SlideShare a Scribd company logo
1 of 51
Download to read offline
Drilling Technology 
Types of Drilling Rigs 
Land Rig(Onshore)
When a drilling project is commenced, two goals are governing all 
aspects of it. 
1. The first is to realize the well in a safe manner (personal 
injuries, technical problems) 
2. The second one is to complete it with minimum 
Cost 
For making hole, different technologies have been invented 
(We Focus on Rotary Drilling Technology) 
Percussion drilling 
With mud -> Quick percussion drilling 
Without mud -> “Canadian drilling” 
Rotating bit 
Full cross-section drilling 
Surface driven 
Rotary drilling 
Rotary nozzle drilling 
Subsurface driven 
Turbine drilling 
Positive displacement motor drilling 
Electro motor drilling 
Annular drilling 
Diamond coring 
Shot drilling
Abrasive jet drilling 
Cavitating jet drilling 
Electric arc and plasma drilling 
Electric beam drilling 
Electric disintegration drilling 
Explosive drilling 
Flame jet drilling 
Implosion drilling 
Laser drilling 
REAM drilling 
Replaceable cutter head drilling 
Rocket Exhaust drilling 
Spark drilling 
Sub terrene drilling 
Terra drilling 
Thermal-mechanical drilling 
Thermo corer drilling
Tool Pusher 
The tool pusher supervises all drilling operations and is the leading man of the drilling contractor 
on location. Along with this supervision duties, he has to co-ordinate company and contractor 
affairs. 
Company Man 
The company man is in direct charge of all the company’s activities on the rig site. He is responsible 
for the drilling strategy as well as the supplies and services in need. His decisions directly effect 
the progress of the well. 
Driller 
The driller operates the drilling machinery on the rig floor and is the overall supervisor of all 
floor men. He is directly responsible to the tool pusher and is the person who is most closely 
involved in the drilling process. He manipulates from his position at the control console on the 
rig floor brakes, switches, levers and other related controls that influence the drilling parameters. 
In case of a kick he is the first person to take action by moving the bit off bottom and close the 
BOP. 
Floor Man and Roustabout 
During tripping, the rotary helpers are responsible for handling the lower end of the drill pipe as 
well as operating tongs and wrenches to make or break a connection. During other times, they 
also maintain equipment, keep it clean, do painting and in general help where ever help is needed 
Derrick Man 
The derrick man works on the so-called monkey board, a small platform up in the derrick, usually 
about 90 [ft] above the rotary table. When a connection is made or during tripping operations he 
is handling and guiding the upper end of the pipe. During drilling operations the derrick man is 
responsible for maintaining and repairing the pumps and other equipment as well as keeping tabs 
on the drilling fluid. 
Mud Engineer, Mud Logger 
The service company who provides the mud almost always sends a mud engineer and a mud logger 
to the rig site. They are constantly responsible for logging what is happening in the hole as well 
as maintaining the proper mud conditions.
According to a wells final depth, it can be classified into: 
Shallow well: < 2,000 [m] 
Conventional well: 2,000 [m] - 3,500 [m] 
Deep well: 3,500 [m] - 5,000 [m] 
Ultra deep well: > 5,000 [m] 
With the help of advanced technologies in MWD/LWD and extended reach drilling techniques 
horizontal departures of 10,000+ [m] are possible today (Wytch Farm).
Land Rigs 
The parts of the rig can be grouped into five systems: 
Power 
Rotating 
Hoisting 
Circulating 
Control and measurement
The bit is the main critical item of a drilling operation. 
This does not mean that the bit can make hole alone. 
To select a bit, some information must be known about the nature of the rocks to be drilled
Drill stem consists of three main components: 
drill collars, 
drill pipe and 
Kelly.
The following are the principal functions of the drill stem: 
1. Drill stem lowers the bit into the hole and withdraws it 
2.Part of the drill stem puts weight on the bit so that the bit can penetrate the formations more effectively 
3.Drill stem transmits a turning, or rotating, action to the bit. 
4.Drill stem conducts the drilling fluid under pressure from the surface to the bit.
The traveling block, crown block and wire line are the three components. 
The main function is to connect the supporting derrick or mast with the load of pipe to be lowered into or withdraw from the hole.
 Traveling block is a free moving section of a block and tackle that contains a set of pulleys or sheaves through which the drill line is threaded or revved and is opposite (and under) the crown block (the stationary section).
A crown block is the stationary section of a block and tackle. It contains a set of pulleys or sheaves which the drill line (wire rope) is threaded or revved and is opposite and above the traveling block.
A mast is also called the standard mast. It is a structure with four supporting legs resting on a square base, the entire work area of the floor is in the derrick square. 
In contrast, the mast is much slenderer and may be thought of as sitting on one side of the derrick floor or work space.
The two main purposes of the draw works are: 
 To lift the pipe out of the hole 
To lower the pipe back into of the hole.
Blowout preventer (BOP) is the equipment associated with a rig and devices installed at the wellhead to prevent fluids and gasses from unintentionally escaping from the borehole.
Centrifuge is the equipment which is used to separate fine silt and sand from the drilling fluid.
It is used to provide clockwise rotational force to facilitate the process of drilling a borehole 
Operating through drive bushings, the rotary rotates the Kelly and, through it, the drill stem and the bit
MAIN FUNCTIONS OF A ROTORY TABLE 
To rotate the drill stem 
To hold devices called slips that support the weigh of the drill stem when the latter is not supported by hook and elevators.
Kelly is a long square or hexagonal steel bar with a hole drilled through the middle for a fluid path. 
The Kelly is used to transmit rotary motion from the rotary table or Kelly bushing to the drill string while allowing the drill string to be lowered or raised during rotation.
The Kelly goes through the Kelly bushing, which is driven by the rotary table. 
The Kelly bushing has an inside profile matching the Kelly’s outside profile (either square or hexagonal), but with slightly larger dimensions so that the Kelly can freely move up and down inside.
Swivel is a mechanical device that must simultaneously suspend the weight of the drill string, provide for rotation of the drill string beneath it while keeping the upper portion stationary, and permit high-volume flow of high- pressure drilling mud from the fixed portion to the rotating portion without leaking
MAIN FUNCTIONS 
Support the load of the drill stem 
 Allow rotation of the drilling assembly 
Provide a passageway for fluid under high pressure to enter the drill stem.
Power is provided to the rig by diesel engines, diesel- electric engines, or in some cases, butane engines. Power is transferred from the engines to the different rig systems by belts, chains, and drive shafts on a mechanical rig, or by generated DC electrical power on an electric rig. Power is distributed to the rotary table and mud pumps (34 in Figure 1) while drilling and to the draw works (15) when tripping.
he hoisting system includes the parts of the rig that are used to raise the drill stem. The hoisting gear parts include the draw works (15 in Figure 1), crown block (1), and traveling block (4). The draw works is a large winch on which the drill line spools. The drill line is wire rope that is strung between the crown block (a pulley located at the top of the derrick), the traveling block, and the draw works. The drill line can be strung in multiples for a total of 4,6, 8, 10, or 12 lines. More lines means more lifting capacity but a slower running speed. The drill line needs to be “cut and slipped” at periodic ton-miles to distribute the line wear and stress. A weight indicator (16) is attached to the drill line so that the driller can measure the drill string, slack-off, and pick-up weights. This information helps determine the amount of hole friction and the correct amount of weight to put on the bit. The draw works also transfers power to make up and break out the drill string via the tongs (13 and 14).
The derrick supports the crown block and provides a place to stack pipe that is pulled out of the hole. The depth rating of the derrick is related to the size of the rig. The height of the derrick is commonly referred to in multiples of pipe joints (a joint of pipe is approximately 30 ft long). Rigs that can stack double joints of drill pipe are called double derricks, and those that stack three joints are called treble derricks. Part way up the derrick are the monkey board (3) and pipe fingers. The derrick man handles the top end of each stand of pipe from the monkey board during trips. The pipe is racked in the finger boards and tied off to keep it from falling. The derrick substructure (23), the platform under the derrick, is rated by set back capacity; that is, the weight of the drill string stacked in the derrick plus the weight of casing that can be lifted. The height of the substructure is dictated by the height of the blowout preventers (38). The top of the substructure is called the derrick floor. This is the primary working area of the rig. 
The catwalk is the deck located to the side of the derrick floor and between the pipe racks (22). Joints of drill pipe and casing are rolled from the pipe racks where they are stored on the catwalk and hoisted up through the slide (21) and V-door. The catwalk is also the primary location to process core and assemble wire line logging tools.
Circulation of drilling fluid (mud) serves several functions on a rig, including cooling the bit, providing hole stability, and aiding in formation evaluation. 
Drilling fluid is circulated by the mud pumps (34 in Figure 1). The volume of mud being pumped is measured by the stroke counters, and the rate of movement is recorded by the stand pipe pressure. The stand pipe connects the mud pumps to the kelly hose. The kelly hose is connected to the swivel (6) on top of the kelly. Mud is pumped down the drill string through the bit and up the annulus or “back side” (the space between the drill pipe and the borehole). Returning mud flows down the flow line (24) into a surge tank (possum belly) and across the shale shakers (25). Shale shakers are vibrating screening devices that are designed to shake so as to separate out the drill cuttings from the mud. The shale shakers are the first place that drill cuttings can be examined and where the gas is extracted from the mud (27 and 28) (Figure 2). After going through the shake shakers the mud passes through a series of tanks or pits where the finer solids are removed via desanders (32), desilters (31) and centrifuges (33), and the mud properties are adjusted. Pits are named for their function (e.g., shale pit, settling pit, volume pit, mixing pit, and suction pit). The mud pumps are charged from the suction pit. Excess mud can also be diverted from the metal mud pits into a large, plastic lined reserve pit (29) located to the side of the rig.
The blowout preventers (BOPs) (38 in Figure 1) are the major component of the control system on a rig, and they are the last line of defenses against a blowout. The BOPs are bolted to the wellhead and are not removed until the well is completed and production equipment is installed. BOPs usually have at least four sections: 
Annulars are large, hard rubber slips that fit around any sized pipe. The size flexibility, however, is at the expense of the pressure rating. 
Pipe rams are metal donut-shaped sealing mechanisms that fit only a specific sized pipe but at a high pressure rating. 
Blind or shear rams are edged high-carbon steel sealing mechanisms that can cut pipe and close the hole completely. 
Crossover spools are metal junctions where the choke and kill lines attach.
Additional control equipment includes the kill line, choke line, and flare line. The kill line is used to pump mud into the annulus at the crossover spool in the event that heavier mud is needed to control wellbore pressures. The choke line also helps control wellbore pressures by allowing drilling mud to circulate through a choke manifold (26) (which is a set of backpressure valves). The mud and gas can then be sent down the flare line for disposal or burning in the reserve pit (29). 
Monitoring and measurement of the basic functions of the rig are usually made from the driller's console (17) located on the derrick floor. From this console, the driller can monitor equipment, distribute power, change gears, and oversee crew activities. Additional measurement equipment and records are located in the dog house (18) or service shed. The dog house is located to the side of the rig floor and contains the geolograph, a device that makes a time-based chart record of several rig functions, including the following: 
Kelly height or rate of penetration (ROP) (in ft/hr, m/hr, or min/ft) 
Depth (in ft or m) 
Pump pressure (in psi) 
String weight (in thousands of lb) 
Rotary speed (in rpm) 
Rotary torque (in ft-lb) 
Stroke rate (in strokes/min) 
Circulation rate (in gal/min)
Personal safety equipment 
Hard hat 
Safety shoes 
Safety glasses 
Hearing protection 
The following are recommended: 
Well-fitted, protective clothing 
CPR and first aid training 
Do not have the following: 
Long shoe strings 
Floppy gloves 
Neckties or fringes 
Jewelry 
Long, loose hair 
A bad attitude
Drilling engineering zaidi

More Related Content

What's hot

Rig Operations & Equipment
Rig Operations & EquipmentRig Operations & Equipment
Rig Operations & EquipmentM.T.H Group
 
Sequence of well drilling part 1
Sequence of well drilling part 1Sequence of well drilling part 1
Sequence of well drilling part 1Elsayed Amer
 
2.2 rig components
2.2 rig components2.2 rig components
2.2 rig componentsElsayed Amer
 
Basic drilling engineering
Basic drilling engineeringBasic drilling engineering
Basic drilling engineeringSaad Raja
 
Rotary Drilling System: Introduction
Rotary Drilling System:IntroductionRotary Drilling System:Introduction
Rotary Drilling System: IntroductionAFATous
 
Rotary drilling rig (onshore)
Rotary drilling rig (onshore)Rotary drilling rig (onshore)
Rotary drilling rig (onshore)IshaneeSharma
 
Drilling Operations
Drilling OperationsDrilling Operations
Drilling OperationsTarek Saati
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operationsElsayed Amer
 
Presentation 2 drilling rig systems
Presentation 2 drilling rig systemsPresentation 2 drilling rig systems
Presentation 2 drilling rig systemsAli Trichelli
 
Wireline Operations
Wireline OperationsWireline Operations
Wireline OperationsMubarik Rao
 
4 drilling problems and prevent
4 drilling problems and prevent4 drilling problems and prevent
4 drilling problems and preventShabaz Ahmad
 
rotary drilling.pptx
rotary drilling.pptxrotary drilling.pptx
rotary drilling.pptxTuralEmirli
 
Intro to offshore drilling
Intro to offshore drilling Intro to offshore drilling
Intro to offshore drilling amrhaggag
 
Offshore Drilling Rig Equipment
Offshore Drilling Rig EquipmentOffshore Drilling Rig Equipment
Offshore Drilling Rig EquipmentAijaz Ahmed
 

What's hot (20)

Rig Operations & Equipment
Rig Operations & EquipmentRig Operations & Equipment
Rig Operations & Equipment
 
Sequence of well drilling part 1
Sequence of well drilling part 1Sequence of well drilling part 1
Sequence of well drilling part 1
 
2.2 rig components
2.2 rig components2.2 rig components
2.2 rig components
 
Basic drilling engineering
Basic drilling engineeringBasic drilling engineering
Basic drilling engineering
 
Rotary Drilling System: Introduction
Rotary Drilling System:IntroductionRotary Drilling System:Introduction
Rotary Drilling System: Introduction
 
2.1 rig types
2.1 rig types2.1 rig types
2.1 rig types
 
Directional Drilling
Directional DrillingDirectional Drilling
Directional Drilling
 
Rig components
Rig componentsRig components
Rig components
 
Rotary drilling rig (onshore)
Rotary drilling rig (onshore)Rotary drilling rig (onshore)
Rotary drilling rig (onshore)
 
Drilling Operations
Drilling OperationsDrilling Operations
Drilling Operations
 
Drill string
Drill stringDrill string
Drill string
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operations
 
Presentation 2 drilling rig systems
Presentation 2 drilling rig systemsPresentation 2 drilling rig systems
Presentation 2 drilling rig systems
 
rig types and its components
rig types and its componentsrig types and its components
rig types and its components
 
Drilling equipment
Drilling equipmentDrilling equipment
Drilling equipment
 
Wireline Operations
Wireline OperationsWireline Operations
Wireline Operations
 
4 drilling problems and prevent
4 drilling problems and prevent4 drilling problems and prevent
4 drilling problems and prevent
 
rotary drilling.pptx
rotary drilling.pptxrotary drilling.pptx
rotary drilling.pptx
 
Intro to offshore drilling
Intro to offshore drilling Intro to offshore drilling
Intro to offshore drilling
 
Offshore Drilling Rig Equipment
Offshore Drilling Rig EquipmentOffshore Drilling Rig Equipment
Offshore Drilling Rig Equipment
 

Viewers also liked

Off Shore Oil Drilling Presentation
Off Shore Oil Drilling PresentationOff Shore Oil Drilling Presentation
Off Shore Oil Drilling PresentationChristian Ricchezza
 
أعمال الانشاءات النفطية - Oil Structure Works
أعمال الانشاءات النفطية - Oil Structure Worksأعمال الانشاءات النفطية - Oil Structure Works
أعمال الانشاءات النفطية - Oil Structure WorksHussain Sbetan
 
Ligonier Wastewater Treatment Plant Presentation
Ligonier Wastewater Treatment Plant PresentationLigonier Wastewater Treatment Plant Presentation
Ligonier Wastewater Treatment Plant Presentationfought70
 
Well design and construction i
Well design and construction iWell design and construction i
Well design and construction iYalçın Dalgıç
 
Wastewater sampling and treatment كورس تدريبي عن أخذ العينات والتحاليل لميا...
Wastewater sampling and treatment   كورس تدريبي عن أخذ العينات والتحاليل لميا...Wastewater sampling and treatment   كورس تدريبي عن أخذ العينات والتحاليل لميا...
Wastewater sampling and treatment كورس تدريبي عن أخذ العينات والتحاليل لميا...Kimia Store
 
Borehole and Drilling problems
Borehole and Drilling problems  Borehole and Drilling problems
Borehole and Drilling problems Vívêk Årýàñ
 
مشروع العتقاء حفر أبار - العشر- النجاة الخيرية
مشروع العتقاء حفر أبار - العشر- النجاة الخيريةمشروع العتقاء حفر أبار - العشر- النجاة الخيرية
مشروع العتقاء حفر أبار - العشر- النجاة الخيريةجمعية النجاة الخيرية
 
Drilling Engineering - Casing Design
Drilling Engineering - Casing DesignDrilling Engineering - Casing Design
Drilling Engineering - Casing DesignJames Craig
 
Drilling and producing well
Drilling and  producing wellDrilling and  producing well
Drilling and producing wellRaja Rosenani
 

Viewers also liked (10)

Off Shore Oil Drilling Presentation
Off Shore Oil Drilling PresentationOff Shore Oil Drilling Presentation
Off Shore Oil Drilling Presentation
 
أعمال الانشاءات النفطية - Oil Structure Works
أعمال الانشاءات النفطية - Oil Structure Worksأعمال الانشاءات النفطية - Oil Structure Works
أعمال الانشاءات النفطية - Oil Structure Works
 
Ligonier Wastewater Treatment Plant Presentation
Ligonier Wastewater Treatment Plant PresentationLigonier Wastewater Treatment Plant Presentation
Ligonier Wastewater Treatment Plant Presentation
 
Well design and construction i
Well design and construction iWell design and construction i
Well design and construction i
 
Wastewater sampling and treatment كورس تدريبي عن أخذ العينات والتحاليل لميا...
Wastewater sampling and treatment   كورس تدريبي عن أخذ العينات والتحاليل لميا...Wastewater sampling and treatment   كورس تدريبي عن أخذ العينات والتحاليل لميا...
Wastewater sampling and treatment كورس تدريبي عن أخذ العينات والتحاليل لميا...
 
Borehole and Drilling problems
Borehole and Drilling problems  Borehole and Drilling problems
Borehole and Drilling problems
 
مشروع العتقاء حفر أبار - العشر- النجاة الخيرية
مشروع العتقاء حفر أبار - العشر- النجاة الخيريةمشروع العتقاء حفر أبار - العشر- النجاة الخيرية
مشروع العتقاء حفر أبار - العشر- النجاة الخيرية
 
Oil Drilling
Oil DrillingOil Drilling
Oil Drilling
 
Drilling Engineering - Casing Design
Drilling Engineering - Casing DesignDrilling Engineering - Casing Design
Drilling Engineering - Casing Design
 
Drilling and producing well
Drilling and  producing wellDrilling and  producing well
Drilling and producing well
 

Similar to Drilling engineering zaidi

1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd
1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd
1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjdahmdrabymnswr
 
Drilling rig components ( illustrated glossary )
Drilling rig components ( illustrated glossary )Drilling rig components ( illustrated glossary )
Drilling rig components ( illustrated glossary )amrhaggag
 
01_Rig Components & Personel.pdf
01_Rig Components & Personel.pdf01_Rig Components & Personel.pdf
01_Rig Components & Personel.pdfDrilling Manual
 
Top hammer drilling
Top hammer drillingTop hammer drilling
Top hammer drillingAqibAliNaich
 
Drill String & Bottom Hole Assembly Design
Drill String & Bottom Hole Assembly DesignDrill String & Bottom Hole Assembly Design
Drill String & Bottom Hole Assembly Designrahul827662
 
oil & gas drilling preliminaries
oil & gas drilling preliminariesoil & gas drilling preliminaries
oil & gas drilling preliminariesKartikeya Pandey
 
Rotary drilling rig systems overview
Rotary drilling rig  systems overview Rotary drilling rig  systems overview
Rotary drilling rig systems overview Shaukat Ali
 
Wel Planing
Wel PlaningWel Planing
Wel Planingsaqib129
 
drilling lecture 1.
drilling lecture 1.drilling lecture 1.
drilling lecture 1.nasastore
 
Conventional shaft sinking by manual means
Conventional shaft sinking by manual meansConventional shaft sinking by manual means
Conventional shaft sinking by manual meansSafdar Ali
 
Graduation Drilling Technology .pptx
Graduation  Drilling Technology .pptxGraduation  Drilling Technology .pptx
Graduation Drilling Technology .pptxHayder Al Ali
 
Q922+de1+l06 v1
Q922+de1+l06 v1Q922+de1+l06 v1
Q922+de1+l06 v1AFATous
 
A poster presentation on raise boring machine
A poster presentation on raise boring machineA poster presentation on raise boring machine
A poster presentation on raise boring machineMd. Shahadot Hossain
 

Similar to Drilling engineering zaidi (20)

6 day.pptx
6 day.pptx6 day.pptx
6 day.pptx
 
1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd
1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd
1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd
 
176589.pptx.ppt
176589.pptx.ppt176589.pptx.ppt
176589.pptx.ppt
 
Drilling rig components ( illustrated glossary )
Drilling rig components ( illustrated glossary )Drilling rig components ( illustrated glossary )
Drilling rig components ( illustrated glossary )
 
01_Rig Components & Personel.pdf
01_Rig Components & Personel.pdf01_Rig Components & Personel.pdf
01_Rig Components & Personel.pdf
 
Top hammer drilling
Top hammer drillingTop hammer drilling
Top hammer drilling
 
Drill String & Bottom Hole Assembly Design
Drill String & Bottom Hole Assembly DesignDrill String & Bottom Hole Assembly Design
Drill String & Bottom Hole Assembly Design
 
oil & gas drilling preliminaries
oil & gas drilling preliminariesoil & gas drilling preliminaries
oil & gas drilling preliminaries
 
Rotary drilling rig systems overview
Rotary drilling rig  systems overview Rotary drilling rig  systems overview
Rotary drilling rig systems overview
 
Machineries and Maintenance Question Patterns for Mining students
Machineries and Maintenance Question Patterns for Mining studentsMachineries and Maintenance Question Patterns for Mining students
Machineries and Maintenance Question Patterns for Mining students
 
Wel Planing
Wel PlaningWel Planing
Wel Planing
 
Drilling Equipments
Drilling EquipmentsDrilling Equipments
Drilling Equipments
 
drilling lecture 1.
drilling lecture 1.drilling lecture 1.
drilling lecture 1.
 
Conventional shaft sinking by manual means
Conventional shaft sinking by manual meansConventional shaft sinking by manual means
Conventional shaft sinking by manual means
 
Graduation Drilling Technology .pptx
Graduation  Drilling Technology .pptxGraduation  Drilling Technology .pptx
Graduation Drilling Technology .pptx
 
Drilling - Qazma English
Drilling - Qazma English Drilling - Qazma English
Drilling - Qazma English
 
Drilling - Qazma English
Drilling - Qazma EnglishDrilling - Qazma English
Drilling - Qazma English
 
Q922+de1+l06 v1
Q922+de1+l06 v1Q922+de1+l06 v1
Q922+de1+l06 v1
 
Drilling equipments
Drilling equipmentsDrilling equipments
Drilling equipments
 
A poster presentation on raise boring machine
A poster presentation on raise boring machineA poster presentation on raise boring machine
A poster presentation on raise boring machine
 

More from Syed Muhammad Zaidi

More from Syed Muhammad Zaidi (7)

Tems 8 Basic steps for beginners
Tems 8 Basic steps for beginners Tems 8 Basic steps for beginners
Tems 8 Basic steps for beginners
 
Reflector Antenna
Reflector AntennaReflector Antenna
Reflector Antenna
 
PTCL Report final
PTCL Report finalPTCL Report final
PTCL Report final
 
Copy of syed muhammad zaidi caa
Copy of syed muhammad zaidi caaCopy of syed muhammad zaidi caa
Copy of syed muhammad zaidi caa
 
Drive test from a t z (part 3)-actix
Drive test from a t z (part 3)-actixDrive test from a t z (part 3)-actix
Drive test from a t z (part 3)-actix
 
Drive test 1
Drive test 1Drive test 1
Drive test 1
 
Drive test from a to z (part 2)
Drive test from a to z (part 2)Drive test from a to z (part 2)
Drive test from a to z (part 2)
 

Recently uploaded

Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...nehasharma67844
 
Call Girls in Sarita Vihar Delhi Just Call 👉👉9873777170 Independent Female ...
Call Girls in  Sarita Vihar Delhi Just Call 👉👉9873777170  Independent Female ...Call Girls in  Sarita Vihar Delhi Just Call 👉👉9873777170  Independent Female ...
Call Girls in Sarita Vihar Delhi Just Call 👉👉9873777170 Independent Female ...adilkhan87451
 
The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learningNAP Global Network
 
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
SMART BANGLADESH I PPTX I SLIDE IShovan Prita Paul.pptx
SMART BANGLADESH  I    PPTX   I    SLIDE   IShovan Prita Paul.pptxSMART BANGLADESH  I    PPTX   I    SLIDE   IShovan Prita Paul.pptx
SMART BANGLADESH I PPTX I SLIDE IShovan Prita Paul.pptxShovan Prita Paul .
 
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...SUHANI PANDEY
 
Hinjewadi * VIP Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service ...
Hinjewadi * VIP Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service ...Hinjewadi * VIP Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service ...
Hinjewadi * VIP Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service ...SUHANI PANDEY
 
An Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCAn Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCNAP Global Network
 
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...SUHANI PANDEY
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCNAP Global Network
 
Pimple Gurav ) Call Girls Service Pune | 8005736733 Independent Escorts & Dat...
Pimple Gurav ) Call Girls Service Pune | 8005736733 Independent Escorts & Dat...Pimple Gurav ) Call Girls Service Pune | 8005736733 Independent Escorts & Dat...
Pimple Gurav ) Call Girls Service Pune | 8005736733 Independent Escorts & Dat...SUHANI PANDEY
 
World Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterWorld Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterChristina Parmionova
 
best call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakur
best call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakurbest call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakur
best call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha ThakurSUHANI PANDEY
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'NAP Global Network
 
2024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 312024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 31JSchaus & Associates
 
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...SUHANI PANDEY
 
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...SUHANI PANDEY
 

Recently uploaded (20)

Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...
 
Call Girls in Sarita Vihar Delhi Just Call 👉👉9873777170 Independent Female ...
Call Girls in  Sarita Vihar Delhi Just Call 👉👉9873777170  Independent Female ...Call Girls in  Sarita Vihar Delhi Just Call 👉👉9873777170  Independent Female ...
Call Girls in Sarita Vihar Delhi Just Call 👉👉9873777170 Independent Female ...
 
The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learning
 
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
 
SMART BANGLADESH I PPTX I SLIDE IShovan Prita Paul.pptx
SMART BANGLADESH  I    PPTX   I    SLIDE   IShovan Prita Paul.pptxSMART BANGLADESH  I    PPTX   I    SLIDE   IShovan Prita Paul.pptx
SMART BANGLADESH I PPTX I SLIDE IShovan Prita Paul.pptx
 
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
 
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
 
Hinjewadi * VIP Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service ...
Hinjewadi * VIP Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service ...Hinjewadi * VIP Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service ...
Hinjewadi * VIP Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service ...
 
An Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCAn Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCC
 
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
Pimple Gurav ) Call Girls Service Pune | 8005736733 Independent Escorts & Dat...
Pimple Gurav ) Call Girls Service Pune | 8005736733 Independent Escorts & Dat...Pimple Gurav ) Call Girls Service Pune | 8005736733 Independent Escorts & Dat...
Pimple Gurav ) Call Girls Service Pune | 8005736733 Independent Escorts & Dat...
 
AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024
 
World Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterWorld Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - Poster
 
best call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakur
best call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakurbest call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakur
best call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakur
 
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'
 
2024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 312024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 31
 
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
 
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
 

Drilling engineering zaidi

  • 1.
  • 2.
  • 3.
  • 4.
  • 5.
  • 6. Drilling Technology Types of Drilling Rigs Land Rig(Onshore)
  • 7. When a drilling project is commenced, two goals are governing all aspects of it. 1. The first is to realize the well in a safe manner (personal injuries, technical problems) 2. The second one is to complete it with minimum Cost For making hole, different technologies have been invented (We Focus on Rotary Drilling Technology) Percussion drilling With mud -> Quick percussion drilling Without mud -> “Canadian drilling” Rotating bit Full cross-section drilling Surface driven Rotary drilling Rotary nozzle drilling Subsurface driven Turbine drilling Positive displacement motor drilling Electro motor drilling Annular drilling Diamond coring Shot drilling
  • 8. Abrasive jet drilling Cavitating jet drilling Electric arc and plasma drilling Electric beam drilling Electric disintegration drilling Explosive drilling Flame jet drilling Implosion drilling Laser drilling REAM drilling Replaceable cutter head drilling Rocket Exhaust drilling Spark drilling Sub terrene drilling Terra drilling Thermal-mechanical drilling Thermo corer drilling
  • 9. Tool Pusher The tool pusher supervises all drilling operations and is the leading man of the drilling contractor on location. Along with this supervision duties, he has to co-ordinate company and contractor affairs. Company Man The company man is in direct charge of all the company’s activities on the rig site. He is responsible for the drilling strategy as well as the supplies and services in need. His decisions directly effect the progress of the well. Driller The driller operates the drilling machinery on the rig floor and is the overall supervisor of all floor men. He is directly responsible to the tool pusher and is the person who is most closely involved in the drilling process. He manipulates from his position at the control console on the rig floor brakes, switches, levers and other related controls that influence the drilling parameters. In case of a kick he is the first person to take action by moving the bit off bottom and close the BOP. Floor Man and Roustabout During tripping, the rotary helpers are responsible for handling the lower end of the drill pipe as well as operating tongs and wrenches to make or break a connection. During other times, they also maintain equipment, keep it clean, do painting and in general help where ever help is needed Derrick Man The derrick man works on the so-called monkey board, a small platform up in the derrick, usually about 90 [ft] above the rotary table. When a connection is made or during tripping operations he is handling and guiding the upper end of the pipe. During drilling operations the derrick man is responsible for maintaining and repairing the pumps and other equipment as well as keeping tabs on the drilling fluid. Mud Engineer, Mud Logger The service company who provides the mud almost always sends a mud engineer and a mud logger to the rig site. They are constantly responsible for logging what is happening in the hole as well as maintaining the proper mud conditions.
  • 10. According to a wells final depth, it can be classified into: Shallow well: < 2,000 [m] Conventional well: 2,000 [m] - 3,500 [m] Deep well: 3,500 [m] - 5,000 [m] Ultra deep well: > 5,000 [m] With the help of advanced technologies in MWD/LWD and extended reach drilling techniques horizontal departures of 10,000+ [m] are possible today (Wytch Farm).
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17. Land Rigs The parts of the rig can be grouped into five systems: Power Rotating Hoisting Circulating Control and measurement
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25. The bit is the main critical item of a drilling operation. This does not mean that the bit can make hole alone. To select a bit, some information must be known about the nature of the rocks to be drilled
  • 26. Drill stem consists of three main components: drill collars, drill pipe and Kelly.
  • 27. The following are the principal functions of the drill stem: 1. Drill stem lowers the bit into the hole and withdraws it 2.Part of the drill stem puts weight on the bit so that the bit can penetrate the formations more effectively 3.Drill stem transmits a turning, or rotating, action to the bit. 4.Drill stem conducts the drilling fluid under pressure from the surface to the bit.
  • 28. The traveling block, crown block and wire line are the three components. The main function is to connect the supporting derrick or mast with the load of pipe to be lowered into or withdraw from the hole.
  • 29.  Traveling block is a free moving section of a block and tackle that contains a set of pulleys or sheaves through which the drill line is threaded or revved and is opposite (and under) the crown block (the stationary section).
  • 30. A crown block is the stationary section of a block and tackle. It contains a set of pulleys or sheaves which the drill line (wire rope) is threaded or revved and is opposite and above the traveling block.
  • 31. A mast is also called the standard mast. It is a structure with four supporting legs resting on a square base, the entire work area of the floor is in the derrick square. In contrast, the mast is much slenderer and may be thought of as sitting on one side of the derrick floor or work space.
  • 32. The two main purposes of the draw works are:  To lift the pipe out of the hole To lower the pipe back into of the hole.
  • 33. Blowout preventer (BOP) is the equipment associated with a rig and devices installed at the wellhead to prevent fluids and gasses from unintentionally escaping from the borehole.
  • 34.
  • 35. Centrifuge is the equipment which is used to separate fine silt and sand from the drilling fluid.
  • 36. It is used to provide clockwise rotational force to facilitate the process of drilling a borehole Operating through drive bushings, the rotary rotates the Kelly and, through it, the drill stem and the bit
  • 37. MAIN FUNCTIONS OF A ROTORY TABLE To rotate the drill stem To hold devices called slips that support the weigh of the drill stem when the latter is not supported by hook and elevators.
  • 38. Kelly is a long square or hexagonal steel bar with a hole drilled through the middle for a fluid path. The Kelly is used to transmit rotary motion from the rotary table or Kelly bushing to the drill string while allowing the drill string to be lowered or raised during rotation.
  • 39. The Kelly goes through the Kelly bushing, which is driven by the rotary table. The Kelly bushing has an inside profile matching the Kelly’s outside profile (either square or hexagonal), but with slightly larger dimensions so that the Kelly can freely move up and down inside.
  • 40.
  • 41. Swivel is a mechanical device that must simultaneously suspend the weight of the drill string, provide for rotation of the drill string beneath it while keeping the upper portion stationary, and permit high-volume flow of high- pressure drilling mud from the fixed portion to the rotating portion without leaking
  • 42. MAIN FUNCTIONS Support the load of the drill stem  Allow rotation of the drilling assembly Provide a passageway for fluid under high pressure to enter the drill stem.
  • 43. Power is provided to the rig by diesel engines, diesel- electric engines, or in some cases, butane engines. Power is transferred from the engines to the different rig systems by belts, chains, and drive shafts on a mechanical rig, or by generated DC electrical power on an electric rig. Power is distributed to the rotary table and mud pumps (34 in Figure 1) while drilling and to the draw works (15) when tripping.
  • 44. he hoisting system includes the parts of the rig that are used to raise the drill stem. The hoisting gear parts include the draw works (15 in Figure 1), crown block (1), and traveling block (4). The draw works is a large winch on which the drill line spools. The drill line is wire rope that is strung between the crown block (a pulley located at the top of the derrick), the traveling block, and the draw works. The drill line can be strung in multiples for a total of 4,6, 8, 10, or 12 lines. More lines means more lifting capacity but a slower running speed. The drill line needs to be “cut and slipped” at periodic ton-miles to distribute the line wear and stress. A weight indicator (16) is attached to the drill line so that the driller can measure the drill string, slack-off, and pick-up weights. This information helps determine the amount of hole friction and the correct amount of weight to put on the bit. The draw works also transfers power to make up and break out the drill string via the tongs (13 and 14).
  • 45. The derrick supports the crown block and provides a place to stack pipe that is pulled out of the hole. The depth rating of the derrick is related to the size of the rig. The height of the derrick is commonly referred to in multiples of pipe joints (a joint of pipe is approximately 30 ft long). Rigs that can stack double joints of drill pipe are called double derricks, and those that stack three joints are called treble derricks. Part way up the derrick are the monkey board (3) and pipe fingers. The derrick man handles the top end of each stand of pipe from the monkey board during trips. The pipe is racked in the finger boards and tied off to keep it from falling. The derrick substructure (23), the platform under the derrick, is rated by set back capacity; that is, the weight of the drill string stacked in the derrick plus the weight of casing that can be lifted. The height of the substructure is dictated by the height of the blowout preventers (38). The top of the substructure is called the derrick floor. This is the primary working area of the rig. The catwalk is the deck located to the side of the derrick floor and between the pipe racks (22). Joints of drill pipe and casing are rolled from the pipe racks where they are stored on the catwalk and hoisted up through the slide (21) and V-door. The catwalk is also the primary location to process core and assemble wire line logging tools.
  • 46. Circulation of drilling fluid (mud) serves several functions on a rig, including cooling the bit, providing hole stability, and aiding in formation evaluation. Drilling fluid is circulated by the mud pumps (34 in Figure 1). The volume of mud being pumped is measured by the stroke counters, and the rate of movement is recorded by the stand pipe pressure. The stand pipe connects the mud pumps to the kelly hose. The kelly hose is connected to the swivel (6) on top of the kelly. Mud is pumped down the drill string through the bit and up the annulus or “back side” (the space between the drill pipe and the borehole). Returning mud flows down the flow line (24) into a surge tank (possum belly) and across the shale shakers (25). Shale shakers are vibrating screening devices that are designed to shake so as to separate out the drill cuttings from the mud. The shale shakers are the first place that drill cuttings can be examined and where the gas is extracted from the mud (27 and 28) (Figure 2). After going through the shake shakers the mud passes through a series of tanks or pits where the finer solids are removed via desanders (32), desilters (31) and centrifuges (33), and the mud properties are adjusted. Pits are named for their function (e.g., shale pit, settling pit, volume pit, mixing pit, and suction pit). The mud pumps are charged from the suction pit. Excess mud can also be diverted from the metal mud pits into a large, plastic lined reserve pit (29) located to the side of the rig.
  • 47.
  • 48. The blowout preventers (BOPs) (38 in Figure 1) are the major component of the control system on a rig, and they are the last line of defenses against a blowout. The BOPs are bolted to the wellhead and are not removed until the well is completed and production equipment is installed. BOPs usually have at least four sections: Annulars are large, hard rubber slips that fit around any sized pipe. The size flexibility, however, is at the expense of the pressure rating. Pipe rams are metal donut-shaped sealing mechanisms that fit only a specific sized pipe but at a high pressure rating. Blind or shear rams are edged high-carbon steel sealing mechanisms that can cut pipe and close the hole completely. Crossover spools are metal junctions where the choke and kill lines attach.
  • 49. Additional control equipment includes the kill line, choke line, and flare line. The kill line is used to pump mud into the annulus at the crossover spool in the event that heavier mud is needed to control wellbore pressures. The choke line also helps control wellbore pressures by allowing drilling mud to circulate through a choke manifold (26) (which is a set of backpressure valves). The mud and gas can then be sent down the flare line for disposal or burning in the reserve pit (29). Monitoring and measurement of the basic functions of the rig are usually made from the driller's console (17) located on the derrick floor. From this console, the driller can monitor equipment, distribute power, change gears, and oversee crew activities. Additional measurement equipment and records are located in the dog house (18) or service shed. The dog house is located to the side of the rig floor and contains the geolograph, a device that makes a time-based chart record of several rig functions, including the following: Kelly height or rate of penetration (ROP) (in ft/hr, m/hr, or min/ft) Depth (in ft or m) Pump pressure (in psi) String weight (in thousands of lb) Rotary speed (in rpm) Rotary torque (in ft-lb) Stroke rate (in strokes/min) Circulation rate (in gal/min)
  • 50. Personal safety equipment Hard hat Safety shoes Safety glasses Hearing protection The following are recommended: Well-fitted, protective clothing CPR and first aid training Do not have the following: Long shoe strings Floppy gloves Neckties or fringes Jewelry Long, loose hair A bad attitude