Projects executed
1. PROJECTS EXECUTED
CLIENT Project Details
TAKREER Shutdown Maintenance Services for Warranty Inspection of Condesate Plant
TAKREER Inspection & Maintenance of 18 No. Tanks at Ruwais Refinery
TAKREER
Bundle, Tube, Heat Exchanger SA 179/ Freight Charges / Fabrication, Testing and
supply of Tube Bundles for Pre-Flash Tower Overhead Product Coolers 211-E-009A,
211-E-009B, 411-E-009A and 411-E-009B
TAKREER
Bundle, Tube. Heat Exchanger, 416, 3/4" OD x 6096MM LG x 16 BWG, Annealed
Cold Drawn 321 SS ASTM
TAKREER Manufacture and Supply of Process Muffle Furnace
TAKREER Bundle, Tube, Heat Exchanger
TAKREER Tube Bundle for Heat Exchanger
TAKREER Manufacture and Supply of Channel Head for 1507C
TAKREER Heat Exchanger for 1209C2 & 1605C
TAKREER Heat Exchanger for 1204C
TAKREER Tube Bundle for Air Cooler (1111CA/B, 4002C & 7102C F1/F2)
TAKREER Fabrication and Supply of complete heat exchanger top unit (1351C1A and 1351C1B)
TAKREER Drum Process, Intermittent Blowdown 9DRM52176/ Tag No: R13D16)
TAKREER Bundle, Tube, Heat Exchanger. 416, 3/4" OD x 6096MM LG x 16 BWG (103E01A2)
TAKREER Bundle, Tube, Heat exchanger, SA179;
TAKREER Complete Heat Exchanger 103-E-01D4
TAKREER Exchanger, Shell & Tube Exchanger, 102-E-07
TAKREER RE Report
TAKREER RE Report
GASCO Replacement of Stainless Steel Headers for Train no. 2 at Bu Hasa
GASCO
Part Replacement of Sulphur Incinerator Stack (50-S-101) at Thammama 'C' -
Habshan
2. GASCO Replacement of Residue Gas Flare System #1
GASCO
Shutdown of Thammama "C" Units 20,21,30,31,40,41,45,50,51,62,65,71 & 80 for
Periodical Inspection and Maintenance
GASCO
Shutdowns for OGD I, Train I and OGD II, Trains 2 and 3 for Periodic Inspection
/Maintenance - Habshan
GASCO Shutdown Train 2 at Ruwais Gas Plant for Periodic Inspection/ Maintenance
GASCO Welding and Miscellaneous Static Activities
GASCO Train 3 tie-Ins (during train 2 shutdown)
GASCO
HYP # 1 Additional by pass tie-in / New additional filter (proser) (train 1 -Buhasa Plant
Capacity)
GASCO Fabrication and supply of deluge piping spools
GASCO Pure propane plant shutdown
GASCO
Fabricate, supply, install temporary launcher, receiver, supports, kicker and balance
line spools
GASCO Fabrication & erection of Structural Steel
GASCO Hiring of Bundle Puller
GASCO Supply and Re-Tubing of 3 Nos Air Cooler Bundles for Bu Hasa NGL Plant
GASCO Cleaning of CW intake header & cw basin & p.house
GASCO Supply of Liquid Nitrogen for Train-I Shutdown
GASCO Supply of Senior Planning and Scheduling Engineer
L& T Construction Works for Sulphur Recovery Unit (SRU) - 19 -50% Piping
Supply of DEA Storage Tank
L& T
Supply of Claus Reactor (119-E-002, 119-E-004, 119-D-003, 119-D-005AVB, 119-D-
006, 119-E-001, 119-E-003, 119-E-005)
119-D-003, 119-D-005 A/B, 119-D-006
119-E-002, 119-E-004
Supply of Heat Exchanger (119-E-001, 119-E-003 & 119-E-005) inc. Erection,
Commissioning spare
L& T
Supply of Sulphur Tank (119-F-001, 119-B-001, 119-B-003, 119-D-001, 119-D-009,
119-D-010). Plus Supply of 2 years operational spares reactors
119-D-001, 119-D-002, 119-D-009, 119-D-010
3. 119-F-001
119-B-001, 119-B-003
Supply of 2 years operational spares reactors
L& T
Design, Engineering, Supply of CBA Steam condeser (air Fin Cooler) including
erection, commissioning and pre commissioning spares for SRU - 19
L& T Supply of 2 years Operational Spares for Combustion Chambers
L& T Supply of 2 years Operational Spares for Sulphur Condensers
L& T Supply of 2 years Operational Spares for Heat Exchangers
L& T Supply of 2 years Operational Spares for Sulphur Tanks
L& T Supply of 2 years Operational Spares for Vessels
ADGAS Vessel (21-C-1 & 21-C-2); Shell (1-E-103 B; 1-E-103 D & 1-E-203 B)
ADGAS Supply of Air fin Cooler Bundles (5)
ADGAS Re-engineering of 9 Nos. Exchangers
ADGAS Replacement of HIC Defected Vessel (2-C-102)
ADGAS Liquid Splitter Reflux Drum 2-C-102/202
ADGAS Manufacture and Supply 1-4 PSV Exhaust Silencers
ADGAS Fabrication and Supply of 2 Liquid Splitter Columns (2-C-201 and 2-C-101)
ADGAS Bundle U Tube and Heat Exchanger (Item No. 10 2-E-311 A/B)
ADGAS Offshore Feed Gas (OFG) Heater 1-E-311
ADGAS Propane Desuperheaters
ADGAS Heat Exchanger Shell (Tag: 2-E-104D)
ADGAS
FFS Ph-II&IIIStatic Equipments (Supply of Static Equipments 17 Nos) Complete: 1-C-
104, 1-C-110, 24-C-102 Shell: 2-S-102A, 26-E-101A, 26-E-101B, 1-E-0103A, 1-E-
202A, 2-E-212A, 26-E-201A, 2-E-211A, 2-E-211B, Complete HE (2): 4-E-116A, 4-E-
116B, Tube Bundle: -Replacement
ADGAS Supply of 1 Tube Bundle and Air/Fin Fan Cooler (9-E-101)
ADGAS PGA columns (2C-103/203)
ADGAS
Material Test Certification (Test Ring for Heat Exchangers) 9-E-0202A/B & 3-E-0203
A/B
ADGAS Fabrication and Supply of 2 Nos Vessels and 3 Nos HE Shells
4. ADGAS Fabrication & supply of 'U' Tube Bundles 2E 106 A/B
ADGAS Fabrication and Installation of Boat Shed
ADGAS Manufacture and Supply of 4 Nos Heat Exchangers
ADGAS Supply of Junior Manpower (Technical)
ADGAS Supply of Junior Manpower (Non-Technical)
ADGAS Manufacture and Supply of 2 Nos HIC defeted Vessels
ADGAS Fabrication and Supply of 2 Nos Air Cooled Heat Exchangers (2E-105/205)
ADCO Provision for Support services for Asab Gas Plant Warranty Shutdown
ADCO Replacement of Ruptured Boilers Tubes
ADCO Refurbishnent of sour water stripper boiler 172-E-102
ADCO Additional Works and repair works upon inspection findings
ADCO Warranty Shutdown (Asab Gas Plant) -Maintenance Heat Exchanger/Shutdown
ADMA OPCO ZWSC-Replacement of Open floor Channels and Handrails
ADMA OPCO Floor Panel for Offshore Platform (Construction)
ADMA OPCO
Floor Panel for Offshore Platform/Manufacture and Supply of 500M Handrails
(Offshore)
ADMA OPCO Replacement of Opend Grid Flooring P-11
ADNOC-FOD Gen. Maint. Of Floating Roof
ADNOC Provision of Manpower Services on call out basis (Specialist Manpower)
ADNOC-FOD Refurbishment of 2 Nos tanks
ENOC
Provide material and fabrication of one heat exchanger tube bundle for 02E-202 Heat
Exchanger
ENOC Replacement of tank 23D-101 floor plates
ENOC Replacement of tank 23D-103, 23D-105 and 23D-117 floor plates
ENOC Repair of tank
ENOC Weld build up jobs carried out for SBR-D
ENOC Plate
ENOC Pressure Vessel Cone
FERTIL Replacement of Corroded Plates of K3802 Air Ducts
FERTIL Galvanizes grating for shiploader walkways
FERTIL Galvanized Grating for reclaimer walkways
5. FERTIL Bags Store Sprinkler System
FERTIL Fabrication and Supply of Elbow/Duct of Air Intake Diffuser
AL JABER
Fabrication, installation and field welding of piping works (Fujairah Water & Power
Project (Pipelines)
AL JABER Field Weld Piping -Fujairah
EMCO
Hydrocracker and Hydroskimmer turnaround 2003/2004 at Ruwais Refinery - Hiring of
manpower
JORD ENG Air Inlet Modification Project of GASCO-BAB
VELOCI Staff Accomodation
ZARCON Supply of Treated Sand in EPCL Jebel Ali
JGC Manufacture of 15 Pressure Vessels (BAB Field Production Facilities Project)
DEUTCH & BABCOOK
Site Survey and Detailed Engineering, Man Power Supply and Equipment Hirefor
Gasco-Habshan Site
TECHNIP GASCO Habshan OGD -2 Shutdown
TECHNIP KNPC Vacum Re-run Revamp Project -9063B Shell & Heat Exchangers
TECHNIP
Implement FCCU Resid Processing Project (Supply of Hoppers & Pressure Vessel
Silos)
TECHNIP
KNPC Vacum Re-run Revamp Project -9063B Vacuum Tower Design & Material
Supply
TECHNIP Stripping Steam Rings & Fabricated Strainers
TECHNIP Manufacture, test and Supply of 2 Nos Incinerators for ALBA Coke Calcining Project
TECHNIP
Design, Manufacture and Supply of Potable Water Storage Tank for ALBA Coke
Calcining Project
BECHTEL
OGD III Vessel - C.S. Thin Wall, Up to 19mm Thick (320-V-106, 321-V-106, 330-V-
111, 331-V-111, 332-V-101, 340-V-120, 341-V-120, 340-V-121, 341-V-121, 340-V-
126, 341-V-126, 340-V-129, 341-V-129, 342-V-101A, 342-V-101B, 342-V-101C, 345-
V-105, 362-V-102A, 36
BECHTEL
OGD III Vessel - C.S. Thin Wall, 20 - 50mm Thick (340-V-127, 341-V-127, 340-V-137,
341-V-137, 342-V-102A to 102C, 342-V-103A to 103C, 345-V-104, 365-V-101, 367-V-
101, 340-V-122/123/124/125/127/137, 342-V-102 A/B/C, 342-V-103-A/B/C, 345-V-
104, 365-V-101, 3
BECHTEL
AGD II Vessel - C.S. Thin Wall, Up to 19mm Thick (130-V-107/120, 145-V102, 145-V-
104A/S, 262-V-101/102/104/105/106/110/111/112/113, 264-V-101, 265-V102, 267-V-
101/102, 271-V-102/106/107)
BECHTEL
AGD II Vessel - C.S. Thin Wall, 20 - 50mm Thick (130-V-104, 230-V-104, 130-F-103,
230-F-103, 130-V-104, 230-V-104, 141-V-201, 241-V-201, 141-V-202, 241-V-202,
141-V-205, 241-V-205, 141-V-206, 241-V-206, 268-V-102)
6. BECHTEL Supply & Erection of Silos
SNAMPROGETTI Supply of Reactors (59C-306; 59C-307 & 59C-312)
SNAMPROGETTI
19 Vessels (7C-314, 7C-315, 7C-302, 7C-383, 7C-384, 5C-309A, 5C-309B, 5C-331,
5C-333, 59C-321, 5C-351, 5C-354, 5C-357, 5C-359, 5C-361, 5C-382, 5C-385, 6C-
303, 9C-206) -EURO 2,249,100
SNAMPROGETTI
22 Vessels (59C-329, 59C-330, 59T-303, 5C-306, 5C-308A, 5C-308B, 5C-310, 5C-
315, 5C-317A, 5C-317B, 5C-320A, 5C-320B, 5C-320C, 5C-321, 5C-353, 5C-387, 5C-
396, ST-360, ST-381, 7C-385, 59D-304, 59E-320) -EURO 2,665,500
SNAMPROGETTI GASCO-3rd NGL 70C7016
SNAMPROGETTI GASCO-3rd NGL 32C2
SNAMPROGETTI GASCO-3rd NGL 65V6504A
SNAMPROGETTI GASCO-3rd NGL 65V6504B
SNAMPROGETTI GASCO-3rd NGL 65V6504C
SNAMPROGETTI GASCO-3rd NGL 62C6222X
SNAMPROGETTI GASCO-3rd NGL 62C6224X
SNAMPROGETTI GASCO-3rd NGL 62C6261AX
SNAMPROGETTI GASCO-3rd NGL 68V6808
SNAMPROGETTI GASCO-3rd NGL 66V6604A
SNAMPROGETTI Asab Gas Plant Shutdown of ADCO
SNAMPROGETTI Plates
FLUOR EPC Habshan Gas Complex (113-V101-A, 113-V101-B)
FLUOR Fabrication and Supply of Port Area Vessels -6Nos
FLUOR Plate
SIDEM
Supply and Fabrication Exchanger and Ejector (WQ07B1/B2, WQ04B1/B2,
WQ03B1/B2, WQ01B1/02B2, WV40N1, WV30N1)
CAMP RUWAIS
Foster Wheeler
Supply of PS-022542 Off Gas Absorber, PS-022543 Off Gas Absorber 32C2, PS-
022516 Sulfur Seals, PS-022517 Sweet Gas K.O. Drum, PS-022518 LP Absor. Inlet
Drum 62 C6224X, PS-022519 Carbon Filter 62 C6261AX, PS-022546 TGTU MDEA
Sump Tank 68 V6808
Tyco Replacement of the Old RTR Pipes in GUP at Ruwais Refinery (Phase III)
SAIPEM
Design, Fabrication & Supply of Aluminum Bed Support for Ruwais 3rd NGL Train -
Butane Treaters Projects -GASCO