RISK ASSESSMENT
PRESENTED BY
USAMA SAEED
ARSLAN ZAFAR
WHAT IS A RISK ASSESSMENT?
It is a way of determining risks and dangers in work
places.
In risk assessment we think about what might cause harm/risk to a project
or workplace and decide whether you are taking reasonable steps to
prevent that harm.
If the harm/risk cannot be avoided in a safe way, then the risk
assessment will say that the activity shouldn’t be carried
out.
CONTINUED…
Risk assessment involve 2 things…
Identifying and analyzing potential (future) events that may have a
negative impact on project.
 For example Risk Analysis.
Making judgments "on the tolerability of the risk on the basis of a risk
analysis" while considering influencing factors.
 For example Risk Evaluation.
CONTINUED…
In simple words, risk assessment analyzes what can go wrong…
How likely it is to happen…
What the potential consequences are…
How tolerable the identified risk is.
Based on this Risk Assessment, the impact of risk can be expressed as
quantitative or qualitative.
HOW TO DO RISK ASSESSMENT
There are no fixed rules for this.
But a few general principles.
Five(5) steps are followed to ensure risk assessment is done correctly.
STEPS IN RISK ASSESSMENT
Identify
Hazards
Risk Analysis
Risk
Evaluation
Risk Control
Review
STEP 1 IDENTIFY HAZARDS
The process of finding, listing, and characterizing hazards.
Difference between Hazard and Risk.
A Hazard is ‘something with the potential to cause harm’.
Risk is the chance, high or low, that somebody or something could be
harmed by these and other hazards.
It can be identified by using many methods, for example asking employees,
monitoring carefully.
STEP 2 RISK ANALYSIS
A process for understanding the nature of hazards and determining the
level of risk.
It tells who or what might be harmed and how.
It provides basis for risk evaluation and decisions about risk control.
Includes data, analysis, opinions, interests of stakeholders.
STEP 3 EVALUATION
After identifying hazard and analyzing risk we evaluate them.
The hazards can either be removed completely…
Or the risks can be controlled so that the its effect is unlikely.
If there is no way to eliminate a risk use precaution.
 For example, try and carry out a less risky activity.
It is done usually using Risk Assessment Matrix.
STEP 4 RISK CONTROL
Implementing actions after risk evaluation decisions.
1. Elimination – get rid of the risk altogether.
2. Substitution – exchange one risk for something less likely or severe.
3. Physical Controls - eliminate contact with the hazard.
Risk control can involve monitoring and re-evaluation.
STEP 5 MONITOR AND REVIEW
You must ensure that the control measures are achieving the desired level
of control.
You must review the assessment on a regular basis or if anything changes.
 For example, new staff, change in machinery or process.
Use Project Risk Register to monitor, review and track risks.
Review your assessment and update if possible.
WHEN TO DO?
Before new processes or activities are introduced.
Before changes are introduced to existing processes or activities
When hazards are identified.
WHO SHOULD DO?
Risk assessments should always be carried out by a person who is
experienced and competent.
Competence can be expressed as a combination of Knowledge, Awareness,
training, and experience.
Competence does not mean knowing everything.
Competence means knowing when to call for help or assistance.
RISK ASSESSMENT
MATRIX
WHAT IS IT?
A risk assessment matrix is a is a project management tool used during
risk assessment.
Its main function is to prioritize risks.
Based on likelihood or probability(on Y-axis) and impact(on X-axis) of a
risk.
Also known as risk matrix.
CONTINUED…
It falls under the qualitative and quantitative risk analyses process.
Typically looks like a chart and contains the following columns…
 Probability
 Impact
 Ratings
 Rankings
Rating is calculated as…
 Probability of risk * Impact of risk
PROBABILITY
The probability rating means the likelihood (chance) of risk to occur.
It is recorded in percentage.
LIKELIHOOD
The likelihood of a risk is broken down into parts as…
Very Likely A risk that is almost certain to show-up during project
execution. More then 80% chances.
Likely Risks that have 60-80% chances of occurrence can be
grouped as likely.
Possible Risks which have a near 50/50 probability of occurrence.
Unlikely Risks that have a low probability of occurrence but still can
not be ruled out completely. Almost 20-40 % chances
Very
Unlikely
Rare and exceptional risks which have a less than 10%
chance of occurrence.
RISK IMPACT
Risk impact refers to how much the risk, if it occurs, will effect the project
scope, cost or schedule.
Insignificant Risks that bring no real negative consequences or pose no
significant threat to the organization or project.
Minor Risks that have a small potential for negative consequences but
will not significantly impact overall success.
Moderate Risks that could potentially bring negative consequences, posing
a moderate threat to the project or organization.
Critical Risks with substantial negative consequences that will seriously
impact the success of the organization or project.
Catastrophic Risks with extreme negative consequences that could cause the
entire project to fail or severely impact daily operations of the
organization.
CLASSIFYING AND PRIORITIZING RISK
Matrix Insignifi
cant
Minor Moderat
e
Critical Catastr
ophic
Rare Low Low Medium Medium High
Unlikel
y
Low Medium Medium Medium High
Possible Low Medium Medium High Critical
Likely Medium Medium High High Critical
Very
Likely
Medium High High Critical Critical
Apart from other divisions, Matrix has 4
major zones.
A low-risk zone that is considered acceptable,
consequences of the risk are minor, These
types of risks are generally ignored (Green).
A moderate risk zone that may or may not be
acceptable, come with slightly more serious
consequences, If possible, take steps to
prevent medium risks from occurring
(Yellow).
Impact
Probability
CLASSIFYING AND PRIORITIZING RISK
 A high-risk zone that is considered unacceptable, these are serious risks that
both have significant consequences, and are likely to occur. Prioritize and respond
to these risks in the near term. (Orange).
 A critical-risk zone that is considered extremely unacceptable, Catastrophic
risks that have severe consequences and are highly likely to occur, these risks are
the highest priority. You should respond to them immediately, as they can threaten
the success of the organization or project. (Red)
AFTER RANKING
Once you’ve ranked your risks, you can make a risk response plan.
A risk response plan is about…
To prevent or address those risks that are “high” or “extreme.”
You may not need to respond to risks ranked “low” or “medium” before work
begins.
Response for the risk depend upon both priority or rating and ranking.
WHY TO USE RISK MATRIX
In risk assessments, you don’t have to use a risk matrix…
If you have identified hazards and have a plan to avoid risks.
Why use matrix…
To understand the severity of risks being caused.
To rank or prioritize risk.
To prevent major risks at time to avoid negative consequences.
EXAMPLE
 A risk with probability of 4 and
impact of 3
 4 * 3 = 12
 A risk with probability of 5 and
impact of 2
 5 * 2 = 10
 A risk with probability of 2 and
impact of 5
 2 * 5 = 10
 So in all the risk after prioritization
we will plan to handle the risk
according to their ranking.
Matrix 1 2 3 4 5
5 5 10 15 20 25
4 4 8 12 16 20
3 3 6 9 12 15
2 2 4 6 8 10
1 1 2 3 4 5
Impact
Probability
END

More Related Content

What's hot

Risk Management
Risk ManagementRisk Management
Risk Managementcgeorgeo
 
Powerpoint Risk Assessment
Powerpoint Risk AssessmentPowerpoint Risk Assessment
Powerpoint Risk AssessmentSteve Bishop
 
Risk Management Procedure PowerPoint Presentation Slides
Risk Management Procedure PowerPoint Presentation Slides Risk Management Procedure PowerPoint Presentation Slides
Risk Management Procedure PowerPoint Presentation Slides SlideTeam
 
Risk assessment presentation
Risk assessment presentationRisk assessment presentation
Risk assessment presentationmmagario
 
Risk Management module PowerPoint Presentation Slides
Risk Management module PowerPoint Presentation SlidesRisk Management module PowerPoint Presentation Slides
Risk Management module PowerPoint Presentation SlidesSlideTeam
 
Risk Management Lifecycle PowerPoint Presentation Slides
Risk Management Lifecycle PowerPoint Presentation Slides Risk Management Lifecycle PowerPoint Presentation Slides
Risk Management Lifecycle PowerPoint Presentation Slides SlideTeam
 
Risk Management Process in OH&S
Risk Management Process in OH&SRisk Management Process in OH&S
Risk Management Process in OH&SAhmed-Refat Refat
 
Risk Identification PowerPoint Presentation Slide
Risk Identification PowerPoint Presentation SlideRisk Identification PowerPoint Presentation Slide
Risk Identification PowerPoint Presentation SlideSlideTeam
 
Risk strategies presentation
Risk strategies presentationRisk strategies presentation
Risk strategies presentationRaven Morgan
 
Risk Analysis
Risk AnalysisRisk Analysis
Risk AnalysisCIToolkit
 
Leadership and safety culture
Leadership and safety cultureLeadership and safety culture
Leadership and safety cultureChandrakant Singh
 

What's hot (20)

Risk assessment-training
Risk assessment-trainingRisk assessment-training
Risk assessment-training
 
Risk management
Risk managementRisk management
Risk management
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Powerpoint Risk Assessment
Powerpoint Risk AssessmentPowerpoint Risk Assessment
Powerpoint Risk Assessment
 
Risk Management Procedure PowerPoint Presentation Slides
Risk Management Procedure PowerPoint Presentation Slides Risk Management Procedure PowerPoint Presentation Slides
Risk Management Procedure PowerPoint Presentation Slides
 
Risk assessment presentation
Risk assessment presentationRisk assessment presentation
Risk assessment presentation
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Risk Management module PowerPoint Presentation Slides
Risk Management module PowerPoint Presentation SlidesRisk Management module PowerPoint Presentation Slides
Risk Management module PowerPoint Presentation Slides
 
Risk assessment tools and techniques
Risk assessment tools and techniquesRisk assessment tools and techniques
Risk assessment tools and techniques
 
Risk Management Training
Risk Management TrainingRisk Management Training
Risk Management Training
 
Risk Management Lifecycle PowerPoint Presentation Slides
Risk Management Lifecycle PowerPoint Presentation Slides Risk Management Lifecycle PowerPoint Presentation Slides
Risk Management Lifecycle PowerPoint Presentation Slides
 
Risk Management Process in OH&S
Risk Management Process in OH&SRisk Management Process in OH&S
Risk Management Process in OH&S
 
7 Keys for Creating A Safety Culture
7 Keys for Creating A Safety Culture7 Keys for Creating A Safety Culture
7 Keys for Creating A Safety Culture
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk management
Risk managementRisk management
Risk management
 
Risk Identification PowerPoint Presentation Slide
Risk Identification PowerPoint Presentation SlideRisk Identification PowerPoint Presentation Slide
Risk Identification PowerPoint Presentation Slide
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Risk strategies presentation
Risk strategies presentationRisk strategies presentation
Risk strategies presentation
 
Risk Analysis
Risk AnalysisRisk Analysis
Risk Analysis
 
Leadership and safety culture
Leadership and safety cultureLeadership and safety culture
Leadership and safety culture
 

Similar to Risk Assessment Matrix Prioritization

Risk Assessment.pptx
Risk Assessment.pptxRisk Assessment.pptx
Risk Assessment.pptxDivyesh Jha
 
Project risk management: Techniques and strategies
Project risk management: Techniques and strategiesProject risk management: Techniques and strategies
Project risk management: Techniques and strategiesDebashishDas49
 
Information Security Risk Management
Information Security Risk ManagementInformation Security Risk Management
Information Security Risk ManagementNikhil Soni
 
Calculation of Estimated Risk for Individual/Family
Calculation of Estimated Risk for Individual/FamilyCalculation of Estimated Risk for Individual/Family
Calculation of Estimated Risk for Individual/Familymandalina landy
 
Security Risk management Chapther 8: Risk Evaluation and Mitigation Strategies
Security Risk management Chapther 8:  Risk Evaluation and Mitigation StrategiesSecurity Risk management Chapther 8:  Risk Evaluation and Mitigation Strategies
Security Risk management Chapther 8: Risk Evaluation and Mitigation StrategiesErnst Dettbarn
 
HSE-BMS-006 Risk Assessment & JSA.ppt
HSE-BMS-006 Risk Assessment & JSA.pptHSE-BMS-006 Risk Assessment & JSA.ppt
HSE-BMS-006 Risk Assessment & JSA.pptGkMechanical
 
Chapter 1 risk management (3)
Chapter 1  risk management (3)Chapter 1  risk management (3)
Chapter 1 risk management (3)rafeeqameen
 
Risk Assessment and Job Safety Analysis
Risk Assessment and Job Safety AnalysisRisk Assessment and Job Safety Analysis
Risk Assessment and Job Safety AnalysisGaurav Singh Rajput
 
Risk Assessment & Job Safety Analysis | JSA | RA
Risk Assessment & Job Safety Analysis | JSA | RARisk Assessment & Job Safety Analysis | JSA | RA
Risk Assessment & Job Safety Analysis | JSA | RAGaurav Singh Rajput
 
سيمينار إدارة المخاطر (1).pptx
سيمينار إدارة المخاطر (1).pptxسيمينار إدارة المخاطر (1).pptx
سيمينار إدارة المخاطر (1).pptxAhmadHassanein
 
PMI-RMP Exam Prep Presentation
PMI-RMP Exam Prep PresentationPMI-RMP Exam Prep Presentation
PMI-RMP Exam Prep Presentationscottdreynolds
 
“Construction Risk Management”
“Construction Risk Management”“Construction Risk Management”
“Construction Risk Management”Ary Jamil
 
Risk Management
Risk ManagementRisk Management
Risk Managementrajuinstru
 

Similar to Risk Assessment Matrix Prioritization (20)

Risk Assessment.pptx
Risk Assessment.pptxRisk Assessment.pptx
Risk Assessment.pptx
 
Risk Matrix.docx
Risk Matrix.docxRisk Matrix.docx
Risk Matrix.docx
 
Project risk management: Techniques and strategies
Project risk management: Techniques and strategiesProject risk management: Techniques and strategies
Project risk management: Techniques and strategies
 
Information Security Risk Management
Information Security Risk ManagementInformation Security Risk Management
Information Security Risk Management
 
Calculation of Estimated Risk for Individual/Family
Calculation of Estimated Risk for Individual/FamilyCalculation of Estimated Risk for Individual/Family
Calculation of Estimated Risk for Individual/Family
 
Security Risk management Chapther 8: Risk Evaluation and Mitigation Strategies
Security Risk management Chapther 8:  Risk Evaluation and Mitigation StrategiesSecurity Risk management Chapther 8:  Risk Evaluation and Mitigation Strategies
Security Risk management Chapther 8: Risk Evaluation and Mitigation Strategies
 
HSE-BMS-006 Risk Assessment & JSA.ppt
HSE-BMS-006 Risk Assessment & JSA.pptHSE-BMS-006 Risk Assessment & JSA.ppt
HSE-BMS-006 Risk Assessment & JSA.ppt
 
Chapter 1 risk management (3)
Chapter 1  risk management (3)Chapter 1  risk management (3)
Chapter 1 risk management (3)
 
Risk Assessment and Job Safety Analysis
Risk Assessment and Job Safety AnalysisRisk Assessment and Job Safety Analysis
Risk Assessment and Job Safety Analysis
 
Risk Assessment & Job Safety Analysis | JSA | RA
Risk Assessment & Job Safety Analysis | JSA | RARisk Assessment & Job Safety Analysis | JSA | RA
Risk Assessment & Job Safety Analysis | JSA | RA
 
سيمينار إدارة المخاطر (1).pptx
سيمينار إدارة المخاطر (1).pptxسيمينار إدارة المخاطر (1).pptx
سيمينار إدارة المخاطر (1).pptx
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
PMI-RMP Exam Prep Presentation
PMI-RMP Exam Prep PresentationPMI-RMP Exam Prep Presentation
PMI-RMP Exam Prep Presentation
 
Li Rmp Prep
Li Rmp PrepLi Rmp Prep
Li Rmp Prep
 
“Construction Risk Management”
“Construction Risk Management”“Construction Risk Management”
“Construction Risk Management”
 
8. project risk management
8. project risk management8. project risk management
8. project risk management
 
Risk management
Risk managementRisk management
Risk management
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
11 risk management
11 risk management11 risk management
11 risk management
 
Risk management
Risk managementRisk management
Risk management
 

Recently uploaded

PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.
PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.
PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.KathleenAnnCordero2
 
proposal kumeneger edited.docx A kumeeger
proposal kumeneger edited.docx A kumeegerproposal kumeneger edited.docx A kumeeger
proposal kumeneger edited.docx A kumeegerkumenegertelayegrama
 
RACHEL-ANN M. TENIBRO PRODUCT RESEARCH PRESENTATION
RACHEL-ANN M. TENIBRO PRODUCT RESEARCH PRESENTATIONRACHEL-ANN M. TENIBRO PRODUCT RESEARCH PRESENTATION
RACHEL-ANN M. TENIBRO PRODUCT RESEARCH PRESENTATIONRachelAnnTenibroAmaz
 
Dutch Power - 26 maart 2024 - Henk Kras - Circular Plastics
Dutch Power - 26 maart 2024 - Henk Kras - Circular PlasticsDutch Power - 26 maart 2024 - Henk Kras - Circular Plastics
Dutch Power - 26 maart 2024 - Henk Kras - Circular PlasticsDutch Power
 
Call Girls In Aerocity 🤳 Call Us +919599264170
Call Girls In Aerocity 🤳 Call Us +919599264170Call Girls In Aerocity 🤳 Call Us +919599264170
Call Girls In Aerocity 🤳 Call Us +919599264170Escort Service
 
Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸mathanramanathan2005
 
Engaging Eid Ul Fitr Presentation for Kindergartners.pptx
Engaging Eid Ul Fitr Presentation for Kindergartners.pptxEngaging Eid Ul Fitr Presentation for Kindergartners.pptx
Engaging Eid Ul Fitr Presentation for Kindergartners.pptxAsifArshad8
 
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...漢銘 謝
 
DGT @ CTAC 2024 Valencia: Most crucial invest to digitalisation_Sven Zoelle_v...
DGT @ CTAC 2024 Valencia: Most crucial invest to digitalisation_Sven Zoelle_v...DGT @ CTAC 2024 Valencia: Most crucial invest to digitalisation_Sven Zoelle_v...
DGT @ CTAC 2024 Valencia: Most crucial invest to digitalisation_Sven Zoelle_v...Henrik Hanke
 
Application of GIS in Landslide Disaster Response.pptx
Application of GIS in Landslide Disaster Response.pptxApplication of GIS in Landslide Disaster Response.pptx
Application of GIS in Landslide Disaster Response.pptxRoquia Salam
 
Internship Presentation | PPT | CSE | SE
Internship Presentation | PPT | CSE | SEInternship Presentation | PPT | CSE | SE
Internship Presentation | PPT | CSE | SESaleh Ibne Omar
 
Chizaram's Women Tech Makers Deck. .pptx
Chizaram's Women Tech Makers Deck.  .pptxChizaram's Women Tech Makers Deck.  .pptx
Chizaram's Women Tech Makers Deck. .pptxogubuikealex
 
CHROMATOGRAPHY and its types with procedure,diagrams,flow charts,advantages a...
CHROMATOGRAPHY and its types with procedure,diagrams,flow charts,advantages a...CHROMATOGRAPHY and its types with procedure,diagrams,flow charts,advantages a...
CHROMATOGRAPHY and its types with procedure,diagrams,flow charts,advantages a...university
 
Early Modern Spain. All about this period
Early Modern Spain. All about this periodEarly Modern Spain. All about this period
Early Modern Spain. All about this periodSaraIsabelJimenez
 
The Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism PresentationThe Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism PresentationNathan Young
 
INDIAN GCP GUIDELINE. for Regulatory affair 1st sem CRR
INDIAN GCP GUIDELINE. for Regulatory  affair 1st sem CRRINDIAN GCP GUIDELINE. for Regulatory  affair 1st sem CRR
INDIAN GCP GUIDELINE. for Regulatory affair 1st sem CRRsarwankumar4524
 
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.com
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.comSaaStr Workshop Wednesday w/ Kyle Norton, Owner.com
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.comsaastr
 
Quality by design.. ppt for RA (1ST SEM
Quality by design.. ppt for  RA (1ST SEMQuality by design.. ppt for  RA (1ST SEM
Quality by design.. ppt for RA (1ST SEMCharmi13
 
Event 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptxEvent 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptxaryanv1753
 

Recently uploaded (19)

PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.
PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.
PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.
 
proposal kumeneger edited.docx A kumeeger
proposal kumeneger edited.docx A kumeegerproposal kumeneger edited.docx A kumeeger
proposal kumeneger edited.docx A kumeeger
 
RACHEL-ANN M. TENIBRO PRODUCT RESEARCH PRESENTATION
RACHEL-ANN M. TENIBRO PRODUCT RESEARCH PRESENTATIONRACHEL-ANN M. TENIBRO PRODUCT RESEARCH PRESENTATION
RACHEL-ANN M. TENIBRO PRODUCT RESEARCH PRESENTATION
 
Dutch Power - 26 maart 2024 - Henk Kras - Circular Plastics
Dutch Power - 26 maart 2024 - Henk Kras - Circular PlasticsDutch Power - 26 maart 2024 - Henk Kras - Circular Plastics
Dutch Power - 26 maart 2024 - Henk Kras - Circular Plastics
 
Call Girls In Aerocity 🤳 Call Us +919599264170
Call Girls In Aerocity 🤳 Call Us +919599264170Call Girls In Aerocity 🤳 Call Us +919599264170
Call Girls In Aerocity 🤳 Call Us +919599264170
 
Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸
 
Engaging Eid Ul Fitr Presentation for Kindergartners.pptx
Engaging Eid Ul Fitr Presentation for Kindergartners.pptxEngaging Eid Ul Fitr Presentation for Kindergartners.pptx
Engaging Eid Ul Fitr Presentation for Kindergartners.pptx
 
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
 
DGT @ CTAC 2024 Valencia: Most crucial invest to digitalisation_Sven Zoelle_v...
DGT @ CTAC 2024 Valencia: Most crucial invest to digitalisation_Sven Zoelle_v...DGT @ CTAC 2024 Valencia: Most crucial invest to digitalisation_Sven Zoelle_v...
DGT @ CTAC 2024 Valencia: Most crucial invest to digitalisation_Sven Zoelle_v...
 
Application of GIS in Landslide Disaster Response.pptx
Application of GIS in Landslide Disaster Response.pptxApplication of GIS in Landslide Disaster Response.pptx
Application of GIS in Landslide Disaster Response.pptx
 
Internship Presentation | PPT | CSE | SE
Internship Presentation | PPT | CSE | SEInternship Presentation | PPT | CSE | SE
Internship Presentation | PPT | CSE | SE
 
Chizaram's Women Tech Makers Deck. .pptx
Chizaram's Women Tech Makers Deck.  .pptxChizaram's Women Tech Makers Deck.  .pptx
Chizaram's Women Tech Makers Deck. .pptx
 
CHROMATOGRAPHY and its types with procedure,diagrams,flow charts,advantages a...
CHROMATOGRAPHY and its types with procedure,diagrams,flow charts,advantages a...CHROMATOGRAPHY and its types with procedure,diagrams,flow charts,advantages a...
CHROMATOGRAPHY and its types with procedure,diagrams,flow charts,advantages a...
 
Early Modern Spain. All about this period
Early Modern Spain. All about this periodEarly Modern Spain. All about this period
Early Modern Spain. All about this period
 
The Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism PresentationThe Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism Presentation
 
INDIAN GCP GUIDELINE. for Regulatory affair 1st sem CRR
INDIAN GCP GUIDELINE. for Regulatory  affair 1st sem CRRINDIAN GCP GUIDELINE. for Regulatory  affair 1st sem CRR
INDIAN GCP GUIDELINE. for Regulatory affair 1st sem CRR
 
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.com
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.comSaaStr Workshop Wednesday w/ Kyle Norton, Owner.com
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.com
 
Quality by design.. ppt for RA (1ST SEM
Quality by design.. ppt for  RA (1ST SEMQuality by design.. ppt for  RA (1ST SEM
Quality by design.. ppt for RA (1ST SEM
 
Event 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptxEvent 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptx
 

Risk Assessment Matrix Prioritization

  • 2. WHAT IS A RISK ASSESSMENT? It is a way of determining risks and dangers in work places. In risk assessment we think about what might cause harm/risk to a project or workplace and decide whether you are taking reasonable steps to prevent that harm. If the harm/risk cannot be avoided in a safe way, then the risk assessment will say that the activity shouldn’t be carried out.
  • 3. CONTINUED… Risk assessment involve 2 things… Identifying and analyzing potential (future) events that may have a negative impact on project.  For example Risk Analysis. Making judgments "on the tolerability of the risk on the basis of a risk analysis" while considering influencing factors.  For example Risk Evaluation.
  • 4. CONTINUED… In simple words, risk assessment analyzes what can go wrong… How likely it is to happen… What the potential consequences are… How tolerable the identified risk is. Based on this Risk Assessment, the impact of risk can be expressed as quantitative or qualitative.
  • 5. HOW TO DO RISK ASSESSMENT There are no fixed rules for this. But a few general principles. Five(5) steps are followed to ensure risk assessment is done correctly.
  • 6. STEPS IN RISK ASSESSMENT Identify Hazards Risk Analysis Risk Evaluation Risk Control Review
  • 7. STEP 1 IDENTIFY HAZARDS The process of finding, listing, and characterizing hazards. Difference between Hazard and Risk. A Hazard is ‘something with the potential to cause harm’. Risk is the chance, high or low, that somebody or something could be harmed by these and other hazards. It can be identified by using many methods, for example asking employees, monitoring carefully.
  • 8. STEP 2 RISK ANALYSIS A process for understanding the nature of hazards and determining the level of risk. It tells who or what might be harmed and how. It provides basis for risk evaluation and decisions about risk control. Includes data, analysis, opinions, interests of stakeholders.
  • 9. STEP 3 EVALUATION After identifying hazard and analyzing risk we evaluate them. The hazards can either be removed completely… Or the risks can be controlled so that the its effect is unlikely. If there is no way to eliminate a risk use precaution.  For example, try and carry out a less risky activity. It is done usually using Risk Assessment Matrix.
  • 10. STEP 4 RISK CONTROL Implementing actions after risk evaluation decisions. 1. Elimination – get rid of the risk altogether. 2. Substitution – exchange one risk for something less likely or severe. 3. Physical Controls - eliminate contact with the hazard. Risk control can involve monitoring and re-evaluation.
  • 11. STEP 5 MONITOR AND REVIEW You must ensure that the control measures are achieving the desired level of control. You must review the assessment on a regular basis or if anything changes.  For example, new staff, change in machinery or process. Use Project Risk Register to monitor, review and track risks. Review your assessment and update if possible.
  • 12. WHEN TO DO? Before new processes or activities are introduced. Before changes are introduced to existing processes or activities When hazards are identified.
  • 13. WHO SHOULD DO? Risk assessments should always be carried out by a person who is experienced and competent. Competence can be expressed as a combination of Knowledge, Awareness, training, and experience. Competence does not mean knowing everything. Competence means knowing when to call for help or assistance.
  • 15. WHAT IS IT? A risk assessment matrix is a is a project management tool used during risk assessment. Its main function is to prioritize risks. Based on likelihood or probability(on Y-axis) and impact(on X-axis) of a risk. Also known as risk matrix.
  • 16. CONTINUED… It falls under the qualitative and quantitative risk analyses process. Typically looks like a chart and contains the following columns…  Probability  Impact  Ratings  Rankings Rating is calculated as…  Probability of risk * Impact of risk
  • 17. PROBABILITY The probability rating means the likelihood (chance) of risk to occur. It is recorded in percentage.
  • 18. LIKELIHOOD The likelihood of a risk is broken down into parts as… Very Likely A risk that is almost certain to show-up during project execution. More then 80% chances. Likely Risks that have 60-80% chances of occurrence can be grouped as likely. Possible Risks which have a near 50/50 probability of occurrence. Unlikely Risks that have a low probability of occurrence but still can not be ruled out completely. Almost 20-40 % chances Very Unlikely Rare and exceptional risks which have a less than 10% chance of occurrence.
  • 19. RISK IMPACT Risk impact refers to how much the risk, if it occurs, will effect the project scope, cost or schedule. Insignificant Risks that bring no real negative consequences or pose no significant threat to the organization or project. Minor Risks that have a small potential for negative consequences but will not significantly impact overall success. Moderate Risks that could potentially bring negative consequences, posing a moderate threat to the project or organization. Critical Risks with substantial negative consequences that will seriously impact the success of the organization or project. Catastrophic Risks with extreme negative consequences that could cause the entire project to fail or severely impact daily operations of the organization.
  • 20. CLASSIFYING AND PRIORITIZING RISK Matrix Insignifi cant Minor Moderat e Critical Catastr ophic Rare Low Low Medium Medium High Unlikel y Low Medium Medium Medium High Possible Low Medium Medium High Critical Likely Medium Medium High High Critical Very Likely Medium High High Critical Critical Apart from other divisions, Matrix has 4 major zones. A low-risk zone that is considered acceptable, consequences of the risk are minor, These types of risks are generally ignored (Green). A moderate risk zone that may or may not be acceptable, come with slightly more serious consequences, If possible, take steps to prevent medium risks from occurring (Yellow). Impact Probability
  • 21. CLASSIFYING AND PRIORITIZING RISK  A high-risk zone that is considered unacceptable, these are serious risks that both have significant consequences, and are likely to occur. Prioritize and respond to these risks in the near term. (Orange).  A critical-risk zone that is considered extremely unacceptable, Catastrophic risks that have severe consequences and are highly likely to occur, these risks are the highest priority. You should respond to them immediately, as they can threaten the success of the organization or project. (Red)
  • 22. AFTER RANKING Once you’ve ranked your risks, you can make a risk response plan. A risk response plan is about… To prevent or address those risks that are “high” or “extreme.” You may not need to respond to risks ranked “low” or “medium” before work begins. Response for the risk depend upon both priority or rating and ranking.
  • 23. WHY TO USE RISK MATRIX In risk assessments, you don’t have to use a risk matrix… If you have identified hazards and have a plan to avoid risks. Why use matrix… To understand the severity of risks being caused. To rank or prioritize risk. To prevent major risks at time to avoid negative consequences.
  • 24. EXAMPLE  A risk with probability of 4 and impact of 3  4 * 3 = 12  A risk with probability of 5 and impact of 2  5 * 2 = 10  A risk with probability of 2 and impact of 5  2 * 5 = 10  So in all the risk after prioritization we will plan to handle the risk according to their ranking. Matrix 1 2 3 4 5 5 5 10 15 20 25 4 4 8 12 16 20 3 3 6 9 12 15 2 2 4 6 8 10 1 1 2 3 4 5 Impact Probability
  • 25. END