  1. 1. A REPORT ON RATE ANALYSIS OF CONSTRUCTION MATERIAL SYED MUSTAFA HUSSAIN 2011-CV-027 (G.L) MARYAM KHAN 2011-CV-55 OWAIS SIDDIQUI 2011-CV-064 SAAD RAZA RIZVI 2011-CV-032 AHTESHAM UDDIN 2011-CV-012 ANAS HASHMI 2011-CV-042 SUBMITTED TO: PROFESSOR SYED FARAZ JAFRI
  2. 2. ACKNOWLEDGEMENT First of all we thank Almighty ALLAH who made it possible for us to accomplish the task which was assign to us. Those who are gifted by God are exceptions and those who are gifted by their teachers are lucky. The present work is the result of inspirations of our teacher PROFESSOR SYED FARAZ JAFRI and also any future work that we may achieve. We are very much thankful to him for assigning us such a job which helped us in understanding all technical terms, estimating the cost of a project and computing the amount and rate of material used in project. It also vitalizes our confidence level and motivated us towards field work analysis.
  3. 3. ABSTRACT The Assignment gives a clear vision of rate analysis of different construction materials. We focused on every minor commodity so that we may extract maximum data. The rates are collected from various areas of the metropolitan city in order to ensure the stability and fluctuation in price and quality so that it can enable a contractor to finalize his tender document. This analysis contains the most recent market price of materials that can assist a contractor in bidding.
  4. 4. INDEX S# DESCRIPTION PAGE EXCAVATION AND FORMWORK 1-2 1 EXCAVATION AND FORMWORK 2 CEMENT,BLOCKS,SAND,CRUSH AND STEEL 3-7 2 CEMENT 4 3 BLOCKS 5 4 SAND AND CRUSH 6 5 STEEL 7 SANITARY FITTINGS 8-15 6 SANITARY FITTING 9 7 PIPE FITTINGS 10-11 8 COMMODE 12 9 WC 13 10 BASIN 14 11 TILES 15 ELECTRICAL FITTINGS 16-18 12 ACCESSORIES AND FITTING 17 13 WIRES AND CABLES 18 PAINTS 19-21 14 PAINTS 20-21 DOORS, WINDOWS AND WARDROBE 22-24 15 DOORS ,WINDOWS AND WARDROBE 23-24 STEEL WORKS 25-26 16 MAIN GATE 26 LABOUR 27-28 17 MASON, PAINTER, PLUMBER,ELECTRICIAN 28
  5. 5. EXCAVATION AND FORMWORK
  6. 6. Page 6 of 33 EXCAVATION AND FORMWORK S NO SIZE(inches) UNIT COST DEALER 1 EXCAVATION Sq. Yd 40-45 ATIF ALI AND BROTHERS SAFURA CHOWRANGI KARACHI 0321-3434214 2 FORMWORK OLD PLANKS Sq. Ft 15 NEW PLANKS Sq. Ft 19 3 EXCAVATION Sq. Yd 45-50 KHALID CONTRACTORS PEHALWAN GOTH , KARACHI 0333-3429648 4 FORMWORK OLD PLANKS Sq. Ft 16 NEW PLANKS Sq. Ft 20 5 EXCAVATION Sq. Yd 35-40 IMTIAZ AND SONS SOHRAB GOTH , KARACHI 0343-2006872 6 FORMWORK OLD PLANKS Sq. Ft 18 NEW PLANKS Sq. Ft 22
  7. 7. Page 7 of 33 CEMENT, BLOCKS, SAND,CRUSH AND STEEL
  8. 8. Page 8 of 33 CEMENT S NO ITEM MAKER UNIT COST DEALER 1 OPC LUCKY BAG(50 KG) 475 FALCON BAG(50 KG) 490 POWER BAG(50 KG) 445 2 SULPHATE RESISTING LUCKY BAG(50 KG) 540 FALCON BAG(50 KG) 530 POWER BAG(50 KG) 490 3 WHITE CEMENT KOHAT BAG(40 KG) 800 MAPLE BAG(40 KG) 730 4 OPC LUCKY BAG(50 KG) 470 FALCON BAG(50 KG) 485 POWER BAG(50 KG) 450 5 SULPHATE RESISTING LUCKY BAG(50 KG) 540 FALCON BAG(50 KG) 540 POWER BAG(50 KG) 500 6 WHITE CEMENT KOHAT BAG(40 KG) 820 MAPLE BAG(40 KG) 750 7 OPC LUCKY BAG(50 KG) 490 FALCON BAG(50 KG) 500 POWER BAG(50 KG) 470 8 SULPHATE RESISTING LUCKY BAG(50 KG) 560 FALCON BAG(50 KG) 600 POWER BAG(50 KG) 520 9 WHITE CEMENT KOHAT BAG(40 KG) 850 MAPLE BAG(40 KG) 800
  9. 9. Page 9 of 33 BLOCKS S NO SIZE(inches) UNIT COST DEALER 1 3x8x12 1 PIECE 15 2 4x8x12 1 PIECE 16 3 5x8x12 1 PIECE 18 4 6x8x12 1 PIECE 28 5 2x6x11 1 PIECE 13 6 3x8x12 1 PIECE 19 7 4x8x12 1 PIECE 21 8 5x8x12 1 PIECE 23 9 6x8x12 1 PIECE 32 10 2x6x11 1 PIECE 15 11 3x8x12 1 PIECE 15 12 4x8x12 1 PIECE 16 13 5x8x12 1 PIECE 18 14 6x8x12 1 PIECE 28 15 2x6x11 1 PIECE 13
  10. 10. Page 10 of 33 SAND AND CRUSH S NO ITEM UNIT COST DEALER 1 COARSE DUMPER(450 ftᶟ) 14000 2 FINE DUMPER(450 ftᶟ) 15000 3 CRUSH DUMPER(500 ftᶟ) 16000 4 COARSE DUMPER(450 ftᶟ) 13500 5 FINE DUMPER(450 ftᶟ) 17000 6 CRUSH DUMPER(500 ftᶟ) 17500 7 COARSE DUMPER(450 ftᶟ) 15000 8 FINE DUMPER(450 ftᶟ) 17000 9 CRUSH DUMPER(500 ftᶟ) 16000
  11. 11. Page 11 of 33 STEEL S NO DIA OF BAR TYPE UNIT COST DEALER TWISTED SHIP PLATES 1 3/8 TONNES 71500 2 1/2 TONNES 72000 3 5/8 TONNES 74000 PLAIN SHIP PLATES 4 2/8 TONNES 73000 TWISTED SHIP PLATES 5 3/8 TONNES 72000 6 1/2 TONNES 73000 7 5/8 TONNES 74500 PLAIN SHIP PLATES 8 2/8 TONNES 74000 TWISTED SHIP PLATES 9 3/8 TONNES 72000 10 1/2 TONNES 72500 11 5/8 TONNES 74000 PLAIN SHIP PLATES 12 2/8 TONNES 74500
  12. 12. Page 12 of 33 SANITARY FITTINGS AND TILES
  13. 13. Page 13 of 33 SANITARY FITTINGS S NO ITEM MAKER UNIT COST DEALER 1 SANITARY SET VISION PER SET 5600 SONEX PER SET 8800 MASTER PER SET 8200 2 SANITARY FITTNG CLIMAX PER SET 6500 MASTER PER SET 9000 3 SANITARY SET VISION PER SET 5800 SONEX PER SET 8800 MASTER PER SET 8500 4 SANITARY FITTNG CLIMAX PER SET 6700 MASTER PER SET 9000 5 SANITARY SET VISION PER SET 6200 SONEX PER SET 9000 MASTER PER SET 8700 6 SANITARY FITTNG CLIMAX PER SET 6800 MASTER PER SET 9200
  14. 14. Page 14 of 33 S NO ITEM MAKER UNIT COST DEALER 1 PIPES(20 Ft) 1” DIA PAK ARAB PER PIECE 600 2” DIA PAK ARAB PER PIECE 750 3”DIA PAK ARAB PER PIECE 900 2 TEE 1” DIA PAK ARAB PER PIECE 35 2” DIA PAK ARAB PER PIECE 50 3”DIA PAK ARAB PER PIECE 90 3 ELBOW 1” DIA PAK ARAB PER PIECE 35 2” DIA PAK ARAB PER PIECE 50 3”DIA PAK ARAB PER PIECE 80 4 UNION 1” DIA PAK ARAB PER PIECE 80 2” DIA PAK ARAB PER PIECE 280 5 VALVE 1” PAK ARAB PER PIECE 120 1.5” PAK ARAB PER PIECE 190 2” PAK ARAB PER PIECE 350 6 PIPES(20 Ft) 1” DIA PAK ARAB PER PIECE 620 2” DIA PAK ARAB PER PIECE 750 3”DIA PAK ARAB PER PIECE 920 7 TEE 1” DIA PAK ARAB PER PIECE 35 2” DIA PAK ARAB PER PIECE 50 3”DIA PAK ARAB PER PIECE 85 8 ELBOW 1” DIA PAK ARAB PER PIECE 35 2” DIA PAK ARAB PER PIECE 50 3”DIA PAK ARAB PER PIECE 75 9 UNION 1” DIA PAK ARAB PER PIECE 80 2” DIA PAK ARAB PER PIECE 270 10 VALVE 1” PAK ARAB PER PIECE 120 1.5” PAK ARAB PER PIECE 200 2” PAK ARAB PER PIECE 350
  15. 15. Page 15 of 33 S NO ITEM MAKER UNIT COST DEALER 1 PIPES(20 Ft) 1” DIA PAK ARAB PER PIECE 625 2” DIA PAK ARAB PER PIECE 760 3”DIA PAK ARAB PER PIECE 940 2 TEE 1” DIA PAK ARAB PER PIECE 40 2” DIA PAK ARAB PER PIECE 55 3”DIA PAK ARAB PER PIECE 95 3 ELBOW 1” DIA PAK ARAB PER PIECE 40 2” DIA PAK ARAB PER PIECE 50 3”DIA PAK ARAB PER PIECE 85 4 UNION 1” DIA PAK ARAB PER PIECE 90 2” DIA PAK ARAB PER PIECE 300 5 VALVE 1” PAK ARAB PER PIECE 130 1.5” PAK ARAB PER PIECE 200 2” PAK ARAB PER PIECE 370
  16. 16. Page 16 of 33 COMMODE S NO SHADE MAKER SIZE COST DEALER 1 LIGHT GENERAL ASIA LARGE 6200 DARK LARGE 6800 2 LIGHT MASTER LARGE 9100 DARK LARGE 9800 3 LIGHT AL KARAM LARGE 6100 DARK LARGE 6600 4 LIGHT GENERAL ASIA LARGE 6000 DARK LARGE 6500 5 LIGHT MASTER LARGE 9000 DARK LARGE 9800 6 LIGHT AL KARAM LARGE 6100 DARK LARGE 6700 7 LIGHT GENERAL ASIA LARGE 5900 DARK LARGE 6500 8 LIGHT MASTER LARGE 9200 DARK LARGE 10000 9 LIGHT AL KARAM LARGE 6500 DARK LARGE 7000
  17. 17. Page 17 of 33 WC S NO SHADE MAKER SIZE COST DEALER 1 LIGHT GENERAL ASIA LARGE 980 DARK LARGE 1150 2 LIGHT MASTER LARGE 2500 DARK LARGE 2800 3 LIGHT AL KARAM LARGE 1800 DARK LARGE 2000 4 LIGHT GENERAL ASIA LARGE 950 DARK LARGE 1120 5 LIGHT MASTER LARGE 2300 DARK LARGE 2700 6 LIGHT AL KARAM LARGE 1700 DARK LARGE 2000 7 LIGHT GENERAL ASIA LARGE 1000 DARK LARGE 1150 8 LIGHT MASTER LARGE 2500 DARK LARGE 2900 9 LIGHT AL KARAM LARGE 1700 DARK LARGE 2100
  18. 18. Page 18 of 33 BASIN S NO SHADE MAKER SIZE COST DEALER 1 LIGHT GENERAL ASIA LARGE 2100 DARK LARGE 2450 2 LIGHT MASTER LARGE 4700 DARK LARGE 5100 3 LIGHT AL KARAM LARGE 3650 DARK LARGE 3800 4 LIGHT GENERAL ASIA LARGE 3000 DARK LARGE 3400 5 LIGHT MASTER LARGE 4300 DARK LARGE 4800 6 LIGHT AL KARAM LARGE 3500 DARK LARGE 3800 7 LIGHT GENERAL ASIA LARGE 3000 DARK LARGE 3400 8 LIGHT MASTER LARGE 4300 DARK LARGE 4800 9 LIGHT AL KARAM LARGE 3500 DARK LARGE 3800
  19. 19. Page 19 of 33 TILES S NO ITEM MAKER UNIT COST DEALER FLOOR 1 16x16 KAMRAN m² 550 2 16x16 SONEX m² 850 3 16x16 ALKARAM m² 600 WALL 4 8x12 KAMRAN m² 550 5 8x12 SONEX m² 650 6 8x12 ALKARAM m² 620 FLOOR 7 16x16 KAMRAN m² 540 8 16x16 SONEX m² 820 9 16x16 ALKARAM m² 560 WALL 10 8x12 KAMRAN m² 540 11 8x12 SONIX m² 620 12 8x12 ALKARAM m² 600 FLOOR 7 16x16 KAMRAN m² 550 8 16x16 SONEX m² 820 9 16x16 ALKARAM m² 550 WALL 10 8x12 KAMRAN m² 560 11 8x12 SONIX m² 610 12 8x12 ALKARAM m² 620
  20. 20. Page 20 of 33 ELECTRICAL FITTINGS
  21. 21. Page 21 of 33 S NO ITEM MAKER UNIT COST DEALER 1 MAIN SWITCH MILLAT PER PIECE 260 2 DOUBLE BREAKER MILLAT PER PIECE 200 3 DB(12X15) MILLAT PER PIECE 950 4 BREAKER MILLAT PER PIECE 280 5 SWITCH SHEET MILLAT PER PIECE 90 6 MULTIPOWER SWITCH MILLAT PER PIECE 90 7 POWER BOARD MILLAT PER PIECE 180 8 SWITCH SHEET MILLAT PER PIECE 30 9 DIMMER MILLAT PER PIECE 80 10 SWITCH MILLAT PER PIECE 15 11 SOCKET MILLAT PER PIECE 20 12 CHANNEL FITTING MILLAT PER Ft 5.5 13 MAIN SWITCH MILLAT PER PIECE 280 14 DOUBLE BREAKER MILLAT PER PIECE 240 15 DB(12X15) MILLAT PER PIECE 980 16 BREAKER MILLAT PER PIECE 250 17 SWITCH SHEET MILLAT PER PIECE 120 18 MULTIPOWER SWITCH MILLAT PER PIECE 100 19 POWER BOARD MILLAT PER PIECE 190 20 SWITCH SHEET MILLAT PER PIECE 40 21 DIMMER MILLAT PER PIECE 80 22 SWITCH MILLAT PER PIECE 15 23 SOCKET MILLAT PER PIECE 20 24 CHANNEL FITTING MILLAT PER Ft 6 25 MAIN SWITCH MILLAT PER PIECE 285 26 DOUBLE BREAKER MILLAT PER PIECE 240 27 DB(12X15) MILLAT PER PIECE 980 28 BREAKER MILLAT PER PIECE 270 29 SWITCH SHEET MILLAT PER PIECE 120 30 MULTIPOWER SWITCH MILLAT PER PIECE 100 31 POWER BOARD MILLAT PER PIECE 200 32 SWITCH SHEET MILLAT PER PIECE 45 33 DIMMER MILLAT PER PIECE 80 34 SWITCH MILLAT PER PIECE 15 35 SOCKET MILLAT PER PIECE 15 36 CHANNEL FITTING MILLAT PER Ft 6
  22. 22. Page 22 of 33 S NO ITEM MAKER UNIT COST DEALER 1 3-29 PAKISTAN CABLES PER COIL 1700 ASHFAQ CABLES PER COIL 880 FAYAZ CABLES PER COIL 1060 2 7-29 PAKISTAN CABLES PER COIL 3630 ASHFAQ CABLES PER COIL 1880 FAYAZ CABLES PER COIL 2400 3 7-36 PAKISTAN CABLES PER COIL 4570 ASHFAQ CABLES PER COIL 2750 FAYAZ CABLES PER COIL 3680 4 7-44 PAKISTAN CABLES PER COIL 6990 ASHFAQ CABLES PER COIL 4300 FAYAZ CABLES PER COIL 5425 PER COIL 5 3-29 PAKISTAN CABLES PER COIL 1850 ASHFAQ CABLES PER COIL 940 FAYAZ CABLES PER COIL 1200 6 7-29 PAKISTAN CABLES PER COIL 3700 ASHFAQ CABLES PER COIL 1900 FAYAZ CABLES PER COIL 2500 7 7-36 PAKISTAN CABLES PER COIL 4600 ASHFAQ CABLES PER COIL 2800 FAYAZ CABLES PER COIL 3750 8 7-44 PAKISTAN CABLES PER COIL 7000 ASHFAQ CABLES PER COIL 4400 FAYAZ CABLES PER COIL 5500 9 3-29 PAKISTAN CABLES PER COIL 1750 ASHFAQ CABLES PER COIL 890 FAYAZ CABLES PER COIL 1120 10 7-29 PAKISTAN CABLES PER COIL 3680 ASHFAQ CABLES PER COIL 1900 FAYAZ CABLES PER COIL 2450 11 7-36 PAKISTAN CABLES PER COIL 4600 ASHFAQ CABLES PER COIL 2770 FAYAZ CABLES PER COIL 3700 12 7-44 PAKISTAN CABLES PER COIL 7000 ASHFAQ CABLES PER COIL 4500 FAYAZ CABLES PER COIL 5500
  23. 23. Page 23 of 33 PAINTS
  24. 24. Page 24 of 33 PAINTS S NO ITEM MAKER UNIT COST DEALER 1 OIL PAINT NELSON 1 GALLON 1800 GOBI 1 GALLON 1900 ICI 1 GALLON 1700 2 MATT FINISH NELSON 1 GALLON 1900 GOBI 1 GALLON 1900 ICI 1 GALLON 1950 3 WEATHER SHIELD NELSON 1 GALLON 1890 GOBI 1 GALLON 2050 ICI 1 GALLON 1950 4 DISTEMPER NELSON 1 GALLON 1900 GOBI 1 GALLON 1100 ICI 1 GALLON 880 5 PUTTY NELSON BAG(20 KG) 2450 GOBI BAG(20 KG) 2500 ICI BAG(20 KG) 1500 6 OIL PAINT NELSON 1 GALLON 1550 GOBI 1 GALLON 1900 ICI 1 GALLON 1700 7 MATT FINISH NELSON 1 GALLON 1900 GOBI 1 GALLON 1950 ICI 1 GALLON 1800 8 WEATHERSHIELD NELSON 1 GALLON 2100 GOBI 1 GALLON 2000 ICI 1 GALLON 1800 9 DISTEMPER NELSON 1 GALLON 1000 GOBI 1 GALLON 1050 ICI 1 GALLON 800 10 PUTTY NELSON BAG(20 KG) 2400 GOBI BAG(20 KG) 2600 ICI BAG(20 KG) 1400
  25. 25. Page 25 of 33 S NO ITEM MAKER UNIT COST DEALER 11 OIL PAINT NELSON 1 GALLON 1750 GOBI 1 GALLON 1950 ICI 1 GALLON 1750 12 MATT FINISH NELSON 1 GALLON 1900 GOBI 1 GALLON 1980 ICI 1 GALLON 1850 13 WEATHER SHIELD NELSON 1 GALLON 2200 GOBI 1 GALLON 1980 ICI 1 GALLON 1850 14 DISTEMPER NELSON 1 GALLON 1100 GOBI 1 GALLON 1070 ICI 1 GALLON 830 15 PUTTY NELSON BAG(20 KG) 2600 GOBI BAG(20 KG) 2720 ICI BAG(20 KG) 1500
  26. 26. Page 26 of 33 DOORS, WINDOWS AND WARDROBE
  27. 27. Page 27 of 33 DOORS AND WINDOWS S NO ITEM SIZE UNIT COST DEALER 1 DOORS INTELLECT INTERIORS WATERPUMP , KARACHI MR. REHAN 0331-2454232 SKIN DOOR 3’x7’ Sq.Ft 2400 SKIN DOOR(CAL) 3’x7’ Sq.Ft 4000 SKIN DOOR(GLASS) 3’x7’ Sq.Ft 8500 2 WINDOWS SIMPLE RUNNING Ft 95 FANCY RUNNING Ft 95> 3 PANEL CAL RUNNING Ft 185 GOLDEN TEAK RUNNING Ft 250 4 CABINET LASANI Sq.Ft 380 LASANI(GLASS) Sq.Ft 750 5 WARDROBE CHIPBOARD Sq.Ft 550 LASANI Sq.Ft 700 6 DOORS ISHTIAQ WOOD WORKS LIAQATABAD, B AREA, KARACHI ISHTIAQ ALI 0345-2984525 SKIN DOOR 3’x7’ Sq.Ft 2000 SKIN DOOR(CAL) 3’x7’ Sq.Ft 3700 SKIN DOOR(GLASS) 3’x7’ Sq.Ft 8200 7 WINDOWS SIMPLE RUNNING Ft 90 FANCY RUNNING Ft 90> 8 PANEL CAL RUNNING Ft 175 GOLDEN TEAK RUNNING Ft 250 9 CABINET LASANI Sq.Ft 360 LASANI(GLASS) Sq.Ft 750 10 WARDROBE CHIPBOARD Sq.Ft 520 LASANI Sq.Ft 675
  28. 28. Page 28 of 33 S NO ITEM SIZE UNIT COST DEALER 11 DOORS MOIZ INTERIORS SAFURA CHOWK ,KARACHI MUHAMMAD MOIZ AHMAD 0213- 4656182 SKIN DOOR 3’x7’ Sq.Ft 2200 SKIN DOOR(CAL) 3’x7’ Sq.Ft 3900 SKIN DOOR(GLASS) 3’x7’ Sq.Ft 8400 12 WINDOWS SIMPLE RUNNING Ft 92 FANCY RUNNING Ft 92> 13 PANEL CAL RUNNING Ft 180 GOLDEN TEAK RUNNING Ft 240 14 CABINET LASANI Sq.Ft 380 LASANI(GLASS) Sq.Ft 730 15 WARDROBE CHIPBOARD Sq.Ft 540 LASANI Sq.Ft 680
  29. 29. Page 29 of 33 STEEL WORKS
  30. 30. Page 30 of 33 STEEL WORKS S NO ITEM SIZE COST DEALER 1 MAIN GATE FRIENDS IRON WORKS SHOP NO 18, SABA APARTMENT SAFURA GOTH, KARACHI 0331-2418272 18 GAUGE 10’x7’ 28000 20 GAUGE 10’x7’ 30000 2 TANK CAP BEAD 18x18 830 STEEL 18x18 1350 3 GUTTER CAP BEAD 24x24 2030 STEEL 24x24 2300 4 MAIN GATE WALEED BROTHERS SHOP NO 3 , NISHTAR ROAD GARDEN, KARACHI 0300-2249127 18 GAUGE 10’x7’ 28000 20 GAUGE 10’x7’ 30000 5 TANK CAP BEAD 18x18 830 STEEL 18x18 1350 6 GUTTER CAP BEAD 24x24 2030 STEEL 24x24 2300 7 MAIN GATE GHAUSIA IRON AND ALUMINIUM WORKS SHOP NO 17, LIAQATABAD B AREA , KARACHI 0322- 2441975 18 GAUGE 10’x7’ 28000 20 GAUGE 10’x7’ 30000 8 TANK CAP BEAD 18x18 830 STEEL 18x18 1350 9 GUTTER CAP BEAD 24x24 2030 STEEL 24x24 2300
  31. 31. Page 31 of 33 LABOUR
  32. 32. Page 32 of 33 LABOUR S NO ITEM UNIT COST CONTACT 1 MASON SHAFIQ AHMAD, SOHRAB GOTH, 0332-2584475 SKILLED PER DAY 1000 UNSKILLED PER DAY 500 2 MASON WALI KHAN, WATERPUMP 0300-2545232 SKILLED PER DAY 1100 UNSKILLED PER DAY 600 3 MASON MOLA BUKSH, SAFURA GOTH 0343-2985521 SKILLED PER DAY 1000 UNSKILLED PER DAY 550 4 ELECTRICIAN Sq Ft 12 MAQSUD, HYDERI 0345-2316903 Sq Ft 10 SHAKEEL, LIAQATABAD 0306-2010420 Sq Ft 14 REHAN, NAZIMABAD 0300-9214169 5 PLUMBER FOR 120 Sq Yds LUMP SUM 17000 QASIM, GOLIMAAR 0345-2760866 FOR 120 Sq Yds LUMP SUM 20000 ALI RAZA, WATERPUMP 0300-2554100 FOR 120 Sq Yds LUMP SUM 19000 NOOR MUHAMMAD, SAFURA 0342-2705358 6 PAINTER FOR 120 Sq Yds LUMP SUM 14000 YAMIN KHAN, SAFURA 0346-2773248 FOR 120 Sq Yds LUMP SUM 17000 SULEMAN , LIAQATABAD 0313-2757653 FOR 120 Sq Yds LUMP SUM 18500 ABDULLAH, WATERPUMP 0312- 2130742

    Be the first to comment

    Login to see the comments

  • Engrsanju

    Feb. 24, 2016
  • jevan786

    Apr. 8, 2018
  • abujafri

    Apr. 10, 2018
  • dhirajdeka5

    May. 21, 2018
  • hruaiajh

    Jun. 4, 2019

Views

Total views

3,458

On Slideshare

0

From embeds

0

Number of embeds

2

Actions

Downloads

89

Shares

0

Comments

0

Likes

5

×