SlideShare a Scribd company logo
1 of 45
Design of People System
 
Job Design ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Design of Work Systems ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Decisions in Job Design
Approaches in Job Design ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Behavioral Approaches (Psycho-Social Factors) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Specialization in Business (Table 7.1) For   Management: 1. Difficult to motivate quality 2. Worker dissatisfaction, possibly resulting in absenteeism, high turnover, disruptive tactics, poor attention to  quality For  Labor: 1. Monotonous work 2. Limited opportunities for advancement 3. Little control over work 4. Little opportunity for self-fulfillment
Disadvantages For   Management: 1. Difficult to motivate quality 2. Worker dissatisfaction, possibly resulting in absenteeism, high turnover, disruptive tactics, poor attention to quality For  Labor: 1. Monotonous work 2. Limited opportunities for advancement 3. Little control over work 4. Little opportunity for self-fulfillment
Efficiency Approach (Technical-Physical Factors)  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
The Work Environment
Work Methods ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Document and Analyze Present Method ,[object Object],[object Object],[object Object],[object Object],[object Object]
Assembly Chart (Operation Process Chart) ,[object Object]
Assembly Chart … (Continued) ,[object Object]
Process Flowchart Symbols Operation: An activity directly contributing to  product or service Storage: Store of the product or service Inspection: Examining the product or service for completeness, irregularities, or quality Transportation: Moving the product or service from one location to another Delay: Process having to wait
Figure 7-2 FLOW PROCESS CHART Job Requisition of petty cash Details of Method ANALYST D. Kolb PAGE 1 of 2 Operation Movement Inspection Delay Storage Requisition made by department head Put in “pick-up” basket To accounting department Account and signature verified Amount approved by treasurer Amount counted by cashier Amount recorded by bookkeeper Petty cash sealed in envelope Petty cash carried to department Petty cash checked against requisition Receipt signed Petty cash stored in safety box
Worker-Machine Chart ,[object Object],[object Object],[object Object]
Worker-Machine Chart –  1 –  2 –  3 –  4 –  5 –  6 –  7 –  8 –  9 Key in customer data on card Feed data card in Position customer for photo Take picture Inspect card & trim edges Idle Idle Idle Idle Photo/card processed Accept card Begin photo process 2.6 0.4 1.0 0.6 3.4 1.2 Job Photo-Id Cards Date  10/14 Time Time (min)  Operator  (min)  Photo Machine
Operation Analysis ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Operation Analysis ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Principles of Motion Economy ,[object Object],[object Object],[object Object],[object Object],[object Object]
Work Measurement ,[object Object],[object Object],[object Object],[object Object]
Major Methods of Work Measurement
The Critics of Work Measurement ,[object Object],[object Object],[object Object],[object Object],[object Object]
Time Study Sheet
Elemental Standard Time Data ,[object Object],[object Object]
Predetermined Motion-Time Data Systems ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
The MTM Predetermined  Motion-Time Data System
Work Sampling ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Work Sampling Study ,[object Object],[object Object],[object Object],[object Object]
Maslow’s Hierarchy of Needs
Compensation Methods ,[object Object],[object Object],[object Object],[object Object]
Wage Incentive Plans ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Group Incentive Plans ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Lincoln Electric ,[object Object],[object Object],[object Object],[object Object]
Lincoln Electric Disbursed Ten Year Average
Employee Health & Safety ,[object Object],[object Object],[object Object],[object Object],[object Object]
Learning Curves ,[object Object],[object Object],Units produced Processing time per unit
t n  = time required for  n th unit produced t 1  = time required for first unit produced n  = cumulative number of units produced b  =  , where  r  is the learning curve % (decimal coefficient) Time required for the  n th unit = t n  =  t 1 n b where:
Learning Curve Effect Contract to produce 36 computers. t 1  = 18 hours, learning rate = 80% What is time for 9th, 18th, 36th units? t 9 = (18)(9) ln(0.8)/ln 2  = (18)(9) -0.322  = (18)/(9) 0.322  = (18)(0.493) = 8.874hrs t 18 = (18)(18) ln(0.8)/ln 2  = (18)(0.394) = 7.092hrs t 36 = (18)(36) ln(0.8)/ln 2  = (18)(0.315) = 5.674hrs
Learning Curve for Mass Production Job Standard time End of improvement Units produced Processing time per unit
Learning Curves (cont.) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]

More Related Content

What's hot (20)

Time and motion study
Time and motion study Time and motion study
Time and motion study
 
Work measurement (1)
Work measurement (1)Work measurement (1)
Work measurement (1)
 
Work measurement
Work measurementWork measurement
Work measurement
 
Work motion study
Work motion studyWork motion study
Work motion study
 
Motion And Time Study
Motion And Time StudyMotion And Time Study
Motion And Time Study
 
Time study
Time studyTime study
Time study
 
Work Study
Work StudyWork Study
Work Study
 
Time study ratings&&allowances
Time  study ratings&&allowancesTime  study ratings&&allowances
Time study ratings&&allowances
 
Introduction to time study
Introduction to time studyIntroduction to time study
Introduction to time study
 
8. chapter 7 work study (time and motion study)
8. chapter 7   work study (time and motion study)8. chapter 7   work study (time and motion study)
8. chapter 7 work study (time and motion study)
 
Time study
Time studyTime study
Time study
 
Work study
Work studyWork study
Work study
 
Work study method and time study-final - copy
Work study method and time study-final - copyWork study method and time study-final - copy
Work study method and time study-final - copy
 
Work study and ergonomics
Work study and ergonomicsWork study and ergonomics
Work study and ergonomics
 
Measurment techniques
Measurment techniquesMeasurment techniques
Measurment techniques
 
Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivity
 
Work study method-and_time_study-final
Work study method-and_time_study-finalWork study method-and_time_study-final
Work study method-and_time_study-final
 
Work measurement
Work measurementWork measurement
Work measurement
 
3 work measurement ppt
3 work measurement ppt3 work measurement ppt
3 work measurement ppt
 
Worksampling - Methods Engineering
Worksampling - Methods EngineeringWorksampling - Methods Engineering
Worksampling - Methods Engineering
 

Viewers also liked

Viewers also liked (7)

Methods-Time Measurement and Functional Capacity Evaluation 041610
Methods-Time Measurement and Functional Capacity Evaluation 041610Methods-Time Measurement and Functional Capacity Evaluation 041610
Methods-Time Measurement and Functional Capacity Evaluation 041610
 
Motion and time study
Motion and time studyMotion and time study
Motion and time study
 
GSD Manual For Students
GSD Manual For StudentsGSD Manual For Students
GSD Manual For Students
 
3 work charting_methods
3 work charting_methods3 work charting_methods
3 work charting_methods
 
04. Konsep Perancangan Sistem Produksi, Teknik Tata Cara Kerja, dan Peta Kerja
04. Konsep Perancangan Sistem Produksi, Teknik Tata Cara Kerja, dan Peta Kerja04. Konsep Perancangan Sistem Produksi, Teknik Tata Cara Kerja, dan Peta Kerja
04. Konsep Perancangan Sistem Produksi, Teknik Tata Cara Kerja, dan Peta Kerja
 
Methods time measurement (mtm)
Methods time measurement (mtm)Methods time measurement (mtm)
Methods time measurement (mtm)
 
Brain herniation imaging
Brain herniation imagingBrain herniation imaging
Brain herniation imaging
 

Similar to DesignPeopleSystem

Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...viveksangwan007
 
Industrial Engineering - Method Study
Industrial Engineering - Method StudyIndustrial Engineering - Method Study
Industrial Engineering - Method Studyjosy2108
 
Employee productivity
Employee productivityEmployee productivity
Employee productivitySelf-employed
 
Employee productivity and Role of HR
Employee productivity and Role of HREmployee productivity and Role of HR
Employee productivity and Role of HRSelf-employed
 
Work Measurement and Operational Effectiveness
Work Measurement and Operational EffectivenessWork Measurement and Operational Effectiveness
Work Measurement and Operational Effectivenessgrubinm
 
Chapter-3-Methods_Engineering_and_Operations_Analysis.ppt
Chapter-3-Methods_Engineering_and_Operations_Analysis.pptChapter-3-Methods_Engineering_and_Operations_Analysis.ppt
Chapter-3-Methods_Engineering_and_Operations_Analysis.pptdhesinghraja2
 
Methods_Engineering_and_Operations_Analysis.pdf
Methods_Engineering_and_Operations_Analysis.pdfMethods_Engineering_and_Operations_Analysis.pdf
Methods_Engineering_and_Operations_Analysis.pdfAdarshDKarki1
 
195846452 work-study-layout
195846452 work-study-layout195846452 work-study-layout
195846452 work-study-layouthomeworkping3
 
Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...Khairul Bashar
 
Chapter-7 Job Design and Work Measurement Final.pptx
Chapter-7 Job Design and Work Measurement Final.pptxChapter-7 Job Design and Work Measurement Final.pptx
Chapter-7 Job Design and Work Measurement Final.pptxamanuel236786
 
Work study ......operational management presentation
Work study ......operational management presentationWork study ......operational management presentation
Work study ......operational management presentationvish0110
 
CH-7 Design.ppt
CH-7 Design.pptCH-7 Design.ppt
CH-7 Design.pptAbinet17
 
Application of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments IndustryApplication of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments Industryzaman parvez
 

Similar to DesignPeopleSystem (20)

Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
 
Industrial Engineering - Method Study
Industrial Engineering - Method StudyIndustrial Engineering - Method Study
Industrial Engineering - Method Study
 
Work study
Work studyWork study
Work study
 
4th-IE-BSS.pptx.pptx
4th-IE-BSS.pptx.pptx4th-IE-BSS.pptx.pptx
4th-IE-BSS.pptx.pptx
 
Employee productivity
Employee productivityEmployee productivity
Employee productivity
 
Improving the productivity_and_introducing_the_work_study
Improving the productivity_and_introducing_the_work_studyImproving the productivity_and_introducing_the_work_study
Improving the productivity_and_introducing_the_work_study
 
Employee productivity and Role of HR
Employee productivity and Role of HREmployee productivity and Role of HR
Employee productivity and Role of HR
 
Work Measurement and Operational Effectiveness
Work Measurement and Operational EffectivenessWork Measurement and Operational Effectiveness
Work Measurement and Operational Effectiveness
 
Chapter-3-Methods_Engineering_and_Operations_Analysis.ppt
Chapter-3-Methods_Engineering_and_Operations_Analysis.pptChapter-3-Methods_Engineering_and_Operations_Analysis.ppt
Chapter-3-Methods_Engineering_and_Operations_Analysis.ppt
 
Methods_Engineering_and_Operations_Analysis.pdf
Methods_Engineering_and_Operations_Analysis.pdfMethods_Engineering_and_Operations_Analysis.pdf
Methods_Engineering_and_Operations_Analysis.pdf
 
195846452 work-study-layout
195846452 work-study-layout195846452 work-study-layout
195846452 work-study-layout
 
Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...
 
Chapter-7 Job Design and Work Measurement Final.pptx
Chapter-7 Job Design and Work Measurement Final.pptxChapter-7 Job Design and Work Measurement Final.pptx
Chapter-7 Job Design and Work Measurement Final.pptx
 
Work study ......operational management presentation
Work study ......operational management presentationWork study ......operational management presentation
Work study ......operational management presentation
 
Operation management
Operation managementOperation management
Operation management
 
Work measurement
Work measurementWork measurement
Work measurement
 
CH-7 Design.ppt
CH-7 Design.pptCH-7 Design.ppt
CH-7 Design.ppt
 
Work Study
Work Study Work Study
Work Study
 
Application of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments IndustryApplication of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments Industry
 
137 work study
137 work study137 work study
137 work study
 

More from ahmad bassiouny (20)

Motion Study
Motion StudyMotion Study
Motion Study
 
The Christmas Story
The Christmas StoryThe Christmas Story
The Christmas Story
 
Turkey Photos
Turkey PhotosTurkey Photos
Turkey Photos
 
Mission Bo Kv3
Mission Bo Kv3Mission Bo Kv3
Mission Bo Kv3
 
Miramar
MiramarMiramar
Miramar
 
Mom
MomMom
Mom
 
Linearization
LinearizationLinearization
Linearization
 
Kblmt B000 Intro Kaizen Based Lean Manufacturing
Kblmt B000 Intro Kaizen Based Lean ManufacturingKblmt B000 Intro Kaizen Based Lean Manufacturing
Kblmt B000 Intro Kaizen Based Lean Manufacturing
 
How To Survive
How To SurviveHow To Survive
How To Survive
 
Dad
DadDad
Dad
 
Ancient Hieroglyphics
Ancient HieroglyphicsAncient Hieroglyphics
Ancient Hieroglyphics
 
Dubai In 2009
Dubai In 2009Dubai In 2009
Dubai In 2009
 
Organizational Behavior
Organizational BehaviorOrganizational Behavior
Organizational Behavior
 
Work Study Workshop
Work Study WorkshopWork Study Workshop
Work Study Workshop
 
Workstudy
WorkstudyWorkstudy
Workstudy
 
_olympic
_olympic_olympic
_olympic
 
_Egypt
_Egypt_Egypt
_Egypt
 
_Ancient_Greece_-_Gods_and_Goddesses
_Ancient_Greece_-_Gods_and_Goddesses_Ancient_Greece_-_Gods_and_Goddesses
_Ancient_Greece_-_Gods_and_Goddesses
 
Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivity
 
Office Lean Overview
Office Lean OverviewOffice Lean Overview
Office Lean Overview
 

DesignPeopleSystem

  • 2.  
  • 3.
  • 4.
  • 6.
  • 7.
  • 8.
  • 9. Specialization in Business (Table 7.1) For Management: 1. Difficult to motivate quality 2. Worker dissatisfaction, possibly resulting in absenteeism, high turnover, disruptive tactics, poor attention to quality For Labor: 1. Monotonous work 2. Limited opportunities for advancement 3. Little control over work 4. Little opportunity for self-fulfillment
  • 10. Disadvantages For Management: 1. Difficult to motivate quality 2. Worker dissatisfaction, possibly resulting in absenteeism, high turnover, disruptive tactics, poor attention to quality For Labor: 1. Monotonous work 2. Limited opportunities for advancement 3. Little control over work 4. Little opportunity for self-fulfillment
  • 11.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18. Process Flowchart Symbols Operation: An activity directly contributing to product or service Storage: Store of the product or service Inspection: Examining the product or service for completeness, irregularities, or quality Transportation: Moving the product or service from one location to another Delay: Process having to wait
  • 19. Figure 7-2 FLOW PROCESS CHART Job Requisition of petty cash Details of Method ANALYST D. Kolb PAGE 1 of 2 Operation Movement Inspection Delay Storage Requisition made by department head Put in “pick-up” basket To accounting department Account and signature verified Amount approved by treasurer Amount counted by cashier Amount recorded by bookkeeper Petty cash sealed in envelope Petty cash carried to department Petty cash checked against requisition Receipt signed Petty cash stored in safety box
  • 20.
  • 21. Worker-Machine Chart – 1 – 2 – 3 – 4 – 5 – 6 – 7 – 8 – 9 Key in customer data on card Feed data card in Position customer for photo Take picture Inspect card & trim edges Idle Idle Idle Idle Photo/card processed Accept card Begin photo process 2.6 0.4 1.0 0.6 3.4 1.2 Job Photo-Id Cards Date 10/14 Time Time (min) Operator (min) Photo Machine
  • 22.
  • 23.
  • 24.
  • 25.
  • 26. Major Methods of Work Measurement
  • 27.
  • 29.
  • 30.
  • 31. The MTM Predetermined Motion-Time Data System
  • 32.
  • 33.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39. Lincoln Electric Disbursed Ten Year Average
  • 40.
  • 41.
  • 42. t n = time required for n th unit produced t 1 = time required for first unit produced n = cumulative number of units produced b = , where r is the learning curve % (decimal coefficient) Time required for the n th unit = t n = t 1 n b where:
  • 43. Learning Curve Effect Contract to produce 36 computers. t 1 = 18 hours, learning rate = 80% What is time for 9th, 18th, 36th units? t 9 = (18)(9) ln(0.8)/ln 2 = (18)(9) -0.322 = (18)/(9) 0.322 = (18)(0.493) = 8.874hrs t 18 = (18)(18) ln(0.8)/ln 2 = (18)(0.394) = 7.092hrs t 36 = (18)(36) ln(0.8)/ln 2 = (18)(0.315) = 5.674hrs
  • 44. Learning Curve for Mass Production Job Standard time End of improvement Units produced Processing time per unit
  • 45.