QMPs for Large D-B &
D-B-B Projects
Brown Bag
Quote
“… If it is signed by George Little, then it is a requirement
not a guideline.”
(Bill Raleigh 2012)
QMP is a Project Requirement
Project Quality Management Plan is:
• An extension of our internal protocols
• Tailored to meet project requirements
• Contract requirement
 FTA
 Denver RTD
 D-B
Company vs. Project
COMPANY LEVEL
We typically refer to our
internal QC processes as
“QC Reviews”.
PROJECT LEVEL
At the project level, we
distinguish between Checks
and Reviews.
• Detail Checking
• Constructability Review
• Crossdisciplinary Review
• Technical Review
Design Quality Management Plan
• Quality Statement - “Quality is the responsibility of each
person working on the Project”
• Quality Goal - “… produce deliverables in a well-defined
and systematic fashion that meet the contract
requirements”
• Quality Objectives - training, submittal reviews, etc.
Design Quality Management Plan
• Narrative
• Appendices
 Design Control Procedures
 Forms and Tools
 List of Deliverables
ISO Compliant
ISO Certified
FTA Compliant
Design Quality Management Plan
Design Control Procedures
o DCPR-01 Quality Records
o DCPR-02 Checking of Reports and Studies
o DCPR-03 Checking of Calculations
o DCPR-04 Independent Design Check
o DCPR-05 Checking of Drawings
o DCPR-06 Checking of Input to Computer Programs
o DCPR-07 Checking of Special Provisions
o DCPR-08 Spreadsheet Checking
o DCPR-09 Revisions to Released for Construction Documents
o DCPR-10 Computer Software
o DCPR-11 Constructability and Cross Disciplinary Reviews
o DCPR-12 Quality Control Reviews
o DCPR-13 Design Quality Assurance Audits
o DCPR-14 As-Built Documents
o DCPR-15 Corrective and Preventive Actions
o DCPR-16 Parallel Model Checking
More on the way!
Detail Checking
• Not performed until production toward
a milestone is complete.
• Checker is independent of the Originator.
• Checker shall not have developed any portion
of the deliverable being checked.
• Our work needs to be readable.
• Be clear what the intent is.
• Spelling counts!
oh, so that is an “H”
Detail Checking
• Rechecker must confirm the edit on a hard copy!
First Page Only: Design Package No. or Description
No. Date
CHECK PRINT
Dwg. Only: Checked against calcs. and calc. check
confirmed by _________ Date ________
Originator Date
Checker Date
Backchecker Date
Updater Date
Rechecker Date
The Checker and Rechecker must be independent from
the Originator, Backchecker and Updater.
The Checker and Rechecker do not have to be the same
person, but it is preferred,
Originator, Checker and Backchecker always required.
Updater and Rechecker based on Checker’s red lines.
QC CHECK PRINT COLOR CODING SYSTEM
A color coding system is used for marking on a Check Print to identify various actions to be taken and
to identify the various stages of the checking process. We can tailor to a client requirement or project
preference, but our internal color coding is:
Yellow is used by the Checker to indicate agreement.
Red is used by the Checker to mark-up corrections, changes and additions.
Red is also used by the Backchecker to indicate approval (√) or disapproval (x) of Checker's mark-ups.
Yellow is also used by the Updater to indicate that changes to the original drawing have been made.
Green checkmark (√) is used by the Rechecker to verify that the changes made to the original drawing
are correct. A green checkmark (√) is used by the Rechecker to verify that the changes agreed not to be
made are not made.
***** Blue or (blue) cloud is used for non-record comments or instructions. *****
Non-record questions, for example, need to be answered in blue. If there is an action by the
Backchecker, Updater and Rechecker, then the QC process is followed on the comment. If the
comment results in a “significant” correction or addition to the document, then a check print with the
change specifically checked is required.
The same color coding is used for all documents and by all members of the design team.
Constructability Reviews
The Contractor can help
see problems:
Crossdisciplinary Reviews
Looking for conflicts
(CDR, DCR, IDR)
Technical Reviews
Project Requirements;
Standard of Care; Industry
Standard.
(TQR, IQR & QCR)
Responses are Important
“There aren’t any utilities on that side of the road;
so put the pole wherever you want”.
Responses are Important
“Just do what it shows on
the drawing!”
Quality Assurance
DQCM will:
• Create DQMP
• Perform review of QC Documentation
• Review submittal prior to submittal
• Certify QC performed per DQMP
• Perform internal audits, report the results
and resolve nonconformances
May be required to have ASQ, or equal,
Certification
Oversights Happen
Don’t beat yourself up; there is a
reason we perform checks
and reviews.
Questions?
David Irish, PE, CMQ/OE
David.irish@hdrinc.com
(208) 387-7004 off
(208) 869-1197 cell

More Related Content

What's hot

Sushil Kumar Jain resume (National) mod 3 (2)
Sushil Kumar Jain resume (National) mod 3 (2)Sushil Kumar Jain resume (National) mod 3 (2)
Sushil Kumar Jain resume (National) mod 3 (2)Sushil Kumar Jain
 
CustomerCopy raghu
CustomerCopy raghuCustomerCopy raghu
CustomerCopy raghuRaghu p
 
Ppap training-presentation
Ppap training-presentationPpap training-presentation
Ppap training-presentationRanvijay Akela
 
Construction quality control inspection program (qcip)
Construction quality control inspection program (qcip)Construction quality control inspection program (qcip)
Construction quality control inspection program (qcip)Mital Damani
 
Managing The Risk Of Financing Renewable Energy Projects
Managing The Risk Of Financing Renewable Energy ProjectsManaging The Risk Of Financing Renewable Energy Projects
Managing The Risk Of Financing Renewable Energy Projectsmtingle
 
Abdul Halim Sadikun - Resume 2016 (1)
Abdul Halim Sadikun - Resume 2016 (1)Abdul Halim Sadikun - Resume 2016 (1)
Abdul Halim Sadikun - Resume 2016 (1)Abdul Halim Sadikun
 
CV-PRAVIN-BE_MECH-__04_years_EXP new.PDF
CV-PRAVIN-BE_MECH-__04_years_EXP new.PDFCV-PRAVIN-BE_MECH-__04_years_EXP new.PDF
CV-PRAVIN-BE_MECH-__04_years_EXP new.PDFPravin Bhure
 
The ROI of Improved Project Flow: How Injection Molders Impact Outcomes
The ROI of Improved Project Flow: How Injection Molders Impact OutcomesThe ROI of Improved Project Flow: How Injection Molders Impact Outcomes
The ROI of Improved Project Flow: How Injection Molders Impact OutcomesKaysun Corporation
 
Ppap training presentation
Ppap   training presentationPpap   training presentation
Ppap training presentationJitesh Gaurav
 
KSI Presentation Expediting 2014
KSI Presentation Expediting 2014KSI Presentation Expediting 2014
KSI Presentation Expediting 2014Samanta Ribeiro
 

What's hot (20)

Sushil Kumar Jain resume (National) mod 3 (2)
Sushil Kumar Jain resume (National) mod 3 (2)Sushil Kumar Jain resume (National) mod 3 (2)
Sushil Kumar Jain resume (National) mod 3 (2)
 
Get Relief for Your PPAP Grief
Get Relief for Your PPAP GriefGet Relief for Your PPAP Grief
Get Relief for Your PPAP Grief
 
CustomerCopy raghu
CustomerCopy raghuCustomerCopy raghu
CustomerCopy raghu
 
Ppap training-presentation
Ppap training-presentationPpap training-presentation
Ppap training-presentation
 
Construction quality control inspection program (qcip)
Construction quality control inspection program (qcip)Construction quality control inspection program (qcip)
Construction quality control inspection program (qcip)
 
Painting inspector
Painting inspectorPainting inspector
Painting inspector
 
Managing The Risk Of Financing Renewable Energy Projects
Managing The Risk Of Financing Renewable Energy ProjectsManaging The Risk Of Financing Renewable Energy Projects
Managing The Risk Of Financing Renewable Energy Projects
 
Tahir CV
Tahir CVTahir CV
Tahir CV
 
Ppap training ppt
Ppap training   ppt Ppap training   ppt
Ppap training ppt
 
Qa qc
Qa qcQa qc
Qa qc
 
Abdul Halim Sadikun - Resume 2016 (1)
Abdul Halim Sadikun - Resume 2016 (1)Abdul Halim Sadikun - Resume 2016 (1)
Abdul Halim Sadikun - Resume 2016 (1)
 
CV-PRAVIN-BE_MECH-__04_years_EXP new.PDF
CV-PRAVIN-BE_MECH-__04_years_EXP new.PDFCV-PRAVIN-BE_MECH-__04_years_EXP new.PDF
CV-PRAVIN-BE_MECH-__04_years_EXP new.PDF
 
JD-QC Inspector
JD-QC InspectorJD-QC Inspector
JD-QC Inspector
 
The ROI of Improved Project Flow: How Injection Molders Impact Outcomes
The ROI of Improved Project Flow: How Injection Molders Impact OutcomesThe ROI of Improved Project Flow: How Injection Molders Impact Outcomes
The ROI of Improved Project Flow: How Injection Molders Impact Outcomes
 
Ppap training presentation
Ppap   training presentationPpap   training presentation
Ppap training presentation
 
CV.C
CV.CCV.C
CV.C
 
KSI Presentation Expediting 2014
KSI Presentation Expediting 2014KSI Presentation Expediting 2014
KSI Presentation Expediting 2014
 
Resume S Dash
Resume S DashResume S Dash
Resume S Dash
 
Toyota Part Approval (PA) Process
Toyota Part Approval (PA) ProcessToyota Part Approval (PA) Process
Toyota Part Approval (PA) Process
 
2015 Toronto Section Presentation
2015 Toronto Section Presentation2015 Toronto Section Presentation
2015 Toronto Section Presentation
 

Viewers also liked

Air Quality Compliance Affecting Oil and Gas Development
Air Quality Compliance Affecting Oil and Gas DevelopmentAir Quality Compliance Affecting Oil and Gas Development
Air Quality Compliance Affecting Oil and Gas DevelopmentTrihydro Corporation
 
Web accessibility: An overview
Web accessibility: An overviewWeb accessibility: An overview
Web accessibility: An overviewWebcredible
 
What is Study Island?
What is Study Island?What is Study Island?
What is Study Island?dkeddie
 
Chapter 1 overview
Chapter 1 overviewChapter 1 overview
Chapter 1 overviewdr_edw777
 
Usi correcto del correo elecctronico
Usi correcto del correo elecctronicoUsi correcto del correo elecctronico
Usi correcto del correo elecctronicoJohana Mise
 
)2012-05-23) Medicina y nuevas tecnologias doc
)2012-05-23) Medicina y nuevas tecnologias doc)2012-05-23) Medicina y nuevas tecnologias doc
)2012-05-23) Medicina y nuevas tecnologias docUDMAFyC SECTOR ZARAGOZA II
 
Getty
GettyGetty
GettyMark
 
Community Partners - Program Overview
Community Partners - Program OverviewCommunity Partners - Program Overview
Community Partners - Program Overviewmfairchild
 
Grundfos Annual Report
Grundfos Annual ReportGrundfos Annual Report
Grundfos Annual ReportBalarama Raju
 
How to Block NDR Spam
How to Block NDR SpamHow to Block NDR Spam
How to Block NDR SpamGFI Software
 
2013 Economic Development Report
2013 Economic Development Report2013 Economic Development Report
2013 Economic Development ReportOne Columbus
 
Madison Area Rankings
Madison Area RankingsMadison Area Rankings
Madison Area Rankingsbsanders
 
Planning night sophomores 2012
Planning night sophomores 2012Planning night sophomores 2012
Planning night sophomores 2012cscanlon
 
3com_Convergence center client_7.2_user_guide
3com_Convergence center client_7.2_user_guide 3com_Convergence center client_7.2_user_guide
3com_Convergence center client_7.2_user_guide Victor Jaramillo
 

Viewers also liked (20)

370Syllabus
370Syllabus370Syllabus
370Syllabus
 
Air Quality Compliance Affecting Oil and Gas Development
Air Quality Compliance Affecting Oil and Gas DevelopmentAir Quality Compliance Affecting Oil and Gas Development
Air Quality Compliance Affecting Oil and Gas Development
 
Web accessibility: An overview
Web accessibility: An overviewWeb accessibility: An overview
Web accessibility: An overview
 
What is Study Island?
What is Study Island?What is Study Island?
What is Study Island?
 
Chapter 1 overview
Chapter 1 overviewChapter 1 overview
Chapter 1 overview
 
Usi correcto del correo elecctronico
Usi correcto del correo elecctronicoUsi correcto del correo elecctronico
Usi correcto del correo elecctronico
 
)2012-05-23) Medicina y nuevas tecnologias doc
)2012-05-23) Medicina y nuevas tecnologias doc)2012-05-23) Medicina y nuevas tecnologias doc
)2012-05-23) Medicina y nuevas tecnologias doc
 
Getty
GettyGetty
Getty
 
Community Partners - Program Overview
Community Partners - Program OverviewCommunity Partners - Program Overview
Community Partners - Program Overview
 
LG Catalogo seguridad 2011
LG Catalogo seguridad 2011LG Catalogo seguridad 2011
LG Catalogo seguridad 2011
 
Grundfos Annual Report
Grundfos Annual ReportGrundfos Annual Report
Grundfos Annual Report
 
How to Block NDR Spam
How to Block NDR SpamHow to Block NDR Spam
How to Block NDR Spam
 
Crisis Communications
Crisis CommunicationsCrisis Communications
Crisis Communications
 
The Downtowner
The DowntownerThe Downtowner
The Downtowner
 
2013 Economic Development Report
2013 Economic Development Report2013 Economic Development Report
2013 Economic Development Report
 
Madison Area Rankings
Madison Area RankingsMadison Area Rankings
Madison Area Rankings
 
Electronic Participatory Budgeting
Electronic Participatory BudgetingElectronic Participatory Budgeting
Electronic Participatory Budgeting
 
Planning night sophomores 2012
Planning night sophomores 2012Planning night sophomores 2012
Planning night sophomores 2012
 
3com_Convergence center client_7.2_user_guide
3com_Convergence center client_7.2_user_guide 3com_Convergence center client_7.2_user_guide
3com_Convergence center client_7.2_user_guide
 
CrossRoads
CrossRoadsCrossRoads
CrossRoads
 

Similar to QMPs for Large D-B & D-B-B Projects

Managing Software Debt - Quality Debt Focus - QASIG Kirkland
Managing Software Debt - Quality Debt Focus - QASIG KirklandManaging Software Debt - Quality Debt Focus - QASIG Kirkland
Managing Software Debt - Quality Debt Focus - QASIG KirklandChris Sterling
 
Complete guide to manual testing@uma
Complete guide to manual  testing@umaComplete guide to manual  testing@uma
Complete guide to manual testing@umaUma Sapireddy
 
Complete testing@uma
Complete testing@umaComplete testing@uma
Complete testing@umaUma Sapireddy
 
2.08 quality management 1
2.08 quality management 12.08 quality management 1
2.08 quality management 1reddvise
 
20080704 innovative approach in contracts and tender procurement management
20080704 innovative approach in contracts and tender procurement management20080704 innovative approach in contracts and tender procurement management
20080704 innovative approach in contracts and tender procurement managementraymond_wan2005
 
Manual testing good notes
Manual testing good notesManual testing good notes
Manual testing good notesdkns0906
 
Completeguidetomanualtestinguma 120608233901-phpapp01
Completeguidetomanualtestinguma 120608233901-phpapp01Completeguidetomanualtestinguma 120608233901-phpapp01
Completeguidetomanualtestinguma 120608233901-phpapp01bdivyadeepu
 
Completeguidetomanualtestinguma 120608233901-phpapp01
Completeguidetomanualtestinguma 120608233901-phpapp01Completeguidetomanualtestinguma 120608233901-phpapp01
Completeguidetomanualtestinguma 120608233901-phpapp01bdivyadeepu
 
Software testing concepts
Software testing conceptsSoftware testing concepts
Software testing conceptssatyatwrmca
 
Quality control inspection reports and outcomes wrt contract management
Quality control inspection reports and outcomes wrt contract managementQuality control inspection reports and outcomes wrt contract management
Quality control inspection reports and outcomes wrt contract managementEdwinJacob5
 
Backward thinking design qa system for quality goals
Backward thinking   design qa system for quality goalsBackward thinking   design qa system for quality goals
Backward thinking design qa system for quality goalsgaoliang641
 
FDA Design Controls: What Medical Device Makers Need to Know
FDA Design Controls: What Medical Device Makers Need to KnowFDA Design Controls: What Medical Device Makers Need to Know
FDA Design Controls: What Medical Device Makers Need to KnowGreenlight Guru
 
Metrics-driven Continuous Delivery
Metrics-driven Continuous DeliveryMetrics-driven Continuous Delivery
Metrics-driven Continuous DeliveryAndrew Phillips
 
1. Quality Assurance and Quality Control.pdf
1. Quality Assurance and Quality Control.pdf1. Quality Assurance and Quality Control.pdf
1. Quality Assurance and Quality Control.pdfChetanChauhan636607
 
1. Quality Assurance and Quality Control.pdf
1. Quality Assurance and Quality Control.pdf1. Quality Assurance and Quality Control.pdf
1. Quality Assurance and Quality Control.pdfDHYUTHIA
 
Design & Development Procedure (Automotive)
Design & Development Procedure (Automotive)Design & Development Procedure (Automotive)
Design & Development Procedure (Automotive)Rahul137054
 

Similar to QMPs for Large D-B & D-B-B Projects (20)

Managing Software Debt - Quality Debt Focus - QASIG Kirkland
Managing Software Debt - Quality Debt Focus - QASIG KirklandManaging Software Debt - Quality Debt Focus - QASIG Kirkland
Managing Software Debt - Quality Debt Focus - QASIG Kirkland
 
Complete guide to manual testing@uma
Complete guide to manual  testing@umaComplete guide to manual  testing@uma
Complete guide to manual testing@uma
 
Complete testing@uma
Complete testing@umaComplete testing@uma
Complete testing@uma
 
2.08 quality management 1
2.08 quality management 12.08 quality management 1
2.08 quality management 1
 
20080704 innovative approach in contracts and tender procurement management
20080704 innovative approach in contracts and tender procurement management20080704 innovative approach in contracts and tender procurement management
20080704 innovative approach in contracts and tender procurement management
 
Manual testing good notes
Manual testing good notesManual testing good notes
Manual testing good notes
 
Completeguidetomanualtestinguma 120608233901-phpapp01
Completeguidetomanualtestinguma 120608233901-phpapp01Completeguidetomanualtestinguma 120608233901-phpapp01
Completeguidetomanualtestinguma 120608233901-phpapp01
 
Completeguidetomanualtestinguma 120608233901-phpapp01
Completeguidetomanualtestinguma 120608233901-phpapp01Completeguidetomanualtestinguma 120608233901-phpapp01
Completeguidetomanualtestinguma 120608233901-phpapp01
 
1. cmpm
1. cmpm1. cmpm
1. cmpm
 
The Value of Building Commissioning
The Value of Building CommissioningThe Value of Building Commissioning
The Value of Building Commissioning
 
Software testing concepts
Software testing conceptsSoftware testing concepts
Software testing concepts
 
Quality control inspection reports and outcomes wrt contract management
Quality control inspection reports and outcomes wrt contract managementQuality control inspection reports and outcomes wrt contract management
Quality control inspection reports and outcomes wrt contract management
 
Backward thinking design qa system for quality goals
Backward thinking   design qa system for quality goalsBackward thinking   design qa system for quality goals
Backward thinking design qa system for quality goals
 
FDA Design Controls: What Medical Device Makers Need to Know
FDA Design Controls: What Medical Device Makers Need to KnowFDA Design Controls: What Medical Device Makers Need to Know
FDA Design Controls: What Medical Device Makers Need to Know
 
5.2 DMADOV Phase.pptx
5.2 DMADOV  Phase.pptx5.2 DMADOV  Phase.pptx
5.2 DMADOV Phase.pptx
 
5.2 DMADOV Phase.pptx
5.2 DMADOV  Phase.pptx5.2 DMADOV  Phase.pptx
5.2 DMADOV Phase.pptx
 
Metrics-driven Continuous Delivery
Metrics-driven Continuous DeliveryMetrics-driven Continuous Delivery
Metrics-driven Continuous Delivery
 
1. Quality Assurance and Quality Control.pdf
1. Quality Assurance and Quality Control.pdf1. Quality Assurance and Quality Control.pdf
1. Quality Assurance and Quality Control.pdf
 
1. Quality Assurance and Quality Control.pdf
1. Quality Assurance and Quality Control.pdf1. Quality Assurance and Quality Control.pdf
1. Quality Assurance and Quality Control.pdf
 
Design & Development Procedure (Automotive)
Design & Development Procedure (Automotive)Design & Development Procedure (Automotive)
Design & Development Procedure (Automotive)
 

QMPs for Large D-B & D-B-B Projects

  • 1. QMPs for Large D-B & D-B-B Projects Brown Bag
  • 2. Quote “… If it is signed by George Little, then it is a requirement not a guideline.” (Bill Raleigh 2012)
  • 3. QMP is a Project Requirement Project Quality Management Plan is: • An extension of our internal protocols • Tailored to meet project requirements • Contract requirement  FTA  Denver RTD  D-B
  • 4. Company vs. Project COMPANY LEVEL We typically refer to our internal QC processes as “QC Reviews”. PROJECT LEVEL At the project level, we distinguish between Checks and Reviews. • Detail Checking • Constructability Review • Crossdisciplinary Review • Technical Review
  • 5. Design Quality Management Plan • Quality Statement - “Quality is the responsibility of each person working on the Project” • Quality Goal - “… produce deliverables in a well-defined and systematic fashion that meet the contract requirements” • Quality Objectives - training, submittal reviews, etc.
  • 6. Design Quality Management Plan • Narrative • Appendices  Design Control Procedures  Forms and Tools  List of Deliverables ISO Compliant ISO Certified FTA Compliant
  • 7. Design Quality Management Plan Design Control Procedures o DCPR-01 Quality Records o DCPR-02 Checking of Reports and Studies o DCPR-03 Checking of Calculations o DCPR-04 Independent Design Check o DCPR-05 Checking of Drawings o DCPR-06 Checking of Input to Computer Programs o DCPR-07 Checking of Special Provisions o DCPR-08 Spreadsheet Checking o DCPR-09 Revisions to Released for Construction Documents o DCPR-10 Computer Software o DCPR-11 Constructability and Cross Disciplinary Reviews o DCPR-12 Quality Control Reviews o DCPR-13 Design Quality Assurance Audits o DCPR-14 As-Built Documents o DCPR-15 Corrective and Preventive Actions o DCPR-16 Parallel Model Checking More on the way!
  • 8. Detail Checking • Not performed until production toward a milestone is complete. • Checker is independent of the Originator. • Checker shall not have developed any portion of the deliverable being checked. • Our work needs to be readable. • Be clear what the intent is. • Spelling counts! oh, so that is an “H”
  • 9. Detail Checking • Rechecker must confirm the edit on a hard copy! First Page Only: Design Package No. or Description No. Date CHECK PRINT Dwg. Only: Checked against calcs. and calc. check confirmed by _________ Date ________ Originator Date Checker Date Backchecker Date Updater Date Rechecker Date The Checker and Rechecker must be independent from the Originator, Backchecker and Updater. The Checker and Rechecker do not have to be the same person, but it is preferred, Originator, Checker and Backchecker always required. Updater and Rechecker based on Checker’s red lines.
  • 10. QC CHECK PRINT COLOR CODING SYSTEM A color coding system is used for marking on a Check Print to identify various actions to be taken and to identify the various stages of the checking process. We can tailor to a client requirement or project preference, but our internal color coding is: Yellow is used by the Checker to indicate agreement. Red is used by the Checker to mark-up corrections, changes and additions. Red is also used by the Backchecker to indicate approval (√) or disapproval (x) of Checker's mark-ups. Yellow is also used by the Updater to indicate that changes to the original drawing have been made. Green checkmark (√) is used by the Rechecker to verify that the changes made to the original drawing are correct. A green checkmark (√) is used by the Rechecker to verify that the changes agreed not to be made are not made. ***** Blue or (blue) cloud is used for non-record comments or instructions. ***** Non-record questions, for example, need to be answered in blue. If there is an action by the Backchecker, Updater and Rechecker, then the QC process is followed on the comment. If the comment results in a “significant” correction or addition to the document, then a check print with the change specifically checked is required. The same color coding is used for all documents and by all members of the design team.
  • 11. Constructability Reviews The Contractor can help see problems:
  • 12. Crossdisciplinary Reviews Looking for conflicts (CDR, DCR, IDR)
  • 13. Technical Reviews Project Requirements; Standard of Care; Industry Standard. (TQR, IQR & QCR)
  • 14. Responses are Important “There aren’t any utilities on that side of the road; so put the pole wherever you want”.
  • 15. Responses are Important “Just do what it shows on the drawing!”
  • 16. Quality Assurance DQCM will: • Create DQMP • Perform review of QC Documentation • Review submittal prior to submittal • Certify QC performed per DQMP • Perform internal audits, report the results and resolve nonconformances May be required to have ASQ, or equal, Certification
  • 17. Oversights Happen Don’t beat yourself up; there is a reason we perform checks and reviews.
  • 18. Questions? David Irish, PE, CMQ/OE David.irish@hdrinc.com (208) 387-7004 off (208) 869-1197 cell