Introduction to well completion
General Procedure of well completion
Open hole well completion
Cased hole well completion
Informal definition:
The high time of the well when engineer and
personnel comes to decide whether to install the
production casing in order to initiate the production at
the surface or it should be abandoned .
Technical Definition:
Well completion means to prepare the well for
production by installing the necessary
equipments into the well in order to allow the safe
and controlled flow of HCS at the surface.
In an open hole well completion the production casing is
just set above the pay zone, while the entire deepen bottom
of pay zone is left uncased.
•Maximum exposure of pay zone
•Less pressure drawdown during flow
•No formation damage occurs due to cementing
and perforation.
•Less formation damage
•Inability to plug off water or gas zones
•Inability to stimulate the separate zones within the
productive zones
•For the most common type of well completion today
involves the cased hole completion, in which the
production casing and liner are cemented and
perforated subsequently.
•Select the sections of the pay zone we wish to produce
•Stimulate the separate pay zone from the well
•Multiple completion zones
•A Liner is installed across the pay zone
•It can be divided into two: Screen Liner and perforated
liner
•Screen Liner : Casing is set above the producing zone and
an uncemented screen and liner assembly is installed
across the pay zone
•Casing is set above the producing
zone and a liner assembly is installed
across the pay zone and cemented
in place. The liner is then perforated
selectively for production.
•Production casing is cemented through the
producing zone and pay section is selectively
perforated
•Production tubing is perforated and cemented
•Casing flow: large flow rate no tubing is required, used in middle
east.
•Tubing and Annulus flow: large flow rate flow segregation.
•Tubing flow: Used widely in Malaysia due to safety, may use one
more tubing strings.
•Simplest way of completing the well
•In this method well is completed by single zone with single
tubing
•In this multiple branches are drilled from a single zone
•It is used to improve productivity from closely spaced target zones.
Introduction to well completion procedures and techniques

More Related Content

What's hot (20)

Casing design
Casing designCasing design
Casing design
 
Petroleum Production Engineering - Perforation
Petroleum Production Engineering - PerforationPetroleum Production Engineering - Perforation
Petroleum Production Engineering - Perforation
 
Well Control
Well ControlWell Control
Well Control
 
Well Completion Design.pdf
Well Completion Design.pdfWell Completion Design.pdf
Well Completion Design.pdf
 
Well completion and stimulation
Well completion and stimulation Well completion and stimulation
Well completion and stimulation
 
Sand control
Sand controlSand control
Sand control
 
Basic Hydraulic Fracturing
Basic Hydraulic FracturingBasic Hydraulic Fracturing
Basic Hydraulic Fracturing
 
Drilling problems and optimization
Drilling problems and optimizationDrilling problems and optimization
Drilling problems and optimization
 
Formation Damage
Formation DamageFormation Damage
Formation Damage
 
Drillstring & BHA Design
Drillstring & BHA DesignDrillstring & BHA Design
Drillstring & BHA Design
 
Well control
Well controlWell control
Well control
 
Rig types and components
Rig types and componentsRig types and components
Rig types and components
 
Rig types.
Rig types.Rig types.
Rig types.
 
Well Workover
Well Workover Well Workover
Well Workover
 
4 1 reservoir-drive_mechanisms
4 1 reservoir-drive_mechanisms4 1 reservoir-drive_mechanisms
4 1 reservoir-drive_mechanisms
 
introduction to completions and workovers (2)
introduction to completions and workovers (2)introduction to completions and workovers (2)
introduction to completions and workovers (2)
 
Casing design
Casing designCasing design
Casing design
 
Drilling fluids
Drilling fluidsDrilling fluids
Drilling fluids
 
Stuck pipe
Stuck pipeStuck pipe
Stuck pipe
 
Formation Damage Presentation Group F
Formation Damage Presentation Group FFormation Damage Presentation Group F
Formation Damage Presentation Group F
 

Similar to Introduction to well completion procedures and techniques

Well completion techniques
Well completion techniquesWell completion techniques
Well completion techniquesvelMurugan260
 
Fundamentals of Petroleum Engineering Module 6
Fundamentals of Petroleum Engineering Module 6Fundamentals of Petroleum Engineering Module 6
Fundamentals of Petroleum Engineering Module 6Aijaz Ali Mooro
 
overview of DRILLING OPERATION.pptx
overview of DRILLING OPERATION.pptxoverview of DRILLING OPERATION.pptx
overview of DRILLING OPERATION.pptxTemitopeBello6
 
Dewatering techniques
Dewatering techniquesDewatering techniques
Dewatering techniquesjamali husain
 
Fluids & cementing 2022-2023 (1) (1).pdf
Fluids & cementing 2022-2023 (1) (1).pdfFluids & cementing 2022-2023 (1) (1).pdf
Fluids & cementing 2022-2023 (1) (1).pdfLokmanDridah
 
dewateringtechniques 2.pptx
dewateringtechniques 2.pptxdewateringtechniques 2.pptx
dewateringtechniques 2.pptxCarolTumaneng
 
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)  Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
Analyzing Multi-zone completion using multilayer by IPR (PROSPER) Arez Luqman
 
Well completion d.pptx
Well completion d.pptxWell completion d.pptx
Well completion d.pptxAihamAltayeh1
 
Intelligent well completion
Intelligent well completionIntelligent well completion
Intelligent well completionAkshaya Mishra
 
Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreMohamed Abdelshafy Abozeima
 
wellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdfwellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdfAZLANAiyub
 
Cement Manufacturing Plant Construction
Cement Manufacturing Plant ConstructionCement Manufacturing Plant Construction
Cement Manufacturing Plant ConstructionShyam Anandjiwala
 
260416413-Well-Completion-ppt with examples
260416413-Well-Completion-ppt with examples260416413-Well-Completion-ppt with examples
260416413-Well-Completion-ppt with examplessreeharshavandavasi
 
Presentation on surface investigation techniques for foundation
Presentation on surface investigation techniques  for foundationPresentation on surface investigation techniques  for foundation
Presentation on surface investigation techniques for foundationashishcivil098
 
Offshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundOffshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundSigve Hamilton Aspelund
 
Best practices day 4 am new
Best practices day 4 am newBest practices day 4 am new
Best practices day 4 am newAhmed Radwan
 

Similar to Introduction to well completion procedures and techniques (20)

Well completion techniques
Well completion techniquesWell completion techniques
Well completion techniques
 
WELL COMPLETIONS.pptx
WELL COMPLETIONS.pptxWELL COMPLETIONS.pptx
WELL COMPLETIONS.pptx
 
Fundamentals of Petroleum Engineering Module 6
Fundamentals of Petroleum Engineering Module 6Fundamentals of Petroleum Engineering Module 6
Fundamentals of Petroleum Engineering Module 6
 
overview of DRILLING OPERATION.pptx
overview of DRILLING OPERATION.pptxoverview of DRILLING OPERATION.pptx
overview of DRILLING OPERATION.pptx
 
Mine dewatering techniques
Mine dewatering techniquesMine dewatering techniques
Mine dewatering techniques
 
Dewatering techniques
Dewatering techniquesDewatering techniques
Dewatering techniques
 
Fluids & cementing 2022-2023 (1) (1).pdf
Fluids & cementing 2022-2023 (1) (1).pdfFluids & cementing 2022-2023 (1) (1).pdf
Fluids & cementing 2022-2023 (1) (1).pdf
 
Secondary cementing
Secondary cementingSecondary cementing
Secondary cementing
 
dewateringtechniques 2.pptx
dewateringtechniques 2.pptxdewateringtechniques 2.pptx
dewateringtechniques 2.pptx
 
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)  Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
 
Well completion d.pptx
Well completion d.pptxWell completion d.pptx
Well completion d.pptx
 
Intelligent well completion
Intelligent well completionIntelligent well completion
Intelligent well completion
 
Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and more
 
wellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdfwellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdf
 
Cement Manufacturing Plant Construction
Cement Manufacturing Plant ConstructionCement Manufacturing Plant Construction
Cement Manufacturing Plant Construction
 
260416413-Well-Completion-ppt with examples
260416413-Well-Completion-ppt with examples260416413-Well-Completion-ppt with examples
260416413-Well-Completion-ppt with examples
 
Presentation on surface investigation techniques for foundation
Presentation on surface investigation techniques  for foundationPresentation on surface investigation techniques  for foundation
Presentation on surface investigation techniques for foundation
 
Offshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundOffshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton Aspelund
 
PVD Prefabricated Vertical Drain.ppt
PVD Prefabricated Vertical Drain.pptPVD Prefabricated Vertical Drain.ppt
PVD Prefabricated Vertical Drain.ppt
 
Best practices day 4 am new
Best practices day 4 am newBest practices day 4 am new
Best practices day 4 am new
 

Recently uploaded

main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
An introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxAn introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxPurva Nikam
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 

Recently uploaded (20)

main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
An introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxAn introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptx
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 

Introduction to well completion procedures and techniques

  • 1. Introduction to well completion General Procedure of well completion Open hole well completion Cased hole well completion
  • 2. Informal definition: The high time of the well when engineer and personnel comes to decide whether to install the production casing in order to initiate the production at the surface or it should be abandoned . Technical Definition: Well completion means to prepare the well for production by installing the necessary equipments into the well in order to allow the safe and controlled flow of HCS at the surface.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9. In an open hole well completion the production casing is just set above the pay zone, while the entire deepen bottom of pay zone is left uncased.
  • 10.
  • 11. •Maximum exposure of pay zone •Less pressure drawdown during flow •No formation damage occurs due to cementing and perforation. •Less formation damage
  • 12. •Inability to plug off water or gas zones •Inability to stimulate the separate zones within the productive zones
  • 13. •For the most common type of well completion today involves the cased hole completion, in which the production casing and liner are cemented and perforated subsequently.
  • 14. •Select the sections of the pay zone we wish to produce •Stimulate the separate pay zone from the well •Multiple completion zones
  • 15. •A Liner is installed across the pay zone •It can be divided into two: Screen Liner and perforated liner •Screen Liner : Casing is set above the producing zone and an uncemented screen and liner assembly is installed across the pay zone
  • 16.
  • 17. •Casing is set above the producing zone and a liner assembly is installed across the pay zone and cemented in place. The liner is then perforated selectively for production.
  • 18.
  • 19. •Production casing is cemented through the producing zone and pay section is selectively perforated
  • 20.
  • 21. •Production tubing is perforated and cemented
  • 22.
  • 23. •Casing flow: large flow rate no tubing is required, used in middle east. •Tubing and Annulus flow: large flow rate flow segregation. •Tubing flow: Used widely in Malaysia due to safety, may use one more tubing strings.
  • 24. •Simplest way of completing the well •In this method well is completed by single zone with single tubing
  • 25. •In this multiple branches are drilled from a single zone •It is used to improve productivity from closely spaced target zones.

Editor's Notes

  1. Major cost of the total well is consumed by casing so to select the size, grade and setting depth is a primary function of an engineering consideration. Conductor Casing: is attached with the casing head above which the BOP is installed, it’s 1st casing installed into the sub surface and it isolates the sand water, fresh water bearing zones and prevents the contamination. Surface casing: is the 2nd casing installed in the series of casing the primary function surface casing is to provide the support to the well head in order to make it stable ,to isolate sand water and water zones and to prevent the lost circulation.
  2. Tubing is run into the well with smaller diameter compared to the production casing in order to move the oil or gas up to the surface. Packer: is attatched just above the producing zone and performs the job of seal b/w out side of the casing and inside of the tubing. The packer is expanded and grips and seal off the walls of the the production casing outside of the tubing and inside of the production casing.
  3. Chrissmass tree: A collection of valves called the chriss mass tree is installed at the surface on the top of the casing hanger. As the production of the oil or gas enters into the xmass tree and through the closing and oopening valves of the chrissmass tree the flow of HCS is controlled.