Introduction:
▪ Human Resource Information
System (HRIS) is a systematic
way of storing data and
information for each individual
employee to aid planning,
decision making, and
submitting of returns and
reports to the external
agencies.
▪ It can be briefly defined as
integrated systems used to
gather, store and analyze
information regarding an
organization’s human resources.
Steps in Developing and
Implementing HRIS:
Steps to be followed:
▪ The following steps are
involved in developing and
implementing an HRIS.
▪ Step 1:Inception of idea
The first step of HRIS
implementation is the
inception of the idea. The
need of the organization to
have HRIS software must
be realized and agreed by
the top management. It is
an investment and
management needs to keep
it in mind
▪ Step 2. Feasibility study
▪ As this is an investment the
feasibility of HRIS must be assessed.
▪ It covers the following areas
 Scope of the software
 Future benefits after implementation
 Potential software developers
assessment
 Cost estimate
 Value addition to business
 ROI calculation
▪ A proper feasibility study will help
the management to make the
decision based on facts and figures.
▪ Step 3. Selecting a project
team
 Implementation of HRIS is a
project as it requires ensuring
budgeted cost, specific timeline with
quality delivery.
 Successful implementation largely
depends on capability and effort of
project team.
 Project team members should be
taken from both HR and IT.
 Involvement of senior managers is
required to get the top management
buy in on different issues.
▪ Step 4. Defining the requirements
 At this stage the scope needs to be defined.
 It will not be a detailed requirement specification
but at least the processes that will be
incorporated in the software.
 Some organization may want to develop the
payroll module while others may want more
modules to be developed.
 It all depends on the affordability and plan of
the concerned organization. But it is an essential
step before communicating with the vendor or
software developers.
 Otherwise it will create complexity during
discussion and negotiation with the software
developers.
 At this stage the company HR policies and
processes must be analyzed and defined
rigorously.
 If there is any ambiguity in process, difficulty
may arise to incorporate it in the software
▪ Step 5. Vendor analysis
 Selecting the right software developer is
another challenge.
 The capability, track record and good will
of the developers must be taken into
consideration.
 The requirement of the organization must
be shared with the developers clearly
without ambiguity.
 The existing processes can be clarified with
them, if required. After getting clear
understanding about the requirement they
will come up with their offer that includes
cost and specific timeline for project
completion.
 The software requirement specification
needs to be documented to avoid ambiguity
in future.
▪ Step 6. Package contract
negotiation
 After getting the final offer
from the vendors, the decision
of work order will be finalized
based on cost and quality
actors.
 Then the contract will be signed
with the software developers.
 The development work will
start then.
 But the company needs to
monitor the development work
time to time to ensure on
time quality delivery of the
project.
▪ Step 7. Training
 Training usually begins as soon
as possible after the contract
has been signed.
 First, the members of the
project team are trained to use
the Human Resource
Information System.
 Toward the end of the
implementation, the human
resource representation will
train managers from other
departments in how to submit
information to the HRIS and
how to request information
from it.
▪ Step 8. Tailoring the
system
 After finalizing the
system requirement
specification, the design
of the software will be
initiated. The design
should be shared with
the company to identify
improvement areas
▪ Step 9. Collecting data
 At this stage required data
to enter in the software will
be collected.
 A team of HR needs to be
deployed to collect data for
the software. Data validation
is also required.
 This is a very critical part of
the project.
▪ Step 10. Testing the
system
 Once the system is
developed with data the
testing is required. Some
organizations call it User
Acceptance Test.
 At this stage the users
use it and try to check if
there is any gap between
requirement and the
delivery of the software.
 If the test is okay then
the final delivery is given
to the company.
▪ Step 11. Starting
up
 After the User
Acceptance the
software will be
installed in user’s
PC or web as per
system
configuration and
requirement
specification.
▪ Step 12. Running in
parallel
 It is a safe stand to run
the existing process
whether it is manual or
software and the new
software run in parallel.
 In case of any malfunction
of the new software the
process will not get
hampered.
 At least one full cycle of
the process needs to be
run in parallel to avoid any
technical hitch.
▪ Step 13. Maintenance
 Once the software has
been installed regular
maintenance and
performance monitoring
is essential.
 For effectiveness annual
maintenance contract
can be signed with the
software development
company.
▪ Step 14. Evaluation
 After running the
software for a certain
period of time the
performance evaluation
will be done. What value
the software has added
since its inception needs
to be evaluated
Development and implementation of hris

More Related Content

What's hot

T & d in ihrm
T & d in ihrmT & d in ihrm
T & d in ihrmjsindu
 
case analysis mahindra and mahindra and nokia (Trade unions)
case analysis mahindra and mahindra and nokia (Trade unions)case analysis mahindra and mahindra and nokia (Trade unions)
case analysis mahindra and mahindra and nokia (Trade unions)Sakshi Sharma
 
Dunlop’s system theory (1958) – theories of industrial relations - industria...
Dunlop’s system theory (1958) – theories of industrial relations -  industria...Dunlop’s system theory (1958) – theories of industrial relations -  industria...
Dunlop’s system theory (1958) – theories of industrial relations - industria...manumelwin
 
Collective bargaining 1
Collective bargaining 1Collective bargaining 1
Collective bargaining 1Komal Kataria
 
Industrial relations & concept and approaches
Industrial relations & concept and approachesIndustrial relations & concept and approaches
Industrial relations & concept and approachesjpbbk
 
Techniques of Strategic Evaluation & Strategic
Techniques of Strategic Evaluation & Strategic Techniques of Strategic Evaluation & Strategic
Techniques of Strategic Evaluation & Strategic Manik Kudyar
 
Success and failures in organization design
Success and failures in organization designSuccess and failures in organization design
Success and failures in organization designNivethithaMeenakshi
 
Industrial disputes Act,1947
Industrial disputes Act,1947 Industrial disputes Act,1947
Industrial disputes Act,1947 Sylvester D'Souza
 
Wastage analysis
Wastage analysisWastage analysis
Wastage analysisanjupoonia
 
the role of state in industrial relations , role of state in IR
the role of state in industrial relations , role of state in IR the role of state in industrial relations , role of state in IR
the role of state in industrial relations , role of state in IR jagannath ojha
 
International Human Resources Management
International Human Resources ManagementInternational Human Resources Management
International Human Resources ManagementMaksudul Huq Chowdhury
 
Human resource informtion system ppt
Human resource informtion system pptHuman resource informtion system ppt
Human resource informtion system pptAnkur Bhadauria
 
Wageboard & pay comission
Wageboard & pay comissionWageboard & pay comission
Wageboard & pay comissionsimran nagi
 

What's hot (20)

Industrial Relations & Labour laws unit 1
Industrial Relations &  Labour laws  unit 1Industrial Relations &  Labour laws  unit 1
Industrial Relations & Labour laws unit 1
 
T & d in ihrm
T & d in ihrmT & d in ihrm
T & d in ihrm
 
case analysis mahindra and mahindra and nokia (Trade unions)
case analysis mahindra and mahindra and nokia (Trade unions)case analysis mahindra and mahindra and nokia (Trade unions)
case analysis mahindra and mahindra and nokia (Trade unions)
 
Dunlop’s system theory (1958) – theories of industrial relations - industria...
Dunlop’s system theory (1958) – theories of industrial relations -  industria...Dunlop’s system theory (1958) – theories of industrial relations -  industria...
Dunlop’s system theory (1958) – theories of industrial relations - industria...
 
Recent trends in trade union
Recent trends in trade unionRecent trends in trade union
Recent trends in trade union
 
DESIGNING A HR PORTAL
DESIGNING A HR PORTALDESIGNING A HR PORTAL
DESIGNING A HR PORTAL
 
Collective bargaining 1
Collective bargaining 1Collective bargaining 1
Collective bargaining 1
 
Industrial relations & concept and approaches
Industrial relations & concept and approachesIndustrial relations & concept and approaches
Industrial relations & concept and approaches
 
Techniques of Strategic Evaluation & Strategic
Techniques of Strategic Evaluation & Strategic Techniques of Strategic Evaluation & Strategic
Techniques of Strategic Evaluation & Strategic
 
Success and failures in organization design
Success and failures in organization designSuccess and failures in organization design
Success and failures in organization design
 
Hrd audit
Hrd auditHrd audit
Hrd audit
 
Industrial disputes Act,1947
Industrial disputes Act,1947 Industrial disputes Act,1947
Industrial disputes Act,1947
 
Grievance Redressal
Grievance RedressalGrievance Redressal
Grievance Redressal
 
Statutory and non statutory welfare schemes at workplace
Statutory and non statutory welfare schemes at workplaceStatutory and non statutory welfare schemes at workplace
Statutory and non statutory welfare schemes at workplace
 
Wastage analysis
Wastage analysisWastage analysis
Wastage analysis
 
the role of state in industrial relations , role of state in IR
the role of state in industrial relations , role of state in IR the role of state in industrial relations , role of state in IR
the role of state in industrial relations , role of state in IR
 
International Human Resources Management
International Human Resources ManagementInternational Human Resources Management
International Human Resources Management
 
Human resource informtion system ppt
Human resource informtion system pptHuman resource informtion system ppt
Human resource informtion system ppt
 
Wageboard & pay comission
Wageboard & pay comissionWageboard & pay comission
Wageboard & pay comission
 
Hrd strategies
Hrd strategiesHrd strategies
Hrd strategies
 

Viewers also liked

steps of implementation of HRIS
steps of implementation of HRISsteps of implementation of HRIS
steps of implementation of HRISSwejal Keshri
 
HRIS IMPLIMANTATION OF SRI LANKA RUPAVAHINI CORPORATION
HRIS IMPLIMANTATION OF SRI LANKA RUPAVAHINI CORPORATIONHRIS IMPLIMANTATION OF SRI LANKA RUPAVAHINI CORPORATION
HRIS IMPLIMANTATION OF SRI LANKA RUPAVAHINI CORPORATIONMahinda Samarakoon
 
HRIS Implementation and Change Management
HRIS Implementation and Change ManagementHRIS Implementation and Change Management
HRIS Implementation and Change ManagementThu Nandi Nwe
 
ERP Packaged Solution Implementation Model
ERP Packaged Solution Implementation ModelERP Packaged Solution Implementation Model
ERP Packaged Solution Implementation ModelDimitry Shlyonsky
 
Workplace Privacy Presentation
Workplace Privacy PresentationWorkplace Privacy Presentation
Workplace Privacy PresentationSarah Forbes
 
GenRays Project Scope Document
GenRays Project Scope DocumentGenRays Project Scope Document
GenRays Project Scope DocumentApril Drake
 
Software Project Managment
Software Project ManagmentSoftware Project Managment
Software Project ManagmentSaqib Naveed
 
Hris data management
Hris data managementHris data management
Hris data managementalexhuq2010
 
Genrays Project Charter
Genrays Project CharterGenrays Project Charter
Genrays Project CharterApril Drake
 
HR Needs Analysis and Cost Estimation
HR Needs Analysis and Cost EstimationHR Needs Analysis and Cost Estimation
HR Needs Analysis and Cost EstimationThu Nandi Nwe
 
HR Cost Benefit Analysis
HR Cost Benefit AnalysisHR Cost Benefit Analysis
HR Cost Benefit AnalysisMsChevalier
 
Human Resource Information System - HRIS
Human Resource Information System - HRIS Human Resource Information System - HRIS
Human Resource Information System - HRIS antonyjosephtharayil
 
MGT2 - GenRays HRIS Project Charter
MGT2 - GenRays HRIS Project CharterMGT2 - GenRays HRIS Project Charter
MGT2 - GenRays HRIS Project CharterAlan Oviatt, MBA
 
Human resource information system
Human   resource information   systemHuman   resource information   system
Human resource information systemUjjwal 'Shanu'
 
Human Resource Information System Applications
Human Resource Information System Applications Human Resource Information System Applications
Human Resource Information System Applications Markos Mulat G
 

Viewers also liked (20)

Human Resource Information System (HRIS) – Implementation and Control
Human Resource Information System (HRIS) – Implementation and ControlHuman Resource Information System (HRIS) – Implementation and Control
Human Resource Information System (HRIS) – Implementation and Control
 
steps of implementation of HRIS
steps of implementation of HRISsteps of implementation of HRIS
steps of implementation of HRIS
 
HRIS IMPLIMANTATION OF SRI LANKA RUPAVAHINI CORPORATION
HRIS IMPLIMANTATION OF SRI LANKA RUPAVAHINI CORPORATIONHRIS IMPLIMANTATION OF SRI LANKA RUPAVAHINI CORPORATION
HRIS IMPLIMANTATION OF SRI LANKA RUPAVAHINI CORPORATION
 
HRIS Implementation and Change Management
HRIS Implementation and Change ManagementHRIS Implementation and Change Management
HRIS Implementation and Change Management
 
Hris
HrisHris
Hris
 
ERP Packaged Solution Implementation Model
ERP Packaged Solution Implementation ModelERP Packaged Solution Implementation Model
ERP Packaged Solution Implementation Model
 
Software project manager
Software project managerSoftware project manager
Software project manager
 
Workplace Privacy Presentation
Workplace Privacy PresentationWorkplace Privacy Presentation
Workplace Privacy Presentation
 
GenRays Project Scope Document
GenRays Project Scope DocumentGenRays Project Scope Document
GenRays Project Scope Document
 
Software Project Managment
Software Project ManagmentSoftware Project Managment
Software Project Managment
 
Hris data management
Hris data managementHris data management
Hris data management
 
Genrays Project Charter
Genrays Project CharterGenrays Project Charter
Genrays Project Charter
 
HR Needs Analysis and Cost Estimation
HR Needs Analysis and Cost EstimationHR Needs Analysis and Cost Estimation
HR Needs Analysis and Cost Estimation
 
Hris
HrisHris
Hris
 
HR Cost Benefit Analysis
HR Cost Benefit AnalysisHR Cost Benefit Analysis
HR Cost Benefit Analysis
 
Human Resource Information System - HRIS
Human Resource Information System - HRIS Human Resource Information System - HRIS
Human Resource Information System - HRIS
 
MGT2 - GenRays HRIS Project Charter
MGT2 - GenRays HRIS Project CharterMGT2 - GenRays HRIS Project Charter
MGT2 - GenRays HRIS Project Charter
 
E-Training
E-TrainingE-Training
E-Training
 
Human resource information system
Human   resource information   systemHuman   resource information   system
Human resource information system
 
Human Resource Information System Applications
Human Resource Information System Applications Human Resource Information System Applications
Human Resource Information System Applications
 

Similar to Development and implementation of hris

Human Resource Information Ssystem Planning.pptx
Human Resource Information Ssystem Planning.pptxHuman Resource Information Ssystem Planning.pptx
Human Resource Information Ssystem Planning.pptxFaiza Omar
 
Chapter 3 hris planning
Chapter 3 hris planningChapter 3 hris planning
Chapter 3 hris planningFaiza Omar
 
6 Steps to Confirm Successful Workday Deployment
6 Steps to Confirm Successful Workday Deployment6 Steps to Confirm Successful Workday Deployment
6 Steps to Confirm Successful Workday DeploymentZaranTech LLC
 
8 Steps to an Effective ERP Project Launch
8 Steps to an Effective ERP Project Launch8 Steps to an Effective ERP Project Launch
8 Steps to an Effective ERP Project LaunchLionshare Software, Inc.
 
RUNNING HEAD ERP SYSTEM IMPLIMENTATION PROJECT .docx
RUNNING HEAD ERP SYSTEM IMPLIMENTATION PROJECT                   .docxRUNNING HEAD ERP SYSTEM IMPLIMENTATION PROJECT                   .docx
RUNNING HEAD ERP SYSTEM IMPLIMENTATION PROJECT .docxsusanschei
 
vulnerability-response-implementation.pptx
vulnerability-response-implementation.pptxvulnerability-response-implementation.pptx
vulnerability-response-implementation.pptxDronadulaVenkataSuma
 
QUALITY AUDIT TRACKING: THE KEY TO EFFICIENCY, EFFECTIVENESS AND VALUE
QUALITY AUDIT TRACKING: THE KEY TO EFFICIENCY, EFFECTIVENESS AND VALUEQUALITY AUDIT TRACKING: THE KEY TO EFFICIENCY, EFFECTIVENESS AND VALUE
QUALITY AUDIT TRACKING: THE KEY TO EFFICIENCY, EFFECTIVENESS AND VALUEeAuditor Audits & Inspections
 
Sample audit plan
Sample audit planSample audit plan
Sample audit planMaher Manan
 
40 JANUARYFEBRUARY 2010 INFORMATIONMANAGEMENTSelecting .docx
40 JANUARYFEBRUARY 2010 INFORMATIONMANAGEMENTSelecting .docx40 JANUARYFEBRUARY 2010 INFORMATIONMANAGEMENTSelecting .docx
40 JANUARYFEBRUARY 2010 INFORMATIONMANAGEMENTSelecting .docxalinainglis
 
Software Testing and Quality
Software Testing and QualitySoftware Testing and Quality
Software Testing and QualityAsamHussain3
 
COMP6214 Project 2.docx
COMP6214 Project 2.docxCOMP6214 Project 2.docx
COMP6214 Project 2.docxwrite31
 
1Running Head Business ProjectSection 1 Business Requirement.docx
1Running Head Business ProjectSection 1 Business Requirement.docx1Running Head Business ProjectSection 1 Business Requirement.docx
1Running Head Business ProjectSection 1 Business Requirement.docxfelicidaddinwoodie
 
2012 Survey of Higher Education CRM Deployment Practices
2012 Survey of Higher Education CRM Deployment Practices2012 Survey of Higher Education CRM Deployment Practices
2012 Survey of Higher Education CRM Deployment PracticesJohn Copeland
 
Enterprise Software Implementation
Enterprise Software ImplementationEnterprise Software Implementation
Enterprise Software Implementationbrh184
 
19701759 Project Report On Railway Reservation System By Amit Mittal
19701759 Project Report On Railway Reservation System By Amit Mittal19701759 Project Report On Railway Reservation System By Amit Mittal
19701759 Project Report On Railway Reservation System By Amit MittalCourtney Esco
 
Integrated Receivables: 5 Critical Factors For Adoption
Integrated Receivables: 5 Critical Factors For AdoptionIntegrated Receivables: 5 Critical Factors For Adoption
Integrated Receivables: 5 Critical Factors For Adoption3 Point Alliance
 
Group Presentation Strategy Research. Using the comprehensive s.docx
Group Presentation Strategy Research.   Using the comprehensive s.docxGroup Presentation Strategy Research.   Using the comprehensive s.docx
Group Presentation Strategy Research. Using the comprehensive s.docxwhittemorelucilla
 
169960087 j2 ee-project-report
169960087 j2 ee-project-report169960087 j2 ee-project-report
169960087 j2 ee-project-reporthomeworkping8
 

Similar to Development and implementation of hris (20)

Human Resource Information Ssystem Planning.pptx
Human Resource Information Ssystem Planning.pptxHuman Resource Information Ssystem Planning.pptx
Human Resource Information Ssystem Planning.pptx
 
Chapter 3 hris planning
Chapter 3 hris planningChapter 3 hris planning
Chapter 3 hris planning
 
6 Steps to Confirm Successful Workday Deployment
6 Steps to Confirm Successful Workday Deployment6 Steps to Confirm Successful Workday Deployment
6 Steps to Confirm Successful Workday Deployment
 
8 Steps to an Effective ERP Project Launch
8 Steps to an Effective ERP Project Launch8 Steps to an Effective ERP Project Launch
8 Steps to an Effective ERP Project Launch
 
RUNNING HEAD ERP SYSTEM IMPLIMENTATION PROJECT .docx
RUNNING HEAD ERP SYSTEM IMPLIMENTATION PROJECT                   .docxRUNNING HEAD ERP SYSTEM IMPLIMENTATION PROJECT                   .docx
RUNNING HEAD ERP SYSTEM IMPLIMENTATION PROJECT .docx
 
vulnerability-response-implementation.pptx
vulnerability-response-implementation.pptxvulnerability-response-implementation.pptx
vulnerability-response-implementation.pptx
 
QUALITY AUDIT TRACKING: THE KEY TO EFFICIENCY, EFFECTIVENESS AND VALUE
QUALITY AUDIT TRACKING: THE KEY TO EFFICIENCY, EFFECTIVENESS AND VALUEQUALITY AUDIT TRACKING: THE KEY TO EFFICIENCY, EFFECTIVENESS AND VALUE
QUALITY AUDIT TRACKING: THE KEY TO EFFICIENCY, EFFECTIVENESS AND VALUE
 
Sample audit plan
Sample audit planSample audit plan
Sample audit plan
 
40 JANUARYFEBRUARY 2010 INFORMATIONMANAGEMENTSelecting .docx
40 JANUARYFEBRUARY 2010 INFORMATIONMANAGEMENTSelecting .docx40 JANUARYFEBRUARY 2010 INFORMATIONMANAGEMENTSelecting .docx
40 JANUARYFEBRUARY 2010 INFORMATIONMANAGEMENTSelecting .docx
 
Software Testing and Quality
Software Testing and QualitySoftware Testing and Quality
Software Testing and Quality
 
COMP6214 Project 2.docx
COMP6214 Project 2.docxCOMP6214 Project 2.docx
COMP6214 Project 2.docx
 
How to Choose an Agency Management System
How to Choose an Agency Management SystemHow to Choose an Agency Management System
How to Choose an Agency Management System
 
1Running Head Business ProjectSection 1 Business Requirement.docx
1Running Head Business ProjectSection 1 Business Requirement.docx1Running Head Business ProjectSection 1 Business Requirement.docx
1Running Head Business ProjectSection 1 Business Requirement.docx
 
2012 Survey of Higher Education CRM Deployment Practices
2012 Survey of Higher Education CRM Deployment Practices2012 Survey of Higher Education CRM Deployment Practices
2012 Survey of Higher Education CRM Deployment Practices
 
Enterprise Software Implementation
Enterprise Software ImplementationEnterprise Software Implementation
Enterprise Software Implementation
 
19701759 Project Report On Railway Reservation System By Amit Mittal
19701759 Project Report On Railway Reservation System By Amit Mittal19701759 Project Report On Railway Reservation System By Amit Mittal
19701759 Project Report On Railway Reservation System By Amit Mittal
 
Integrated Receivables: 5 Critical Factors For Adoption
Integrated Receivables: 5 Critical Factors For AdoptionIntegrated Receivables: 5 Critical Factors For Adoption
Integrated Receivables: 5 Critical Factors For Adoption
 
Group Presentation Strategy Research. Using the comprehensive s.docx
Group Presentation Strategy Research.   Using the comprehensive s.docxGroup Presentation Strategy Research.   Using the comprehensive s.docx
Group Presentation Strategy Research. Using the comprehensive s.docx
 
Erp
ErpErp
Erp
 
169960087 j2 ee-project-report
169960087 j2 ee-project-report169960087 j2 ee-project-report
169960087 j2 ee-project-report
 

Recently uploaded

RecruZone - Your Recruiting Bounty marketplace
RecruZone - Your Recruiting Bounty marketplaceRecruZone - Your Recruiting Bounty marketplace
RecruZone - Your Recruiting Bounty marketplaceDavide Donghi
 
BASIC SUMMARY OF HUMAN RESOURCE MANAGEMENT
BASIC SUMMARY OF HUMAN RESOURCE MANAGEMENTBASIC SUMMARY OF HUMAN RESOURCE MANAGEMENT
BASIC SUMMARY OF HUMAN RESOURCE MANAGEMENTHabibulHashan
 
100%Safe delivery(+971558539980)Abortion pills for sale..dubai sharjah, abu d...
100%Safe delivery(+971558539980)Abortion pills for sale..dubai sharjah, abu d...100%Safe delivery(+971558539980)Abortion pills for sale..dubai sharjah, abu d...
100%Safe delivery(+971558539980)Abortion pills for sale..dubai sharjah, abu d...hyt3577
 
2k Shots ≽ 9205541914 ≼ Call Girls In Vinod Nagar East (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Vinod Nagar East (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Vinod Nagar East (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Vinod Nagar East (Delhi)Delhi Call girls
 
Webinar - How to set pay ranges in the context of pay transparency legislation
Webinar - How to set pay ranges in the context of pay transparency legislationWebinar - How to set pay ranges in the context of pay transparency legislation
Webinar - How to set pay ranges in the context of pay transparency legislationPayScale, Inc.
 
Will Robots Steal Your Jobs? Will Robots Steal Your Jobs? 10 Eye-Opening Work...
Will Robots Steal Your Jobs? Will Robots Steal Your Jobs? 10 Eye-Opening Work...Will Robots Steal Your Jobs? Will Robots Steal Your Jobs? 10 Eye-Opening Work...
Will Robots Steal Your Jobs? Will Robots Steal Your Jobs? 10 Eye-Opening Work...Jasper Colin
 

Recently uploaded (6)

RecruZone - Your Recruiting Bounty marketplace
RecruZone - Your Recruiting Bounty marketplaceRecruZone - Your Recruiting Bounty marketplace
RecruZone - Your Recruiting Bounty marketplace
 
BASIC SUMMARY OF HUMAN RESOURCE MANAGEMENT
BASIC SUMMARY OF HUMAN RESOURCE MANAGEMENTBASIC SUMMARY OF HUMAN RESOURCE MANAGEMENT
BASIC SUMMARY OF HUMAN RESOURCE MANAGEMENT
 
100%Safe delivery(+971558539980)Abortion pills for sale..dubai sharjah, abu d...
100%Safe delivery(+971558539980)Abortion pills for sale..dubai sharjah, abu d...100%Safe delivery(+971558539980)Abortion pills for sale..dubai sharjah, abu d...
100%Safe delivery(+971558539980)Abortion pills for sale..dubai sharjah, abu d...
 
2k Shots ≽ 9205541914 ≼ Call Girls In Vinod Nagar East (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Vinod Nagar East (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Vinod Nagar East (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Vinod Nagar East (Delhi)
 
Webinar - How to set pay ranges in the context of pay transparency legislation
Webinar - How to set pay ranges in the context of pay transparency legislationWebinar - How to set pay ranges in the context of pay transparency legislation
Webinar - How to set pay ranges in the context of pay transparency legislation
 
Will Robots Steal Your Jobs? Will Robots Steal Your Jobs? 10 Eye-Opening Work...
Will Robots Steal Your Jobs? Will Robots Steal Your Jobs? 10 Eye-Opening Work...Will Robots Steal Your Jobs? Will Robots Steal Your Jobs? 10 Eye-Opening Work...
Will Robots Steal Your Jobs? Will Robots Steal Your Jobs? 10 Eye-Opening Work...
 

Development and implementation of hris

  • 2. Introduction: ▪ Human Resource Information System (HRIS) is a systematic way of storing data and information for each individual employee to aid planning, decision making, and submitting of returns and reports to the external agencies. ▪ It can be briefly defined as integrated systems used to gather, store and analyze information regarding an organization’s human resources.
  • 3. Steps in Developing and Implementing HRIS:
  • 4. Steps to be followed: ▪ The following steps are involved in developing and implementing an HRIS. ▪ Step 1:Inception of idea The first step of HRIS implementation is the inception of the idea. The need of the organization to have HRIS software must be realized and agreed by the top management. It is an investment and management needs to keep it in mind
  • 5. ▪ Step 2. Feasibility study ▪ As this is an investment the feasibility of HRIS must be assessed. ▪ It covers the following areas  Scope of the software  Future benefits after implementation  Potential software developers assessment  Cost estimate  Value addition to business  ROI calculation ▪ A proper feasibility study will help the management to make the decision based on facts and figures.
  • 6. ▪ Step 3. Selecting a project team  Implementation of HRIS is a project as it requires ensuring budgeted cost, specific timeline with quality delivery.  Successful implementation largely depends on capability and effort of project team.  Project team members should be taken from both HR and IT.  Involvement of senior managers is required to get the top management buy in on different issues.
  • 7. ▪ Step 4. Defining the requirements  At this stage the scope needs to be defined.  It will not be a detailed requirement specification but at least the processes that will be incorporated in the software.  Some organization may want to develop the payroll module while others may want more modules to be developed.  It all depends on the affordability and plan of the concerned organization. But it is an essential step before communicating with the vendor or software developers.  Otherwise it will create complexity during discussion and negotiation with the software developers.  At this stage the company HR policies and processes must be analyzed and defined rigorously.  If there is any ambiguity in process, difficulty may arise to incorporate it in the software
  • 8. ▪ Step 5. Vendor analysis  Selecting the right software developer is another challenge.  The capability, track record and good will of the developers must be taken into consideration.  The requirement of the organization must be shared with the developers clearly without ambiguity.  The existing processes can be clarified with them, if required. After getting clear understanding about the requirement they will come up with their offer that includes cost and specific timeline for project completion.  The software requirement specification needs to be documented to avoid ambiguity in future.
  • 9. ▪ Step 6. Package contract negotiation  After getting the final offer from the vendors, the decision of work order will be finalized based on cost and quality actors.  Then the contract will be signed with the software developers.  The development work will start then.  But the company needs to monitor the development work time to time to ensure on time quality delivery of the project.
  • 10. ▪ Step 7. Training  Training usually begins as soon as possible after the contract has been signed.  First, the members of the project team are trained to use the Human Resource Information System.  Toward the end of the implementation, the human resource representation will train managers from other departments in how to submit information to the HRIS and how to request information from it.
  • 11. ▪ Step 8. Tailoring the system  After finalizing the system requirement specification, the design of the software will be initiated. The design should be shared with the company to identify improvement areas
  • 12. ▪ Step 9. Collecting data  At this stage required data to enter in the software will be collected.  A team of HR needs to be deployed to collect data for the software. Data validation is also required.  This is a very critical part of the project.
  • 13. ▪ Step 10. Testing the system  Once the system is developed with data the testing is required. Some organizations call it User Acceptance Test.  At this stage the users use it and try to check if there is any gap between requirement and the delivery of the software.  If the test is okay then the final delivery is given to the company.
  • 14. ▪ Step 11. Starting up  After the User Acceptance the software will be installed in user’s PC or web as per system configuration and requirement specification.
  • 15. ▪ Step 12. Running in parallel  It is a safe stand to run the existing process whether it is manual or software and the new software run in parallel.  In case of any malfunction of the new software the process will not get hampered.  At least one full cycle of the process needs to be run in parallel to avoid any technical hitch.
  • 16. ▪ Step 13. Maintenance  Once the software has been installed regular maintenance and performance monitoring is essential.  For effectiveness annual maintenance contract can be signed with the software development company.
  • 17. ▪ Step 14. Evaluation  After running the software for a certain period of time the performance evaluation will be done. What value the software has added since its inception needs to be evaluated