Vattenfall Q3 and 9M results 2015
Magnus Hall, CEO and Ingrid Bonde, CFO
Presentation 27 October 2015
Financial highlights
Vattenfall Q3 2015 Results | Presentation | 27 October 20152
SEK bn
Q3
2015
Q3
2014
9M
2015
9M
2014
FY
2014
Net Sales 37.5 34.7 119.0 117.2 165.9
Underlying EBIT 3.4 2.8 14.1 15.9 24.1
EBIT 3.0 -19.4 -26.7 -9.2 -2.2
Profit after tax 1.6 -18.1 -22.2 -12.2 -8.3
Return on capital employed (ROCE), % -7.1* -1.9* -7.1* -1.9* -0.7
Return on capital employed (ROCE) excl. items
affecting comparability, %
8.1* 8.1* 8.1* 8.1* 8.2
* Last twelve months
15
20
25
30
35
40
45
50
55
60
2013 2014 2015
EEX 2016 EEX 2017 ICE 2016 ICE 2017 NPX 2016 NPX 2017
EUR/MWh
Pricing environment
Electricity futures
3
Monthly spot power price average
Commodity prices
Vattenfall Q3 2015 Results | Presentation | 27 October 20153
• Nordic spot prices 58% lower vs Q3/2014,
mainly due to high precipitation
• German and Dutch spot prices approx. 5%
higher vs Q3/2014, mainly due to higher
exports
• Electricity futures prices lower on all
Vattenfall’s markets
• Lower prices on oil (Brent crude), coal and
gas. Higher prices on CO2 emission
allowances
5
15
25
35
45
55
65
2013 2014 2015
EPEX APX NordPool
EUR/MWh
0
5
10
15
20
25
30
35
40
40
50
60
70
80
90
100
110
120
2013 2014 2015
Coal (USD/t), API2, Front Year Oil (USD/bbl), Brent Front Month
Emission allowances CO2 (EUR/t), Dec 09-12 Gas (EUR/MWh), NBP, Front Year
USD EUR
Increased electricity generation in Q3
Vattenfall Q3 2015 Results | Presentation | 27 October 20154
0
5
10
15
20
25
6.1
9.5
Nuclear
11.0
9.1
Fossil
18.8
21.4
0.1 0.2
Biomass, wasteWind
0.71.1
Hydro
Q3 2014: 36.8 TWh
Q3 2015: 41.2 TWh
• Total electricity generation output increased by 4.4 TWh vs. Q3/2014
- Fossil based generation increased due to the commissioning of German Moorburg
Block A
- Nuclear generation decreased, mainly due to extended outages at Ringhals 2 and
Forsmark 3
- Hydro power increased due to higher precipitation
- Wind power generation increased, mainly thanks to the new wind farms DanTysk (Ger)
and Clashindarroch (UK)
TWh
Regulatory development
Vattenfall Q3 2015 Results | Presentation | 27 October 2015
German nuclear
stress test
• Provisions for nuclear decommissioning deemed within acceptable
range according to stress test carried out by the German
government. Nuclear Commission appointed to look into
fund/foundation solution, work starts in November
Structural reforms to
strengthen the EU ETS
system
• Market Stability Reserve (MSR) in place by 1 January 2019.
• Legislative proposal to further revise the EU ETS directive tabled by
the European Commission on 15 July and currently in the legislative
process
Lignite standby
capacity reserve
• Bilateral agreements between lignite operators and the German
government on establishment of a standby capacity reserve of lignite
plants with a total capacity of 2,700 MW and their subsequent
decommissioning. Vattenfall to contribute 1,000 MW
55
Lignite standby capacity reserve
• Bilateral agreements reached between lignite operators and the government to establish a
temporary standby capacity reserve of lignite plants with a combined capacity of
2,700 MW. Plants will gradually be transferred to the reserve during 2016 and 2019. After
four years the plants shall be shut down completely
• With Jänschwalde units F and E (each 500 MW) Vattenfall will contribute 1,000 MW to the
reserve. Units to be placed in standby mode on 1 October 2018 and 2019 respectively,
and subsequently shut down in 2022 and 2023
• 1,000 MW corresponds to approx. 13% of Vattenfall’s total installed lignite capacity of
7,800 MW. The closure of the two units corresponds to a reduction of 8 million tonnes of
CO2 emissions
• Plant owners will be remunerated for keeping the plants in the standby reserve. According
to the government, remuneration for all plants in the reserve will amount to approximately
EUR 230 million per year over seven years, to be paid by the transmission system
operator. The detailed design and the mechanisms of the remuneration scheme are still to
be worked out by the legislative bodies
Vattenfall Q3 2015 Results | Presentation | 27 October 20156
Ongoing process to divest lignite assets
• On 22 September Vattenfall announced the next step in
the lignite sales process by publicly inviting potential
bidders to state their interest in acquiring Vattenfall’s
German lignite assets
• By 20 October Vattenfall has received statements of
interest from a number of potential bidders
• Qualification process is now ongoing
• Vattenfall’s ambition is to reach an agreement in
H1 2016
Vattenfall Q3 2015 Results | Presentation | 27 October 20157
Update on early phase out of Ringhals 1 and 2
Vattenfall changed direction for operational lifetimes of Ringhals 1 and 2,
meaning an early closure by 2020 instead of, around 2025 as previously
announced
Ringhals AB Board of Directors decided to limit investments in the reactors
1 and 2
An extraordinary general meeting of Ringhals AB decided to phase out
Ringhals 2 in 2019 and Ringhals 1 in 2020
Vattenfall Q3 2015 Results | Presentation | 27 October 20158
Ringhals 1 Ringhals 2
Commercial start up (year) 1976 1975
Installed capacity (MW) 879 809
Average annual generation
(TWh)
6.3 5.9
• 28 April
• 28 August
• 15 October
• The existing plans of at least 60 years of operation remain unchanged for Vattenfall’s five
other nuclear reactors Ringhals 3 and 4 and Forsmark 1,2 and 3
Update on German nuclear provisions
• On 10 October the German government published a stress-test prepared by the
government appointed auditing firm Warth & Klein Thornton AG
• The auditing firm reported that they have found no reason to dispute the nuclear power
operator’s principles for calculating their nuclear provisions
• The government has appointed a special commission to issue recommendations, by
January 2016, on how to secure the long-term financing of nuclear decommissioning
costs, including a possible fund/foundation solution
• Vattenfall has made provisions of approximately EUR 3bn for the decommissioning of its
partly owned nuclear plants in Germany, including the disposal of nuclear waste
Vattenfall Q3 2015 Results | Presentation | 27 October 20159
Other important events
• Decision to invest approx. SEK 1.2bn in Ray Wind Farm, a new, 54 MW, onshore wind
farm in the UK
- To be commissioned in early 2017
• Vattenfall’s largest wind repowering project, Klim, was completed. With 70.4 MW Klim is
Denmarks largest onshore wind farm
• Final payment for shares in N.V. Nuon Energy
- On 1 July EUR 2,071.3 million (approx. SEK 19bn) was paid for the remaining 21% of
the shares
• Rating changes
- Moody’s affirmed long-term ”A3” rating, but changed outlook from stable to negative
- S&P changed long-term rating from ”A-” to ”BBB+” and changed outlook to negative
Vattenfall Q3 2015 Results | Presentation | 27 October 201510
Financials
Ingrid Bonde, CFO
Vattenfall Q3 2015 Results | Presentation | 27 October 201511
Q3 2015 Financial highlights
Vattenfall Q3 2015 Results | Presentation | 27 October 201512
SEK bn Q3 2015 Q3 2014
Net Sales 37.5 34.7
EBITDA 7.5 8.4
Underlying EBITDA (excl. items affecting comparability) 7.8 7.5
EBIT 3.0 -19.4
Underlying EBIT (excl. items affecting comparability) 3.4 2.8
Financial items, net -1.1 -1.4
Profit after tax 1.6 -18.1
Cash flow (FFO) 5.7 5.0
Operating cash flow (after change in working capital) 14.9 10.0
Net debt 65.4 79.5*
Adjusted net debt 143.1 158.3*
FFO/Adjusted net debt (%) 22.5** 17.3**
Adjusted net debt/EBITDA (times) 4.0** 4.0**
* As of 31 December 2014
** Last twelve months
Development of underlying EBIT Q3 2015
Vattenfall Q3 2015 Results | Presentation | 27 October 201513
0.4
Operating
costs
0.5
Electricity
distribution
0.3
Production
margins
-0.8
Generation
volumes
0.5
Underlying
EBIT Q3
2014
2.8
3.4
Underlying
EBIT Q3
2015
Other
-0.3
Depreciation
SEK bn
Development of underlying EBIT 9M 2015
Vattenfall Q3 2015 Results | Presentation | 27 October 201514
SEK bn
0.5
Underlying
EBIT 9M 2015
14.1
Other
0.4
Sales
business
0.5
Electricity
distribution
Generation
volumes
-0.4
Production
margins
-2.8
Underlying
EBIT 9M 2014
15.9
Underlying EBIT per operating segment – Q3 2015
Vattenfall Q3 2015 Results | Presentation | 27 October 201515
SEK bn Q3 2015 Q3 2014 FY 2014
Customers & Solutions 0.2 0.1 1.0
Power Generation 2.9 2.6 15.6
Wind 0.1 0.1 1.7
Heat -0.5 -0.4 2.4
Distribution 1.1 0.8 4.4
Other* -0.4 -0.3 -1.0
Eliminations ̶ -0.1 -
Total 3.4 2.8 24.1
* Other pertains mainly to all Staff functions including Treasury activities and Shared Service Centres
Cash flow development Q3 2015
Vattenfall Q3 2015 Results | Presentation | 27 October 201516
Cash flow
from operating
activities
14.8
Growth
investments
-3.6
Free cash flow
10.5
Maintenance
investments
-4.3
7.0
Cash flow
before financing
activities
Divestments, net
0.1
SEK bn
Capital expenditures
Vattenfall Q3 2015 Results | Presentation | 27 October 201517
SEK bn
Q3
2015
Q3
2014
Change
%
9M
2015
9M
2014
Change
%
FY
2014
Electricity generation 4.6 4.6 ̶ 12.6 11.9 5.9 17.9
CHP/Heat 1.0 0.9 11.1 2.0 2.1 -4.8 3.7
Electricity networks 1.0 1.0 ̶ 2.8 3.0 -6.7 5.0
Other 1.4 1.4 ̶ 2.9 2.2 31.8 2.4
TOTAL 8.0 7.9 1.3 20.3 19.2 5.7 29.0
- of which maintenance and
replacement
4.3 3.9 10.3 10.6 10.7 -0.9 16.9
- of which growth 3.6 4.0 -10.0 9.7 8.5 14.1 12.1
Current year Current year +1 Current year +2
Ratio Price Year Ratio Price Year Ratio Price Year
Dec
2012
100% 55 2012 77% 52 2013 44% 50 2014
Dec
2013
100% 50 2013 95% 44 2014 56% 40 2015
Dec
2014
99% 45 2015 87% 39 2016 55% 36 2017
Sept.
2015
100% 44 2015 93% 39 2016 74% 36 2017
Development of hedge ratios and hedge prices
Vattenfall Q3 2015 Results | Presentation | 27 October 201518
5051
75
53
6867
59
7273
77
83
72
Current year+2Current year+1Current year
FY 2012 30 Sept. 2015FY 2014FY 2013
Current year Current year +1 Current year +2
Ratio Price Year Ratio Price Year Ratio Price Year
Dec
2012
75% 45 2012 51% 42 2013 50% 41 2014
Dec
2013
67% 40 2013 68% 39 2014 53% 37 2015
Dec
2014
73% 36 2015 72% 34 2016 59% 32 2017
Sept.
2015
72% 37 2015 83% 33 2016 77% 31 2017
Hedge ratios - Nordic Hedge ratios – Continental Europe
44
77
100
56
95
100
55
87
99
74
93
100
Current year Current year+1 Current year+2
30 Sept. 2015FY 2013 FY 2014FY 2012
% %
Note: hedge ratios in % and hedge prices in EUR/MWh
Financial and sustainability targets
Vattenfall Q3 2015 Results | Presentation | 27 October 201519
Financial metrics Target
Outcome
30 Sept. 2015
Outcome
FY 2014
Return on Capital Employed (ROCE)
(Return on capital employed excl. items affecting
comparability)
9.0%
-7.1%*
(8.1%)
-0.7%
(8.2%)
Net debt/Equity 50-90% 57.2% 61.9%
FFO/Adjusted net debt 22-30% 22.5* 20.3%
Dividend policy (% of profit after tax) 40-60% ̶ zero
* Last twelve months
Sustainability metrics & targets
Outcome
Jan-Sept 2015
Outcome
FY 2014
Reduce CO2 exposure to 65 Mtonnes by 2020
(93.7 Mtonnes in 2010)
61.4 Mtonnes 82.3 Mtonnes
Growth in renewable electricity generation capacity to
be higher than the average rate of growth for ten reference
countries
11.8%
6.3%
(Preliminary growth
rate for reference
countries: 9.1%)
Energy efficiency to save 440 GWh in 2015 992 GWh 435 GWh
Summary and conclusions
Vattenfall Q3 2015 Results | Presentation | 27 October 201520
Summary and conclusions
• Increased Q3 results compared to last year but market conditions remain challenging, with
a considerable capacity surplus and low electricity prices, which squeezes production
margins
• Despite having lowered annual controllable costs by 27% since 2010, our cost-cutting
efforts must continue
• Provisions for German nuclear decommissioning deemed within acceptable range
according to stress test
• Lignite sale process continues. We expect to reach an agreement in H1 2016
• Vattenfall to transfer 1,000 MW lignite capacity to a standby reserve, subject to financial
compensation
Vattenfall’s new Vision
Vattenfall Q3 2015 Results | Presentation | 27 October 201521
Vattenfall is a dedicated partner to our customers and society at large,
providing convenient and innovative energy solutions. We are a leader in
sustainable production, ensuring reliable and cost-efficient energy supply.
We call this ”Energy You Want”
Appendix
Vattenfall Q3 2015 Results | Presentation | 27 October 201522
9M 2015 Financial highlights
Vattenfall Q3 2015 Results | Presentation | 27 October 201523
SEK bn 9M 2015 9M 2014
Net Sales 119.0 117.2
EBITDA 23.9 28.9
Underlying EBITDA (excl. items affecting comparability) 28.7 30.3
EBIT -26.7 -9.2
Underlying EBIT (excl. items affecting comparability) 14.1 15.9
Financial items, net -4.1 -4.5
Profit after tax -22.2 -12.2
Cash flow (FFO) 19.6 19.7
Operating cash flow (after change in working capital) 31.3 25.8
Net debt 65.4 79.5*
Adjusted net debt 143.1 158.3*
FFO/Adjusted net debt (%) 22.5** 17.3**
Adjusted net debt/EBITDA (times) 4.0** 4.0**
* As of 31 December 2014
** Last twelve months
Underlying EBIT per operating segment – 9M 2015
Vattenfall Q3 2015 Results | Presentation | 27 October 201524
SEK bn 9M 2015 9M 2014 FY 2014
Customers & Solutions 1.3 0.6 1.0
Power Generation 8.8 11.6 15.6
Wind 0.8 0.6 1.7
Heat 1.4 1.2 2.4
Distribution 3.8 3.0 4.4
Other* -1.8 -0.9 -1.0
Eliminations -0.2 -0.2 -
Total 14.1 15.9 24.1
* Other pertains mainly to all Staff functions including Treasury activities and Shared Service Centres
Debt development
Vattenfall Q3 2015 Results | Presentation | 27 October 201525
0
20
40
60
80
100
120
140
160
180
200
30.06.2015
31.03.2015
31.12.2014
30.09.2014
30.06.2014
31.03.2014
31.12.2013
30.09.2013
30.06.2013
31.03.2013
31.12.2012
30.09.2012
30.06.2012
31.03.2012
31.12.2011
30.9.2011
30.6.2011
31.3.2011
30.09.2015
Gross debt
Adjusted net debt
Net debt
Net debt decreased by SEK 14.1bn compared with 31 December 2014. Adjusted net debt decreased by
SEK 15.2bn, compared with 31 December 2014. For the calculation of adjusted net debt,
see Appendix.
SEK bn
Continued strong liquidity position September 2015
Vattenfall Q3 2015 Results | Presentation | 27 October 201526
Group liquidity MSEK
Cash and cash equivalents 12,497
Short term investments 30,867
Reported cash, cash equivalents & short term investments 43,364
Unavailable liquidity* -6,810
Available liquidity 36,555
Debt maturities** MSEK
Within 90 days 6,135
Within 180 days 16,510
Committed credit facilities Facility size MSEK
RCF (maturity Dec 2019) 2,000 MEUR 18,817
Total undrawn 18,817
* German nuclear ”Solidarvereinbarung” 3,203 MSEK, Margin calls paid (CSA) 2,555 MSEK, Insurance” Provisions for claims outstanding” 1,030 MSEK and Margin accounts 22 MSEK
** Excluding loans from minority owners and associated companies.
Breakdown of gross debt as of 30 September 2015
Total debt : SEK 111bn (EUR 12bn)
External market debt: SEK 95bn
Vattenfall Q3 2015 Results | Presentation | 27 October 201527
Debt issuing
programmes
Size
(MEUR)
Utilization
(MEUR)
EUR 15bn Euro MTN 15,000 6,041
EUR 2bn Euro CP 2,000 460
SEK 15bn Domestic CP 1,594 160
Total 18,594 6,607
• All public debt is issued by Vattenfall AB
• The main part of debt portfolio has no currency
exposure that has an impact on the income
statement. Debt in foreign currency is either
swapped to SEK or booked as hedge against net
foreign investments
• No structural subordination
Loans from
associated companies
12%
Loans from
minority shareholders
5%
2%
Commerical paper
4%
EMTN58%
Margin calls
(CSA)
Hybrid capital
14%
4%
Bank loans
and others
Debt maturity profile*
Vattenfall Q3 2015 Results | Presentation | 27 October 2015
* Loans from associated companies, minority owners, margin calls received (CSA) and valuation at fair value are excluded and currency derivatives for hedging debt in foreign
currency are included
** The maturity of Capital Secturities (hybrid bonds) in 2022 and 2027 reflects first call date of the respective bond.
2828
30 Sept 2015 31 Dec 2014
Duration (years) 3.7 2.8
Average time to maturity (years) 8.4 5.6
Average interest rate (%) 4.0 3.6
Net debt (SEK bn) 65.4 79.5
Available group liquidity (SEK mn) 36,555 37,796
Undrawn committed credit facilities (SEK mn) 18,817 18,786
0
10 000
20 000
30 000
40 000
2015 2017 2019 2021 2023 2025 2027 2029 2031 2033 2035 2037 2039
Capital Securities
Maturity profile
Undrawn back-up
facilities
MSEK
Reported and adjusted net debt
Vattenfall Q3 2015 Results | Presentation | 27 October 201529
* Of which: German nuclear ”Solidarvereinbarung” 3.2, Margin calls paid (CSA) 2.6,
Insurance “Provisions for claims outstanding” 1.0
Reported net debt
(SEK billion)
Sep 30
2015
Dec 31
2014
Hybrid capital -15.4 -9.4
Bond issues and commercial
papers and liabilities to credit
institutions
-71.5 -72.5
Present value of liability pertaining
to acquisition of subsidiaries
- -19.3
Liabilities to associated companies -2.7 -2.6
Liabilities to minority shareholders -13.2 -12.4
Other liabilities -8.3 -9.8
Total interest-bearing liabilities -111.0 -125.9
Reported cash, cash equivalents
& short-term investments
43.4 45.1
Loans to minority owners of
foreign subsidiaries
2.3 1.4
Net debt -65.4 -79.5
Adjusted net debt
(SEK billion)
Sep 30
2015
Dec 31
2014
Total interest-bearing liabilities -111.0 -125.9
50% of Hybrid capital 7.7 4.7
Present value of pension
obligations
-42.3 -45.3
Mining & environmental provisions -18.0 -14.5
Provisions for nuclear power (net) -34.0 -33.7
Margin calls received 6.0 7.0
Liabilities to minority owners due
to consortium agreements
12.1 11.6
= Adjusted gross debt -179.6 -196.1
Reported cash, cash equivalents
& short-term investments
43.4 45.1
Unavailable liquidity -6.8* -7.3*
= Adjusted cash, cash
equivalents & short-term
investments
36.6 37.8
= Adjusted net debt -143.1 -158.3
Discount rates used in calculation of provisions
Vattenfall Q3 2015 Results | Presentation | 27 October 201530
Type of provision Discount rate Inflation rate Real discount rate
Nuclear, Germany 4.0% 3.0% 1.0%
Nuclear, Sweden 4.0% 2.0% 2.0%
Type of provision Discount rate
Pensions, Germany 2.0%
Pensions, Sweden 2.5%
Discount rates for pensions in Sweden and Germany were raised in Q2 2015 as a result of increased
market interest rates.
Nuclear provisions as per 31 Dec 2014
Vattenfall Q3 2015 Results | Presentation | 27 October 201531
Reactor Net capacity
(MW)
Start (year) Vattenfall
share (%)
Vattenfall
provisions, SEKbn
(IFRS accounting)
Vattenfall provisions,
SEKbn (pro rata)
Sw nuclear waste
fund (Vattenfall pro
rata share)
Ringhals 1 879 1976 70.4
Ringhals 2 809 1975 70.4
Ringhals 3 1,070 1981 70.4 Total Ringhals: 21,672 Total Ringhals: 21,672 1)
Ringhals 4 942 1983 70.4
Forsmark 1 984 1980 66.0
Forsmark 2 1,120 1981 66.0 Total Forsmark: 19,545 Total Forsmark: 12,900
Forsmark 3 1,170 1985 66.0
Total Sweden 6,974 - 41,217 34,572 26,808 2)
Brunsbüttel 771 1977 66.7 17,730 11,817
Brokdorf 1,410 1986 20.0 0 4,133
Krümmel 1,346 1984 50.0 10,576 10,576
Stade 3) 640 1972 33.3 0 2,019
Total Germany 4,167 - - 28,306 28,545
Total Sw & Germ 11,141 69,523 63,117
1) Vattenfall is 100% liability of Ringhals decommissioning, while owning only 70.4%
2) Vattenfall’s share of the Nuclear Waste Fund (book value). IFRS consolidated value is SEK 41,217mn
3) Stade is being dismantled
Overview of Vattenfall’s lignite operations
Operating opencast mine areas
Recultivation areas
Approved mining fields
Continuation
Future fields
Lignite-fuelled power plants
Refining plant
Central railway operation VEM
Brandenburg
Bagenz-Ost
Spremberg-Ost
Schwarze
Pumpe
Spree
Guben
Cottbus
Forst/
Lausitz
Spremberg
Weißwasser
Hoyerswerda
Reichwalde
mine
Republic of
Poland
Jänschwalde
mine
Welzow-Süd
mine
Nochten
mine
Boxberg
power plant
Jänschwalde
power plant
Jänschwalde
Storage site
Landmark
„Spreyer Höhe“
Saxony
Welzow-Süd,
partial section II
Mining field 2
Nochten,
Cottbus-Nord
mine
Jänschwalde-Nord
* Outside of the Lusatian portfolio
Lignite production 60-65mn tonnes/a
Installed power plant
capacity
8,095 MWgross
Jänschwalde 3,000 MW
Schwarze Pumpe 1,600 MW
Boxberg 2,575 MW
Lippendorf R*
(Vattenfall share)
920 MW
Electricity generation approx. 55 TWh/a
Vattenfall Q3 2015 Results | Presentation | 27 October 201532

More Related Content

What's hot

Vattenfall's year-end report 2015
Vattenfall's year-end report 2015Vattenfall's year-end report 2015
Vattenfall's year-end report 2015Vattenfall
 
Year-End report 2021 – Vattenfall
Year-End report 2021 – VattenfallYear-End report 2021 – Vattenfall
Year-End report 2021 – VattenfallVattenfall
 
Vattenfall Q2 report 2019
Vattenfall Q2 report 2019Vattenfall Q2 report 2019
Vattenfall Q2 report 2019Vattenfall
 
Vattenfall's Q3 report 2018
Vattenfall's Q3 report 2018Vattenfall's Q3 report 2018
Vattenfall's Q3 report 2018Vattenfall
 
Q3 2019: Interim report January-September
Q3 2019: Interim report January-SeptemberQ3 2019: Interim report January-September
Q3 2019: Interim report January-SeptemberVattenfall
 
Enea 2016 H1 - financial results (english)
Enea 2016 H1 - financial results (english) Enea 2016 H1 - financial results (english)
Enea 2016 H1 - financial results (english) Enea
 
Enea 2017 H1 - financial results (english)
Enea 2017 H1 - financial results (english)Enea 2017 H1 - financial results (english)
Enea 2017 H1 - financial results (english)Enea
 
Enea 2017 Q1 - financial results (english)
Enea 2017 Q1 - financial results (english)Enea 2017 Q1 - financial results (english)
Enea 2017 Q1 - financial results (english)Enea
 
Enea 2015 - financial results (english)
Enea 2015 - financial results (english)Enea 2015 - financial results (english)
Enea 2015 - financial results (english)Enea
 
Year end report 2018 - Vattenfall
Year end report 2018 - VattenfallYear end report 2018 - Vattenfall
Year end report 2018 - VattenfallVattenfall
 
Enea 2017 Q3 - financial results (english)
Enea 2017 Q3 - financial results (english)Enea 2017 Q3 - financial results (english)
Enea 2017 Q3 - financial results (english)Enea
 
Vattenfall's quarterly report January - March 2015
Vattenfall's quarterly report January - March 2015Vattenfall's quarterly report January - March 2015
Vattenfall's quarterly report January - March 2015Vattenfall
 
Year-End report 2019 - Vattenfall
Year-End report 2019 - VattenfallYear-End report 2019 - Vattenfall
Year-End report 2019 - VattenfallVattenfall
 
Snam 2020 - 1Q Results
Snam 2020 - 1Q Results Snam 2020 - 1Q Results
Snam 2020 - 1Q Results Snam
 
Olav Johan Botnen - Long Term Analysis for the German Power Market
Olav Johan Botnen - Long Term Analysis for the German Power MarketOlav Johan Botnen - Long Term Analysis for the German Power Market
Olav Johan Botnen - Long Term Analysis for the German Power MarketInnovation Norway
 
Enea 2016 Q1 - financial results (english)
Enea 2016 Q1 - financial results (english)Enea 2016 Q1 - financial results (english)
Enea 2016 Q1 - financial results (english)Enea
 
Enea 2015 H1 - financial results (english)
Enea 2015 H1 - financial results (english) Enea 2015 H1 - financial results (english)
Enea 2015 H1 - financial results (english) Enea
 
Enea 2016 Q3 - financial results (english)
Enea 2016 Q3 - financial results (english) Enea 2016 Q3 - financial results (english)
Enea 2016 Q3 - financial results (english) Enea
 
Terna 2018 2022 Strategic Plan Grid and Values
Terna 2018 2022 Strategic Plan Grid and ValuesTerna 2018 2022 Strategic Plan Grid and Values
Terna 2018 2022 Strategic Plan Grid and ValuesTerna SpA
 
Press release Q1 2015
Press release Q1 2015Press release Q1 2015
Press release Q1 2015Hera Group
 

What's hot (20)

Vattenfall's year-end report 2015
Vattenfall's year-end report 2015Vattenfall's year-end report 2015
Vattenfall's year-end report 2015
 
Year-End report 2021 – Vattenfall
Year-End report 2021 – VattenfallYear-End report 2021 – Vattenfall
Year-End report 2021 – Vattenfall
 
Vattenfall Q2 report 2019
Vattenfall Q2 report 2019Vattenfall Q2 report 2019
Vattenfall Q2 report 2019
 
Vattenfall's Q3 report 2018
Vattenfall's Q3 report 2018Vattenfall's Q3 report 2018
Vattenfall's Q3 report 2018
 
Q3 2019: Interim report January-September
Q3 2019: Interim report January-SeptemberQ3 2019: Interim report January-September
Q3 2019: Interim report January-September
 
Enea 2016 H1 - financial results (english)
Enea 2016 H1 - financial results (english) Enea 2016 H1 - financial results (english)
Enea 2016 H1 - financial results (english)
 
Enea 2017 H1 - financial results (english)
Enea 2017 H1 - financial results (english)Enea 2017 H1 - financial results (english)
Enea 2017 H1 - financial results (english)
 
Enea 2017 Q1 - financial results (english)
Enea 2017 Q1 - financial results (english)Enea 2017 Q1 - financial results (english)
Enea 2017 Q1 - financial results (english)
 
Enea 2015 - financial results (english)
Enea 2015 - financial results (english)Enea 2015 - financial results (english)
Enea 2015 - financial results (english)
 
Year end report 2018 - Vattenfall
Year end report 2018 - VattenfallYear end report 2018 - Vattenfall
Year end report 2018 - Vattenfall
 
Enea 2017 Q3 - financial results (english)
Enea 2017 Q3 - financial results (english)Enea 2017 Q3 - financial results (english)
Enea 2017 Q3 - financial results (english)
 
Vattenfall's quarterly report January - March 2015
Vattenfall's quarterly report January - March 2015Vattenfall's quarterly report January - March 2015
Vattenfall's quarterly report January - March 2015
 
Year-End report 2019 - Vattenfall
Year-End report 2019 - VattenfallYear-End report 2019 - Vattenfall
Year-End report 2019 - Vattenfall
 
Snam 2020 - 1Q Results
Snam 2020 - 1Q Results Snam 2020 - 1Q Results
Snam 2020 - 1Q Results
 
Olav Johan Botnen - Long Term Analysis for the German Power Market
Olav Johan Botnen - Long Term Analysis for the German Power MarketOlav Johan Botnen - Long Term Analysis for the German Power Market
Olav Johan Botnen - Long Term Analysis for the German Power Market
 
Enea 2016 Q1 - financial results (english)
Enea 2016 Q1 - financial results (english)Enea 2016 Q1 - financial results (english)
Enea 2016 Q1 - financial results (english)
 
Enea 2015 H1 - financial results (english)
Enea 2015 H1 - financial results (english) Enea 2015 H1 - financial results (english)
Enea 2015 H1 - financial results (english)
 
Enea 2016 Q3 - financial results (english)
Enea 2016 Q3 - financial results (english) Enea 2016 Q3 - financial results (english)
Enea 2016 Q3 - financial results (english)
 
Terna 2018 2022 Strategic Plan Grid and Values
Terna 2018 2022 Strategic Plan Grid and ValuesTerna 2018 2022 Strategic Plan Grid and Values
Terna 2018 2022 Strategic Plan Grid and Values
 
Press release Q1 2015
Press release Q1 2015Press release Q1 2015
Press release Q1 2015
 

Similar to Q3 presentation 2015 for Vattenfall

Vattenfall's year-end report 2016
Vattenfall's year-end report 2016Vattenfall's year-end report 2016
Vattenfall's year-end report 2016Vattenfall
 
2020 Interim Results
2020 Interim Results2020 Interim Results
2020 Interim ResultsSnam
 
Second Quarter 2015 Results
Second Quarter 2015 ResultsSecond Quarter 2015 Results
Second Quarter 2015 ResultsERG S.p.A.
 
Year-End report 2020 – Vattenfall
Year-End report 2020 – VattenfallYear-End report 2020 – Vattenfall
Year-End report 2020 – VattenfallVattenfall
 
Enea 2015 Q3 - financial results (english)
Enea 2015 Q3 - financial results (english)Enea 2015 Q3 - financial results (english)
Enea 2015 Q3 - financial results (english)Enea
 
Q1 2018: Interim report January-March
Q1 2018: Interim report January-MarchQ1 2018: Interim report January-March
Q1 2018: Interim report January-MarchVattenfall
 
Wärtsilä Corporation's Result presentation 2018
Wärtsilä Corporation's Result presentation 2018Wärtsilä Corporation's Result presentation 2018
Wärtsilä Corporation's Result presentation 2018Wärtsilä Corporation
 
Q2 2020: Interim report January-June
Q2 2020: Interim report January-JuneQ2 2020: Interim report January-June
Q2 2020: Interim report January-JuneVattenfall
 
Q3 2023: Interim report January- September
Q3 2023: Interim report January- SeptemberQ3 2023: Interim report January- September
Q3 2023: Interim report January- SeptemberVattenfall
 
2021 1H Consolidated results
2021 1H Consolidated results2021 1H Consolidated results
2021 1H Consolidated resultsSnam
 
Q2 2021: Interim report January-June
Q2 2021: Interim report January-JuneQ2 2021: Interim report January-June
Q2 2021: Interim report January-JuneVattenfall
 
2023 1Q Consolidated results
2023 1Q Consolidated results2023 1Q Consolidated results
2023 1Q Consolidated resultsSnam
 
Q2 2023: Interim report January- June
Q2 2023: Interim report January- JuneQ2 2023: Interim report January- June
Q2 2023: Interim report January- JuneVattenfall
 
FOURTH QUARTER 2015 RESULTS
FOURTH QUARTER 2015 RESULTSFOURTH QUARTER 2015 RESULTS
FOURTH QUARTER 2015 RESULTSERG S.p.A.
 
ACCIONA FY 2014 results report #ACCIONAFY14
ACCIONA FY 2014 results report #ACCIONAFY14 ACCIONA FY 2014 results report #ACCIONAFY14
ACCIONA FY 2014 results report #ACCIONAFY14 acciona
 
Evaluation of Energy Efficiency policies in Italy - Daniel Giannetti, GSE
Evaluation of Energy Efficiency policies in Italy - Daniel Giannetti, GSEEvaluation of Energy Efficiency policies in Italy - Daniel Giannetti, GSE
Evaluation of Energy Efficiency policies in Italy - Daniel Giannetti, GSEGestore dei Servizi Energetici
 
Vattenfall's year-end report 2017
Vattenfall's year-end report 2017Vattenfall's year-end report 2017
Vattenfall's year-end report 2017Vattenfall
 
Q3: Interim report January-September 2022
Q3: Interim report January-September 2022Q3: Interim report January-September 2022
Q3: Interim report January-September 2022Vattenfall
 

Similar to Q3 presentation 2015 for Vattenfall (20)

Vattenfall's year-end report 2016
Vattenfall's year-end report 2016Vattenfall's year-end report 2016
Vattenfall's year-end report 2016
 
2020 Interim Results
2020 Interim Results2020 Interim Results
2020 Interim Results
 
Second Quarter 2015 Results
Second Quarter 2015 ResultsSecond Quarter 2015 Results
Second Quarter 2015 Results
 
Year-End report 2020 – Vattenfall
Year-End report 2020 – VattenfallYear-End report 2020 – Vattenfall
Year-End report 2020 – Vattenfall
 
Enea 2015 Q3 - financial results (english)
Enea 2015 Q3 - financial results (english)Enea 2015 Q3 - financial results (english)
Enea 2015 Q3 - financial results (english)
 
Q1 2018: Interim report January-March
Q1 2018: Interim report January-MarchQ1 2018: Interim report January-March
Q1 2018: Interim report January-March
 
Wärtsilä Corporation's Result presentation 2018
Wärtsilä Corporation's Result presentation 2018Wärtsilä Corporation's Result presentation 2018
Wärtsilä Corporation's Result presentation 2018
 
Q2 2020: Interim report January-June
Q2 2020: Interim report January-JuneQ2 2020: Interim report January-June
Q2 2020: Interim report January-June
 
Result presentation Q2 2016
Result presentation Q2 2016Result presentation Q2 2016
Result presentation Q2 2016
 
Q3 2023: Interim report January- September
Q3 2023: Interim report January- SeptemberQ3 2023: Interim report January- September
Q3 2023: Interim report January- September
 
2021 1H Consolidated results
2021 1H Consolidated results2021 1H Consolidated results
2021 1H Consolidated results
 
Q2 2021: Interim report January-June
Q2 2021: Interim report January-JuneQ2 2021: Interim report January-June
Q2 2021: Interim report January-June
 
2023 1Q Consolidated results
2023 1Q Consolidated results2023 1Q Consolidated results
2023 1Q Consolidated results
 
Q2 2023: Interim report January- June
Q2 2023: Interim report January- JuneQ2 2023: Interim report January- June
Q2 2023: Interim report January- June
 
Result presentation 2016
Result presentation 2016Result presentation 2016
Result presentation 2016
 
FOURTH QUARTER 2015 RESULTS
FOURTH QUARTER 2015 RESULTSFOURTH QUARTER 2015 RESULTS
FOURTH QUARTER 2015 RESULTS
 
ACCIONA FY 2014 results report #ACCIONAFY14
ACCIONA FY 2014 results report #ACCIONAFY14 ACCIONA FY 2014 results report #ACCIONAFY14
ACCIONA FY 2014 results report #ACCIONAFY14
 
Evaluation of Energy Efficiency policies in Italy - Daniel Giannetti, GSE
Evaluation of Energy Efficiency policies in Italy - Daniel Giannetti, GSEEvaluation of Energy Efficiency policies in Italy - Daniel Giannetti, GSE
Evaluation of Energy Efficiency policies in Italy - Daniel Giannetti, GSE
 
Vattenfall's year-end report 2017
Vattenfall's year-end report 2017Vattenfall's year-end report 2017
Vattenfall's year-end report 2017
 
Q3: Interim report January-September 2022
Q3: Interim report January-September 2022Q3: Interim report January-September 2022
Q3: Interim report January-September 2022
 

More from Vattenfall

Kvartal 3 2023: Delårsrapport Januari-September
Kvartal 3 2023: Delårsrapport Januari-SeptemberKvartal 3 2023: Delårsrapport Januari-September
Kvartal 3 2023: Delårsrapport Januari-SeptemberVattenfall
 
Kvartal 2 2023: Delårsrapport Januari-Juni
Kvartal 2 2023: Delårsrapport Januari-JuniKvartal 2 2023: Delårsrapport Januari-Juni
Kvartal 2 2023: Delårsrapport Januari-JuniVattenfall
 
Q1 2023: Interim Report January-March
Q1 2023: Interim Report January-MarchQ1 2023: Interim Report January-March
Q1 2023: Interim Report January-MarchVattenfall
 
Kvartal 1 2023: Delårsrapport januari-mars
Kvartal 1 2023: Delårsrapport januari-marsKvartal 1 2023: Delårsrapport januari-mars
Kvartal 1 2023: Delårsrapport januari-marsVattenfall
 
Year-End Report 2022
Year-End Report 2022Year-End Report 2022
Year-End Report 2022Vattenfall
 
Bokslutskommuniké 2022
Bokslutskommuniké 2022Bokslutskommuniké 2022
Bokslutskommuniké 2022Vattenfall
 
Kvartal 3 2022: Delårsrapport januari-september
Kvartal 3 2022: Delårsrapport januari-septemberKvartal 3 2022: Delårsrapport januari-september
Kvartal 3 2022: Delårsrapport januari-septemberVattenfall
 
Q2 2022: Interim report January-June
Q2 2022: Interim report January-JuneQ2 2022: Interim report January-June
Q2 2022: Interim report January-JuneVattenfall
 
Kvartal 2 2022: Delårsrapport januari-juni 2022
Kvartal 2 2022: Delårsrapport januari-juni 2022Kvartal 2 2022: Delårsrapport januari-juni 2022
Kvartal 2 2022: Delårsrapport januari-juni 2022Vattenfall
 
Kvartal 1 2022: Delårsrapport januari-mars
Kvartal 1 2022: Delårsrapport januari-marsKvartal 1 2022: Delårsrapport januari-mars
Kvartal 1 2022: Delårsrapport januari-marsVattenfall
 
Q1 2022: Interim Report January-March
Q1 2022: Interim Report January-MarchQ1 2022: Interim Report January-March
Q1 2022: Interim Report January-MarchVattenfall
 
Bokslutskommuniké 2021 - Vattenfall
Bokslutskommuniké 2021 - VattenfallBokslutskommuniké 2021 - Vattenfall
Bokslutskommuniké 2021 - VattenfallVattenfall
 
Kvartal 3 2021: Delårsrapport januari-september 2021
Kvartal 3 2021: Delårsrapport januari-september 2021Kvartal 3 2021: Delårsrapport januari-september 2021
Kvartal 3 2021: Delårsrapport januari-september 2021Vattenfall
 
Kvartal 2 2021: Delårsrapport januari-juni 2021
Kvartal 2 2021: Delårsrapport januari-juni 2021Kvartal 2 2021: Delårsrapport januari-juni 2021
Kvartal 2 2021: Delårsrapport januari-juni 2021Vattenfall
 
Kvartal 1 2021: Delårsrapport januari-mars 2021
Kvartal 1 2021: Delårsrapport januari-mars 2021Kvartal 1 2021: Delårsrapport januari-mars 2021
Kvartal 1 2021: Delårsrapport januari-mars 2021Vattenfall
 
Q1 2021: Interim Report January-March
Q1 2021: Interim Report January-MarchQ1 2021: Interim Report January-March
Q1 2021: Interim Report January-MarchVattenfall
 
Bokslutskommuniké 2020 – Vattenfall
Bokslutskommuniké 2020 – VattenfallBokslutskommuniké 2020 – Vattenfall
Bokslutskommuniké 2020 – VattenfallVattenfall
 
Third quarter 2020: Interim report January-September
Third quarter 2020: Interim report January-SeptemberThird quarter 2020: Interim report January-September
Third quarter 2020: Interim report January-SeptemberVattenfall
 
Kvartal 3 2020: Delårsrapport januari-september 2020
Kvartal 3 2020: Delårsrapport januari-september 2020Kvartal 3 2020: Delårsrapport januari-september 2020
Kvartal 3 2020: Delårsrapport januari-september 2020Vattenfall
 
Kvartal 2 2020: Delårsrapport januari-juni 2020
Kvartal 2 2020: Delårsrapport januari-juni 2020Kvartal 2 2020: Delårsrapport januari-juni 2020
Kvartal 2 2020: Delårsrapport januari-juni 2020Vattenfall
 

More from Vattenfall (20)

Kvartal 3 2023: Delårsrapport Januari-September
Kvartal 3 2023: Delårsrapport Januari-SeptemberKvartal 3 2023: Delårsrapport Januari-September
Kvartal 3 2023: Delårsrapport Januari-September
 
Kvartal 2 2023: Delårsrapport Januari-Juni
Kvartal 2 2023: Delårsrapport Januari-JuniKvartal 2 2023: Delårsrapport Januari-Juni
Kvartal 2 2023: Delårsrapport Januari-Juni
 
Q1 2023: Interim Report January-March
Q1 2023: Interim Report January-MarchQ1 2023: Interim Report January-March
Q1 2023: Interim Report January-March
 
Kvartal 1 2023: Delårsrapport januari-mars
Kvartal 1 2023: Delårsrapport januari-marsKvartal 1 2023: Delårsrapport januari-mars
Kvartal 1 2023: Delårsrapport januari-mars
 
Year-End Report 2022
Year-End Report 2022Year-End Report 2022
Year-End Report 2022
 
Bokslutskommuniké 2022
Bokslutskommuniké 2022Bokslutskommuniké 2022
Bokslutskommuniké 2022
 
Kvartal 3 2022: Delårsrapport januari-september
Kvartal 3 2022: Delårsrapport januari-septemberKvartal 3 2022: Delårsrapport januari-september
Kvartal 3 2022: Delårsrapport januari-september
 
Q2 2022: Interim report January-June
Q2 2022: Interim report January-JuneQ2 2022: Interim report January-June
Q2 2022: Interim report January-June
 
Kvartal 2 2022: Delårsrapport januari-juni 2022
Kvartal 2 2022: Delårsrapport januari-juni 2022Kvartal 2 2022: Delårsrapport januari-juni 2022
Kvartal 2 2022: Delårsrapport januari-juni 2022
 
Kvartal 1 2022: Delårsrapport januari-mars
Kvartal 1 2022: Delårsrapport januari-marsKvartal 1 2022: Delårsrapport januari-mars
Kvartal 1 2022: Delårsrapport januari-mars
 
Q1 2022: Interim Report January-March
Q1 2022: Interim Report January-MarchQ1 2022: Interim Report January-March
Q1 2022: Interim Report January-March
 
Bokslutskommuniké 2021 - Vattenfall
Bokslutskommuniké 2021 - VattenfallBokslutskommuniké 2021 - Vattenfall
Bokslutskommuniké 2021 - Vattenfall
 
Kvartal 3 2021: Delårsrapport januari-september 2021
Kvartal 3 2021: Delårsrapport januari-september 2021Kvartal 3 2021: Delårsrapport januari-september 2021
Kvartal 3 2021: Delårsrapport januari-september 2021
 
Kvartal 2 2021: Delårsrapport januari-juni 2021
Kvartal 2 2021: Delårsrapport januari-juni 2021Kvartal 2 2021: Delårsrapport januari-juni 2021
Kvartal 2 2021: Delårsrapport januari-juni 2021
 
Kvartal 1 2021: Delårsrapport januari-mars 2021
Kvartal 1 2021: Delårsrapport januari-mars 2021Kvartal 1 2021: Delårsrapport januari-mars 2021
Kvartal 1 2021: Delårsrapport januari-mars 2021
 
Q1 2021: Interim Report January-March
Q1 2021: Interim Report January-MarchQ1 2021: Interim Report January-March
Q1 2021: Interim Report January-March
 
Bokslutskommuniké 2020 – Vattenfall
Bokslutskommuniké 2020 – VattenfallBokslutskommuniké 2020 – Vattenfall
Bokslutskommuniké 2020 – Vattenfall
 
Third quarter 2020: Interim report January-September
Third quarter 2020: Interim report January-SeptemberThird quarter 2020: Interim report January-September
Third quarter 2020: Interim report January-September
 
Kvartal 3 2020: Delårsrapport januari-september 2020
Kvartal 3 2020: Delårsrapport januari-september 2020Kvartal 3 2020: Delårsrapport januari-september 2020
Kvartal 3 2020: Delårsrapport januari-september 2020
 
Kvartal 2 2020: Delårsrapport januari-juni 2020
Kvartal 2 2020: Delårsrapport januari-juni 2020Kvartal 2 2020: Delårsrapport januari-juni 2020
Kvartal 2 2020: Delårsrapport januari-juni 2020
 

Recently uploaded

The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...lizamodels9
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperityhemanthkumar470700
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...amitlee9823
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 

Recently uploaded (20)

The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 

Q3 presentation 2015 for Vattenfall

  • 1. Vattenfall Q3 and 9M results 2015 Magnus Hall, CEO and Ingrid Bonde, CFO Presentation 27 October 2015
  • 2. Financial highlights Vattenfall Q3 2015 Results | Presentation | 27 October 20152 SEK bn Q3 2015 Q3 2014 9M 2015 9M 2014 FY 2014 Net Sales 37.5 34.7 119.0 117.2 165.9 Underlying EBIT 3.4 2.8 14.1 15.9 24.1 EBIT 3.0 -19.4 -26.7 -9.2 -2.2 Profit after tax 1.6 -18.1 -22.2 -12.2 -8.3 Return on capital employed (ROCE), % -7.1* -1.9* -7.1* -1.9* -0.7 Return on capital employed (ROCE) excl. items affecting comparability, % 8.1* 8.1* 8.1* 8.1* 8.2 * Last twelve months
  • 3. 15 20 25 30 35 40 45 50 55 60 2013 2014 2015 EEX 2016 EEX 2017 ICE 2016 ICE 2017 NPX 2016 NPX 2017 EUR/MWh Pricing environment Electricity futures 3 Monthly spot power price average Commodity prices Vattenfall Q3 2015 Results | Presentation | 27 October 20153 • Nordic spot prices 58% lower vs Q3/2014, mainly due to high precipitation • German and Dutch spot prices approx. 5% higher vs Q3/2014, mainly due to higher exports • Electricity futures prices lower on all Vattenfall’s markets • Lower prices on oil (Brent crude), coal and gas. Higher prices on CO2 emission allowances 5 15 25 35 45 55 65 2013 2014 2015 EPEX APX NordPool EUR/MWh 0 5 10 15 20 25 30 35 40 40 50 60 70 80 90 100 110 120 2013 2014 2015 Coal (USD/t), API2, Front Year Oil (USD/bbl), Brent Front Month Emission allowances CO2 (EUR/t), Dec 09-12 Gas (EUR/MWh), NBP, Front Year USD EUR
  • 4. Increased electricity generation in Q3 Vattenfall Q3 2015 Results | Presentation | 27 October 20154 0 5 10 15 20 25 6.1 9.5 Nuclear 11.0 9.1 Fossil 18.8 21.4 0.1 0.2 Biomass, wasteWind 0.71.1 Hydro Q3 2014: 36.8 TWh Q3 2015: 41.2 TWh • Total electricity generation output increased by 4.4 TWh vs. Q3/2014 - Fossil based generation increased due to the commissioning of German Moorburg Block A - Nuclear generation decreased, mainly due to extended outages at Ringhals 2 and Forsmark 3 - Hydro power increased due to higher precipitation - Wind power generation increased, mainly thanks to the new wind farms DanTysk (Ger) and Clashindarroch (UK) TWh
  • 5. Regulatory development Vattenfall Q3 2015 Results | Presentation | 27 October 2015 German nuclear stress test • Provisions for nuclear decommissioning deemed within acceptable range according to stress test carried out by the German government. Nuclear Commission appointed to look into fund/foundation solution, work starts in November Structural reforms to strengthen the EU ETS system • Market Stability Reserve (MSR) in place by 1 January 2019. • Legislative proposal to further revise the EU ETS directive tabled by the European Commission on 15 July and currently in the legislative process Lignite standby capacity reserve • Bilateral agreements between lignite operators and the German government on establishment of a standby capacity reserve of lignite plants with a total capacity of 2,700 MW and their subsequent decommissioning. Vattenfall to contribute 1,000 MW 55
  • 6. Lignite standby capacity reserve • Bilateral agreements reached between lignite operators and the government to establish a temporary standby capacity reserve of lignite plants with a combined capacity of 2,700 MW. Plants will gradually be transferred to the reserve during 2016 and 2019. After four years the plants shall be shut down completely • With Jänschwalde units F and E (each 500 MW) Vattenfall will contribute 1,000 MW to the reserve. Units to be placed in standby mode on 1 October 2018 and 2019 respectively, and subsequently shut down in 2022 and 2023 • 1,000 MW corresponds to approx. 13% of Vattenfall’s total installed lignite capacity of 7,800 MW. The closure of the two units corresponds to a reduction of 8 million tonnes of CO2 emissions • Plant owners will be remunerated for keeping the plants in the standby reserve. According to the government, remuneration for all plants in the reserve will amount to approximately EUR 230 million per year over seven years, to be paid by the transmission system operator. The detailed design and the mechanisms of the remuneration scheme are still to be worked out by the legislative bodies Vattenfall Q3 2015 Results | Presentation | 27 October 20156
  • 7. Ongoing process to divest lignite assets • On 22 September Vattenfall announced the next step in the lignite sales process by publicly inviting potential bidders to state their interest in acquiring Vattenfall’s German lignite assets • By 20 October Vattenfall has received statements of interest from a number of potential bidders • Qualification process is now ongoing • Vattenfall’s ambition is to reach an agreement in H1 2016 Vattenfall Q3 2015 Results | Presentation | 27 October 20157
  • 8. Update on early phase out of Ringhals 1 and 2 Vattenfall changed direction for operational lifetimes of Ringhals 1 and 2, meaning an early closure by 2020 instead of, around 2025 as previously announced Ringhals AB Board of Directors decided to limit investments in the reactors 1 and 2 An extraordinary general meeting of Ringhals AB decided to phase out Ringhals 2 in 2019 and Ringhals 1 in 2020 Vattenfall Q3 2015 Results | Presentation | 27 October 20158 Ringhals 1 Ringhals 2 Commercial start up (year) 1976 1975 Installed capacity (MW) 879 809 Average annual generation (TWh) 6.3 5.9 • 28 April • 28 August • 15 October • The existing plans of at least 60 years of operation remain unchanged for Vattenfall’s five other nuclear reactors Ringhals 3 and 4 and Forsmark 1,2 and 3
  • 9. Update on German nuclear provisions • On 10 October the German government published a stress-test prepared by the government appointed auditing firm Warth & Klein Thornton AG • The auditing firm reported that they have found no reason to dispute the nuclear power operator’s principles for calculating their nuclear provisions • The government has appointed a special commission to issue recommendations, by January 2016, on how to secure the long-term financing of nuclear decommissioning costs, including a possible fund/foundation solution • Vattenfall has made provisions of approximately EUR 3bn for the decommissioning of its partly owned nuclear plants in Germany, including the disposal of nuclear waste Vattenfall Q3 2015 Results | Presentation | 27 October 20159
  • 10. Other important events • Decision to invest approx. SEK 1.2bn in Ray Wind Farm, a new, 54 MW, onshore wind farm in the UK - To be commissioned in early 2017 • Vattenfall’s largest wind repowering project, Klim, was completed. With 70.4 MW Klim is Denmarks largest onshore wind farm • Final payment for shares in N.V. Nuon Energy - On 1 July EUR 2,071.3 million (approx. SEK 19bn) was paid for the remaining 21% of the shares • Rating changes - Moody’s affirmed long-term ”A3” rating, but changed outlook from stable to negative - S&P changed long-term rating from ”A-” to ”BBB+” and changed outlook to negative Vattenfall Q3 2015 Results | Presentation | 27 October 201510
  • 11. Financials Ingrid Bonde, CFO Vattenfall Q3 2015 Results | Presentation | 27 October 201511
  • 12. Q3 2015 Financial highlights Vattenfall Q3 2015 Results | Presentation | 27 October 201512 SEK bn Q3 2015 Q3 2014 Net Sales 37.5 34.7 EBITDA 7.5 8.4 Underlying EBITDA (excl. items affecting comparability) 7.8 7.5 EBIT 3.0 -19.4 Underlying EBIT (excl. items affecting comparability) 3.4 2.8 Financial items, net -1.1 -1.4 Profit after tax 1.6 -18.1 Cash flow (FFO) 5.7 5.0 Operating cash flow (after change in working capital) 14.9 10.0 Net debt 65.4 79.5* Adjusted net debt 143.1 158.3* FFO/Adjusted net debt (%) 22.5** 17.3** Adjusted net debt/EBITDA (times) 4.0** 4.0** * As of 31 December 2014 ** Last twelve months
  • 13. Development of underlying EBIT Q3 2015 Vattenfall Q3 2015 Results | Presentation | 27 October 201513 0.4 Operating costs 0.5 Electricity distribution 0.3 Production margins -0.8 Generation volumes 0.5 Underlying EBIT Q3 2014 2.8 3.4 Underlying EBIT Q3 2015 Other -0.3 Depreciation SEK bn
  • 14. Development of underlying EBIT 9M 2015 Vattenfall Q3 2015 Results | Presentation | 27 October 201514 SEK bn 0.5 Underlying EBIT 9M 2015 14.1 Other 0.4 Sales business 0.5 Electricity distribution Generation volumes -0.4 Production margins -2.8 Underlying EBIT 9M 2014 15.9
  • 15. Underlying EBIT per operating segment – Q3 2015 Vattenfall Q3 2015 Results | Presentation | 27 October 201515 SEK bn Q3 2015 Q3 2014 FY 2014 Customers & Solutions 0.2 0.1 1.0 Power Generation 2.9 2.6 15.6 Wind 0.1 0.1 1.7 Heat -0.5 -0.4 2.4 Distribution 1.1 0.8 4.4 Other* -0.4 -0.3 -1.0 Eliminations ̶ -0.1 - Total 3.4 2.8 24.1 * Other pertains mainly to all Staff functions including Treasury activities and Shared Service Centres
  • 16. Cash flow development Q3 2015 Vattenfall Q3 2015 Results | Presentation | 27 October 201516 Cash flow from operating activities 14.8 Growth investments -3.6 Free cash flow 10.5 Maintenance investments -4.3 7.0 Cash flow before financing activities Divestments, net 0.1 SEK bn
  • 17. Capital expenditures Vattenfall Q3 2015 Results | Presentation | 27 October 201517 SEK bn Q3 2015 Q3 2014 Change % 9M 2015 9M 2014 Change % FY 2014 Electricity generation 4.6 4.6 ̶ 12.6 11.9 5.9 17.9 CHP/Heat 1.0 0.9 11.1 2.0 2.1 -4.8 3.7 Electricity networks 1.0 1.0 ̶ 2.8 3.0 -6.7 5.0 Other 1.4 1.4 ̶ 2.9 2.2 31.8 2.4 TOTAL 8.0 7.9 1.3 20.3 19.2 5.7 29.0 - of which maintenance and replacement 4.3 3.9 10.3 10.6 10.7 -0.9 16.9 - of which growth 3.6 4.0 -10.0 9.7 8.5 14.1 12.1
  • 18. Current year Current year +1 Current year +2 Ratio Price Year Ratio Price Year Ratio Price Year Dec 2012 100% 55 2012 77% 52 2013 44% 50 2014 Dec 2013 100% 50 2013 95% 44 2014 56% 40 2015 Dec 2014 99% 45 2015 87% 39 2016 55% 36 2017 Sept. 2015 100% 44 2015 93% 39 2016 74% 36 2017 Development of hedge ratios and hedge prices Vattenfall Q3 2015 Results | Presentation | 27 October 201518 5051 75 53 6867 59 7273 77 83 72 Current year+2Current year+1Current year FY 2012 30 Sept. 2015FY 2014FY 2013 Current year Current year +1 Current year +2 Ratio Price Year Ratio Price Year Ratio Price Year Dec 2012 75% 45 2012 51% 42 2013 50% 41 2014 Dec 2013 67% 40 2013 68% 39 2014 53% 37 2015 Dec 2014 73% 36 2015 72% 34 2016 59% 32 2017 Sept. 2015 72% 37 2015 83% 33 2016 77% 31 2017 Hedge ratios - Nordic Hedge ratios – Continental Europe 44 77 100 56 95 100 55 87 99 74 93 100 Current year Current year+1 Current year+2 30 Sept. 2015FY 2013 FY 2014FY 2012 % % Note: hedge ratios in % and hedge prices in EUR/MWh
  • 19. Financial and sustainability targets Vattenfall Q3 2015 Results | Presentation | 27 October 201519 Financial metrics Target Outcome 30 Sept. 2015 Outcome FY 2014 Return on Capital Employed (ROCE) (Return on capital employed excl. items affecting comparability) 9.0% -7.1%* (8.1%) -0.7% (8.2%) Net debt/Equity 50-90% 57.2% 61.9% FFO/Adjusted net debt 22-30% 22.5* 20.3% Dividend policy (% of profit after tax) 40-60% ̶ zero * Last twelve months Sustainability metrics & targets Outcome Jan-Sept 2015 Outcome FY 2014 Reduce CO2 exposure to 65 Mtonnes by 2020 (93.7 Mtonnes in 2010) 61.4 Mtonnes 82.3 Mtonnes Growth in renewable electricity generation capacity to be higher than the average rate of growth for ten reference countries 11.8% 6.3% (Preliminary growth rate for reference countries: 9.1%) Energy efficiency to save 440 GWh in 2015 992 GWh 435 GWh
  • 20. Summary and conclusions Vattenfall Q3 2015 Results | Presentation | 27 October 201520
  • 21. Summary and conclusions • Increased Q3 results compared to last year but market conditions remain challenging, with a considerable capacity surplus and low electricity prices, which squeezes production margins • Despite having lowered annual controllable costs by 27% since 2010, our cost-cutting efforts must continue • Provisions for German nuclear decommissioning deemed within acceptable range according to stress test • Lignite sale process continues. We expect to reach an agreement in H1 2016 • Vattenfall to transfer 1,000 MW lignite capacity to a standby reserve, subject to financial compensation Vattenfall’s new Vision Vattenfall Q3 2015 Results | Presentation | 27 October 201521 Vattenfall is a dedicated partner to our customers and society at large, providing convenient and innovative energy solutions. We are a leader in sustainable production, ensuring reliable and cost-efficient energy supply. We call this ”Energy You Want”
  • 22. Appendix Vattenfall Q3 2015 Results | Presentation | 27 October 201522
  • 23. 9M 2015 Financial highlights Vattenfall Q3 2015 Results | Presentation | 27 October 201523 SEK bn 9M 2015 9M 2014 Net Sales 119.0 117.2 EBITDA 23.9 28.9 Underlying EBITDA (excl. items affecting comparability) 28.7 30.3 EBIT -26.7 -9.2 Underlying EBIT (excl. items affecting comparability) 14.1 15.9 Financial items, net -4.1 -4.5 Profit after tax -22.2 -12.2 Cash flow (FFO) 19.6 19.7 Operating cash flow (after change in working capital) 31.3 25.8 Net debt 65.4 79.5* Adjusted net debt 143.1 158.3* FFO/Adjusted net debt (%) 22.5** 17.3** Adjusted net debt/EBITDA (times) 4.0** 4.0** * As of 31 December 2014 ** Last twelve months
  • 24. Underlying EBIT per operating segment – 9M 2015 Vattenfall Q3 2015 Results | Presentation | 27 October 201524 SEK bn 9M 2015 9M 2014 FY 2014 Customers & Solutions 1.3 0.6 1.0 Power Generation 8.8 11.6 15.6 Wind 0.8 0.6 1.7 Heat 1.4 1.2 2.4 Distribution 3.8 3.0 4.4 Other* -1.8 -0.9 -1.0 Eliminations -0.2 -0.2 - Total 14.1 15.9 24.1 * Other pertains mainly to all Staff functions including Treasury activities and Shared Service Centres
  • 25. Debt development Vattenfall Q3 2015 Results | Presentation | 27 October 201525 0 20 40 60 80 100 120 140 160 180 200 30.06.2015 31.03.2015 31.12.2014 30.09.2014 30.06.2014 31.03.2014 31.12.2013 30.09.2013 30.06.2013 31.03.2013 31.12.2012 30.09.2012 30.06.2012 31.03.2012 31.12.2011 30.9.2011 30.6.2011 31.3.2011 30.09.2015 Gross debt Adjusted net debt Net debt Net debt decreased by SEK 14.1bn compared with 31 December 2014. Adjusted net debt decreased by SEK 15.2bn, compared with 31 December 2014. For the calculation of adjusted net debt, see Appendix. SEK bn
  • 26. Continued strong liquidity position September 2015 Vattenfall Q3 2015 Results | Presentation | 27 October 201526 Group liquidity MSEK Cash and cash equivalents 12,497 Short term investments 30,867 Reported cash, cash equivalents & short term investments 43,364 Unavailable liquidity* -6,810 Available liquidity 36,555 Debt maturities** MSEK Within 90 days 6,135 Within 180 days 16,510 Committed credit facilities Facility size MSEK RCF (maturity Dec 2019) 2,000 MEUR 18,817 Total undrawn 18,817 * German nuclear ”Solidarvereinbarung” 3,203 MSEK, Margin calls paid (CSA) 2,555 MSEK, Insurance” Provisions for claims outstanding” 1,030 MSEK and Margin accounts 22 MSEK ** Excluding loans from minority owners and associated companies.
  • 27. Breakdown of gross debt as of 30 September 2015 Total debt : SEK 111bn (EUR 12bn) External market debt: SEK 95bn Vattenfall Q3 2015 Results | Presentation | 27 October 201527 Debt issuing programmes Size (MEUR) Utilization (MEUR) EUR 15bn Euro MTN 15,000 6,041 EUR 2bn Euro CP 2,000 460 SEK 15bn Domestic CP 1,594 160 Total 18,594 6,607 • All public debt is issued by Vattenfall AB • The main part of debt portfolio has no currency exposure that has an impact on the income statement. Debt in foreign currency is either swapped to SEK or booked as hedge against net foreign investments • No structural subordination Loans from associated companies 12% Loans from minority shareholders 5% 2% Commerical paper 4% EMTN58% Margin calls (CSA) Hybrid capital 14% 4% Bank loans and others
  • 28. Debt maturity profile* Vattenfall Q3 2015 Results | Presentation | 27 October 2015 * Loans from associated companies, minority owners, margin calls received (CSA) and valuation at fair value are excluded and currency derivatives for hedging debt in foreign currency are included ** The maturity of Capital Secturities (hybrid bonds) in 2022 and 2027 reflects first call date of the respective bond. 2828 30 Sept 2015 31 Dec 2014 Duration (years) 3.7 2.8 Average time to maturity (years) 8.4 5.6 Average interest rate (%) 4.0 3.6 Net debt (SEK bn) 65.4 79.5 Available group liquidity (SEK mn) 36,555 37,796 Undrawn committed credit facilities (SEK mn) 18,817 18,786 0 10 000 20 000 30 000 40 000 2015 2017 2019 2021 2023 2025 2027 2029 2031 2033 2035 2037 2039 Capital Securities Maturity profile Undrawn back-up facilities MSEK
  • 29. Reported and adjusted net debt Vattenfall Q3 2015 Results | Presentation | 27 October 201529 * Of which: German nuclear ”Solidarvereinbarung” 3.2, Margin calls paid (CSA) 2.6, Insurance “Provisions for claims outstanding” 1.0 Reported net debt (SEK billion) Sep 30 2015 Dec 31 2014 Hybrid capital -15.4 -9.4 Bond issues and commercial papers and liabilities to credit institutions -71.5 -72.5 Present value of liability pertaining to acquisition of subsidiaries - -19.3 Liabilities to associated companies -2.7 -2.6 Liabilities to minority shareholders -13.2 -12.4 Other liabilities -8.3 -9.8 Total interest-bearing liabilities -111.0 -125.9 Reported cash, cash equivalents & short-term investments 43.4 45.1 Loans to minority owners of foreign subsidiaries 2.3 1.4 Net debt -65.4 -79.5 Adjusted net debt (SEK billion) Sep 30 2015 Dec 31 2014 Total interest-bearing liabilities -111.0 -125.9 50% of Hybrid capital 7.7 4.7 Present value of pension obligations -42.3 -45.3 Mining & environmental provisions -18.0 -14.5 Provisions for nuclear power (net) -34.0 -33.7 Margin calls received 6.0 7.0 Liabilities to minority owners due to consortium agreements 12.1 11.6 = Adjusted gross debt -179.6 -196.1 Reported cash, cash equivalents & short-term investments 43.4 45.1 Unavailable liquidity -6.8* -7.3* = Adjusted cash, cash equivalents & short-term investments 36.6 37.8 = Adjusted net debt -143.1 -158.3
  • 30. Discount rates used in calculation of provisions Vattenfall Q3 2015 Results | Presentation | 27 October 201530 Type of provision Discount rate Inflation rate Real discount rate Nuclear, Germany 4.0% 3.0% 1.0% Nuclear, Sweden 4.0% 2.0% 2.0% Type of provision Discount rate Pensions, Germany 2.0% Pensions, Sweden 2.5% Discount rates for pensions in Sweden and Germany were raised in Q2 2015 as a result of increased market interest rates.
  • 31. Nuclear provisions as per 31 Dec 2014 Vattenfall Q3 2015 Results | Presentation | 27 October 201531 Reactor Net capacity (MW) Start (year) Vattenfall share (%) Vattenfall provisions, SEKbn (IFRS accounting) Vattenfall provisions, SEKbn (pro rata) Sw nuclear waste fund (Vattenfall pro rata share) Ringhals 1 879 1976 70.4 Ringhals 2 809 1975 70.4 Ringhals 3 1,070 1981 70.4 Total Ringhals: 21,672 Total Ringhals: 21,672 1) Ringhals 4 942 1983 70.4 Forsmark 1 984 1980 66.0 Forsmark 2 1,120 1981 66.0 Total Forsmark: 19,545 Total Forsmark: 12,900 Forsmark 3 1,170 1985 66.0 Total Sweden 6,974 - 41,217 34,572 26,808 2) Brunsbüttel 771 1977 66.7 17,730 11,817 Brokdorf 1,410 1986 20.0 0 4,133 Krümmel 1,346 1984 50.0 10,576 10,576 Stade 3) 640 1972 33.3 0 2,019 Total Germany 4,167 - - 28,306 28,545 Total Sw & Germ 11,141 69,523 63,117 1) Vattenfall is 100% liability of Ringhals decommissioning, while owning only 70.4% 2) Vattenfall’s share of the Nuclear Waste Fund (book value). IFRS consolidated value is SEK 41,217mn 3) Stade is being dismantled
  • 32. Overview of Vattenfall’s lignite operations Operating opencast mine areas Recultivation areas Approved mining fields Continuation Future fields Lignite-fuelled power plants Refining plant Central railway operation VEM Brandenburg Bagenz-Ost Spremberg-Ost Schwarze Pumpe Spree Guben Cottbus Forst/ Lausitz Spremberg Weißwasser Hoyerswerda Reichwalde mine Republic of Poland Jänschwalde mine Welzow-Süd mine Nochten mine Boxberg power plant Jänschwalde power plant Jänschwalde Storage site Landmark „Spreyer Höhe“ Saxony Welzow-Süd, partial section II Mining field 2 Nochten, Cottbus-Nord mine Jänschwalde-Nord * Outside of the Lusatian portfolio Lignite production 60-65mn tonnes/a Installed power plant capacity 8,095 MWgross Jänschwalde 3,000 MW Schwarze Pumpe 1,600 MW Boxberg 2,575 MW Lippendorf R* (Vattenfall share) 920 MW Electricity generation approx. 55 TWh/a Vattenfall Q3 2015 Results | Presentation | 27 October 201532