PROPRIETARY MATERIAL. © The McGraw-Hill Companies, Inc. All rights reserved. No part of this solution may be
displayed, reproduced or distributed in any form or by any means, without the prior written permission of the publisher, or used
beyond the limited distribution to students, teachers and educators permitted by McGraw-Hill for their individual courses. As a
student, you are invited to refer to and learn from this solution, but you should not submit it as your own work for a course in which
you are enrolled. Such action is considered plagiarism.
1
SOLUTIONS TO SELECTED PROBLEMS
Student: You should work the problem completely before referring to the solution.
CHAPTER 9
Solutions included for problems: 1, 4, 7, 10, 13, 16, 19, 22, 25, 28, 32, 34, 37, 40, and 43
9.1 (a) Public sector projects usually require large initial investments while many
private sector investments may be medium to small.
(b) Public sector projects usually have long lives (30-50 years) while private sector
projects are usually in the 2-25 year range.
(c) Public sector projects are usually funded from taxes, government bonds, or user
fees. Private sector projects are usually funded via stocks, corporate bonds, or
bank loans.
9.4 Some different dimensions are:
1. Contractor is involved in design of highway; contractor is not provided with the
final plans before building the highway.
2. Obtaining project financing may be a partial responsibility in conjunction with
the government unit.
3. Corporation will probably operate the highway (tolls, maintenance,
management) for some years after construction.
4. Corporation will legally own the highway right of way and improvements until
contracted time is over and title transfer occurs.
5. Profit (return on investment) will be stated in the contract.
Chapter 9
PROPRIETARY MATERIAL. © The McGraw-Hill Companies, Inc. All rights reserved. No part of this solution may be
displayed, reproduced or distributed in any form or by any means, without the prior written permission of the publisher, or used
beyond the limited distribution to students, teachers and educators permitted by McGraw-Hill for their individual courses. As a
student, you are invited to refer to and learn from this solution, but you should not submit it as your own work for a course in which
you are enrolled. Such action is considered plagiarism.
2
9.7 (a)
(b) Change cell D6 to $200,000 to get B/C = 1.023.
Chapter 9
PROPRIETARY MATERIAL. © The McGraw-Hill Companies, Inc. All rights reserved. No part of this solution may be
displayed, reproduced or distributed in any form or by any means, without the prior written permission of the publisher, or used
beyond the limited distribution to students, teachers and educators permitted by McGraw-Hill for their individual courses. As a
student, you are invited to refer to and learn from this solution, but you should not submit it as your own work for a course in which
you are enrolled. Such action is considered plagiarism.
3
9.10 All parts are solved on the spreadsheet once it is formatted using cell references.
9.13 (a) By-hand solution: First, set up AW value relation of the initial cost, P
capitalized a 7%. Then determine P for B/C = 1.3.
1.3 = 600,000____
P(0.07) + 300,000
P = [(600,000/1.3) – 300,000]/0.07 = $2,307,692
9.16 Convert all estimates to PW values.
PW disbenefits = 45,000(P/A,6%,15) = $437,049
PW M&O Cost = 300,000(P/A,6%,15) = $2,913,660
B/C = 3,800,000 – 437,049__ = 0.66
2,200,000 + 2,913,660
Chapter 9
PROPRIETARY MATERIAL. © The McGraw-Hill Companies, Inc. All rights reserved. No part of this solution may be
displayed, reproduced or distributed in any form or by any means, without the prior written permission of the publisher, or used
beyond the limited distribution to students, teachers and educators permitted by McGraw-Hill for their individual courses. As a
student, you are invited to refer to and learn from this solution, but you should not submit it as your own work for a course in which
you are enrolled. Such action is considered plagiarism.
4
9.19 Calculate the AW of initial cost, then the 3 B/C measures of worth. The roadway
should not be built.
9.22 Alternative B has a larger total annual cost; it must be incrementally justified.
Incr cost = (800,000 – 600,000) + (70,000 – 50,000)(P/A,8%,20)
= $396,362
Incr benefit = (950,000 – 250,000)(P/F,8%,6)
= 441,140
Incr B/C = 441,140/396,362 = 1.11
Select alternative B
Chapter 9
PROPRIETARY MATERIAL. © The McGraw-Hill Companies, Inc. All rights reserved. No part of this solution may be
displayed, reproduced or distributed in any form or by any means, without the prior written permission of the publisher, or used
beyond the limited distribution to students, teachers and educators permitted by McGraw-Hill for their individual courses. As a
student, you are invited to refer to and learn from this solution, but you should not submit it as your own work for a course in which
you are enrolled. Such action is considered plagiarism.
5
9.25 East coast site has the larger total cost. Select east coast site.
9.28 (b) Location E
B = 500,000 – 30,000 – 50,000 = $420,000
C = 3,000,000 (0.12) = $360,000
Modified B/C = 420,000/360,000 = 1.17
Location E is justified.
Location W
Incr B = $200,000
Incr D = $10,000
Incr C = (7 million – 3 million)(0.12) = $480,000
Incr M&O = (65,000 – 25,000) – 50,000 = $-10,000
Note that M&O is now an incremental cost advantage for W.
Chapter 9
PROPRIETARY MATERIAL. © The McGraw-Hill Companies, Inc. All rights reserved. No part of this solution may be
displayed, reproduced or distributed in any form or by any means, without the prior written permission of the publisher, or used
beyond the limited distribution to students, teachers and educators permitted by McGraw-Hill for their individual courses. As a
student, you are invited to refer to and learn from this solution, but you should not submit it as your own work for a course in which
you are enrolled. Such action is considered plagiarism.
6
Modified incr B/C = 200,000 – 10,000 + 10,000 = 0.42
480,000
W is not justified; select location E
9.32 Combine the investment and installation costs, difference in usage fees define
benefits. Use the procedure in Section 9.3 to solve. Benefits are the incremental
amounts for lowered costs of annual usage for each larger size pipe.
1, 2. Order of incremental analysis: Size 130 150 200 230
Total first cost, $ 9,780 11,310 14,580 17,350
3. Annual benefits, $ -- 200 600 300
4. Not used since the benefits are defined by usage costs.
5-7. Determine incremental B and C and select at each pairwise comparison of
defender vs challenger.
150 vs 130 mm
C = (11,310 – 9,780)(A/P,8%,15)
= 1,530(0.11683)
= $178.75
B = 6,000 – 5,800
= $200
B/C = 200/178.75
= 1.12 > 1.0 Eliminate 130 mm size.
200 vs 150 mm
C = (14,580 – 11,310)(A/P,8%,15)
= 3270(0.11683)
= $382.03
B = 5800 – 5200
= $600
B/C = 600/382.03
= 1.57 > 1.0 Eliminate 150 mm size.
230 vs 200 mm
C = (17,350 – 14,580)(A/P,8%,15)
= 2770(0.11683)
= $323.62
B = 5200 – 4900
= $300
B/C = 0.93 < 1.0 Eliminate 230 mm size.
Select 200 mm size.
Chapter 9
PROPRIETARY MATERIAL. © The McGraw-Hill Companies, Inc. All rights reserved. No part of this solution may be
displayed, reproduced or distributed in any form or by any means, without the prior written permission of the publisher, or used
beyond the limited distribution to students, teachers and educators permitted by McGraw-Hill for their individual courses. As a
student, you are invited to refer to and learn from this solution, but you should not submit it as your own work for a course in which
you are enrolled. Such action is considered plagiarism.
7
9.34 (a) Site D is the one selected.
(b) For independent projects, select the largest three of the four with B/C > 1.0.
Those selected are: D, F, and E.
9.37 (a) Find benefits for each alternative and then calculate incremental B/C ratios.
Benefits for P: 1.1 = BP /10 BP = 11
Benefits for Q: 2.4 = BQ/40 BQ = 96
Benefits for R: 1.4 = BR/50 BR = 70
Benefits for S: 1.5 = BS/80 BS = 120
Incremental B/C for Q vs P
B/C = 96 – 11 = 2.83
40 – 10
Incremental B/C for R vs P
B/C = 1.48
Chapter 9
PROPRIETARY MATERIAL. © The McGraw-Hill Companies, Inc. All rights reserved. No part of this solution may be
displayed, reproduced or distributed in any form or by any means, without the prior written permission of the publisher, or used
beyond the limited distribution to students, teachers and educators permitted by McGraw-Hill for their individual courses. As a
student, you are invited to refer to and learn from this solution, but you should not submit it as your own work for a course in which
you are enrolled. Such action is considered plagiarism.
8
9.37 (cont) Incremental B/C for S vs P
B/C = 1.56
Incremental B/C for R vs Q
B/C = -2.60
Disregard due to less B for more C.
Incremental B/C for S vs Q
B/C = 0.60
Incremental B/C for S vs R
B/C = 1.67
(b) Select Q
9.40 Answer is (a)
9.43 Answer is (c)

More Related Content

What's hot

Selected solutions 7
Selected solutions   7Selected solutions   7
Selected solutions 7Tlepoorit
 
heizer jay operations management Ch07pp
heizer jay operations management Ch07ppheizer jay operations management Ch07pp
heizer jay operations management Ch07ppTaliya Hemanth
 
Tutorial 4 eps_answer
Tutorial 4 eps_answerTutorial 4 eps_answer
Tutorial 4 eps_answerkim rae KI
 
leverage chapter problem solution
leverage chapter problem solutionleverage chapter problem solution
leverage chapter problem solutionmianmohsinmumtazshb
 
Annuities and gradient
Annuities and gradientAnnuities and gradient
Annuities and gradientReyman Solas
 
heizer jay operations managementSupp07pp
 heizer jay operations managementSupp07pp heizer jay operations managementSupp07pp
heizer jay operations managementSupp07ppTaliya Hemanth
 
A simple example to calculate net present value and pay back period
A simple example to calculate net present value and pay back period A simple example to calculate net present value and pay back period
A simple example to calculate net present value and pay back period Essam Lotffy, PMP®, CCP®
 
Chapter 03rata de interes
Chapter 03rata de interesChapter 03rata de interes
Chapter 03rata de interesfedericoblanco
 
Reciprocal Allocation Method
Reciprocal Allocation MethodReciprocal Allocation Method
Reciprocal Allocation MethodPaulino Silva
 
Chapter 04interes efectivo y nominal
Chapter 04interes efectivo y nominalChapter 04interes efectivo y nominal
Chapter 04interes efectivo y nominalfedericoblanco
 

What's hot (15)

Chapter 10
Chapter 10Chapter 10
Chapter 10
 
Selected solutions 7
Selected solutions   7Selected solutions   7
Selected solutions 7
 
heizer jay operations management Ch07pp
heizer jay operations management Ch07ppheizer jay operations management Ch07pp
heizer jay operations management Ch07pp
 
Tutorial 4 eps_answer
Tutorial 4 eps_answerTutorial 4 eps_answer
Tutorial 4 eps_answer
 
Chapter 4
Chapter 4Chapter 4
Chapter 4
 
leverage chapter problem solution
leverage chapter problem solutionleverage chapter problem solution
leverage chapter problem solution
 
Annuities and gradient
Annuities and gradientAnnuities and gradient
Annuities and gradient
 
Assignmen (1)
Assignmen (1)Assignmen (1)
Assignmen (1)
 
heizer jay operations managementSupp07pp
 heizer jay operations managementSupp07pp heizer jay operations managementSupp07pp
heizer jay operations managementSupp07pp
 
A simple example to calculate net present value and pay back period
A simple example to calculate net present value and pay back period A simple example to calculate net present value and pay back period
A simple example to calculate net present value and pay back period
 
Chapter 03rata de interes
Chapter 03rata de interesChapter 03rata de interes
Chapter 03rata de interes
 
Ch2(2011
Ch2(2011Ch2(2011
Ch2(2011
 
Reciprocal Allocation Method
Reciprocal Allocation MethodReciprocal Allocation Method
Reciprocal Allocation Method
 
Chapter 04interes efectivo y nominal
Chapter 04interes efectivo y nominalChapter 04interes efectivo y nominal
Chapter 04interes efectivo y nominal
 
Ch2(2011
Ch2(2011Ch2(2011
Ch2(2011
 

Similar to Selected solutions 9

Selected solutions 12
Selected solutions   12Selected solutions   12
Selected solutions 12Tlepoorit
 
Selected solutions 10
Selected solutions   10Selected solutions   10
Selected solutions 10Tlepoorit
 
Chapter 9 benefit & cost analysis
Chapter 9   benefit & cost analysisChapter 9   benefit & cost analysis
Chapter 9 benefit & cost analysisBich Lien Pham
 
Chapter 9 benefit & cost analysis
Chapter 9   benefit & cost analysisChapter 9   benefit & cost analysis
Chapter 9 benefit & cost analysisBich Lien Pham
 
Selected solutions 11
Selected solutions   11Selected solutions   11
Selected solutions 11Tlepoorit
 
3.-Benefit-Cost-Analysis.pdf
3.-Benefit-Cost-Analysis.pdf3.-Benefit-Cost-Analysis.pdf
3.-Benefit-Cost-Analysis.pdf18010YeashRahman
 
9. benefit cost analysis
9. benefit cost analysis9. benefit cost analysis
9. benefit cost analysisMohsin Siddique
 
9 150316005537-conversion-gate01
9 150316005537-conversion-gate019 150316005537-conversion-gate01
9 150316005537-conversion-gate01abidiqbal55
 
Selected solutions 8
Selected solutions   8Selected solutions   8
Selected solutions 8Tlepoorit
 
Selected solutions 3
Selected solutions   3 Selected solutions   3
Selected solutions 3 Tlepoorit
 
Ch9-Lecture 2018 (2).ppt
Ch9-Lecture 2018 (2).pptCh9-Lecture 2018 (2).ppt
Ch9-Lecture 2018 (2).ppt4723bilal
 
Selected solutions 6
Selected solutions   6Selected solutions   6
Selected solutions 6Tlepoorit
 
Selected solutions 5
Selected solutions   5Selected solutions   5
Selected solutions 5Tlepoorit
 
Chapter 12 independent projects & budget limitation
Chapter 12   independent projects & budget limitationChapter 12   independent projects & budget limitation
Chapter 12 independent projects & budget limitationBich Lien Pham
 
Chapter 12 independent projects & budget limitation
Chapter 12   independent projects & budget limitationChapter 12   independent projects & budget limitation
Chapter 12 independent projects & budget limitationBich Lien Pham
 
Lo4a benefit cost analysis (nabil)
Lo4a benefit  cost analysis (nabil)Lo4a benefit  cost analysis (nabil)
Lo4a benefit cost analysis (nabil)Abdulaziz AlSuwaidi
 
Week 15 learning objectives
Week 15 learning objectivesWeek 15 learning objectives
Week 15 learning objectivesYap Hooi
 
solucionario capitulo 1
solucionario  capitulo 1 solucionario  capitulo 1
solucionario capitulo 1 pablo Amaru
 

Similar to Selected solutions 9 (20)

Selected solutions 12
Selected solutions   12Selected solutions   12
Selected solutions 12
 
Selected solutions 10
Selected solutions   10Selected solutions   10
Selected solutions 10
 
Lo4a(arif)
Lo4a(arif)Lo4a(arif)
Lo4a(arif)
 
Chapter 9 benefit & cost analysis
Chapter 9   benefit & cost analysisChapter 9   benefit & cost analysis
Chapter 9 benefit & cost analysis
 
Chapter 9 benefit & cost analysis
Chapter 9   benefit & cost analysisChapter 9   benefit & cost analysis
Chapter 9 benefit & cost analysis
 
Selected solutions 11
Selected solutions   11Selected solutions   11
Selected solutions 11
 
3.-Benefit-Cost-Analysis.pdf
3.-Benefit-Cost-Analysis.pdf3.-Benefit-Cost-Analysis.pdf
3.-Benefit-Cost-Analysis.pdf
 
9. benefit cost analysis
9. benefit cost analysis9. benefit cost analysis
9. benefit cost analysis
 
9 150316005537-conversion-gate01
9 150316005537-conversion-gate019 150316005537-conversion-gate01
9 150316005537-conversion-gate01
 
Selected solutions 8
Selected solutions   8Selected solutions   8
Selected solutions 8
 
Selected solutions 3
Selected solutions   3 Selected solutions   3
Selected solutions 3
 
Ch9-Lecture 2018 (2).ppt
Ch9-Lecture 2018 (2).pptCh9-Lecture 2018 (2).ppt
Ch9-Lecture 2018 (2).ppt
 
Selected solutions 6
Selected solutions   6Selected solutions   6
Selected solutions 6
 
Selected solutions 5
Selected solutions   5Selected solutions   5
Selected solutions 5
 
Chapter 12 independent projects & budget limitation
Chapter 12   independent projects & budget limitationChapter 12   independent projects & budget limitation
Chapter 12 independent projects & budget limitation
 
Chapter 12 independent projects & budget limitation
Chapter 12   independent projects & budget limitationChapter 12   independent projects & budget limitation
Chapter 12 independent projects & budget limitation
 
Lo4a benefit cost analysis (nabil)
Lo4a benefit  cost analysis (nabil)Lo4a benefit  cost analysis (nabil)
Lo4a benefit cost analysis (nabil)
 
Lo4b (nabil) breakeven analysis
Lo4b (nabil)   breakeven analysisLo4b (nabil)   breakeven analysis
Lo4b (nabil) breakeven analysis
 
Week 15 learning objectives
Week 15 learning objectivesWeek 15 learning objectives
Week 15 learning objectives
 
solucionario capitulo 1
solucionario  capitulo 1 solucionario  capitulo 1
solucionario capitulo 1
 

Recently uploaded

Autonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptAutonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptbibisarnayak0
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfChristianCDAM
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectssuserb6619e
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfRajuKanojiya4
 
BSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxBSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxNiranjanYadav41
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Erbil Polytechnic University
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 

Recently uploaded (20)

Autonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptAutonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.ppt
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdf
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdf
 
BSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxBSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptx
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 

Selected solutions 9

  • 1. Chapter 9 PROPRIETARY MATERIAL. © The McGraw-Hill Companies, Inc. All rights reserved. No part of this solution may be displayed, reproduced or distributed in any form or by any means, without the prior written permission of the publisher, or used beyond the limited distribution to students, teachers and educators permitted by McGraw-Hill for their individual courses. As a student, you are invited to refer to and learn from this solution, but you should not submit it as your own work for a course in which you are enrolled. Such action is considered plagiarism. 1 SOLUTIONS TO SELECTED PROBLEMS Student: You should work the problem completely before referring to the solution. CHAPTER 9 Solutions included for problems: 1, 4, 7, 10, 13, 16, 19, 22, 25, 28, 32, 34, 37, 40, and 43 9.1 (a) Public sector projects usually require large initial investments while many private sector investments may be medium to small. (b) Public sector projects usually have long lives (30-50 years) while private sector projects are usually in the 2-25 year range. (c) Public sector projects are usually funded from taxes, government bonds, or user fees. Private sector projects are usually funded via stocks, corporate bonds, or bank loans. 9.4 Some different dimensions are: 1. Contractor is involved in design of highway; contractor is not provided with the final plans before building the highway. 2. Obtaining project financing may be a partial responsibility in conjunction with the government unit. 3. Corporation will probably operate the highway (tolls, maintenance, management) for some years after construction. 4. Corporation will legally own the highway right of way and improvements until contracted time is over and title transfer occurs. 5. Profit (return on investment) will be stated in the contract.
  • 2. Chapter 9 PROPRIETARY MATERIAL. © The McGraw-Hill Companies, Inc. All rights reserved. No part of this solution may be displayed, reproduced or distributed in any form or by any means, without the prior written permission of the publisher, or used beyond the limited distribution to students, teachers and educators permitted by McGraw-Hill for their individual courses. As a student, you are invited to refer to and learn from this solution, but you should not submit it as your own work for a course in which you are enrolled. Such action is considered plagiarism. 2 9.7 (a) (b) Change cell D6 to $200,000 to get B/C = 1.023.
  • 3. Chapter 9 PROPRIETARY MATERIAL. © The McGraw-Hill Companies, Inc. All rights reserved. No part of this solution may be displayed, reproduced or distributed in any form or by any means, without the prior written permission of the publisher, or used beyond the limited distribution to students, teachers and educators permitted by McGraw-Hill for their individual courses. As a student, you are invited to refer to and learn from this solution, but you should not submit it as your own work for a course in which you are enrolled. Such action is considered plagiarism. 3 9.10 All parts are solved on the spreadsheet once it is formatted using cell references. 9.13 (a) By-hand solution: First, set up AW value relation of the initial cost, P capitalized a 7%. Then determine P for B/C = 1.3. 1.3 = 600,000____ P(0.07) + 300,000 P = [(600,000/1.3) – 300,000]/0.07 = $2,307,692 9.16 Convert all estimates to PW values. PW disbenefits = 45,000(P/A,6%,15) = $437,049 PW M&O Cost = 300,000(P/A,6%,15) = $2,913,660 B/C = 3,800,000 – 437,049__ = 0.66 2,200,000 + 2,913,660
  • 4. Chapter 9 PROPRIETARY MATERIAL. © The McGraw-Hill Companies, Inc. All rights reserved. No part of this solution may be displayed, reproduced or distributed in any form or by any means, without the prior written permission of the publisher, or used beyond the limited distribution to students, teachers and educators permitted by McGraw-Hill for their individual courses. As a student, you are invited to refer to and learn from this solution, but you should not submit it as your own work for a course in which you are enrolled. Such action is considered plagiarism. 4 9.19 Calculate the AW of initial cost, then the 3 B/C measures of worth. The roadway should not be built. 9.22 Alternative B has a larger total annual cost; it must be incrementally justified. Incr cost = (800,000 – 600,000) + (70,000 – 50,000)(P/A,8%,20) = $396,362 Incr benefit = (950,000 – 250,000)(P/F,8%,6) = 441,140 Incr B/C = 441,140/396,362 = 1.11 Select alternative B
  • 5. Chapter 9 PROPRIETARY MATERIAL. © The McGraw-Hill Companies, Inc. All rights reserved. No part of this solution may be displayed, reproduced or distributed in any form or by any means, without the prior written permission of the publisher, or used beyond the limited distribution to students, teachers and educators permitted by McGraw-Hill for their individual courses. As a student, you are invited to refer to and learn from this solution, but you should not submit it as your own work for a course in which you are enrolled. Such action is considered plagiarism. 5 9.25 East coast site has the larger total cost. Select east coast site. 9.28 (b) Location E B = 500,000 – 30,000 – 50,000 = $420,000 C = 3,000,000 (0.12) = $360,000 Modified B/C = 420,000/360,000 = 1.17 Location E is justified. Location W Incr B = $200,000 Incr D = $10,000 Incr C = (7 million – 3 million)(0.12) = $480,000 Incr M&O = (65,000 – 25,000) – 50,000 = $-10,000 Note that M&O is now an incremental cost advantage for W.
  • 6. Chapter 9 PROPRIETARY MATERIAL. © The McGraw-Hill Companies, Inc. All rights reserved. No part of this solution may be displayed, reproduced or distributed in any form or by any means, without the prior written permission of the publisher, or used beyond the limited distribution to students, teachers and educators permitted by McGraw-Hill for their individual courses. As a student, you are invited to refer to and learn from this solution, but you should not submit it as your own work for a course in which you are enrolled. Such action is considered plagiarism. 6 Modified incr B/C = 200,000 – 10,000 + 10,000 = 0.42 480,000 W is not justified; select location E 9.32 Combine the investment and installation costs, difference in usage fees define benefits. Use the procedure in Section 9.3 to solve. Benefits are the incremental amounts for lowered costs of annual usage for each larger size pipe. 1, 2. Order of incremental analysis: Size 130 150 200 230 Total first cost, $ 9,780 11,310 14,580 17,350 3. Annual benefits, $ -- 200 600 300 4. Not used since the benefits are defined by usage costs. 5-7. Determine incremental B and C and select at each pairwise comparison of defender vs challenger. 150 vs 130 mm C = (11,310 – 9,780)(A/P,8%,15) = 1,530(0.11683) = $178.75 B = 6,000 – 5,800 = $200 B/C = 200/178.75 = 1.12 > 1.0 Eliminate 130 mm size. 200 vs 150 mm C = (14,580 – 11,310)(A/P,8%,15) = 3270(0.11683) = $382.03 B = 5800 – 5200 = $600 B/C = 600/382.03 = 1.57 > 1.0 Eliminate 150 mm size. 230 vs 200 mm C = (17,350 – 14,580)(A/P,8%,15) = 2770(0.11683) = $323.62 B = 5200 – 4900 = $300 B/C = 0.93 < 1.0 Eliminate 230 mm size. Select 200 mm size.
  • 7. Chapter 9 PROPRIETARY MATERIAL. © The McGraw-Hill Companies, Inc. All rights reserved. No part of this solution may be displayed, reproduced or distributed in any form or by any means, without the prior written permission of the publisher, or used beyond the limited distribution to students, teachers and educators permitted by McGraw-Hill for their individual courses. As a student, you are invited to refer to and learn from this solution, but you should not submit it as your own work for a course in which you are enrolled. Such action is considered plagiarism. 7 9.34 (a) Site D is the one selected. (b) For independent projects, select the largest three of the four with B/C > 1.0. Those selected are: D, F, and E. 9.37 (a) Find benefits for each alternative and then calculate incremental B/C ratios. Benefits for P: 1.1 = BP /10 BP = 11 Benefits for Q: 2.4 = BQ/40 BQ = 96 Benefits for R: 1.4 = BR/50 BR = 70 Benefits for S: 1.5 = BS/80 BS = 120 Incremental B/C for Q vs P B/C = 96 – 11 = 2.83 40 – 10 Incremental B/C for R vs P B/C = 1.48
  • 8. Chapter 9 PROPRIETARY MATERIAL. © The McGraw-Hill Companies, Inc. All rights reserved. No part of this solution may be displayed, reproduced or distributed in any form or by any means, without the prior written permission of the publisher, or used beyond the limited distribution to students, teachers and educators permitted by McGraw-Hill for their individual courses. As a student, you are invited to refer to and learn from this solution, but you should not submit it as your own work for a course in which you are enrolled. Such action is considered plagiarism. 8 9.37 (cont) Incremental B/C for S vs P B/C = 1.56 Incremental B/C for R vs Q B/C = -2.60 Disregard due to less B for more C. Incremental B/C for S vs Q B/C = 0.60 Incremental B/C for S vs R B/C = 1.67 (b) Select Q 9.40 Answer is (a) 9.43 Answer is (c)