3. Losses of using ponds..
Environmental effects
Underground water contamination
Methane emission causing global
warming
Waste of fertile land
Bad odor
Few Countries have banned open
lagoons for effluent treatment due to
hazards
Monetary Losses
USD 2 mio Loss (in 10 years)
Sludge oil losses from POME
CARBON CREDIT losses
Diesel consumption
No savings of BIOMASS
Non productive Sludge
Cost Center – No ROI and additional
annual expenses for maintenance of
lagoons
4. ENVIRONMENTAL BENEFITS
• No Under ground water
pollution
• Methane is captured at
higher efficiency and used
for productive use
• Only 80 x 80m required for
60 TPH mill, upto 5 hectares
land is saved
• No Bad odor
• This technology takes care
of any future change of govt
regulations/environment
laws
5. MONETARY ADVANTAGES :
• Profit from electricity sales
• Recovery of sludge oil
• Profit from Carbon Credit
• Profits from sale of BIOMASS
(PKS & Fiber Briquette
Revenue) saved by using
biogas in boiler
• Saving on Diesel cost
• End Sludge available for
fertilizer
6. BIOGAS – A Proven technology
• Successfully completed 5 projects and another
11 palm oil mill effluent treatment projects
under construction
• More than 85 to 90% of BOD and COD Removal
• The final discharge meets the local
environmental standards
24. Project #3
PT. MAI, Poliplant Group, Indonesia
• Capacity 55 Ton / hour
• Volume POME : 726m3 / day
• Parameter POME : COD 65,000 BOD 30,000
• Reactor Volume : 7500m3
• Construction started: Agustus 2012
• Project completion: Juni 2013
28. Other PROJECTS
Lokasi:
West New Britain,
Papua New Guinea
Tahap konstruksi
Barema Ltd, Sipef Group, Papua New Guinea
29. Other PROJECTS
Lokasi:
Dusun Tanjung
Mulia, Sumatera
Utara
Tahap konstruksi
PT UMW, Sipef Group – 60 TPH Mill, Indonesia.
30. Other PROJECTS
Lokasi:
Tanjung Langsat,
Malaysia
Tahap Konstruksi
EVYAP SABUN MALAYSIA SDN BHD (EVYAP Group of Turkey).
Proyek terbesar di dunia Oleochemical.
Greenfield project pada lahan 50 Acre
dengan investasi sebesar USD 350 juta (One Million Ringgit Project)
Volume limbah per hari adalah 1000 MT
Standar Baku Mutu BOD <20 Mg/L & COD <80 Mg/L
31. Other PROJECTS
Lokasi:
Hulu Sungai Selatan,
Kalimantan Timur
Tahap Konstruksi
Astra Agro Lestari Tbk – 60 TPH Mill, Indonesia.
45. BIOGAS
• Biogas from POME to
electricity (sell to PLN/ or
Community)
BIOMASS
BRIQUETTING
• Export
• Additional feedstock for
gasification
BIOMASS GASIFICATION
• Biomass Gasification from
PKS to electricity (sell to
PLN/ or Community)
ELECTRICITY
GENERATION
BIOGAS
GENERATI
NG
BUFFERI
NG
STORAGE
CHOP/
SHRED
DRYING
ELECTRICITY
GENERATION
GASIFI-CATION
HEAT
GENERATIN
G
Proposed Solution
PLN
EKSPOR
Pupuk