The Total Economic Impact™ Of Using
ThoughtWorks’ “Distributed Agile”
Approach
Single Company Analysis — Financial Services
Project Director:
Jon Erickson, Forrester Consulting
The Total Economic Impact of Using ThoughtWorks Agile Development

Executive Summary
In June 2004, ThoughtWorks, Inc. commissioned Forrester Research, Inc. to examine the financial impact and
potential return on investment (ROI) an enterprise might realize by engaging with ThoughtWorks for a software
development project using ThoughtWorks’ Distributed Agile development approach. In order to determine the
impact, Forrester examined the specific costs, cost savings, flexibility, and the risk elements associated with a
financial services organization that engaged with ThoughtWorks in connection with an application development
project. The organization is a leading, US based insurance and financial services organization that provides
annuities, defined contribution plans and life insurance with annual sales of more than $3 billion and roughly
5,000 employees.

Purpose
The purpose of this study is to provide readers with a framework to evaluate the potential financial impact of
engaging with ThoughtWorks for projects using the Distributed Agile development approach within their own
organizations. Forrester’s aim is to clearly show all calculations and assumptions that go into the analysis. This
study should be seen as a guide to better understand and evaluate ThoughtWorks and its Distributed Agile
development methodology to determine whether it is a worthwhile investment.

Methodology
ThoughtWorks selected Forrester for this project because of its expertise in application development practices
and Forrester’s Total Economic Impact™ (TEI) analysis methodology. TEI not only measures costs and cost
reduction (areas that are typically accounted for within IT) but also weighs the enabling value of a technology in
increasing the effectiveness of overall business processes. Forrester’s TEI methodology serves an extremely
useful purpose by providing a complete picture of the total economic impact of purchase decisions. (Please see
Appendix A for additional information on the TEI methodology.)

Approach
Forrester used a four-step approach for this study. First, Forrester interviewed ThoughtWorks marketing and
sales personnel to fully understand its value proposition. Second, using input from existing Forrester research
and knowledge around ThoughtWorks and the Distributed Agile development methodology, Forrester
representatives conducted in-depth interviews with representatives from the insurance organization. Third,
Forrester constructed a financial ROI model representative of the data collected in the interview. Fourth,
Forrester created this study, which examines the estimated ROI and represents the findings derived from the
customer interview and analysis process, as well as Forrester’s independent research.

Key Findings
Table 1 represents a summary of the ROI that the organization projects to achieve resulting from the specific
value of ThoughtWorks and the Distributed Agile development methodology. How these financial metrics are
calculated is explained in subsequent sections.

-2-
FORRESTER CONSULTING

Table 1: Summary Financial Results — Interviewed Organization
Summary financial results
ROI

Unadjusted
(best case)

Risk-adjusted

56%

41%

13 months

15 months

Total three-year costs (NPV)

$956,198

$1,019,945

Total three-year cost savings
(NPV)

$1,488,817

$1,439,190

Payback

Source: Forrester Research, Inc.

The financial metrics contained within Table 1 illustrate the incremental financial returns that are created from
using ThoughtWorks for application development as part of the overall project. The return on investment
calculation is based specifically on the costs of ThoughtWorks’ contribution and the added benefits that are
received from engaging with ThoughtWorks. As part of this analysis, Forrester also examined the different ROI
of the entire project if the organization had not used ThoughtWorks and agile development. The overall return
from the project if the organization had not engaged with ThoughtWorks would have been 4% over three years.
The total ROI of the entire project, with the ThoughtWorks contribution, is 94%.

Disclosures
The reader should be aware of the following disclosures associated with this study:
•

The study is commissioned by ThoughtWorks and delivered by the Forrester Consulting group.

•

ThoughtWorks and the interviewed organization reviewed and provided feedback to Forrester, but
Forrester maintained editorial control over the study and its findings and did not accept changes to the
study that contradict Forrester’s findings or obscures the meaning of the study.

•

The customer name for the interview was provided by ThoughtWorks, Inc.

•

Forrester makes no assumptions as to the potential ROI that other organizations will receive within
their own environment. Forrester strongly advises that the reader use their own estimates within the
framework provided in the study to determine the appropriateness of engaging with ThoughtWorks
around Agile development.

•

This study is not an endorsement by Forrester of ThoughtWorks or Distributed Agile development.

•

The study is not a competitive product analysis.

Brief Description Of ThoughtWorks Agile Development
Methodology
ThoughtWorks has invested heavily in a consistent methodology for software development and project
management, based largely on Agile development techniques. All consultants are trained in the methodology
and share best practices across engagements. ThoughtWorks’ overall goals with this methodology are to reduce
project risk by enabling visibility into the development process and responsiveness to evolving requirements,
and to deliver high-quality software in less time and using fewer resources.

-3-
FORRESTER CONSULTING

Summary Findings
Developing a TEI model involves a multi-step process. First, Forrester interviewed a customer within the US
insurance industry that had used ThoughtWorks and its Distributed Agile development approach on a custom
development project. Data provided by the organization allowed Forrester to project a three-year return of
between a 41% risk adjusted ROI and 56% non risk-adjusted ROI. Forrester used the interview process to
understand the distinct costs and value statements that the organization saw as a result of its engagement.
Forrester then constructed a representative model based on those individual costs and value statements. The
representative model makes up the main body of this study and should be used by readers as a guide when
determining the ROI for their own organizations.
In discussions with the organization, several key drivers of benefits were uncovered:
1. The quality of the ThoughtWorks staff and their ability to handle difficult projects drove efficiency
within the organization, reducing the potential for defects and rework down the road potentially
associated with complex projects.
2.

The use of a Distributed Agile methodology, requiring close communication between IT and business
stakeholders, delivered key business requirements — and thus benefits — sooner. Business users had
control from the start of the project, ensuring that key business requirements would be met. The
organization noted that prioritizing benefits upfront was a key component in seeing the value of
ThoughtWorks’ approach.

3.

The organization was using Distributed Agile development as part of project development. The
organization had previously used offshore development and considered this a necessary component in
maintaining cost efficiencies. In the past, the organization felt that where offshore development was
successful was in cases of large, clearly defined projects with significant management support.

4.

The use of a Distributed Agile development methodology was relatively new. The client hoped that it
could further leverage ThoughtWorks’ experiences on future internal development efforts.

5.

For the organization, the alternative to engaging with ThoughtWorks was to continue leveraging a
global application development consultancy with a local presence. Issues with this firm’s productivity
could increase the potential risk that the project would be delivered with limited functionality, given
that the system had a fixed end date.

6.

The organization was impressed by ThoughtWorks’ willingness to share risks on the project and noted
ThoughtWorks’ readiness to stand behind its commitment to Distributed Agile development
approaches.

Description of Organization
This section illustrates a sample ROI analysis for the organization. This model was created as a result of
discussions with the organization to determine the underlying costs and benefits of engaging with
ThoughtWorks for Distributed Agile development. Data contained within this model is based on information
received from each of the interview participants and represents preliminary interview findings. Since this model
examines just one customer, data and the financial ROI should not be seen as validation of the potential return
that a given organization may achieve from the use of ThoughtWorks. Organizations must use their own data to
determine their own potential return.
The organization had the following characteristics:
•

The organization is a US-based insurance and financial services institution. The organization has a
centrally located IT development and support staff. It currently uses external onshore and offshore
consultants for a part of its application development effort.
-4-
FORRESTER CONSULTING

•

The organization was looking for a way to automate and streamline handling of proposals within
Pension Operations. In addition, there was a need to develop a more efficient system to generate
proposal and legal documents for all businesses that are quick and easy to update. Finally, the system
needed to be able to track a proposal from inception to completion.

•

The original scope of the project was to roll out the application within a nine-month elapsed
timeframe. The original project budget was $1.88 million. The organization saw that it was under
significant time and budgetary constraints given the original project scope. Across the organization’s
project portfolio, this project was seen as more complex than average.

•

The organization had a choice whether to develop the solution in-house using a traditional consultancy
for development support or to have ThoughtWorks take on a comparable amount of the development
work.

•

The organization also saw the engagement with ThoughtWorks as a test of a Distributed Agile
methodology. If successful, components of the Agile methodologies could be applied on subsequent
internally driven application development projects.

•

The project would be measured on a three-year investment life cycle.

Based on these assumptions, it is possible to construct a financial model that examines the costs and benefits of
moving forward with a ThoughtWorks solution.

Costs Of The ThoughtWorks Contribution
The cost of ThoughtWorks consulting fees is a part of the overall cost of the project. Thus, it is necessary to
first describe the specific cost structure around the individual project. For the purpose of this analysis, we make
the following assumptions around the cost of the project and the cost of ThoughtWorks’ contribution:
•

The project has a two-year cost projection of an estimated $1.88 million. This includes the cost of
internal and external staff, training, hardware and software improvements. The cost of the project is
accrued into the first two years, with 88% in the first year and 12% in the second year. As a result, the
total cost allocation in year one is $1.65 million and in year two is $233,000. This includes the costs
attributed to ThoughtWorks’ services.

•

The ThoughtWorks cost component was estimated to be 54% of the overall cost of the project. This
includes the billable cost of ThoughtWorks staff as well as the indirect costs of planning for and
managing of the ThoughtWorks relationship. Table 2 illustrates the ThoughtWorks and nonThoughtWorks cost components of the project. We assume a 10% yearly discount rate on the cost of
capital for the representative organization.

Table 2: Overall Project Cost — ThoughtWorks Versus Internal Project Cost
Year 1

Year 2

Year 3

Total

PV

ThoughtWorks cost

$970,000

$90,000

0

$1,060,000

$956,198

Internal cost

$680,099

$143,408

0

$823,507

$736,791

$1,650,099

$233,408

0

$1,883,507

$1,692,989

Total project cost
Source: Forrester Research, Inc.

For the purpose of this analysis, we assume that the ThoughtWorks cost will be used as a basis for the
investment in the ROI calculation.
-5-
FORRESTER CONSULTING

Benefits And Savings Of Engaging With ThoughtWorks Agile
Development
In speaking with the organization, Forrester discovered several benefits of the use of Distributed Agile
development within their environment. First, ThoughtWorks teams drove efficiency within the customer’s IT
organization by minimizing the potential that unforeseen changes or errors would increase in overall project
cost. In addition, moving critical functionality to the start of the project had the effect of increasing the speed
with which benefits were achieved. This second benefit can potentially impact areas outside of IT since benefits
attributable to the entire organization will be realized sooner.
IT project efficiency was also a benefit. The organization stated that even though its initial impression was that
the ThoughtWorks component would come in at a higher initial cost than existing alternatives (e.g., in-house
development, previously employed consultants), the efficiency created by the ThoughtWorks engagement
resulted in lower overall cost due in part because of less rework after the first release. This was a result of the
quality of the ThoughtWorks employees and the fact that use of their existing knowledge base reduced the
amount of development errors and downstream changes compared to previous development projects. Smaller
increments build on one another, since it is possible to learn from earlier iterations and apply those experiences
to subsequent iterations. This, in turn, increased the productivity of the customer’s development staff, allowing
them to assign fewer internal resources over the life of the project and more time to other initiatives.
For the purpose of this analysis, the organization assumed that one area where reduction in errors ties directly
into the final internal and external costs was around the reduction in subsequent rework. Table 3 provides an
estimate in the reduction in internal effort created by ensuring that the risk of errors or failure has been reduced.
Table 3: ThoughtWorks Contribution To IT Efficiency
Cost to manage
Number of FTEs to support before
Number of FTE to support after
Cost per worker

$ 124,800

Hours per year
2,080

Total yearly cost savings

5
3
Cost per hour
$ 60
$ 249,600

Source: Forrester Research, Inc.

This savings was primarily driven by ThoughtWorks’ ability to simplify the application development process,
reducing the number of Java classes from 179 to 17. Using these savings as a guide, we can estimate the cost
differential between the ThoughtWorks and non-ThoughtWorks solution. Using the sample $1.8 million
engagement (net present value of $1.7 million), as stated above, the cost of a comparatively complex project
would be roughly a net present value of $2.3 million, 37% more expensive than the ThoughtWorks solution.
Table 4 illustrates these savings. For this analysis, it is assumed that the direct cost per hour per resource is less
for the alternative; the fact that the organization would have to devote more resources to the project increases its
overall cost compared to the ThoughtWorks solution.
Table 4: Project Efficiency Savings With ThoughtWorks
Year 1

Year 2

Year 3

Total

PV

Cost with
ThoughtWorks

$1,650,099

$233,408

$0

$1,883,507

$1,692,989

Cost with alternative

$1,929,939

$483,008

$249,600

$2,662,547

$2,341,198

$249,600

$249,600

$249,600

$748,800

$620,718

Savings from
ThoughtWorks
Source: Forrester Research, Inc.

-6-
FORRESTER CONSULTING

Time to benefit also was a positive. In addition to driving IT efficiency, ThoughtWorks’ use of Distributed
Agile development sped up the time to implementation and therefore allowed the organization to realize
business benefits sooner. The organization indicated several factors that led to this benefit. First,
ThoughtWorks’ ability to understand the business needs upfront and help its clients to prioritize specific
functionality allowed key benefits to be realized early. This created further buy-in from the business side and
reduced the risk of scope creep. In addition, ThoughtWorks’ experienced staff was adept at handling complex
development projects, thus reducing the risk that project benefits might not be achieved. The customer also
noted that the ThoughtWorks worked overtime to meet the fixed time requirements of the project. Table 5
illustrates the ramp up time between the project using ThoughtWorks and a project without including
ThoughtWorks.
Table 5: Percent Complete
Date

% complete
with ThoughtWorks

% complete
alternative

3 months

45%

10%

6 months

75%

20%

8 months

100%

50%

12 months

100%

75%

14 months

100%

100%

Source: Forrester Research, Inc.

For the purpose of this analysis, the following steps were used to determine the magnitude of this benefit for the
representative organization. First, it is necessary to understand the amount of benefits created as a result of the
overall project. Table 6 illustrates the percent breakdown of benefits resulting from the overall pension plan
project.
Table 6: Percent Breakdown Of Benefits For Overall Development Project
Benefits of application

ThoughtWorks

Alternative

Manageability

64%

$2,088,956

$1,533,584

End user
improvements

15%

$497,370

$365,139

Standard form
updates

21%

$678,911

$498,415

$3,265,237

$2,397,137

Source: Forrester Research, Inc.

For this analysis, the organization expected to achieve roughly a 94% return on the overall project. So, for
example, if the present value cost of the overall project was estimated to be $1.7 million, the present value
benefits would equate to roughly $3.3 million ((3.3-1.7/1.7 =94%). Table 6 illustrates the cash flow that is
achieved from the overall project.

-7-
FORRESTER CONSULTING

Table 7: Project Cash Flow With ThoughtWorks
With ThoughtWorks

Year 1

Year 2

Year 3

Total

PV

Cost of project

$1,650,099

$233,408

$0

$1,883,507

$1,692,989

Benefits received

$1,313,000

$1,313,000

$1,313,000

$3,939,000

$3,265,237

-$337,099

$1,079,592

$1,313,000

$2,055,493

$1,572,247

Cash flow
Source: Forrester Research, Inc.

We therefore assume that roughly $1.3 million in benefits are realized in each year of analysis.
Conversely, if the representative organization chose not to engage with ThoughtWorks, the time to realize
benefits would be lengthened, therefore reducing the total amount of benefits achieved within the three-year
timeframe and extending the payback for the project.
During the interview process, the organization noted that time to benefit was a key determinant in choosing
ThoughtWorks. For the purpose of this analysis, the organization assumed, based on statements by the
alternative vendor, that the benefits would be delayed six months using an alternative, similar-sized project,
causing the ramp up time to receive benefits to be extended. The cash flow for that project appears in Table 8.
Table 8: Project Cash Flow With Alternative Development Solution
With alternative
Cost of project
Benefits received
Cash flow

Year 1

Year 2

Year 3

Total

PV

$1,899,699

$483,008

$249,600

$2,632,307

$2,313,707

$656,500

$984,750

$1,313,000

$2,954,250

$2,397,137

-$1,243,199

$501,742

$1,063,400

$321,943

$83,430

Source: Forrester Research, Inc.

The decrease in benefits as well as increase in cost from reduction in efficiency causes this project to realize a
minimal return on its investment. Benefits are created, but they are less than in the ThoughtWorks case and
costs are higher due in part to the reduced efficiency as compared to the ThoughtWorks project.
The resulting net present value savings for both IT efficiency and time-to-market savings equate to $1,488,817
over three years, which is the difference in the cash flow between Table 7 and Table 8.

Risks Associated With Estimates Of Costs And Benefits
Risk-adjusted and non risk-adjusted ROI are both discussed in this study. Risk assessments provide a range of
possible outcomes, based on the risks associated with IT projects in general and specific risks relative to moving
toward a new technology solution. In this study, Forrester discovered that engaging with ThoughtWorks was a
relatively low-to-medium risk endeavor, as expressed by the interviewed organizations as compared to similar
past projects that were undertaken without ThoughtWorks assistance.
Risk factors are used in TEI to widen the possible outcomes of the costs and benefits (and resulting savings)
associated with a project. Since the future cannot be accurately predicted, there is risk inherent in any project.
TEI captures risk in the form of risks to benefits and risks to costs.
The following general risks were considered in this study:
-8-
FORRESTER CONSULTING

•

Lack of organizational buy-in to measure and track specific benefits created by engaging with
ThoughtWorks.

•

Lack of sufficiently trained internal staff to interact and meet the requirements of a ThoughtWorksdriven project.

•

Failure to reduce, transfer, or redeploy IT support and business unit headcount made redundant in a
ThoughtWorks-driven project.

•

Changing external market conditions that may decrease time-to-market benefit estimates.

The following risks associated with distributed development projects were considered in this study:
•

There is a risk that costs will be greater than anticipated. Experience indicates that implementing
projects across two or more sites will be a significant risk factor for cost. Large teams add even more
risk.

•

There is a risk that benefits will not be realized as expected due to lack of accurate and/or effective
communication between distributed groups.

If a risk-adjusted ROI still demonstrates a compelling business case, it raises confidence that the investment is
likely to succeed since the risks that threaten the project have been taken into consideration and quantified. The
risk-adjusted numbers should be taken as “realistic” expectations, since they represent the expected value
considering risk. Assuming normal success at mitigating all risk, the risk-adjusted numbers should more closely
reflect the expected outcome of the investment.
Table 9: Summary Financial Risk-Adjusted Results – Interviewed Organization
Summary financial results

Unadjusted
(best case)

ROI
Payback
Total three-year costs (NPV)
Total three-year cost savings (NPV)
Total three-year net savings (NPV)

Risk-adjusted
56%

41%

13 months

15 months

$956,198

$1,019,945

$1,488,817

$1,439,190

$532,619

$419,245

Source: Forrester Research, Inc.

-9-
FORRESTER CONSULTING

Conclusions
This study is meant to provide the reader with a framework in examining the costs and benefits of engaging
with ThoughtWorks using ThoughtWorks Distributed Agile approach. Data derived from an individual
customer interview corroborates Forrester Research findings around the potential for Agile development to
drive cost efficiencies within a given environment. The core tenets of Agile development — short iterative
cycles, empowered teams, constant reprioritization of requirements, and strong business participation — all lead
to increased benefits. Delivering core requirements in shorter timeframes leads to increased financial benefits.
Increasing team efficiency reduces both development and maintenance costs, and frees the development
organization to address other projects. Each of these can be quantified using Forrester’s TEI model.
Not every project is a good fit for Agile or Distributed Agile development, but ThoughtWorks has demonstrated
that applying Agile processes and strong project management can potentially be a benefit to high-risk projects.
Its emphasis on hiring and retaining highly skilled staff is also a key success factor.

- 10 -
FORRESTER CONSULTING

Appendix A: Total Economic Impact™ Primer
Total Economic Impact™ is primarily a common language tool, designed to capture and properly
communicate the value of IT initiatives in a common business language. In so doing, TEI considers four
elements of any initiative:
1.

Benefits

2.

Costs (sometimes referred to as total cost of ownership (TCO))

3.

Flexibility

4.

Risk

The figure below shows the TEI methodology conceptually. Benefits, flexibility, and costs are considered,
through the filter of risk assessment, in determining an expected ROI for any given initiative.

Benefits
Benefits represent the value delivered to the business by the proposed project. Oftentimes, IT project
justification exercises focus on cost (e.g., TCO) and cost reductions. Among industry leaders, IT is
deployed as an offensive weapon, with value expectations greater than simple cost reduction, especially
when those cost reductions tend to focus within IT. TEI captures the value proposition of the proposed
project by measuring the benefits against the incurred costs.
All benefits captured by TEI must be traceable back to one or more critical success factors (CSFs). These
CSFs are directly linked to a higher-level business strategy. If a proposed technology investment generates
benefits that cannot be satisfactorily linked to a CSF, then it will not be included as a benefit for the
organization in the model. In these cases, TEI requires that the benefit be discarded.
Under TEI, benefits may only accrue to the business units. “Benefits” derived through cost reductions
within IT accrue as negative TCO to the IT budget, thereby showing a reduced TCO. (TCO is considered
by TEI to be a single-dimension, cost-centric focus on the IT budget.)
The TEI process begins with a discovery of potential benefit areas. A representative from the organization
under examination who has the ability to capture the benefit in question must validate each benefit captured
during discovery. In other words, values cannot arbitrarily be assigned to a benefit if that person is not in a
position to deliver that benefit should the project be approved.
Additionally, projects that are expected to deliver business value require some effort on the part of the
business to realize that value. That effort may be in the form of training, organizational change or a
modification of existing business processes. Therefore, TEI requires dialog with the business leaders
actually responsible for making the necessary changes, in order to capture the proposed benefit during the
justification phase. TEI captures this dialog in the form of the names of the individuals, which validates the
value calculation of each benefit.
Within TEI, each benefit entered has a specific capture date. Although the benefit may be captured over
time, TEI requires the specification of a date when most of the benefit has been captured. TEI will then
place the value delivered in the appropriate time frame within the project.

Costs
Costs represent the investment necessary to capture the value, or benefits, of the proposed project. IT or the
business units may incur costs. These may be in the form of fully burdened labor, subcontractors or
- 11 -
FORRESTER CONSULTING

materials. Additionally, costs consider all the investment and expenses necessary to deliver the value
proposed.

Flexibility
Flexibility, as defined by TEI, represents investing in additional capacity that can, for some future
additional investment, be turned into business benefit — for instance, an investment in an enterprisewide
upgrade of the desktop word processor application where the primary driver may be standardization (to
increase efficiency) and licensing (to decrease IT costs). However, a collaborative workgroup feature may
translate into greater worker productivity when the organization is ready to absorb the discipline necessary
to capture that benefit. The collaboration feature does not promise benefit during this phase of the project
and must be captured later, incorporating additional investment, most likely in the form of training.
However, the existence of the option has a present value that can be estimated. The flexibility component
of TEI captures that value.

Risk
Risks are used to widen the possible outcomes of the project. Since the future cannot be accurately
predicted, there is risk inherent in any project. TEI captures risk in the form of risks-to-benefits and risksto-costs.
Risks-to-benefits considers all possible risks to each possible benefit. Likewise, risks-to-costs considers all
possible risks to each possible cost. Then, a range is chosen by applying best judgment for each cost and
benefit, based on the set of risks assigned to each cost and benefit. The range is entered in the form of a low
estimate, a most likely value and a high estimate. For example, the risks to a cost may result in a range
from the expected value as the low estimate, to two times the expected value as the high for a particular
cost (representing a potential two times cost overrun).

- 12 -
FORRESTER CONSULTING

Appendix B: Forrester Copyright
© 2004 Forrester Research, Inc. Circulation or disclosure in whole or in part of this study outside the
authorized recipient organization is expressly forbidden without the prior written permission of Forrester
Research, Inc. Forrester, Forrester Oval Program, Forrester Wave, ForrTel, WholeView 2, Technographics,
TechRankings, Total Economic Impact, and TEI are trademarks of Forrester Research, Inc. All other
trademarks are the property of their respective companies. Information is based on best available resources.
Opinions reflect judgment at the time and are subject to change.

- 13 -

More Related Content

What's hot

Leading and Running a BA Practice - European BA Conference
Leading and Running a BA Practice - European BA ConferenceLeading and Running a BA Practice - European BA Conference
Leading and Running a BA Practice - European BA ConferenceIIBA UK Chapter
 
Presentation by shreyas bhargave
Presentation by shreyas bhargavePresentation by shreyas bhargave
Presentation by shreyas bhargavePMI_IREP_TP
 
Process Transformation: Your Questions Answered
Process Transformation: Your Questions AnsweredProcess Transformation: Your Questions Answered
Process Transformation: Your Questions AnsweredDATAMARK
 
Business Analysis Essentials
Business Analysis EssentialsBusiness Analysis Essentials
Business Analysis EssentialsOxfordCambridge
 
Jagadeesh dv abhaydesai
Jagadeesh dv abhaydesaiJagadeesh dv abhaydesai
Jagadeesh dv abhaydesaiPMI2011
 
The Strategic Business Analyst: Aligning Projects with Organizational Goals
The Strategic Business Analyst: Aligning Projects with Organizational GoalsThe Strategic Business Analyst: Aligning Projects with Organizational Goals
The Strategic Business Analyst: Aligning Projects with Organizational GoalsCorporate Education Group (CEG)
 
Project Management: Business Case
Project Management: Business CaseProject Management: Business Case
Project Management: Business CaseYerbol Buranbay
 
Running head kotter’s model 1 kotter’s model 6
Running head kotter’s model 1 kotter’s model 6Running head kotter’s model 1 kotter’s model 6
Running head kotter’s model 1 kotter’s model 6DIPESH30
 
Final chakradhar purohith proposal milieu analysis (without account data un...
Final chakradhar purohith proposal milieu analysis (without account data   un...Final chakradhar purohith proposal milieu analysis (without account data   un...
Final chakradhar purohith proposal milieu analysis (without account data un...PMI2011
 
Lessons learned report
Lessons learned reportLessons learned report
Lessons learned reportMarsha Cooper
 
DIN: Danish Design-driven Innovation
DIN: Danish Design-driven InnovationDIN: Danish Design-driven Innovation
DIN: Danish Design-driven InnovationMarcin Monko
 
Presentation by somdatta banerjee
Presentation by somdatta banerjeePresentation by somdatta banerjee
Presentation by somdatta banerjeePMI_IREP_TP
 
Software Project Methods
Software Project MethodsSoftware Project Methods
Software Project MethodsCraig Brown
 
Vardarajan sethuraman
Vardarajan sethuramanVardarajan sethuraman
Vardarajan sethuramanPMI2011
 
Presentation by subhajit bhattacharya1
Presentation by subhajit bhattacharya1Presentation by subhajit bhattacharya1
Presentation by subhajit bhattacharya1PMI_IREP_TP
 
Babok2 chapter5 final
Babok2 chapter5 finalBabok2 chapter5 final
Babok2 chapter5 finalkalyanakrishnan
 
Situational crime prevention in an essay, explain how situational
Situational crime prevention in an essay, explain how situationalSituational crime prevention in an essay, explain how situational
Situational crime prevention in an essay, explain how situationalmayank272369
 
Enterprise Analysis
Enterprise AnalysisEnterprise Analysis
Enterprise AnalysisRavikanth-BA
 
Emerging Challenges in Learning: Proving the Business Value
Emerging Challenges in Learning: Proving the Business Value Emerging Challenges in Learning: Proving the Business Value
Emerging Challenges in Learning: Proving the Business Value Human Capital Media
 

What's hot (19)

Leading and Running a BA Practice - European BA Conference
Leading and Running a BA Practice - European BA ConferenceLeading and Running a BA Practice - European BA Conference
Leading and Running a BA Practice - European BA Conference
 
Presentation by shreyas bhargave
Presentation by shreyas bhargavePresentation by shreyas bhargave
Presentation by shreyas bhargave
 
Process Transformation: Your Questions Answered
Process Transformation: Your Questions AnsweredProcess Transformation: Your Questions Answered
Process Transformation: Your Questions Answered
 
Business Analysis Essentials
Business Analysis EssentialsBusiness Analysis Essentials
Business Analysis Essentials
 
Jagadeesh dv abhaydesai
Jagadeesh dv abhaydesaiJagadeesh dv abhaydesai
Jagadeesh dv abhaydesai
 
The Strategic Business Analyst: Aligning Projects with Organizational Goals
The Strategic Business Analyst: Aligning Projects with Organizational GoalsThe Strategic Business Analyst: Aligning Projects with Organizational Goals
The Strategic Business Analyst: Aligning Projects with Organizational Goals
 
Project Management: Business Case
Project Management: Business CaseProject Management: Business Case
Project Management: Business Case
 
Running head kotter’s model 1 kotter’s model 6
Running head kotter’s model 1 kotter’s model 6Running head kotter’s model 1 kotter’s model 6
Running head kotter’s model 1 kotter’s model 6
 
Final chakradhar purohith proposal milieu analysis (without account data un...
Final chakradhar purohith proposal milieu analysis (without account data   un...Final chakradhar purohith proposal milieu analysis (without account data   un...
Final chakradhar purohith proposal milieu analysis (without account data un...
 
Lessons learned report
Lessons learned reportLessons learned report
Lessons learned report
 
DIN: Danish Design-driven Innovation
DIN: Danish Design-driven InnovationDIN: Danish Design-driven Innovation
DIN: Danish Design-driven Innovation
 
Presentation by somdatta banerjee
Presentation by somdatta banerjeePresentation by somdatta banerjee
Presentation by somdatta banerjee
 
Software Project Methods
Software Project MethodsSoftware Project Methods
Software Project Methods
 
Vardarajan sethuraman
Vardarajan sethuramanVardarajan sethuraman
Vardarajan sethuraman
 
Presentation by subhajit bhattacharya1
Presentation by subhajit bhattacharya1Presentation by subhajit bhattacharya1
Presentation by subhajit bhattacharya1
 
Babok2 chapter5 final
Babok2 chapter5 finalBabok2 chapter5 final
Babok2 chapter5 final
 
Situational crime prevention in an essay, explain how situational
Situational crime prevention in an essay, explain how situationalSituational crime prevention in an essay, explain how situational
Situational crime prevention in an essay, explain how situational
 
Enterprise Analysis
Enterprise AnalysisEnterprise Analysis
Enterprise Analysis
 
Emerging Challenges in Learning: Proving the Business Value
Emerging Challenges in Learning: Proving the Business Value Emerging Challenges in Learning: Proving the Business Value
Emerging Challenges in Learning: Proving the Business Value
 

Viewers also liked

The Total Economic Impact of Using ThoughtWorks' Agile Development Approach
The Total Economic Impact of Using ThoughtWorks' Agile Development ApproachThe Total Economic Impact of Using ThoughtWorks' Agile Development Approach
The Total Economic Impact of Using ThoughtWorks' Agile Development ApproachThoughtworks
 
The Total Economic Impact Of Using ThoughtWorks’ “Distributed Agile” Approach
The Total Economic Impact Of Using ThoughtWorks’ “Distributed Agile” ApproachThe Total Economic Impact Of Using ThoughtWorks’ “Distributed Agile” Approach
The Total Economic Impact Of Using ThoughtWorks’ “Distributed Agile” ApproachThoughtworks
 
Predictive Analytics in Software Testing
Predictive Analytics in Software TestingPredictive Analytics in Software Testing
Predictive Analytics in Software TestingPavan Kumar Kodedela
 
Artificial intelligence in qa
Artificial intelligence in qaArtificial intelligence in qa
Artificial intelligence in qaTaras Lytvyn
 
Machine learning in software testing
Machine learning in software testingMachine learning in software testing
Machine learning in software testingThoughtworks
 
Financial Services Executive Lunch: Finding The Missing Millennials
Financial Services Executive Lunch: Finding The Missing MillennialsFinancial Services Executive Lunch: Finding The Missing Millennials
Financial Services Executive Lunch: Finding The Missing MillennialsThoughtworks
 
Data Strategy - Enabling the Data-Guided Enterprise
Data Strategy - Enabling the Data-Guided EnterpriseData Strategy - Enabling the Data-Guided Enterprise
Data Strategy - Enabling the Data-Guided EnterpriseThoughtworks
 
Olhares Diversos, Oportunidades Iguais | ThoughtWorks na HSM
Olhares Diversos, Oportunidades Iguais | ThoughtWorks na HSMOlhares Diversos, Oportunidades Iguais | ThoughtWorks na HSM
Olhares Diversos, Oportunidades Iguais | ThoughtWorks na HSMThoughtworks
 
7 Dimensions of Agile Analytics by Ken Collier
7 Dimensions of Agile Analytics by Ken Collier 7 Dimensions of Agile Analytics by Ken Collier
7 Dimensions of Agile Analytics by Ken Collier Thoughtworks
 
Automated testing of software applications using machine learning edited
Automated testing of software applications using machine learning   editedAutomated testing of software applications using machine learning   edited
Automated testing of software applications using machine learning editedMilind Kelkar
 

Viewers also liked (10)

The Total Economic Impact of Using ThoughtWorks' Agile Development Approach
The Total Economic Impact of Using ThoughtWorks' Agile Development ApproachThe Total Economic Impact of Using ThoughtWorks' Agile Development Approach
The Total Economic Impact of Using ThoughtWorks' Agile Development Approach
 
The Total Economic Impact Of Using ThoughtWorks’ “Distributed Agile” Approach
The Total Economic Impact Of Using ThoughtWorks’ “Distributed Agile” ApproachThe Total Economic Impact Of Using ThoughtWorks’ “Distributed Agile” Approach
The Total Economic Impact Of Using ThoughtWorks’ “Distributed Agile” Approach
 
Predictive Analytics in Software Testing
Predictive Analytics in Software TestingPredictive Analytics in Software Testing
Predictive Analytics in Software Testing
 
Artificial intelligence in qa
Artificial intelligence in qaArtificial intelligence in qa
Artificial intelligence in qa
 
Machine learning in software testing
Machine learning in software testingMachine learning in software testing
Machine learning in software testing
 
Financial Services Executive Lunch: Finding The Missing Millennials
Financial Services Executive Lunch: Finding The Missing MillennialsFinancial Services Executive Lunch: Finding The Missing Millennials
Financial Services Executive Lunch: Finding The Missing Millennials
 
Data Strategy - Enabling the Data-Guided Enterprise
Data Strategy - Enabling the Data-Guided EnterpriseData Strategy - Enabling the Data-Guided Enterprise
Data Strategy - Enabling the Data-Guided Enterprise
 
Olhares Diversos, Oportunidades Iguais | ThoughtWorks na HSM
Olhares Diversos, Oportunidades Iguais | ThoughtWorks na HSMOlhares Diversos, Oportunidades Iguais | ThoughtWorks na HSM
Olhares Diversos, Oportunidades Iguais | ThoughtWorks na HSM
 
7 Dimensions of Agile Analytics by Ken Collier
7 Dimensions of Agile Analytics by Ken Collier 7 Dimensions of Agile Analytics by Ken Collier
7 Dimensions of Agile Analytics by Ken Collier
 
Automated testing of software applications using machine learning edited
Automated testing of software applications using machine learning   editedAutomated testing of software applications using machine learning   edited
Automated testing of software applications using machine learning edited
 

Similar to Total Economic Impact of ThoughtWorks Distributed Agile Approach

The Total Economic Impact Of An Innovation Program Driven by Spigit
The Total Economic Impact Of An Innovation Program Driven by SpigitThe Total Economic Impact Of An Innovation Program Driven by Spigit
The Total Economic Impact Of An Innovation Program Driven by SpigitAJ Kennedy
 
Universal Association Proposal
Universal Association ProposalUniversal Association Proposal
Universal Association ProposalCheryl Litwinczuk
 
Improve business practice
Improve business practiceImprove business practice
Improve business practiceJaleto Sunkemo
 
Ideal partnership strategies
Ideal partnership strategiesIdeal partnership strategies
Ideal partnership strategiesAnkit Kumar
 
Strategic Plan, Part 2 Internal Environmental Analysis Grading .docx
Strategic Plan, Part 2 Internal Environmental Analysis Grading .docxStrategic Plan, Part 2 Internal Environmental Analysis Grading .docx
Strategic Plan, Part 2 Internal Environmental Analysis Grading .docxflorriezhamphrey3065
 
02StrategicPlanning.ppt
02StrategicPlanning.ppt02StrategicPlanning.ppt
02StrategicPlanning.pptailinedonaire
 
Strategic Thinking For PM
Strategic Thinking For PMStrategic Thinking For PM
Strategic Thinking For PMArabella Jones
 
Communication Audit
Communication AuditCommunication Audit
Communication AuditSherwin Manual
 
Page 1 of 2 Capstone Experience in Integration & Strategy .docx
Page 1 of 2 Capstone Experience in Integration & Strategy  .docxPage 1 of 2 Capstone Experience in Integration & Strategy  .docx
Page 1 of 2 Capstone Experience in Integration & Strategy .docxalfred4lewis58146
 
Vodafone Business Performance Measures
Vodafone  Business Performance MeasuresVodafone  Business Performance Measures
Vodafone Business Performance MeasuresToru Sekiguchi
 
Lean Six Sigma Course Training Part 13
Lean Six Sigma Course Training Part 13Lean Six Sigma Course Training Part 13
Lean Six Sigma Course Training Part 13Lean Insight
 
L6 m2 lo3_transcript
L6 m2 lo3_transcriptL6 m2 lo3_transcript
L6 m2 lo3_transcriptBella Akora
 
Running head IMPROVEMENT OPPORTUNITY .docx
Running head IMPROVEMENT OPPORTUNITY                             .docxRunning head IMPROVEMENT OPPORTUNITY                             .docx
Running head IMPROVEMENT OPPORTUNITY .docxwlynn1
 
Scott droney - strategic planning and strategic management
Scott droney -  strategic planning and strategic managementScott droney -  strategic planning and strategic management
Scott droney - strategic planning and strategic managementScott Droney
 
Week 1 Welcome to Business IT/Systems
Week 1 Welcome to Business IT/SystemsWeek 1 Welcome to Business IT/Systems
Week 1 Welcome to Business IT/SystemsJLuker
 
stategic.pptx
stategic.pptxstategic.pptx
stategic.pptxDevarajuBn
 

Similar to Total Economic Impact of ThoughtWorks Distributed Agile Approach (20)

The Total Economic Impact Of An Innovation Program Driven by Spigit
The Total Economic Impact Of An Innovation Program Driven by SpigitThe Total Economic Impact Of An Innovation Program Driven by Spigit
The Total Economic Impact Of An Innovation Program Driven by Spigit
 
Universal Association Proposal
Universal Association ProposalUniversal Association Proposal
Universal Association Proposal
 
Improve business practice
Improve business practiceImprove business practice
Improve business practice
 
Ideal partnership strategies
Ideal partnership strategiesIdeal partnership strategies
Ideal partnership strategies
 
Strategic Plan, Part 2 Internal Environmental Analysis Grading .docx
Strategic Plan, Part 2 Internal Environmental Analysis Grading .docxStrategic Plan, Part 2 Internal Environmental Analysis Grading .docx
Strategic Plan, Part 2 Internal Environmental Analysis Grading .docx
 
PDSA Cycle
PDSA CyclePDSA Cycle
PDSA Cycle
 
Balanced_Scorecard.ppt
Balanced_Scorecard.pptBalanced_Scorecard.ppt
Balanced_Scorecard.ppt
 
02StrategicPlanning.ppt
02StrategicPlanning.ppt02StrategicPlanning.ppt
02StrategicPlanning.ppt
 
UNIT-2.pptx
UNIT-2.pptxUNIT-2.pptx
UNIT-2.pptx
 
Strategic Thinking For PM
Strategic Thinking For PMStrategic Thinking For PM
Strategic Thinking For PM
 
Communication Audit
Communication AuditCommunication Audit
Communication Audit
 
Chap04
Chap04Chap04
Chap04
 
Page 1 of 2 Capstone Experience in Integration & Strategy .docx
Page 1 of 2 Capstone Experience in Integration & Strategy  .docxPage 1 of 2 Capstone Experience in Integration & Strategy  .docx
Page 1 of 2 Capstone Experience in Integration & Strategy .docx
 
Vodafone Business Performance Measures
Vodafone  Business Performance MeasuresVodafone  Business Performance Measures
Vodafone Business Performance Measures
 
Lean Six Sigma Course Training Part 13
Lean Six Sigma Course Training Part 13Lean Six Sigma Course Training Part 13
Lean Six Sigma Course Training Part 13
 
L6 m2 lo3_transcript
L6 m2 lo3_transcriptL6 m2 lo3_transcript
L6 m2 lo3_transcript
 
Running head IMPROVEMENT OPPORTUNITY .docx
Running head IMPROVEMENT OPPORTUNITY                             .docxRunning head IMPROVEMENT OPPORTUNITY                             .docx
Running head IMPROVEMENT OPPORTUNITY .docx
 
Scott droney - strategic planning and strategic management
Scott droney -  strategic planning and strategic managementScott droney -  strategic planning and strategic management
Scott droney - strategic planning and strategic management
 
Week 1 Welcome to Business IT/Systems
Week 1 Welcome to Business IT/SystemsWeek 1 Welcome to Business IT/Systems
Week 1 Welcome to Business IT/Systems
 
stategic.pptx
stategic.pptxstategic.pptx
stategic.pptx
 

More from Thoughtworks

Design System as a Product
Design System as a ProductDesign System as a Product
Design System as a ProductThoughtworks
 
Designers, Developers & Dogs
Designers, Developers & DogsDesigners, Developers & Dogs
Designers, Developers & DogsThoughtworks
 
Cloud-first for fast innovation
Cloud-first for fast innovationCloud-first for fast innovation
Cloud-first for fast innovationThoughtworks
 
More impact with flexible teams
More impact with flexible teamsMore impact with flexible teams
More impact with flexible teamsThoughtworks
 
Culture of Innovation
Culture of InnovationCulture of Innovation
Culture of InnovationThoughtworks
 
Dual-Track Agile
Dual-Track AgileDual-Track Agile
Dual-Track AgileThoughtworks
 
Developer Experience
Developer ExperienceDeveloper Experience
Developer ExperienceThoughtworks
 
When we design together
When we design togetherWhen we design together
When we design togetherThoughtworks
 
Hardware is hard(er)
Hardware is hard(er)Hardware is hard(er)
Hardware is hard(er)Thoughtworks
 
Customer-centric innovation enabled by cloud
 Customer-centric innovation enabled by cloud Customer-centric innovation enabled by cloud
Customer-centric innovation enabled by cloudThoughtworks
 
Amazon's Culture of Innovation
Amazon's Culture of InnovationAmazon's Culture of Innovation
Amazon's Culture of InnovationThoughtworks
 
When in doubt, go live
When in doubt, go liveWhen in doubt, go live
When in doubt, go liveThoughtworks
 
Don't cross the Rubicon
Don't cross the RubiconDon't cross the Rubicon
Don't cross the RubiconThoughtworks
 
Error handling
Error handlingError handling
Error handlingThoughtworks
 
Your test coverage is a lie!
Your test coverage is a lie!Your test coverage is a lie!
Your test coverage is a lie!Thoughtworks
 
Docker container security
Docker container securityDocker container security
Docker container securityThoughtworks
 
Redefining the unit
Redefining the unitRedefining the unit
Redefining the unitThoughtworks
 
Technology Radar Webinar UK - Vol. 22
Technology Radar Webinar UK - Vol. 22Technology Radar Webinar UK - Vol. 22
Technology Radar Webinar UK - Vol. 22Thoughtworks
 
A Tribute to Turing
A Tribute to TuringA Tribute to Turing
A Tribute to TuringThoughtworks
 
Rsa maths worked out
Rsa maths worked outRsa maths worked out
Rsa maths worked outThoughtworks
 

More from Thoughtworks (20)

Design System as a Product
Design System as a ProductDesign System as a Product
Design System as a Product
 
Designers, Developers & Dogs
Designers, Developers & DogsDesigners, Developers & Dogs
Designers, Developers & Dogs
 
Cloud-first for fast innovation
Cloud-first for fast innovationCloud-first for fast innovation
Cloud-first for fast innovation
 
More impact with flexible teams
More impact with flexible teamsMore impact with flexible teams
More impact with flexible teams
 
Culture of Innovation
Culture of InnovationCulture of Innovation
Culture of Innovation
 
Dual-Track Agile
Dual-Track AgileDual-Track Agile
Dual-Track Agile
 
Developer Experience
Developer ExperienceDeveloper Experience
Developer Experience
 
When we design together
When we design togetherWhen we design together
When we design together
 
Hardware is hard(er)
Hardware is hard(er)Hardware is hard(er)
Hardware is hard(er)
 
Customer-centric innovation enabled by cloud
 Customer-centric innovation enabled by cloud Customer-centric innovation enabled by cloud
Customer-centric innovation enabled by cloud
 
Amazon's Culture of Innovation
Amazon's Culture of InnovationAmazon's Culture of Innovation
Amazon's Culture of Innovation
 
When in doubt, go live
When in doubt, go liveWhen in doubt, go live
When in doubt, go live
 
Don't cross the Rubicon
Don't cross the RubiconDon't cross the Rubicon
Don't cross the Rubicon
 
Error handling
Error handlingError handling
Error handling
 
Your test coverage is a lie!
Your test coverage is a lie!Your test coverage is a lie!
Your test coverage is a lie!
 
Docker container security
Docker container securityDocker container security
Docker container security
 
Redefining the unit
Redefining the unitRedefining the unit
Redefining the unit
 
Technology Radar Webinar UK - Vol. 22
Technology Radar Webinar UK - Vol. 22Technology Radar Webinar UK - Vol. 22
Technology Radar Webinar UK - Vol. 22
 
A Tribute to Turing
A Tribute to TuringA Tribute to Turing
A Tribute to Turing
 
Rsa maths worked out
Rsa maths worked outRsa maths worked out
Rsa maths worked out
 

Recently uploaded

Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Call Girls Jp Nagar Just Call đź‘— 7737669865 đź‘— Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call đź‘— 7737669865 đź‘— Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call đź‘— 7737669865 đź‘— Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call đź‘— 7737669865 đź‘— Top Class Call Girl Service Bang...amitlee9823
 
Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 

Recently uploaded (20)

Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Call Girls Jp Nagar Just Call đź‘— 7737669865 đź‘— Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call đź‘— 7737669865 đź‘— Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call đź‘— 7737669865 đź‘— Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call đź‘— 7737669865 đź‘— Top Class Call Girl Service Bang...
 
Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 

Total Economic Impact of ThoughtWorks Distributed Agile Approach

  • 1. Prepared for ThoughtWorks, Inc. July 27, 2004 The Total Economic Impact™ Of Using ThoughtWorks’ “Distributed Agile” Approach Single Company Analysis — Financial Services Project Director: Jon Erickson, Forrester Consulting
  • 2. The Total Economic Impact of Using ThoughtWorks Agile Development Executive Summary In June 2004, ThoughtWorks, Inc. commissioned Forrester Research, Inc. to examine the financial impact and potential return on investment (ROI) an enterprise might realize by engaging with ThoughtWorks for a software development project using ThoughtWorks’ Distributed Agile development approach. In order to determine the impact, Forrester examined the specific costs, cost savings, flexibility, and the risk elements associated with a financial services organization that engaged with ThoughtWorks in connection with an application development project. The organization is a leading, US based insurance and financial services organization that provides annuities, defined contribution plans and life insurance with annual sales of more than $3 billion and roughly 5,000 employees. Purpose The purpose of this study is to provide readers with a framework to evaluate the potential financial impact of engaging with ThoughtWorks for projects using the Distributed Agile development approach within their own organizations. Forrester’s aim is to clearly show all calculations and assumptions that go into the analysis. This study should be seen as a guide to better understand and evaluate ThoughtWorks and its Distributed Agile development methodology to determine whether it is a worthwhile investment. Methodology ThoughtWorks selected Forrester for this project because of its expertise in application development practices and Forrester’s Total Economic Impact™ (TEI) analysis methodology. TEI not only measures costs and cost reduction (areas that are typically accounted for within IT) but also weighs the enabling value of a technology in increasing the effectiveness of overall business processes. Forrester’s TEI methodology serves an extremely useful purpose by providing a complete picture of the total economic impact of purchase decisions. (Please see Appendix A for additional information on the TEI methodology.) Approach Forrester used a four-step approach for this study. First, Forrester interviewed ThoughtWorks marketing and sales personnel to fully understand its value proposition. Second, using input from existing Forrester research and knowledge around ThoughtWorks and the Distributed Agile development methodology, Forrester representatives conducted in-depth interviews with representatives from the insurance organization. Third, Forrester constructed a financial ROI model representative of the data collected in the interview. Fourth, Forrester created this study, which examines the estimated ROI and represents the findings derived from the customer interview and analysis process, as well as Forrester’s independent research. Key Findings Table 1 represents a summary of the ROI that the organization projects to achieve resulting from the specific value of ThoughtWorks and the Distributed Agile development methodology. How these financial metrics are calculated is explained in subsequent sections. -2-
  • 3. FORRESTER CONSULTING Table 1: Summary Financial Results — Interviewed Organization Summary financial results ROI Unadjusted (best case) Risk-adjusted 56% 41% 13 months 15 months Total three-year costs (NPV) $956,198 $1,019,945 Total three-year cost savings (NPV) $1,488,817 $1,439,190 Payback Source: Forrester Research, Inc. The financial metrics contained within Table 1 illustrate the incremental financial returns that are created from using ThoughtWorks for application development as part of the overall project. The return on investment calculation is based specifically on the costs of ThoughtWorks’ contribution and the added benefits that are received from engaging with ThoughtWorks. As part of this analysis, Forrester also examined the different ROI of the entire project if the organization had not used ThoughtWorks and agile development. The overall return from the project if the organization had not engaged with ThoughtWorks would have been 4% over three years. The total ROI of the entire project, with the ThoughtWorks contribution, is 94%. Disclosures The reader should be aware of the following disclosures associated with this study: • The study is commissioned by ThoughtWorks and delivered by the Forrester Consulting group. • ThoughtWorks and the interviewed organization reviewed and provided feedback to Forrester, but Forrester maintained editorial control over the study and its findings and did not accept changes to the study that contradict Forrester’s findings or obscures the meaning of the study. • The customer name for the interview was provided by ThoughtWorks, Inc. • Forrester makes no assumptions as to the potential ROI that other organizations will receive within their own environment. Forrester strongly advises that the reader use their own estimates within the framework provided in the study to determine the appropriateness of engaging with ThoughtWorks around Agile development. • This study is not an endorsement by Forrester of ThoughtWorks or Distributed Agile development. • The study is not a competitive product analysis. Brief Description Of ThoughtWorks Agile Development Methodology ThoughtWorks has invested heavily in a consistent methodology for software development and project management, based largely on Agile development techniques. All consultants are trained in the methodology and share best practices across engagements. ThoughtWorks’ overall goals with this methodology are to reduce project risk by enabling visibility into the development process and responsiveness to evolving requirements, and to deliver high-quality software in less time and using fewer resources. -3-
  • 4. FORRESTER CONSULTING Summary Findings Developing a TEI model involves a multi-step process. First, Forrester interviewed a customer within the US insurance industry that had used ThoughtWorks and its Distributed Agile development approach on a custom development project. Data provided by the organization allowed Forrester to project a three-year return of between a 41% risk adjusted ROI and 56% non risk-adjusted ROI. Forrester used the interview process to understand the distinct costs and value statements that the organization saw as a result of its engagement. Forrester then constructed a representative model based on those individual costs and value statements. The representative model makes up the main body of this study and should be used by readers as a guide when determining the ROI for their own organizations. In discussions with the organization, several key drivers of benefits were uncovered: 1. The quality of the ThoughtWorks staff and their ability to handle difficult projects drove efficiency within the organization, reducing the potential for defects and rework down the road potentially associated with complex projects. 2. The use of a Distributed Agile methodology, requiring close communication between IT and business stakeholders, delivered key business requirements — and thus benefits — sooner. Business users had control from the start of the project, ensuring that key business requirements would be met. The organization noted that prioritizing benefits upfront was a key component in seeing the value of ThoughtWorks’ approach. 3. The organization was using Distributed Agile development as part of project development. The organization had previously used offshore development and considered this a necessary component in maintaining cost efficiencies. In the past, the organization felt that where offshore development was successful was in cases of large, clearly defined projects with significant management support. 4. The use of a Distributed Agile development methodology was relatively new. The client hoped that it could further leverage ThoughtWorks’ experiences on future internal development efforts. 5. For the organization, the alternative to engaging with ThoughtWorks was to continue leveraging a global application development consultancy with a local presence. Issues with this firm’s productivity could increase the potential risk that the project would be delivered with limited functionality, given that the system had a fixed end date. 6. The organization was impressed by ThoughtWorks’ willingness to share risks on the project and noted ThoughtWorks’ readiness to stand behind its commitment to Distributed Agile development approaches. Description of Organization This section illustrates a sample ROI analysis for the organization. This model was created as a result of discussions with the organization to determine the underlying costs and benefits of engaging with ThoughtWorks for Distributed Agile development. Data contained within this model is based on information received from each of the interview participants and represents preliminary interview findings. Since this model examines just one customer, data and the financial ROI should not be seen as validation of the potential return that a given organization may achieve from the use of ThoughtWorks. Organizations must use their own data to determine their own potential return. The organization had the following characteristics: • The organization is a US-based insurance and financial services institution. The organization has a centrally located IT development and support staff. It currently uses external onshore and offshore consultants for a part of its application development effort. -4-
  • 5. FORRESTER CONSULTING • The organization was looking for a way to automate and streamline handling of proposals within Pension Operations. In addition, there was a need to develop a more efficient system to generate proposal and legal documents for all businesses that are quick and easy to update. Finally, the system needed to be able to track a proposal from inception to completion. • The original scope of the project was to roll out the application within a nine-month elapsed timeframe. The original project budget was $1.88 million. The organization saw that it was under significant time and budgetary constraints given the original project scope. Across the organization’s project portfolio, this project was seen as more complex than average. • The organization had a choice whether to develop the solution in-house using a traditional consultancy for development support or to have ThoughtWorks take on a comparable amount of the development work. • The organization also saw the engagement with ThoughtWorks as a test of a Distributed Agile methodology. If successful, components of the Agile methodologies could be applied on subsequent internally driven application development projects. • The project would be measured on a three-year investment life cycle. Based on these assumptions, it is possible to construct a financial model that examines the costs and benefits of moving forward with a ThoughtWorks solution. Costs Of The ThoughtWorks Contribution The cost of ThoughtWorks consulting fees is a part of the overall cost of the project. Thus, it is necessary to first describe the specific cost structure around the individual project. For the purpose of this analysis, we make the following assumptions around the cost of the project and the cost of ThoughtWorks’ contribution: • The project has a two-year cost projection of an estimated $1.88 million. This includes the cost of internal and external staff, training, hardware and software improvements. The cost of the project is accrued into the first two years, with 88% in the first year and 12% in the second year. As a result, the total cost allocation in year one is $1.65 million and in year two is $233,000. This includes the costs attributed to ThoughtWorks’ services. • The ThoughtWorks cost component was estimated to be 54% of the overall cost of the project. This includes the billable cost of ThoughtWorks staff as well as the indirect costs of planning for and managing of the ThoughtWorks relationship. Table 2 illustrates the ThoughtWorks and nonThoughtWorks cost components of the project. We assume a 10% yearly discount rate on the cost of capital for the representative organization. Table 2: Overall Project Cost — ThoughtWorks Versus Internal Project Cost Year 1 Year 2 Year 3 Total PV ThoughtWorks cost $970,000 $90,000 0 $1,060,000 $956,198 Internal cost $680,099 $143,408 0 $823,507 $736,791 $1,650,099 $233,408 0 $1,883,507 $1,692,989 Total project cost Source: Forrester Research, Inc. For the purpose of this analysis, we assume that the ThoughtWorks cost will be used as a basis for the investment in the ROI calculation. -5-
  • 6. FORRESTER CONSULTING Benefits And Savings Of Engaging With ThoughtWorks Agile Development In speaking with the organization, Forrester discovered several benefits of the use of Distributed Agile development within their environment. First, ThoughtWorks teams drove efficiency within the customer’s IT organization by minimizing the potential that unforeseen changes or errors would increase in overall project cost. In addition, moving critical functionality to the start of the project had the effect of increasing the speed with which benefits were achieved. This second benefit can potentially impact areas outside of IT since benefits attributable to the entire organization will be realized sooner. IT project efficiency was also a benefit. The organization stated that even though its initial impression was that the ThoughtWorks component would come in at a higher initial cost than existing alternatives (e.g., in-house development, previously employed consultants), the efficiency created by the ThoughtWorks engagement resulted in lower overall cost due in part because of less rework after the first release. This was a result of the quality of the ThoughtWorks employees and the fact that use of their existing knowledge base reduced the amount of development errors and downstream changes compared to previous development projects. Smaller increments build on one another, since it is possible to learn from earlier iterations and apply those experiences to subsequent iterations. This, in turn, increased the productivity of the customer’s development staff, allowing them to assign fewer internal resources over the life of the project and more time to other initiatives. For the purpose of this analysis, the organization assumed that one area where reduction in errors ties directly into the final internal and external costs was around the reduction in subsequent rework. Table 3 provides an estimate in the reduction in internal effort created by ensuring that the risk of errors or failure has been reduced. Table 3: ThoughtWorks Contribution To IT Efficiency Cost to manage Number of FTEs to support before Number of FTE to support after Cost per worker $ 124,800 Hours per year 2,080 Total yearly cost savings 5 3 Cost per hour $ 60 $ 249,600 Source: Forrester Research, Inc. This savings was primarily driven by ThoughtWorks’ ability to simplify the application development process, reducing the number of Java classes from 179 to 17. Using these savings as a guide, we can estimate the cost differential between the ThoughtWorks and non-ThoughtWorks solution. Using the sample $1.8 million engagement (net present value of $1.7 million), as stated above, the cost of a comparatively complex project would be roughly a net present value of $2.3 million, 37% more expensive than the ThoughtWorks solution. Table 4 illustrates these savings. For this analysis, it is assumed that the direct cost per hour per resource is less for the alternative; the fact that the organization would have to devote more resources to the project increases its overall cost compared to the ThoughtWorks solution. Table 4: Project Efficiency Savings With ThoughtWorks Year 1 Year 2 Year 3 Total PV Cost with ThoughtWorks $1,650,099 $233,408 $0 $1,883,507 $1,692,989 Cost with alternative $1,929,939 $483,008 $249,600 $2,662,547 $2,341,198 $249,600 $249,600 $249,600 $748,800 $620,718 Savings from ThoughtWorks Source: Forrester Research, Inc. -6-
  • 7. FORRESTER CONSULTING Time to benefit also was a positive. In addition to driving IT efficiency, ThoughtWorks’ use of Distributed Agile development sped up the time to implementation and therefore allowed the organization to realize business benefits sooner. The organization indicated several factors that led to this benefit. First, ThoughtWorks’ ability to understand the business needs upfront and help its clients to prioritize specific functionality allowed key benefits to be realized early. This created further buy-in from the business side and reduced the risk of scope creep. In addition, ThoughtWorks’ experienced staff was adept at handling complex development projects, thus reducing the risk that project benefits might not be achieved. The customer also noted that the ThoughtWorks worked overtime to meet the fixed time requirements of the project. Table 5 illustrates the ramp up time between the project using ThoughtWorks and a project without including ThoughtWorks. Table 5: Percent Complete Date % complete with ThoughtWorks % complete alternative 3 months 45% 10% 6 months 75% 20% 8 months 100% 50% 12 months 100% 75% 14 months 100% 100% Source: Forrester Research, Inc. For the purpose of this analysis, the following steps were used to determine the magnitude of this benefit for the representative organization. First, it is necessary to understand the amount of benefits created as a result of the overall project. Table 6 illustrates the percent breakdown of benefits resulting from the overall pension plan project. Table 6: Percent Breakdown Of Benefits For Overall Development Project Benefits of application ThoughtWorks Alternative Manageability 64% $2,088,956 $1,533,584 End user improvements 15% $497,370 $365,139 Standard form updates 21% $678,911 $498,415 $3,265,237 $2,397,137 Source: Forrester Research, Inc. For this analysis, the organization expected to achieve roughly a 94% return on the overall project. So, for example, if the present value cost of the overall project was estimated to be $1.7 million, the present value benefits would equate to roughly $3.3 million ((3.3-1.7/1.7 =94%). Table 6 illustrates the cash flow that is achieved from the overall project. -7-
  • 8. FORRESTER CONSULTING Table 7: Project Cash Flow With ThoughtWorks With ThoughtWorks Year 1 Year 2 Year 3 Total PV Cost of project $1,650,099 $233,408 $0 $1,883,507 $1,692,989 Benefits received $1,313,000 $1,313,000 $1,313,000 $3,939,000 $3,265,237 -$337,099 $1,079,592 $1,313,000 $2,055,493 $1,572,247 Cash flow Source: Forrester Research, Inc. We therefore assume that roughly $1.3 million in benefits are realized in each year of analysis. Conversely, if the representative organization chose not to engage with ThoughtWorks, the time to realize benefits would be lengthened, therefore reducing the total amount of benefits achieved within the three-year timeframe and extending the payback for the project. During the interview process, the organization noted that time to benefit was a key determinant in choosing ThoughtWorks. For the purpose of this analysis, the organization assumed, based on statements by the alternative vendor, that the benefits would be delayed six months using an alternative, similar-sized project, causing the ramp up time to receive benefits to be extended. The cash flow for that project appears in Table 8. Table 8: Project Cash Flow With Alternative Development Solution With alternative Cost of project Benefits received Cash flow Year 1 Year 2 Year 3 Total PV $1,899,699 $483,008 $249,600 $2,632,307 $2,313,707 $656,500 $984,750 $1,313,000 $2,954,250 $2,397,137 -$1,243,199 $501,742 $1,063,400 $321,943 $83,430 Source: Forrester Research, Inc. The decrease in benefits as well as increase in cost from reduction in efficiency causes this project to realize a minimal return on its investment. Benefits are created, but they are less than in the ThoughtWorks case and costs are higher due in part to the reduced efficiency as compared to the ThoughtWorks project. The resulting net present value savings for both IT efficiency and time-to-market savings equate to $1,488,817 over three years, which is the difference in the cash flow between Table 7 and Table 8. Risks Associated With Estimates Of Costs And Benefits Risk-adjusted and non risk-adjusted ROI are both discussed in this study. Risk assessments provide a range of possible outcomes, based on the risks associated with IT projects in general and specific risks relative to moving toward a new technology solution. In this study, Forrester discovered that engaging with ThoughtWorks was a relatively low-to-medium risk endeavor, as expressed by the interviewed organizations as compared to similar past projects that were undertaken without ThoughtWorks assistance. Risk factors are used in TEI to widen the possible outcomes of the costs and benefits (and resulting savings) associated with a project. Since the future cannot be accurately predicted, there is risk inherent in any project. TEI captures risk in the form of risks to benefits and risks to costs. The following general risks were considered in this study: -8-
  • 9. FORRESTER CONSULTING • Lack of organizational buy-in to measure and track specific benefits created by engaging with ThoughtWorks. • Lack of sufficiently trained internal staff to interact and meet the requirements of a ThoughtWorksdriven project. • Failure to reduce, transfer, or redeploy IT support and business unit headcount made redundant in a ThoughtWorks-driven project. • Changing external market conditions that may decrease time-to-market benefit estimates. The following risks associated with distributed development projects were considered in this study: • There is a risk that costs will be greater than anticipated. Experience indicates that implementing projects across two or more sites will be a significant risk factor for cost. Large teams add even more risk. • There is a risk that benefits will not be realized as expected due to lack of accurate and/or effective communication between distributed groups. If a risk-adjusted ROI still demonstrates a compelling business case, it raises confidence that the investment is likely to succeed since the risks that threaten the project have been taken into consideration and quantified. The risk-adjusted numbers should be taken as “realistic” expectations, since they represent the expected value considering risk. Assuming normal success at mitigating all risk, the risk-adjusted numbers should more closely reflect the expected outcome of the investment. Table 9: Summary Financial Risk-Adjusted Results – Interviewed Organization Summary financial results Unadjusted (best case) ROI Payback Total three-year costs (NPV) Total three-year cost savings (NPV) Total three-year net savings (NPV) Risk-adjusted 56% 41% 13 months 15 months $956,198 $1,019,945 $1,488,817 $1,439,190 $532,619 $419,245 Source: Forrester Research, Inc. -9-
  • 10. FORRESTER CONSULTING Conclusions This study is meant to provide the reader with a framework in examining the costs and benefits of engaging with ThoughtWorks using ThoughtWorks Distributed Agile approach. Data derived from an individual customer interview corroborates Forrester Research findings around the potential for Agile development to drive cost efficiencies within a given environment. The core tenets of Agile development — short iterative cycles, empowered teams, constant reprioritization of requirements, and strong business participation — all lead to increased benefits. Delivering core requirements in shorter timeframes leads to increased financial benefits. Increasing team efficiency reduces both development and maintenance costs, and frees the development organization to address other projects. Each of these can be quantified using Forrester’s TEI model. Not every project is a good fit for Agile or Distributed Agile development, but ThoughtWorks has demonstrated that applying Agile processes and strong project management can potentially be a benefit to high-risk projects. Its emphasis on hiring and retaining highly skilled staff is also a key success factor. - 10 -
  • 11. FORRESTER CONSULTING Appendix A: Total Economic Impact™ Primer Total Economic Impact™ is primarily a common language tool, designed to capture and properly communicate the value of IT initiatives in a common business language. In so doing, TEI considers four elements of any initiative: 1. Benefits 2. Costs (sometimes referred to as total cost of ownership (TCO)) 3. Flexibility 4. Risk The figure below shows the TEI methodology conceptually. Benefits, flexibility, and costs are considered, through the filter of risk assessment, in determining an expected ROI for any given initiative. Benefits Benefits represent the value delivered to the business by the proposed project. Oftentimes, IT project justification exercises focus on cost (e.g., TCO) and cost reductions. Among industry leaders, IT is deployed as an offensive weapon, with value expectations greater than simple cost reduction, especially when those cost reductions tend to focus within IT. TEI captures the value proposition of the proposed project by measuring the benefits against the incurred costs. All benefits captured by TEI must be traceable back to one or more critical success factors (CSFs). These CSFs are directly linked to a higher-level business strategy. If a proposed technology investment generates benefits that cannot be satisfactorily linked to a CSF, then it will not be included as a benefit for the organization in the model. In these cases, TEI requires that the benefit be discarded. Under TEI, benefits may only accrue to the business units. “Benefits” derived through cost reductions within IT accrue as negative TCO to the IT budget, thereby showing a reduced TCO. (TCO is considered by TEI to be a single-dimension, cost-centric focus on the IT budget.) The TEI process begins with a discovery of potential benefit areas. A representative from the organization under examination who has the ability to capture the benefit in question must validate each benefit captured during discovery. In other words, values cannot arbitrarily be assigned to a benefit if that person is not in a position to deliver that benefit should the project be approved. Additionally, projects that are expected to deliver business value require some effort on the part of the business to realize that value. That effort may be in the form of training, organizational change or a modification of existing business processes. Therefore, TEI requires dialog with the business leaders actually responsible for making the necessary changes, in order to capture the proposed benefit during the justification phase. TEI captures this dialog in the form of the names of the individuals, which validates the value calculation of each benefit. Within TEI, each benefit entered has a specific capture date. Although the benefit may be captured over time, TEI requires the specification of a date when most of the benefit has been captured. TEI will then place the value delivered in the appropriate time frame within the project. Costs Costs represent the investment necessary to capture the value, or benefits, of the proposed project. IT or the business units may incur costs. These may be in the form of fully burdened labor, subcontractors or - 11 -
  • 12. FORRESTER CONSULTING materials. Additionally, costs consider all the investment and expenses necessary to deliver the value proposed. Flexibility Flexibility, as defined by TEI, represents investing in additional capacity that can, for some future additional investment, be turned into business benefit — for instance, an investment in an enterprisewide upgrade of the desktop word processor application where the primary driver may be standardization (to increase efficiency) and licensing (to decrease IT costs). However, a collaborative workgroup feature may translate into greater worker productivity when the organization is ready to absorb the discipline necessary to capture that benefit. The collaboration feature does not promise benefit during this phase of the project and must be captured later, incorporating additional investment, most likely in the form of training. However, the existence of the option has a present value that can be estimated. The flexibility component of TEI captures that value. Risk Risks are used to widen the possible outcomes of the project. Since the future cannot be accurately predicted, there is risk inherent in any project. TEI captures risk in the form of risks-to-benefits and risksto-costs. Risks-to-benefits considers all possible risks to each possible benefit. Likewise, risks-to-costs considers all possible risks to each possible cost. Then, a range is chosen by applying best judgment for each cost and benefit, based on the set of risks assigned to each cost and benefit. The range is entered in the form of a low estimate, a most likely value and a high estimate. For example, the risks to a cost may result in a range from the expected value as the low estimate, to two times the expected value as the high for a particular cost (representing a potential two times cost overrun). - 12 -
  • 13. FORRESTER CONSULTING Appendix B: Forrester Copyright © 2004 Forrester Research, Inc. Circulation or disclosure in whole or in part of this study outside the authorized recipient organization is expressly forbidden without the prior written permission of Forrester Research, Inc. Forrester, Forrester Oval Program, Forrester Wave, ForrTel, WholeView 2, Technographics, TechRankings, Total Economic Impact, and TEI are trademarks of Forrester Research, Inc. All other trademarks are the property of their respective companies. Information is based on best available resources. Opinions reflect judgment at the time and are subject to change. - 13 -