIECE 270 29 SWITCH SHEET MILLAT PER PIECE 120 30 MULTIPOWER SWITCH MILLAT PER PIECE 100 31 POWER BOARD MILLAT PER PIECE 200 32 SWITCH SHEET MILLAT PER PIECE 45 33 DIMMER MILLAT PER PIECE 80 34 SWITCH MILLAT PER PIECE 15 35 SOCKET MILLAT PER PIECE 15 36 CHANNEL FITTING MILLAT PER Ft 6
  20. 20. 20 | P a g e S NO ITEM MAKER UNIT COST DEALER 1 3-29 PAKISTAN CABLES PER COIL 1700 ASHFAQ CABLES PER COIL 880 FAYAZ CABLES PER COIL 1060 2 7-29 PAKISTAN CABLES PER COIL 3630 ASHFAQ CABLES PER COIL 1880 FAYAZ CABLES PER COIL 2400 3 7-36 PAKISTAN CABLES PER COIL 4570 ASHFAQ CABLES PER COIL 2750 FAYAZ CABLES PER COIL 3680 4 7-44 PAKISTAN CABLES PER COIL 6990 ASHFAQ CABLES PER COIL 4300 FAYAZ CABLES PER COIL 5425 PER COIL 5 3-29 PAKISTAN CABLES PER COIL 1850 ASHFAQ CABLES PER COIL 940 FAYAZ CABLES PER COIL 1200 6 7-29 PAKISTAN CABLES PER COIL 3700 ASHFAQ CABLES PER COIL 1900 FAYAZ CABLES PER COIL 2500 7 7-36 PAKISTAN CABLES PER COIL 4600 ASHFAQ CABLES PER COIL 2800 FAYAZ CABLES PER COIL 3750 8 7-44 PAKISTAN CABLES PER COIL 7000 ASHFAQ CABLES PER COIL 4400 FAYAZ CABLES PER COIL 5500 9 3-29 PAKISTAN CABLES PER COIL 1750 ASHFAQ CABLES PER COIL 890 FAYAZ CABLES PER COIL 1120 10 7-29 PAKISTAN CABLES PER COIL 3680 ASHFAQ CABLES PER COIL 1900 FAYAZ CABLES PER COIL 2450 11 7-36 PAKISTAN CABLES PER COIL 4600 ASHFAQ CABLES PER COIL 2770 FAYAZ CABLES PER COIL 3700 12 7-44 PAKISTAN CABLES PER COIL 7000 ASHFAQ CABLES PER COIL 4500 FAYAZ CABLES PER COIL 5500
  21. 21. 21 | P a g e PAINTS
  22. 22. 22 | P a g e PAINTS S NO ITEM MAKER UNIT COST DEALER 1 OIL PAINT BERGER 1 GALLON 1300 BELTA 1 GALLON 1050 ICI 1 GALLON 1700 2 MATT FINISH BERGER 1 GALLON 1950 BELTA 1 GALLON 2000 ICI 1 GALLON 1950 3 WEATHER SHIELD BERGER 1 GALLON 1930 BELTA 1 GALLON 1750 ICI 1 GALLON 1950 4 DISTEMPER BERGER 1 GALLON 720 BELTA 1 GALLON 1100 ICI 1 GALLON 1980 5 PUTTY BERGER BAG(20 KG) 1900 BELTA BAG(20 KG) 1900 ICI BAG(20 KG) 1500 6 OIL PAINT BERGER 1 GALLON 1800 BELTA 1 GALLON 1900 ICI 1 GALLON 1700 7 MATT FINISH BERGER 1 GALLON 1900 BELTA 1 GALLON 1950 ICI 1 GALLON 1800 8 WEATHERSHIELD BERGER 1 GALLON 2200 BELTA 1 GALLON 2100 ICI 1 GALLON 1800 9 DISTEMPER BERGER 1 GALLON 1000 BELTA 1 GALLON 1050 ICI 1 GALLON 800 10 PUTTY BERGER BAG(20 KG) 2400 BELTA BAG(20 KG) 2600 ICI BAG(20 KG) 1400
  23. 23. 23 | P a g e S NO ITEM MAKER UNIT COST DEALER 11 OIL PAINT NELSON 1 GALLON 1750 GOBI 1 GALLON 1950 ICI 1 GALLON 1750 12 MATT FINISH NELSON 1 GALLON 1900 GOBI 1 GALLON 1980 ICI 1 GALLON 1850 13 WEATHER SHIELD NELSON 1 GALLON 2200 GOBI 1 GALLON 1980 ICI 1 GALLON 1850 14 DISTEMPER NELSON 1 GALLON 1100 GOBI 1 GALLON 1070 ICI 1 GALLON 830 15 PUTTY NELSON BAG(20 KG) 2600 GOBI BAG(20 KG) 2720 ICI BAG(20 KG) 1500
  24. 24. 24 | P a g e DOORS, WINDOWS AND WARDROBE
  25. 25. 25 | P a g e DOORS AND WINDOWS S NO ITEM SIZE UNIT COST DEALER 1 DOORS SKIN DOOR 3’x7’ Sq.Ft 2520 SKIN DOOR(CAL) 3’x7’ Sq.Ft 3150 SKIN DOOR(GLASS) 3’x7’ Sq.Ft 7350 2 WINDOWS SIMPLE RUNNING Ft 110 FANCY RUNNING Ft 130 3 PANEL CAL RUNNING Ft 185 GOLDEN TEAK RUNNING Ft 250 4 CABINET LASANI Sq.Ft 380 LASANI(GLASS) Sq.Ft 750 5 WARDROBE CHIPBOARD Sq.Ft 550 LASANI Sq.Ft 700 6 DOORS SKIN DOOR 3’x7’ Sq.Ft 2300 SKIN DOOR(CAL) 3’x7’ Sq.Ft 1995 SKIN DOOR(GLASS) 3’x7’ Sq.Ft 18900 7 WINDOWS SIMPLE RUNNING Ft 95 FANCY RUNNING Ft 110 8 PANEL CAL RUNNING Ft 175 GOLDEN TEAK RUNNING Ft 250 9 CABINET LASANI Sq.Ft 360 LASANI(GLASS) Sq.Ft 750 10 WARDROBE CHIPBOARD Sq.Ft 520 LASANI Sq.Ft 675
  26. 26. S NO ITEM SIZE UNIT COST DEALER 11 DOORS 26 | P a g e SKIN DOOR 3’x7’ Sq.Ft 2200 SKIN DOOR(CAL) 3’x7’ Sq.Ft 3900 SKIN DOOR(GLASS) 3’x7’ Sq.Ft 8400 12 WINDOWS SIMPLE RUNNING Ft 92 FANCY RUNNING Ft 92> 13 PANEL CAL RUNNING Ft 180 GOLDEN TEAK RUNNING Ft 240 14 CABINET LASANI Sq.Ft 380 LASANI(GLASS) Sq.Ft 730 15 WARDROBE CHIPBOARD Sq.Ft 540 LASANI Sq.Ft 680
  27. 27. 27 | P a g e LABOUR
  28. 28. 28 | P a g e LABOUR S NO ITEM UNIT COST CONTACT 1 MASON SHAFIQ AHMAD, SOHRAB GOTH, 0332-2584475 SKILLED PER DAY 1200 UNSKILLED PER DAY 600 2 MASON WALI KHAN, WATERPUMP 0300-2545232 SKILLED PER DAY 1100 UNSKILLED PER DAY 600 3 MASON MOLA BUKSH, SAFURA GOTH 0343-2985521 SKILLED PER DAY 1300 UNSKILLED PER DAY 700 4 ELECTRICIAN Sq Ft 14 MAQSUD, HYDERI 0345-2316903 Sq Ft 11 SHAKEEL, LIAQATABAD 0306-2010420 Sq Ft 13 REHAN, NAZIMABAD 0300-9214169 5 PLUMBER FOR 120 Sq Yds LUMP SUM 17000 QASIM, GOLIMAAR 0345-2760866 FOR 120 Sq Yds LUMP SUM 20000 ALI RAZA, WATERPUMP 0300-2554100 FOR 120 Sq Yds LUMP SUM 19000 NOOR MUHAMMAD, SAFURA 0342-2705358 6 PAINTER FOR 120 Sq Yds LUMP SUM 22000 YAMIN KHAN, SAFURA 0346-2773248 FOR 120 Sq Yds LUMP SUM 25000 SULEMAN , LIAQATABAD 0313-2757653 FOR 120 Sq Yds LUMP SUM 18500 ABDULLAH, WATERPUMP 0312- 2130742 1 CARPENTER WAQAS AHMED SKILLED PER Sq.ft 250 0302-2894639

×