STEAM BLOWING
OBJECTIVE 
Steam blowing of MS lines, CRH,HRH,SH,RH,HP & LP bypass pipe lines of 
turbine is carried out in order to remove welding slag, loose foreign 
materials, iron pieces, rust etc. from the system, generated during 
manufacturing, transportation & erection. 
PRINCIPLE OF STEAM BLOWING 
To ensure that sufficient cleaning forces are applied to the piping, the 
steam momentum during the steam blow must be equal to or greater than 
the steam momentum at normal maximum load condition. The Cleaning 
Force Ratio (CFR) is typically used to evaluate if satisfactory blow 
conditions are obtained.
PRECONDITIONS FOR STEAM LINE BLOWING 
1) Chemical cleaning should be completed 
2) SH primary and secondary de-superheater piping and 
RH’s emergency de-superheater piping ready for 
operation 
3) All permanent piping & temporary piping insulated 
and supports/hangers are released with cold setting 
4) Silencer should be connected at temporary pipe exit 
5) Soot blowing for APH should be available 
6) Make up for deaerator made ready 
7) Motor Driven BFP with all controls made ready
8) Hydraulic test of the following lines completed: 
*Feed Lines 
* MS, HRH, CRH Lines 
* MS to Aux. PRDS Line 
* All other auxiliary lines identified for steam 
blowing 
9) Sampling system made ready 
10) All safety valve disc installed after removing 
hydro-static plug in drum(sub-critical), 
superheaters and reheaters 
11) Adequate communication between control room, 
boiler and TG area ensured.
12) Flow nozzle, control valves and NRV flaps wherever 
applicable should be not erected before steam blowing and 
suitable spool pieces are erected. Strainers in the path 
should be removed. 
13) Required number of Target Plates and holder made 
available
BASIC TECHNIQUE USED 
1) PUFFING METHOD 
2) PURGING METHOD / CONTINEOUS BLOW 
METHOD
PUFFING METHOD 
ď‚– 
ď‚™ To give a thermal shock to the contour being purged, to 
dislodge the scale etc. 
ď‚™ Procedure: Raise the boiler pressure to a pre-determined value 
(40-60 kg/cm2), shut off firing and at the same time open the 
quick opening valve(EOTV), thus allowing the steam to 
escape to atm. with high velocity carrying with it the loose 
debris.
CONTINEOUS BLOWING METHOD 
ď‚– 
ď‚™The initial procedure is same as puffing 
method except shutting off the firing during 
blowing. 
ď‚™Continuous firing till the completion of steam 
blowing. 
ď‚™Maintain constant pressure during the blow
STAGES 
Steam blowing done in stages 
• Stage-1(a)- SH, MSL, ESV, temporary lines from 
ESV to EOTV, EOTV to CRH line, CRH lines upto 
boiler end with temporary exhaust pipe. 
• stage 1a end point will be concluded by 
observing the indents on the target plate.
STAGE- 1(a)
STAGE- 1(b) 
ď‚— SH,MSL, HP bypass inter connection, hand 
operated valve mounted in place of HP 
bypass valve and CRH lines upto Boiler end 
with temporary exhaust piping. 
ď‚— In this stage 6 to 8 blows will be given through 
HP bypass lines to ensure cleanliness of the 
limb. 
ď‚— EOTV will be kept closed. Manually Operated 
Isolation Valves in HP bypass lines will be kept 
opened fully.
STAGE- 1(b)
STAGE-2(a) 
ď‚— 1a plus reheater, HRH lines , Interceptor Valve 
and temporary pipe. 
ď‚— CRH line along with attemperator shall be 
welded with reheater before start of stage 
2a. LP bypass lines shall be blanked during 
stage 2a. Stage 2a end point will be 
concluded by observing the indents on 
target plates
STAGE- 2(a)
STAGE- 2(b) 
ď‚— 2a upto IV + LP bypass lines with temporary 
exhaust pipe. 
ď‚— Stage 2b blowing will be parallel blow in the 
path 2a & 2b. LP Bypass blanks shall be removed 
for stage 2b. 4 blows will be given through L.P. 
Bypass line to ensure cleanliness of the limbs
STAGE- 2(b)
TARGET PLATE 
• Generally Stainless steel panel 
• Target plate set at the first, sixth, ninth, twelfth purging, 
thereafter set target for each purging until purging results 
qualified . 
• Width about 8% of the steam vent tubes inner diameter(ID) 
and length equal to ID 
• Brinell hardness < 90 
• Steam velocity – 258 m/sec 
• Target plates to be introduced just before steam blowing / 
light up—to be removed soon after blowing is completed.
STEAM BLOWING COMPLETION CRITERIA 
• At least 2 continuous target plates should not have 
ORIFICE GRANULARITY on the target shall be not larger 
than 0.8 mm 
• No impacts with a diameter larger than 1 mm. 
• Not more than 4 impacts with a diameter larger than 0.5 
mm. 
• Not more than 10 impacts with a diameter of 0.2 to 0.5 mm 
.
Martyr V/v 
Martyr V/v 
CRH Line 
Final SH Final SH 
ESV 
ESV 
HP Bypass 
MS Line 
CRH NRV CRH Drain 
Pot 
RH O/L Hdr 
HRH Line 
MSV 
MSV 
LP Bypass 
IP SV 
Open Close Martyr Valve 
Steam Blow Line 
Temporary Line 
Pre Step # 1 : MS Line Steam Blowing 
LPBP V/ v
Final SH Final SH 
Martyr V/v 
ESV 
Martyr V/v 
ESV 
HP Bypass 
MS Line 
CRH NRV CRH Drain 
CRH Line 
Pot 
RH O/L Hdr 
HRH Line 
MSV 
MSV 
LP Bypass 
IP SV 
Open Close Martyr Valve 
Steam Blow Line 
Temporary Line 
Pre Step # 2 : HPBP / CRH Line Steam Blowing
Final SH Final SH 
Martyr V/v 
ESV 
Martyr V/v 
ESV 
HP Bypass 
MS Line 
CRH NRV CRH Drain 
CRH Line 
Pot 
RH O/L Hdr 
HRH Line 
MSV 
MSV 
LP Bypass 
IP SV 
Open Close Martyr Valve 
Steam Blow Line 
Temporary Line 
Main Step # 1 : HRH Line Steam Blowing
Final SH Final SH 
Martyr V/v 
ESV 
Martyr V/v 
ESV 
HP Bypass 
MS Line 
CRH NRV CRH Drain 
CRH Line 
Pot 
RH O/L Hdr 
HRH Line 
MSV 
MSV 
LP Bypass 
IP SV 
Open Close Martyr Valve 
Steam Blow Line 
Temporary Line 
Main Step # 2 :LPBP Line Steam Blowing
Steam Blowing Process

More Related Content

What's hot

INTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNINGINTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNINGSURAJ KUMAR
 
Unit lightup synchronisation &amp; shutdown
Unit lightup synchronisation &amp; shutdownUnit lightup synchronisation &amp; shutdown
Unit lightup synchronisation &amp; shutdownAshvani Shukla
 
Boiler light up & loading
Boiler light up & loadingBoiler light up & loading
Boiler light up & loadingManohar Tatwawadi
 
Power Plant Operations.pdf
Power Plant Operations.pdfPower Plant Operations.pdf
Power Plant Operations.pdfManohar Tatwawadi
 
Erection guidelinesfor500mw boilerpressureparts
Erection guidelinesfor500mw boilerpressurepartsErection guidelinesfor500mw boilerpressureparts
Erection guidelinesfor500mw boilerpressurepartsVijay Raj
 
Relief and blowdown in
Relief and blowdown           inRelief and blowdown           in
Relief and blowdown inAkshay Kotkar
 
Boiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & WorkingBoiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & WorkingTahoor Alam Khan
 
Unit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownUnit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownNitin Mahalle
 
THERMAL POWER PLANT OPERATIONS
THERMAL POWER PLANT OPERATIONSTHERMAL POWER PLANT OPERATIONS
THERMAL POWER PLANT OPERATIONSManohar Tatwawadi
 
STEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTINGSTEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTINGAshish Kumar Jain
 
Boiler circulation theory
Boiler circulation theoryBoiler circulation theory
Boiler circulation theoryNaumanKalshekar
 
Amardeep jadeja copy.ppt [autosaved]
Amardeep jadeja   copy.ppt [autosaved]Amardeep jadeja   copy.ppt [autosaved]
Amardeep jadeja copy.ppt [autosaved]Amardeep Jadeja
 
Handling of turbine during emergencies
Handling of turbine during emergenciesHandling of turbine during emergencies
Handling of turbine during emergenciesManohar Tatwawadi
 
POWER PLANT SIMULATOR 210 MW LMW TURBINE
POWER PLANT SIMULATOR 210 MW LMW TURBINEPOWER PLANT SIMULATOR 210 MW LMW TURBINE
POWER PLANT SIMULATOR 210 MW LMW TURBINEManohar Tatwawadi
 
HYDROSTATIC TESTING
HYDROSTATIC TESTINGHYDROSTATIC TESTING
HYDROSTATIC TESTINGPaul Sumal
 
Pre commissioning steam turbines load trial
Pre commissioning steam turbines load trialPre commissioning steam turbines load trial
Pre commissioning steam turbines load trialNagesh H
 
World Class Manufacturing:Plant Start Up and Commissioning Procedure
World  Class Manufacturing:Plant Start Up and Commissioning Procedure World  Class Manufacturing:Plant Start Up and Commissioning Procedure
World Class Manufacturing:Plant Start Up and Commissioning Procedure HIMADRI BANERJI
 
Construction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerConstruction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerVaibhav Paydelwar
 
Large scale energy recovery ppt HRSG
Large scale energy recovery ppt HRSGLarge scale energy recovery ppt HRSG
Large scale energy recovery ppt HRSGlorenzo Monasca
 

What's hot (20)

INTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNINGINTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNING
 
Unit lightup synchronisation &amp; shutdown
Unit lightup synchronisation &amp; shutdownUnit lightup synchronisation &amp; shutdown
Unit lightup synchronisation &amp; shutdown
 
Boiler light up & loading
Boiler light up & loadingBoiler light up & loading
Boiler light up & loading
 
Power Plant Operations.pdf
Power Plant Operations.pdfPower Plant Operations.pdf
Power Plant Operations.pdf
 
Erection guidelinesfor500mw boilerpressureparts
Erection guidelinesfor500mw boilerpressurepartsErection guidelinesfor500mw boilerpressureparts
Erection guidelinesfor500mw boilerpressureparts
 
Relief and blowdown in
Relief and blowdown           inRelief and blowdown           in
Relief and blowdown in
 
Boiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & WorkingBoiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & Working
 
Unit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownUnit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdown
 
THERMAL POWER PLANT OPERATIONS
THERMAL POWER PLANT OPERATIONSTHERMAL POWER PLANT OPERATIONS
THERMAL POWER PLANT OPERATIONS
 
STEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTINGSTEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTING
 
Cmc philosophy
Cmc philosophyCmc philosophy
Cmc philosophy
 
Boiler circulation theory
Boiler circulation theoryBoiler circulation theory
Boiler circulation theory
 
Amardeep jadeja copy.ppt [autosaved]
Amardeep jadeja   copy.ppt [autosaved]Amardeep jadeja   copy.ppt [autosaved]
Amardeep jadeja copy.ppt [autosaved]
 
Handling of turbine during emergencies
Handling of turbine during emergenciesHandling of turbine during emergencies
Handling of turbine during emergencies
 
POWER PLANT SIMULATOR 210 MW LMW TURBINE
POWER PLANT SIMULATOR 210 MW LMW TURBINEPOWER PLANT SIMULATOR 210 MW LMW TURBINE
POWER PLANT SIMULATOR 210 MW LMW TURBINE
 
HYDROSTATIC TESTING
HYDROSTATIC TESTINGHYDROSTATIC TESTING
HYDROSTATIC TESTING
 
Pre commissioning steam turbines load trial
Pre commissioning steam turbines load trialPre commissioning steam turbines load trial
Pre commissioning steam turbines load trial
 
World Class Manufacturing:Plant Start Up and Commissioning Procedure
World  Class Manufacturing:Plant Start Up and Commissioning Procedure World  Class Manufacturing:Plant Start Up and Commissioning Procedure
World Class Manufacturing:Plant Start Up and Commissioning Procedure
 
Construction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerConstruction of 500 MW Steam Boiler
Construction of 500 MW Steam Boiler
 
Large scale energy recovery ppt HRSG
Large scale energy recovery ppt HRSGLarge scale energy recovery ppt HRSG
Large scale energy recovery ppt HRSG
 

Viewers also liked

Boiler commissioning procedure
Boiler commissioning procedureBoiler commissioning procedure
Boiler commissioning procedureABVSAI
 
Piping and Vessels Flushing and Cleaning Procedure
Piping and Vessels Flushing and Cleaning ProcedurePiping and Vessels Flushing and Cleaning Procedure
Piping and Vessels Flushing and Cleaning ProcedureGerard B. Hawkins
 
The commissioning process
The commissioning processThe commissioning process
The commissioning processtreshammedia
 
Precommissioning and Commissioning
Precommissioning and CommissioningPrecommissioning and Commissioning
Precommissioning and CommissioningWendy Soerachman
 
Commissioning &amp; Interface With Engineering
Commissioning &amp; Interface With EngineeringCommissioning &amp; Interface With Engineering
Commissioning &amp; Interface With Engineeringasim569
 
06 procedure of start up boiler ok
06 procedure of start up boiler ok06 procedure of start up boiler ok
06 procedure of start up boiler okBunk Bonk
 
Boiler chemical cleaning_
Boiler chemical cleaning_Boiler chemical cleaning_
Boiler chemical cleaning_rkpandey85
 
Types of turbine & thier application
Types of turbine & thier applicationTypes of turbine & thier application
Types of turbine & thier applicationdaudsangeenkhan
 
Froth flush process
Froth flush processFroth flush process
Froth flush processanesan
 
Mechanical Completions
Mechanical CompletionsMechanical Completions
Mechanical CompletionsAndy Lang
 
Basic Mechanical Engineering-Steam turbines
Basic Mechanical Engineering-Steam turbines  Basic Mechanical Engineering-Steam turbines
Basic Mechanical Engineering-Steam turbines Steve M S
 
Chemical Cleaning of Boiler in a Thermal Power Plant
Chemical Cleaning of Boiler in a Thermal Power PlantChemical Cleaning of Boiler in a Thermal Power Plant
Chemical Cleaning of Boiler in a Thermal Power PlantSUDHEER KUMAR KALYANAM
 
Steam Turbines
Steam Turbines Steam Turbines
Steam Turbines Amir Ayad
 
[PPT] on Steam Turbine
[PPT] on Steam Turbine[PPT] on Steam Turbine
[PPT] on Steam TurbineSumit Sharma
 
Ppt of turbine
Ppt of turbinePpt of turbine
Ppt of turbineRajeev Mandal
 
Steam Turbines Basics
Steam Turbines BasicsSteam Turbines Basics
Steam Turbines BasicsPrasad Vejendla
 
Veolia OGE - Coal Pile Run Off - SW Chemistry 2016 (SUBMITTED)
Veolia OGE - Coal Pile Run Off - SW Chemistry 2016 (SUBMITTED)Veolia OGE - Coal Pile Run Off - SW Chemistry 2016 (SUBMITTED)
Veolia OGE - Coal Pile Run Off - SW Chemistry 2016 (SUBMITTED)Michael Reyes
 
B&W Steam Blowing Services
B&W Steam Blowing ServicesB&W Steam Blowing Services
B&W Steam Blowing ServicesDennis Miller
 

Viewers also liked (20)

Boiler commissioning procedure
Boiler commissioning procedureBoiler commissioning procedure
Boiler commissioning procedure
 
Piping and Vessels Flushing and Cleaning Procedure
Piping and Vessels Flushing and Cleaning ProcedurePiping and Vessels Flushing and Cleaning Procedure
Piping and Vessels Flushing and Cleaning Procedure
 
The commissioning process
The commissioning processThe commissioning process
The commissioning process
 
Precommissioning and Commissioning
Precommissioning and CommissioningPrecommissioning and Commissioning
Precommissioning and Commissioning
 
Commissioning &amp; Interface With Engineering
Commissioning &amp; Interface With EngineeringCommissioning &amp; Interface With Engineering
Commissioning &amp; Interface With Engineering
 
Steam turbine
Steam turbineSteam turbine
Steam turbine
 
06 procedure of start up boiler ok
06 procedure of start up boiler ok06 procedure of start up boiler ok
06 procedure of start up boiler ok
 
Boiler chemical cleaning_
Boiler chemical cleaning_Boiler chemical cleaning_
Boiler chemical cleaning_
 
Steam turbine Working
Steam turbine WorkingSteam turbine Working
Steam turbine Working
 
Types of turbine & thier application
Types of turbine & thier applicationTypes of turbine & thier application
Types of turbine & thier application
 
Froth flush process
Froth flush processFroth flush process
Froth flush process
 
Mechanical Completions
Mechanical CompletionsMechanical Completions
Mechanical Completions
 
Basic Mechanical Engineering-Steam turbines
Basic Mechanical Engineering-Steam turbines  Basic Mechanical Engineering-Steam turbines
Basic Mechanical Engineering-Steam turbines
 
Chemical Cleaning of Boiler in a Thermal Power Plant
Chemical Cleaning of Boiler in a Thermal Power PlantChemical Cleaning of Boiler in a Thermal Power Plant
Chemical Cleaning of Boiler in a Thermal Power Plant
 
Steam Turbines
Steam Turbines Steam Turbines
Steam Turbines
 
[PPT] on Steam Turbine
[PPT] on Steam Turbine[PPT] on Steam Turbine
[PPT] on Steam Turbine
 
Ppt of turbine
Ppt of turbinePpt of turbine
Ppt of turbine
 
Steam Turbines Basics
Steam Turbines BasicsSteam Turbines Basics
Steam Turbines Basics
 
Veolia OGE - Coal Pile Run Off - SW Chemistry 2016 (SUBMITTED)
Veolia OGE - Coal Pile Run Off - SW Chemistry 2016 (SUBMITTED)Veolia OGE - Coal Pile Run Off - SW Chemistry 2016 (SUBMITTED)
Veolia OGE - Coal Pile Run Off - SW Chemistry 2016 (SUBMITTED)
 
B&W Steam Blowing Services
B&W Steam Blowing ServicesB&W Steam Blowing Services
B&W Steam Blowing Services
 

Similar to Steam Blowing Process

Steam Blowing by Ankit Goyal
Steam Blowing by Ankit GoyalSteam Blowing by Ankit Goyal
Steam Blowing by Ankit GoyalAnkit Goyal
 
Obra Presentaton Ash Handling Sysytem 28032023.pptx
Obra Presentaton Ash Handling Sysytem 28032023.pptxObra Presentaton Ash Handling Sysytem 28032023.pptx
Obra Presentaton Ash Handling Sysytem 28032023.pptxmrujjavalsinghvarana
 
Heat recovery steam generator (HRSG) condition monitoring methods
Heat recovery steam generator (HRSG) condition monitoring methodsHeat recovery steam generator (HRSG) condition monitoring methods
Heat recovery steam generator (HRSG) condition monitoring methodsmahdi esfahani
 
Turbo generator & its auxiliaries
Turbo generator & its auxiliariesTurbo generator & its auxiliaries
Turbo generator & its auxiliariesarvind singh rathore
 
Coiled Tubing Conveyed Perforations
Coiled Tubing Conveyed PerforationsCoiled Tubing Conveyed Perforations
Coiled Tubing Conveyed PerforationsKamel Elsayed
 
Control valves for thermal power plants
Control valves for thermal power plantsControl valves for thermal power plants
Control valves for thermal power plantsSHIVAJI CHOUDHURY
 
Turbo Generator & Its auxiliaries.ppt
Turbo Generator & Its auxiliaries.pptTurbo Generator & Its auxiliaries.ppt
Turbo Generator & Its auxiliaries.pptNarhari1
 
ESP PPT NABINAGAR.pptx
ESP PPT NABINAGAR.pptxESP PPT NABINAGAR.pptx
ESP PPT NABINAGAR.pptxKhemantOd
 
Instrument questions
Instrument questionsInstrument questions
Instrument questions1job1
 
660 mw turbo generator &amp; its auxiliaries
660 mw turbo generator &amp; its auxiliaries660 mw turbo generator &amp; its auxiliaries
660 mw turbo generator &amp; its auxiliariesAshvani Shukla
 
Drilling engineering glossary, Sigve Hamilton Aspelund
Drilling engineering glossary, Sigve Hamilton AspelundDrilling engineering glossary, Sigve Hamilton Aspelund
Drilling engineering glossary, Sigve Hamilton AspelundSigve Hamilton Aspelund
 
Industrial training ppt bhel bhopal
Industrial training ppt bhel bhopalIndustrial training ppt bhel bhopal
Industrial training ppt bhel bhopalPRAVEENKUMARSINGH87
 
SPM FHS SHUT DOWN REPORT
SPM FHS SHUT DOWN REPORTSPM FHS SHUT DOWN REPORT
SPM FHS SHUT DOWN REPORTRam Manohar Reddy
 
40 CFR 98 Tier 4 Greenhouse Gas Reporting with Stack Emissions Flow Meter
40 CFR 98 Tier 4 Greenhouse Gas Reporting with Stack Emissions Flow Meter40 CFR 98 Tier 4 Greenhouse Gas Reporting with Stack Emissions Flow Meter
40 CFR 98 Tier 4 Greenhouse Gas Reporting with Stack Emissions Flow MeterEmerson Exchange
 
Testing_of_transformers_adjusted.ppt
Testing_of_transformers_adjusted.pptTesting_of_transformers_adjusted.ppt
Testing_of_transformers_adjusted.pptSatish Pydimarla
 
UNIT 1 SCTN_Vacuum Fundamentals_011.pptx
UNIT 1 SCTN_Vacuum Fundamentals_011.pptxUNIT 1 SCTN_Vacuum Fundamentals_011.pptx
UNIT 1 SCTN_Vacuum Fundamentals_011.pptxAwnishTripathi4
 

Similar to Steam Blowing Process (20)

Steam Blowing by Ankit Goyal
Steam Blowing by Ankit GoyalSteam Blowing by Ankit Goyal
Steam Blowing by Ankit Goyal
 
steam_blowing.pdf
steam_blowing.pdfsteam_blowing.pdf
steam_blowing.pdf
 
Obra Presentaton Ash Handling Sysytem 28032023.pptx
Obra Presentaton Ash Handling Sysytem 28032023.pptxObra Presentaton Ash Handling Sysytem 28032023.pptx
Obra Presentaton Ash Handling Sysytem 28032023.pptx
 
Punch point
Punch pointPunch point
Punch point
 
Heat recovery steam generator (HRSG) condition monitoring methods
Heat recovery steam generator (HRSG) condition monitoring methodsHeat recovery steam generator (HRSG) condition monitoring methods
Heat recovery steam generator (HRSG) condition monitoring methods
 
Turbo generator & its auxiliaries
Turbo generator & its auxiliariesTurbo generator & its auxiliaries
Turbo generator & its auxiliaries
 
Coiled Tubing Conveyed Perforations
Coiled Tubing Conveyed PerforationsCoiled Tubing Conveyed Perforations
Coiled Tubing Conveyed Perforations
 
Control valves for thermal power plants
Control valves for thermal power plantsControl valves for thermal power plants
Control valves for thermal power plants
 
Turbo Generator & Its auxiliaries.ppt
Turbo Generator & Its auxiliaries.pptTurbo Generator & Its auxiliaries.ppt
Turbo Generator & Its auxiliaries.ppt
 
ESP PPT NABINAGAR.pptx
ESP PPT NABINAGAR.pptxESP PPT NABINAGAR.pptx
ESP PPT NABINAGAR.pptx
 
Instrument questions
Instrument questionsInstrument questions
Instrument questions
 
660 mw turbo generator &amp; its auxiliaries
660 mw turbo generator &amp; its auxiliaries660 mw turbo generator &amp; its auxiliaries
660 mw turbo generator &amp; its auxiliaries
 
Drilling engineering glossary, Sigve Hamilton Aspelund
Drilling engineering glossary, Sigve Hamilton AspelundDrilling engineering glossary, Sigve Hamilton Aspelund
Drilling engineering glossary, Sigve Hamilton Aspelund
 
Industrial training ppt bhel bhopal
Industrial training ppt bhel bhopalIndustrial training ppt bhel bhopal
Industrial training ppt bhel bhopal
 
Hplpbp
HplpbpHplpbp
Hplpbp
 
SPM FHS SHUT DOWN REPORT
SPM FHS SHUT DOWN REPORTSPM FHS SHUT DOWN REPORT
SPM FHS SHUT DOWN REPORT
 
Piping system
Piping systemPiping system
Piping system
 
40 CFR 98 Tier 4 Greenhouse Gas Reporting with Stack Emissions Flow Meter
40 CFR 98 Tier 4 Greenhouse Gas Reporting with Stack Emissions Flow Meter40 CFR 98 Tier 4 Greenhouse Gas Reporting with Stack Emissions Flow Meter
40 CFR 98 Tier 4 Greenhouse Gas Reporting with Stack Emissions Flow Meter
 
Testing_of_transformers_adjusted.ppt
Testing_of_transformers_adjusted.pptTesting_of_transformers_adjusted.ppt
Testing_of_transformers_adjusted.ppt
 
UNIT 1 SCTN_Vacuum Fundamentals_011.pptx
UNIT 1 SCTN_Vacuum Fundamentals_011.pptxUNIT 1 SCTN_Vacuum Fundamentals_011.pptx
UNIT 1 SCTN_Vacuum Fundamentals_011.pptx
 

Recently uploaded

Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringJuanCarlosMorales19600
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
lifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxlifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxsomshekarkn64
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 

Recently uploaded (20)

Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineering
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
lifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxlifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptx
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 

Steam Blowing Process

  • 2. OBJECTIVE Steam blowing of MS lines, CRH,HRH,SH,RH,HP & LP bypass pipe lines of turbine is carried out in order to remove welding slag, loose foreign materials, iron pieces, rust etc. from the system, generated during manufacturing, transportation & erection. PRINCIPLE OF STEAM BLOWING To ensure that sufficient cleaning forces are applied to the piping, the steam momentum during the steam blow must be equal to or greater than the steam momentum at normal maximum load condition. The Cleaning Force Ratio (CFR) is typically used to evaluate if satisfactory blow conditions are obtained.
  • 3. PRECONDITIONS FOR STEAM LINE BLOWING 1) Chemical cleaning should be completed 2) SH primary and secondary de-superheater piping and RH’s emergency de-superheater piping ready for operation 3) All permanent piping & temporary piping insulated and supports/hangers are released with cold setting 4) Silencer should be connected at temporary pipe exit 5) Soot blowing for APH should be available 6) Make up for deaerator made ready 7) Motor Driven BFP with all controls made ready
  • 4. 8) Hydraulic test of the following lines completed: *Feed Lines * MS, HRH, CRH Lines * MS to Aux. PRDS Line * All other auxiliary lines identified for steam blowing 9) Sampling system made ready 10) All safety valve disc installed after removing hydro-static plug in drum(sub-critical), superheaters and reheaters 11) Adequate communication between control room, boiler and TG area ensured.
  • 5. 12) Flow nozzle, control valves and NRV flaps wherever applicable should be not erected before steam blowing and suitable spool pieces are erected. Strainers in the path should be removed. 13) Required number of Target Plates and holder made available
  • 6. BASIC TECHNIQUE USED 1) PUFFING METHOD 2) PURGING METHOD / CONTINEOUS BLOW METHOD
  • 7. PUFFING METHOD ď‚– ď‚™ To give a thermal shock to the contour being purged, to dislodge the scale etc. ď‚™ Procedure: Raise the boiler pressure to a pre-determined value (40-60 kg/cm2), shut off firing and at the same time open the quick opening valve(EOTV), thus allowing the steam to escape to atm. with high velocity carrying with it the loose debris.
  • 8. CONTINEOUS BLOWING METHOD ď‚– ď‚™The initial procedure is same as puffing method except shutting off the firing during blowing. ď‚™Continuous firing till the completion of steam blowing. ď‚™Maintain constant pressure during the blow
  • 9. STAGES Steam blowing done in stages • Stage-1(a)- SH, MSL, ESV, temporary lines from ESV to EOTV, EOTV to CRH line, CRH lines upto boiler end with temporary exhaust pipe. • stage 1a end point will be concluded by observing the indents on the target plate.
  • 11. STAGE- 1(b) ď‚— SH,MSL, HP bypass inter connection, hand operated valve mounted in place of HP bypass valve and CRH lines upto Boiler end with temporary exhaust piping. ď‚— In this stage 6 to 8 blows will be given through HP bypass lines to ensure cleanliness of the limb. ď‚— EOTV will be kept closed. Manually Operated Isolation Valves in HP bypass lines will be kept opened fully.
  • 13. STAGE-2(a) ď‚— 1a plus reheater, HRH lines , Interceptor Valve and temporary pipe. ď‚— CRH line along with attemperator shall be welded with reheater before start of stage 2a. LP bypass lines shall be blanked during stage 2a. Stage 2a end point will be concluded by observing the indents on target plates
  • 15. STAGE- 2(b) ď‚— 2a upto IV + LP bypass lines with temporary exhaust pipe. ď‚— Stage 2b blowing will be parallel blow in the path 2a & 2b. LP Bypass blanks shall be removed for stage 2b. 4 blows will be given through L.P. Bypass line to ensure cleanliness of the limbs
  • 17. TARGET PLATE • Generally Stainless steel panel • Target plate set at the first, sixth, ninth, twelfth purging, thereafter set target for each purging until purging results qualified . • Width about 8% of the steam vent tubes inner diameter(ID) and length equal to ID • Brinell hardness < 90 • Steam velocity – 258 m/sec • Target plates to be introduced just before steam blowing / light up—to be removed soon after blowing is completed.
  • 18. STEAM BLOWING COMPLETION CRITERIA • At least 2 continuous target plates should not have ORIFICE GRANULARITY on the target shall be not larger than 0.8 mm • No impacts with a diameter larger than 1 mm. • Not more than 4 impacts with a diameter larger than 0.5 mm. • Not more than 10 impacts with a diameter of 0.2 to 0.5 mm .
  • 19.
  • 20.
  • 21.
  • 22.
  • 23. Martyr V/v Martyr V/v CRH Line Final SH Final SH ESV ESV HP Bypass MS Line CRH NRV CRH Drain Pot RH O/L Hdr HRH Line MSV MSV LP Bypass IP SV Open Close Martyr Valve Steam Blow Line Temporary Line Pre Step # 1 : MS Line Steam Blowing LPBP V/ v
  • 24. Final SH Final SH Martyr V/v ESV Martyr V/v ESV HP Bypass MS Line CRH NRV CRH Drain CRH Line Pot RH O/L Hdr HRH Line MSV MSV LP Bypass IP SV Open Close Martyr Valve Steam Blow Line Temporary Line Pre Step # 2 : HPBP / CRH Line Steam Blowing
  • 25. Final SH Final SH Martyr V/v ESV Martyr V/v ESV HP Bypass MS Line CRH NRV CRH Drain CRH Line Pot RH O/L Hdr HRH Line MSV MSV LP Bypass IP SV Open Close Martyr Valve Steam Blow Line Temporary Line Main Step # 1 : HRH Line Steam Blowing
  • 26. Final SH Final SH Martyr V/v ESV Martyr V/v ESV HP Bypass MS Line CRH NRV CRH Drain CRH Line Pot RH O/L Hdr HRH Line MSV MSV LP Bypass IP SV Open Close Martyr Valve Steam Blow Line Temporary Line Main Step # 2 :LPBP Line Steam Blowing