SPILLWAYS:-
 A spillways is a structure constructed a or near the dam site to dispose of
surplus water from the reservoir to the channel downstream.
 Spillways are provided for all dams as a safety measure against overtopping
and the consequent damages and failure.
 A spillways acts as a safety valve for the dam, because as soon as the water
level in the reservoir rises above a predetermined level, excess water I
discharged safety to the downstream channel, and the dam is not damaged.
TYPES OF SPILLWAY BASED ON MOST
PROMINENT FEATURES
 Free overflow spillway
 Overflow spillway
 Side channel spillway
 Open channel spillway
 Tunnel spillway
 Shaft spillway
 Siphon spillway
FREE OVERFLOW SPILLWAY
 A free overflow spillway is a type of spillway in which the control structure
consists of a low- height, narrow crested weir and less vertical.
 The overflowing water may discharge as a free jet clearly away from the d/s
face crest of the spillway.
 If no artificial protection is
provided on the down
stream side of the overflow
section.
Overflow spillway:-
 An overflow spillway is the most commonly used spillway. It is widely used
with gravity dams, arch dams and buttress dams.
 An overflow spillway is an improvement upon the free overflow spillway.
 The profile of the spillway is ‘ogee’ or ‘s’. The overflowing water is guided
smoothly over the crest and profile of the spillway so that overflow
water does not break
contact with the spillway
surface.
SIDE CHANNEL SPILLWAY
 A side channel spillway is the one in which the flow, after passing over a
weir, is carried away by the channel running essentially parallel to the
crest.
 The side channel spillway is usually constructed in a narrow canyon where
sufficient space is not available for an overflow spillway.
 Side channel spillway is also the best choice where a long overflow crest is
desired in order to limit
the surcharge head and
the abutment are steep.
OPEN CHANNEL SPILLWAY
 Open channel spillway is provided in the following situation :
(a) when it is not possible to provide overflow spillway.
(b) when valley is narrow.
(c) when separate site for spillway is not available.
 Generally this type of spillway is provided on earth or rock fill dam, and is
isolated from the main dam.
 The open channel is sometimes of constant width , but usually narrowed for
economy.
TUNNEL SPILLWAY
 A tunnel spillway is the one in which a closed channel is used to
convey the discharge around or near a dam.
 The control structure for this spillway may be in the form of an
overflow crest, vertical or inclined orifice entrance and side channel
crest.
 The tunnel is designed to flow partly full and it is not allowed to flow
full because siphonic action may develop due to negative pessure being
developed in the tunnel.
SHAFT SPILLWAY
 Shaft spillway is the one which has horizontally positioned lip through
which water enters and then drops through a vertical shaft and then to a
horizontal tunnel which convey water past the dam.
 A shaft spillway consists of three main elements :
(a) overflow control weir
(b) vertical control
(c) closed discharge channel
 The vertical shaft of large structures Is usually made of reinforced concrete
and the horizontal tunnel is tunnelled in rock.
 There are two general types of shaft spillway :
(a) standard crest type
(b) flat crest type
THANK YOU

More Related Content

What's hot

Cve471 lecture notes 4 spillways
Cve471 lecture notes 4   spillwaysCve471 lecture notes 4   spillways
Cve471 lecture notes 4 spillways
saibabu48
 
Types of spillways
Types of spillwaysTypes of spillways
Types of spillways
saibabu48
 

What's hot (20)

Canal Regulation & Cross Drainage Works
Canal Regulation & Cross Drainage WorksCanal Regulation & Cross Drainage Works
Canal Regulation & Cross Drainage Works
 
Spillways
SpillwaysSpillways
Spillways
 
Embankment lecture 1
Embankment lecture 1Embankment lecture 1
Embankment lecture 1
 
Weir and barrage lecture
Weir and barrage lectureWeir and barrage lecture
Weir and barrage lecture
 
Dams and spillways
Dams and spillwaysDams and spillways
Dams and spillways
 
Design of Hydraulic Structures
Design of Hydraulic StructuresDesign of Hydraulic Structures
Design of Hydraulic Structures
 
hydro power energy water conveyance system
hydro power energy water conveyance system   hydro power energy water conveyance system
hydro power energy water conveyance system
 
Spillways components and types
Spillways components and typesSpillways components and types
Spillways components and types
 
Canal MASONRY WORK
Canal MASONRY WORKCanal MASONRY WORK
Canal MASONRY WORK
 
types of canals
types of canals types of canals
types of canals
 
Canal regulation works. m4pptx
Canal regulation works. m4pptxCanal regulation works. m4pptx
Canal regulation works. m4pptx
 
Dams
DamsDams
Dams
 
Spillways
SpillwaysSpillways
Spillways
 
Classification of dams
Classification of damsClassification of dams
Classification of dams
 
Cve471 lecture notes 4 spillways
Cve471 lecture notes 4   spillwaysCve471 lecture notes 4   spillways
Cve471 lecture notes 4 spillways
 
Types of spillways
Types of spillwaysTypes of spillways
Types of spillways
 
Canal outlets and modules
Canal outlets and modulesCanal outlets and modules
Canal outlets and modules
 
Design of Hydraulic Structures
Design of Hydraulic StructuresDesign of Hydraulic Structures
Design of Hydraulic Structures
 
Canal outlets
Canal outletsCanal outlets
Canal outlets
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworks
 

Similar to TYPES OF SPILLWAYS & PROMINENT FEATURES

4 Spillway, Sluices and crest gates and how to construct it
4 Spillway, Sluices and crest gates and how to construct it4 Spillway, Sluices and crest gates and how to construct it
4 Spillway, Sluices and crest gates and how to construct it
mv689093
 

Similar to TYPES OF SPILLWAYS & PROMINENT FEATURES (20)

Spillways & energy dissipator
Spillways & energy dissipatorSpillways & energy dissipator
Spillways & energy dissipator
 
Spillways2000 101110063804-phpapp02 - copy
Spillways2000 101110063804-phpapp02 - copySpillways2000 101110063804-phpapp02 - copy
Spillways2000 101110063804-phpapp02 - copy
 
Spillways
SpillwaysSpillways
Spillways
 
unit-3.pdf
unit-3.pdfunit-3.pdf
unit-3.pdf
 
SPILLWAYS.pdf
SPILLWAYS.pdfSPILLWAYS.pdf
SPILLWAYS.pdf
 
Spillways
SpillwaysSpillways
Spillways
 
SPILLWAYS
SPILLWAYSSPILLWAYS
SPILLWAYS
 
4 Spillway, Sluices and crest gates and how to construct it
4 Spillway, Sluices and crest gates and how to construct it4 Spillway, Sluices and crest gates and how to construct it
4 Spillway, Sluices and crest gates and how to construct it
 
seminar presentation report on spillway
 seminar presentation report on spillway seminar presentation report on spillway
seminar presentation report on spillway
 
Canal irrigation
Canal irrigationCanal irrigation
Canal irrigation
 
4. Spillways.ppt
4. Spillways.ppt4. Spillways.ppt
4. Spillways.ppt
 
Spillways and Diversion Headwork's
Spillways and Diversion Headwork'sSpillways and Diversion Headwork's
Spillways and Diversion Headwork's
 
Data preparation error
Data preparation errorData preparation error
Data preparation error
 
Spillways
SpillwaysSpillways
Spillways
 
Module 4.pptx
Module 4.pptxModule 4.pptx
Module 4.pptx
 
Spillway
SpillwaySpillway
Spillway
 
Diversion head work
Diversion head workDiversion head work
Diversion head work
 
Canal Regulation Works
Canal Regulation WorksCanal Regulation Works
Canal Regulation Works
 
Unit 3 spillway
Unit 3 spillwayUnit 3 spillway
Unit 3 spillway
 
Canal structures
Canal structuresCanal structures
Canal structures
 

More from Malay Talaviya

More from Malay Talaviya (11)

Concrete Sleeper
Concrete SleeperConcrete Sleeper
Concrete Sleeper
 
Dragline
DraglineDragline
Dragline
 
Cavity wall
Cavity wall Cavity wall
Cavity wall
 
Dumpy level
Dumpy levelDumpy level
Dumpy level
 
Slump test
Slump testSlump test
Slump test
 
Advanced Type Civil Engineering Structures
Advanced Type  Civil Engineering StructuresAdvanced Type  Civil Engineering Structures
Advanced Type Civil Engineering Structures
 
concepts of TQM(total quality management)
concepts of TQM(total quality management)concepts of TQM(total quality management)
concepts of TQM(total quality management)
 
Project:- SURVEY AND ANALYSIS OF ROAD PAVEMENT FAILURES
Project:- SURVEY AND ANALYSIS OF ROAD PAVEMENT FAILURESProject:- SURVEY AND ANALYSIS OF ROAD PAVEMENT FAILURES
Project:- SURVEY AND ANALYSIS OF ROAD PAVEMENT FAILURES
 
Pavement failures
Pavement failuresPavement failures
Pavement failures
 
Green building
Green buildingGreen building
Green building
 
Green building
Green buildingGreen building
Green building
 

Recently uploaded

VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 

Recently uploaded (20)

VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 

TYPES OF SPILLWAYS & PROMINENT FEATURES

  • 2. SPILLWAYS:-  A spillways is a structure constructed a or near the dam site to dispose of surplus water from the reservoir to the channel downstream.  Spillways are provided for all dams as a safety measure against overtopping and the consequent damages and failure.  A spillways acts as a safety valve for the dam, because as soon as the water level in the reservoir rises above a predetermined level, excess water I discharged safety to the downstream channel, and the dam is not damaged.
  • 3. TYPES OF SPILLWAY BASED ON MOST PROMINENT FEATURES  Free overflow spillway  Overflow spillway  Side channel spillway  Open channel spillway  Tunnel spillway  Shaft spillway  Siphon spillway
  • 4. FREE OVERFLOW SPILLWAY  A free overflow spillway is a type of spillway in which the control structure consists of a low- height, narrow crested weir and less vertical.  The overflowing water may discharge as a free jet clearly away from the d/s face crest of the spillway.  If no artificial protection is provided on the down stream side of the overflow section.
  • 5. Overflow spillway:-  An overflow spillway is the most commonly used spillway. It is widely used with gravity dams, arch dams and buttress dams.  An overflow spillway is an improvement upon the free overflow spillway.  The profile of the spillway is ‘ogee’ or ‘s’. The overflowing water is guided smoothly over the crest and profile of the spillway so that overflow water does not break contact with the spillway surface.
  • 6. SIDE CHANNEL SPILLWAY  A side channel spillway is the one in which the flow, after passing over a weir, is carried away by the channel running essentially parallel to the crest.  The side channel spillway is usually constructed in a narrow canyon where sufficient space is not available for an overflow spillway.  Side channel spillway is also the best choice where a long overflow crest is desired in order to limit the surcharge head and the abutment are steep.
  • 7. OPEN CHANNEL SPILLWAY  Open channel spillway is provided in the following situation : (a) when it is not possible to provide overflow spillway. (b) when valley is narrow. (c) when separate site for spillway is not available.  Generally this type of spillway is provided on earth or rock fill dam, and is isolated from the main dam.  The open channel is sometimes of constant width , but usually narrowed for economy.
  • 8. TUNNEL SPILLWAY  A tunnel spillway is the one in which a closed channel is used to convey the discharge around or near a dam.  The control structure for this spillway may be in the form of an overflow crest, vertical or inclined orifice entrance and side channel crest.  The tunnel is designed to flow partly full and it is not allowed to flow full because siphonic action may develop due to negative pessure being developed in the tunnel.
  • 9.
  • 10. SHAFT SPILLWAY  Shaft spillway is the one which has horizontally positioned lip through which water enters and then drops through a vertical shaft and then to a horizontal tunnel which convey water past the dam.  A shaft spillway consists of three main elements : (a) overflow control weir (b) vertical control (c) closed discharge channel  The vertical shaft of large structures Is usually made of reinforced concrete and the horizontal tunnel is tunnelled in rock.  There are two general types of shaft spillway : (a) standard crest type (b) flat crest type