SlideShare a Scribd company logo
1 of 50
MEASUREMENT OF QUANTITIES




                     ● Mat Naim bin Abdullah @ Mohd Asmoni
                     ● Diploma QS (UTM), BSc. QS (Glasgow
                         Caledonian University), M.Eng. Construction
                         (UTM), PhD Facilities Management (UTM)
                     ●   matnaim@utm.my
                     ●   amn871969@yahoo.com
                     ●   C04-308
                     ●   019-7573760




        www.utm.my              innovative ● entrepreneurial ● global   1
MEASUREMENT OF QUANTITIES


Assumption No. 1:       Total land area = 10m x 10m




                                  Project Title: Construction and completion of
                                  guard house
                                  Owner: Panicsonic Sdn Bhd
                                  Architect: A to Z Sdn Bhd
                                  Drawing Title: Ground beam and foundation plan
                                  -------------------------------------------------------------------------
                                  Drawn by: Sheila
                                  Checked by: Aaron




           www.utm.my            innovative ● entrepreneurial ● global                                        2
MEASUREMENT OF QUANTITIES




        www.utm.my          innovative ● entrepreneurial ● global   3
MEASUREMENT OF QUANTITIES

                      Construction Method

 1.    Preliminaries (Initial site works) - % of total cost
 2.    Site clearance and earthwork
 3.    Foundation construction (E.g. Piling and footing)
 4.    Work below lowest floor finish
 5.    Frame
 6.    Staircase
 7.    Upper Floor
 8.    Roof
 9.    Wall and partition
 10.   Door and window
 11.   Finishes
 12.   Sundries (Built-in furniture)
 13.   Building services (M&E, ICT etc)
 14.   External works (Water reticulation, landscape etc)



              www.utm.my                  innovative ● entrepreneurial ● global   4
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

1) Site clearance

1.1) Clear the site including grubbing of Area of the site:
     trees, shrubs and demolish any       10 x 10 = 100m2
     existing structure and cart away
     and dump to the specified
     location.

      10.00
      10.00
     ----------
     100.00          100 m2
     ----------




                    www.utm.my                  innovative ● entrepreneurial ● global   5
MEASUREMENT OF QUANTITIES




        www.utm.my          innovative ● entrepreneurial ● global   6
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

2) Foundation

2.1) Piling including all related works   Area of the building:
                                          Length = 3048 + 3048 = 6096
        6.10                              Width = 3048 + 3048 = 6096
        6.10
     ----------
      37.21         37 m2
     ----------




                    www.utm.my                 innovative ● entrepreneurial ● global   7
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

2) Foundation

2.2) Excavation for pile cap            Size of pile cap = 1219 x 1219
                                        Depth of excavation:
     9/1.22                                1524 + 50 (lean concrete) = 1574
        1.22
        1.57
     ----------
      21.03        21 m3
     ----------



                                              Excavation and Lean concrete as base
                                                               for pile cap




                    www.utm.my               innovative ● entrepreneurial ● global   8
MEASUREMENT OF QUANTITIES




        www.utm.my          innovative ● entrepreneurial ● global   9
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

2) Foundation
2.3) Reinforced concrete Grade 30 for   Size of pile cap:
     pile cap                           Length = 1219
                                        Width = 1219
    9/1.22                              Thickness = 305
       1.22
       0.31
    ----------
       4.15       4 m3
    ----------



                                                     Concrete for pile cap




                   www.utm.my                 innovative ● entrepreneurial ● global   10
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

2) Foundation
2.4) 50mm thick lean concrete Grade     Size of pile cap:
     15 for pile cap                    Length = 1219
                                        Width = 1219
   9 / 1.22
       1.22
    ----------
     13.40        13 m2
    ----------




                                               Excavation and Lean concrete as base
                                                                for pile cap




                   www.utm.my                 innovative ● entrepreneurial ● global   11
MEASUREMENT OF QUANTITIES




        www.utm.my          innovative ● entrepreneurial ● global   12
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

2) Foundation

2.5) Formwork for pile cap              Size of pile cap:
                                        Length = 1219
 9 / 4 /1.22                            Width = 1219
        0.31                            Thickness = 305
     ----------
       13.62             14 m2          9/2/1.22
     ----------                              0.31 6.81

                                        9/2/1.50
                                             0.31 8.37
                                                 15.18 15m2



              Formwork for pile cap


                          www.utm.my          innovative ● entrepreneurial ● global   13
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

2) Foundation
2.6) Reinforcement bar Y12 for pile cap   Length:
                                            a                    c
 9/2/ 12/ 1.53
       ----------                                      b

       330.48m x 0.89 kg/m = 294.13kg     = a + b + c – cover
       ----------                         = 305 + 1219 + 305 – 6(50)
                            = 294 kg      = 1829 – 300
                                          = 1529

                                          No. of bars:
                                          = (b/100) + 1
                                          = ((1219 – 2(50)cover )/100 )+1
                                          = 12 nos.



                   www.utm.my                   innovative ● entrepreneurial ● global   14
MEASUREMENT OF QUANTITIES




                     @100 c/c




        www.utm.my              innovative ● entrepreneurial ● global   15
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF                                Taker off :              Checked by:
3.1) Column stump                       Size of column stump:
3.1.1) Reinforced concrete Grade 30     Length = 229
       for column stump                 Width = 229
                                        Height = 1524 – 305 thickness of pile
    9/0.23                                         cap – (351/2) Half of beam’s
       0.23                                        thickness
       1.04                                      = 1043.50
    ----------
       0.50       1 m3
    ----------




                   www.utm.my                 innovative ● entrepreneurial ● global   16
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.1) Column stump                       Size of column stump:
3.1.2) Formwork for column stump        Length = 229
                                        Width = 229
  9/4/0.23                              Height = 1524 – 305 thickness of pile
        1.04                                       cap – (351/2) Half of beam’s
     ----------                                    thickness
       8.61       9 m2                           = 1043.50
     ----------




                   www.utm.my                innovative ● entrepreneurial ● global   17
MEASUREMENT OF QUANTITIES




               Height of column stump

                        @100 c/c




        www.utm.my                      innovative ● entrepreneurial ● global   18
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.1) Column stump                       Length = a + half beam’s thickness –
3.1.3) Reinforcement bar Y12 for        cover + 2 laps
       column stump                          lap



  9/4/2.97
     ----------                                    a

     106.92m x 0.89kg/m = 95.16kg
     ----------                                        lap
                           95kg
                                        = 1524 + (351/2) – 50 + (660x2)
                                        = 2969.50




                   www.utm.my                innovative ● entrepreneurial ● global   19
MEASUREMENT OF QUANTITIES
                     General Notes




        www.utm.my                   innovative ● entrepreneurial ● global   20
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.1) Column stump                       Length of link: (length of CS– 2cover) x
3.1.4) R6 link in for column stump      4 +hook            Hook


  9/6/0.62
     ----------
      33.48m x 0.22kg/m = 7.36kg        =(229-100)+(229-100)+(229-100)+(229-
     ----------                         100)+100=616
                           7kg
                                        No. of link:
                                        Height of column stump = 1043.50
                                        =(1043.50/229)+1
                                        = 6 nos.




                   www.utm.my                innovative ● entrepreneurial ● global   21
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.2) Ground beam                        Size of ground beam:
3.2.1) Excavation for ground beam       Length=3048+3048=6096
                                        Width = 229
  2/3/6.10                              Thickness = 351
       0.23
       0.35
     ----------
       2.95m3
     ----------
                           3m3


                                               Excavation for ground beam



                   www.utm.my                innovative ● entrepreneurial ● global   22
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.2) Ground beam                          Size of ground beam:
3.2.2) Reinforced concrete Grade 30 for   Length=3048+3048=6096
        ground beam                       Width = 229
                                          Thickness = 351
  2/3/6.10
       0.23
       0.35
     ----------
       2.95m3
     ----------
                            3m3


                                                  RC for ground beam


                   www.utm.my                 innovative ● entrepreneurial ● global   23
MEASUREMENT OF QUANTITIES


Assumption No. 1:       Total land area = 10m x 10m




                                  Project Title: Construction and completion of
                                  guard house
                                  Owner: Panicsonic Sdn Bhd
                                  Architect: A to Z Sdn Bhd
                                  Drawing Title: Ground beam and foundation plan
                                  -------------------------------------------------------------------------
                                  Drawn by: Sheila
                                  Checked by: Aaron




           www.utm.my            innovative ● entrepreneurial ● global                                        24
MEASUREMENT OF QUANTITIES




               Height of column stump

                        @100 c/c




        www.utm.my                      innovative ● entrepreneurial ● global   25
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.2) Ground beam                        Size of ground beam:
3.2.3) Formwork for ground beam         Length=3048+3048=6096
                                        Width = 229
                                        Thickness = 351
2/3/2/6.10
       0.35
     ----------
      25.62       26m2
     ----------



                                                 Installation of reinforcement bar and
                                                           formwork for ground beam




                   www.utm.my                innovative ● entrepreneurial ● global       26
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.2) Ground beam                        Length = (length–2cover)+(2bend-
3.2.4) Reinforcement bar Y10 for        2cover)
       ground beam                      =(6096-(2x50))+(2x351)-(4x50)
                                        = 6498
2/3/4/6.50
     ----------
    156.00m x 0.62kg/m = 96.72kg
     ----------
                          97kg




                   www.utm.my                innovative ● entrepreneurial ● global   27
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.2) Ground beam                        Length of stirrup:
3.2.5) R6 stirrup for ground beam                            Hook


2/3/28/0.86
      ----------                        =(229-100)+(351-100)+(229-100)+(351-
     144.48m x 0.22kg/m = 31.79kg       100)+100
      ----------                        =860
                          32kg
                                        No. of stirrup:
                                        Length of grd beam= 6096
                                        =(6096/229)+1
                                        = 28 nos.




                   www.utm.my                innovative ● entrepreneurial ● global   28
MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF

3.3) Ground slab                                     Area of slab = length x width
3.3.1) Excavation for ground slab                    Depth of excavation = 500mm

       6.10
       6.10                                                             BRC A8
                                                                                     150mm thick
                                                                                     concrete slab
       0.50
      ----------
      18.61m3               19 m3
      ----------                                                                             50mm thick
                                                                                                sand

                                                                                            300mm thick
                                                                                              hardcore



                                                                             DPM




      Installation of formwork,Damp Proof Membrane
         (DPM) and BRC wire mesh for ground slab



                               www.utm.my                     innovative ● entrepreneurial ● global       29
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.3) Ground slab                        Area of slab = length x width
3.3.2) Reinforced concrete G30 in       Depth of excavation = 500mm
       ground slab
                                                                      150mm thick
                                                        BRC A8
                                                                      concrete slab
       6.10
       6.10
       0.15                                                                   50mm thick

      ----------                                                                 sand


       5.58m3                                                                300mm thick
                                                                               hardcore

      ----------   6 m3
                                                            DPM




                   www.utm.my                innovative ● entrepreneurial ● global         30
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.3) Ground slab                        Area of slab = length x width
3.3.3) Formwork for ground slab         Depth of excavation = 500mm

     4/6.10                                            BRC A8
                                                                     150mm thick
                                                                     concrete slab
       0.15
      ----------
       3.66m2                                                                50mm thick

      ----------                                                                sand


                           4 m2                                             300mm thick
                                                                              hardcore



                                                           DPM




                   www.utm.my                innovative ● entrepreneurial ● global        31
MEASUREMENT OF QUANTITIES


Project: Construction and completion of
Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.3) Ground slab                          Area of slab = length x width
3.3.4) BRC A8 for ground slab             Depth of excavation = 500mm
                                                                       150mm thick
                                                         BRC A8
       6.10                                                            concrete slab


       6.10
      ----------
                                                                               50mm thick
      37.21m2                                                                     sand

      ----------                                                              300mm thick
                                                                                hardcore
                           37 m2
                                                             DPM




                   www.utm.my                  innovative ● entrepreneurial ● global        32
MEASUREMENT OF QUANTITIES


Project: Construction and completion of
Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.3) Ground slab                          Area of slab = length x width
3.3.5) DPM for ground slab                Depth of excavation = 500mm
                                                                        150mm thick
                                                          BRC A8
       6.10                                                             concrete slab


       6.10
      ----------
                                                                                50mm thick
      37.21m2                                                                      sand

      ----------                                                               300mm thick
                                                                                 hardcore
                             37 m2
                                                              DPM




                   www.utm.my                  innovative ● entrepreneurial ● global         33
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.3) Ground slab                         Area of slab = length x width
3.3.6) 50mm sand blinding for ground     Depth of excavation = 500mm
       slab
                                                                         150mm thick
                                                          BRC A8
       6.10                                                              concrete slab


       6.10
      ----------
                                                                                 50mm thick
      37.21m2                                                                       sand

      ----------                                                                300mm thick
                                                                                  hardcore
                           37 m2
                                                              DPM




                   www.utm.my                 innovative ● entrepreneurial ● global           34
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.3) Ground slab                        Area of slab = length x width
3.3.7) Hardcore for ground slab         Depth of excavation = 500mm

       6.10                                             BRC A8
                                                                      150mm thick
                                                                      concrete slab
       6.10
       0.30
      ----------                                                              50mm thick

      11.16m3                                                                    sand


      ----------                                                             300mm thick
                                                                               hardcore

                           11 m3
                                                            DPM




                   www.utm.my                innovative ● entrepreneurial ● global         35
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

4) FRAME                                Taker off :                       Checked by:
4.1) Column                             Size of column:
4.1.1) Reinforced concrete Grade 30     Length = 229
       for column                       Width = 229
                                        Height = Height of the wall
    9/0.23                                       = 3000mm
       0.23
       3.00
    ----------
       1.43       1 m3
    ----------



                                                Installation of reinforcement bar and
                                                             formwork for column



                   www.utm.my                 innovative ● entrepreneurial ● global     36
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

4) FRAME
4.1) Column                             Size of column:
4.1.2) Formwork for column              Length = 229
                                        Width = 229
  9/4/0.23                              Height = 3000
        3.00
     ----------
      24.84       25 m2
     ----------




                   www.utm.my                innovative ● entrepreneurial ● global   37
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

4) FRAME
4.1) Column                             Length = height of column + half of roof
4.1.3) Reinforcement bar Y12 for        beam + 1 lap + bend
       column
                                                 bend


  9/4/4.50
     ----------                                  Height of wall
    162.00m x 0.89kg/m = 144.18kg
     ----------
                          144kg
                                                  lap




                                        = 3000+ (0.5x351) + 660 + 660
                                        = 4495.5


                   www.utm.my                innovative ● entrepreneurial ● global   38
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

4) FRAME
4.1) Column                             Length of link: (length of CS– 2cover) x
4.1.4) R6 link in for column            4 +hook
                                                          Hook

  9/14/0.82
     ----------
    103.32m x 0.22kg/m = 22.73kg        =(229-50)+(229-50)+(229-50)+(229-
     ----------                         50)+100=816
                          23kg
                                        No. of link:
                                        Height of column = 3000
                                        =(3000/229)+1
                                        = 14 nos.



                    www.utm.my               innovative ● entrepreneurial ● global   39
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

4) FRAME
4.2) Roof beam                            Size of roof beam:
4.2.1) Reinforced concrete Grade 30 for   Length=3048+3048=6096
        roof beam                         Width = 229
                                          Thickness = 351
  2/3/6.10
       0.23
       0.35
     ----------
       2.95m3
     ----------
                            3m3




                   www.utm.my                 innovative ● entrepreneurial ● global   40
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

4) FRAME
4.2) Roof beam                          Size of roof beam:
4.2.2) Formwork for roof beam           Length=3048+3048=6096
                                        Width = 229                        Side

                                        Thickness = 351
  2/3/6.10                                                             Soffit
       0.93
     ----------
      34.04       34m2
     ----------




                                        = 351 + 229 + 351
                                        = 931
                   www.utm.my                 innovative ● entrepreneurial ● global   41
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

4) FRAME
4.2) Roof beam                          Length = (length–2cover)+(2bend-
4.2.3) Reinforcement bar Y10 for roof   2cover)
       beam                             =(6096-(2x50))+(2x351)-(4x50)
                                        = 6498
2/3/4/6.50
     ----------
    156.00m x 0.62kg/m = 96.72kg
     ----------
                          97kg




                   www.utm.my                innovative ● entrepreneurial ● global   42
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

4) FRAME
3.2) Roof beam                          Length of stirrup:
3.2.5) R6 stirrup for roof beam                              Hook


2/3/28/1.06
      ----------                        =(229-50)+(351-50)+(229-50)+(351-
     178.08m x 0.22kg/m = 39.18kg       50)+100
      ----------                        =1060
                          39kg
                                        No. of stirrup:
                                        Length of beam= 6096
                                        =(6096/229)+1
                                        = 28 nos.




                   www.utm.my                innovative ● entrepreneurial ● global   43
MEASUREMENT OF QUANTITIES


Assumption No. 1:       Total land area = 10m x 10m




                                  Project Title: Construction and completion of
                                  guard house
                                  Owner: Panicsonic Sdn Bhd
                                  Architect: A to Z Sdn Bhd
                                  Drawing Title: Ground beam and foundation plan
                                  -------------------------------------------------------------------------
                                  Drawn by: Sheila
                                  Checked by: Aaron




           www.utm.my            innovative ● entrepreneurial ● global                                        44
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

5) ROOF                                      = area of roof
                                             =axbx2               a                          3m
5.1) Roof trusses and covering

2/8.50
   5.20                                      a = 42482 + 30002
  ----------
  88.40m2               88 m2                                     Front and rear elevation
  ----------                                 a = 5200

                                             b = 6096 +
                                                  1200 +                     b
                                                  1200
                                             b = 8496


                                                                  Right and left elevation

                         www.utm.my                innovative ● entrepreneurial ● global          45
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

6) DOOR and WINDOW                            Door can be
                                              measured either     a                          3m
6.1) Single leaf panel door size 2100 x 900   in m2 or
      including frame and painting            number. If
                                              enumerated then
                                              need to state
                                              type and size
        2            2 nos.                                       Front and rear elevation
  ----------


                                                                             b



                                                                  Right and left elevation

                          www.utm.my               innovative ● entrepreneurial ● global          46
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

6) DOOR and WINDOW                           Window can be
                                             measured either      a                          3m
6.2) Adjustable louvres window 1200 x 600    in m2 or
      including frame , painting and glass   number. If
                                             enumerated then
                                             need to state
                                             type and size
      6              6 nos.                                       Front and rear elevation
  ----------


                                                                             b



                                                                  Right and left elevation

                        www.utm.my                 innovative ● entrepreneurial ● global          47
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

7) WALL AND PARTITION
                                                                  a                          3m
7.1) Half brickwall in comon brick

 4/ 6.10
    3.00 73.20

Less opening (e.g. door and window)                               Front and rear elevation

 2/2.10
   0.90    3.78 (door)
                              65 m2                                          b
 6/1.20
   0.60    4.32 (window)
                                                    Brickwall
          65.10

                                                                  Right and left elevation

                         www.utm.my                innovative ● entrepreneurial ● global          48
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

8) FINISHES                                  Area of plastering
                                             and panting =        a                          3m
8.1) Plastering and painting                 Area of wall x 2
 2/ 65m2           130m2                     Area of ceiling =
                                             area of slab
8.2) Floor Finishes – cement render                               Front and rear elevation

               37 m2

                                                                             b
8.3) Ceiling       37m2


                                                      Brickwall

                                                                  Right and left elevation

                          www.utm.my               innovative ● entrepreneurial ● global          49
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

9) SUNDRIES
                                                                  a                          3m
9.1) Built-in counter size 1800mm x 900mm
      x 725mm(h).


   1
                           1 no.                                  Front and rear elevation




                                                                             b


                                                      Brickwall

                                                                  Right and left elevation

                        www.utm.my                 innovative ● entrepreneurial ● global          50

More Related Content

What's hot

Int walls finishes to list
Int walls finishes to list Int walls finishes to list
Int walls finishes to list
Jeanne Hoo
 
Smm2 second edition
Smm2 second editionSmm2 second edition
Smm2 second edition
Bt Lee
 
Project management project 1 report (pr architects)
Project management project 1 report (pr architects)Project management project 1 report (pr architects)
Project management project 1 report (pr architects)
Jannah Jailani
 
Eca presentation slides
Eca presentation slidesEca presentation slides
Eca presentation slides
ahmong4
 
Bq preamble
Bq preambleBq preamble
Bq preamble
aizat76
 
Eca presentation-compile
Eca presentation-compileEca presentation-compile
Eca presentation-compile
Timun Loh
 
M3 EG BQ steel struture
M3 EG BQ steel strutureM3 EG BQ steel struture
M3 EG BQ steel struture
Est
 

What's hot (20)

ECA form
ECA formECA form
ECA form
 
Int walls finishes to list
Int walls finishes to list Int walls finishes to list
Int walls finishes to list
 
Boq piling works
Boq   piling worksBoq   piling works
Boq piling works
 
Jenis kontraktor
Jenis kontraktorJenis kontraktor
Jenis kontraktor
 
ECA Workshop - ECA Form
ECA Workshop - ECA FormECA Workshop - ECA Form
ECA Workshop - ECA Form
 
Final Bills of Quantity
Final Bills of QuantityFinal Bills of Quantity
Final Bills of Quantity
 
ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - Brief
 
Smm2 second edition
Smm2 second editionSmm2 second edition
Smm2 second edition
 
Elemental Cost Analysis
Elemental Cost AnalysisElemental Cost Analysis
Elemental Cost Analysis
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantity
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)
 
Project management project 1 report (pr architects)
Project management project 1 report (pr architects)Project management project 1 report (pr architects)
Project management project 1 report (pr architects)
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in Malaysia
 
Eca presentation slides
Eca presentation slidesEca presentation slides
Eca presentation slides
 
Measurement II BQ
Measurement II BQMeasurement II BQ
Measurement II BQ
 
Bq floor
Bq floorBq floor
Bq floor
 
Bq preamble
Bq preambleBq preamble
Bq preamble
 
Site possession
Site possessionSite possession
Site possession
 
Eca presentation-compile
Eca presentation-compileEca presentation-compile
Eca presentation-compile
 
M3 EG BQ steel struture
M3 EG BQ steel strutureM3 EG BQ steel struture
M3 EG BQ steel struture
 

Viewers also liked (6)

Chapter 6 column
Chapter 6   columnChapter 6   column
Chapter 6 column
 
Architecture of-brunei
Architecture of-bruneiArchitecture of-brunei
Architecture of-brunei
 
Thai architecture
Thai architectureThai architecture
Thai architecture
 
AESTETA: Formalism
AESTETA: FormalismAESTETA: Formalism
AESTETA: Formalism
 
Indonesian architecture
Indonesian architectureIndonesian architecture
Indonesian architecture
 
HISTORY: Thai (Thailand) Architecture 1.0
HISTORY: Thai (Thailand) Architecture 1.0HISTORY: Thai (Thailand) Architecture 1.0
HISTORY: Thai (Thailand) Architecture 1.0
 

Similar to Sgp4813 measurement of quantities

Industrial training report
Industrial training reportIndustrial training report
Industrial training report
kiransuresh7
 
Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)
AJAY SHAHU
 
Environment friendly building_material_technologies_for_low_cost_housing (1)
Environment friendly building_material_technologies_for_low_cost_housing (1)Environment friendly building_material_technologies_for_low_cost_housing (1)
Environment friendly building_material_technologies_for_low_cost_housing (1)
Hammam El Meseiry
 
Architect Sample
Architect SampleArchitect Sample
Architect Sample
Hai Nguyen
 
Icng eco housing (1)
Icng eco housing (1)Icng eco housing (1)
Icng eco housing (1)
Sarah Waddle
 

Similar to Sgp4813 measurement of quantities (20)

DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRCDELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
Dda training presentation
Dda training presentationDda training presentation
Dda training presentation
 
11. KGA, MALL - Execution Plan - R- 06.03.2023.pptx
11. KGA, MALL - Execution Plan - R- 06.03.2023.pptx11. KGA, MALL - Execution Plan - R- 06.03.2023.pptx
11. KGA, MALL - Execution Plan - R- 06.03.2023.pptx
 
Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)
 
DSLIP 2015 Technical Report
DSLIP 2015 Technical ReportDSLIP 2015 Technical Report
DSLIP 2015 Technical Report
 
Dslip report
Dslip reportDslip report
Dslip report
 
Building materials, Basic civil engineering ,unit-1
Building materials, Basic civil engineering ,unit-1Building materials, Basic civil engineering ,unit-1
Building materials, Basic civil engineering ,unit-1
 
Introduction & under ground water tank problem
Introduction & under ground water tank problemIntroduction & under ground water tank problem
Introduction & under ground water tank problem
 
Environment friendly building_material_technologies_for_low_cost_housing (1)
Environment friendly building_material_technologies_for_low_cost_housing (1)Environment friendly building_material_technologies_for_low_cost_housing (1)
Environment friendly building_material_technologies_for_low_cost_housing (1)
 
Modeling of Interlocking Soil Stabilized Bricks for Improved Wall Constructio...
Modeling of Interlocking Soil Stabilized Bricks for Improved Wall Constructio...Modeling of Interlocking Soil Stabilized Bricks for Improved Wall Constructio...
Modeling of Interlocking Soil Stabilized Bricks for Improved Wall Constructio...
 
hochPPT thesis statement master civil engineering.pptx
hochPPT thesis statement master civil engineering.pptxhochPPT thesis statement master civil engineering.pptx
hochPPT thesis statement master civil engineering.pptx
 
Présentation master thesesis in civil department pptx
Présentation master thesesis in civil department pptxPrésentation master thesesis in civil department pptx
Présentation master thesesis in civil department pptx
 
Burj al arab
Burj al arabBurj al arab
Burj al arab
 
@ETCONp Construction Exam 8 .DOCX
@ETCONp Construction Exam 8  .DOCX@ETCONp Construction Exam 8  .DOCX
@ETCONp Construction Exam 8 .DOCX
 
IRJET - Experimental Investigation on Plasticizing Agent in Concrete
IRJET - Experimental Investigation on Plasticizing Agent in ConcreteIRJET - Experimental Investigation on Plasticizing Agent in Concrete
IRJET - Experimental Investigation on Plasticizing Agent in Concrete
 
IRJET- Design and Analysis of Residential Building
IRJET-  	  Design and Analysis of Residential BuildingIRJET-  	  Design and Analysis of Residential Building
IRJET- Design and Analysis of Residential Building
 
Architect Sample
Architect SampleArchitect Sample
Architect Sample
 
Icng eco housing (1)
Icng eco housing (1)Icng eco housing (1)
Icng eco housing (1)
 

Recently uploaded

Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Anamikakaur10
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
amitlee9823
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
dlhescort
 

Recently uploaded (20)

Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 

Sgp4813 measurement of quantities

  • 1. MEASUREMENT OF QUANTITIES ● Mat Naim bin Abdullah @ Mohd Asmoni ● Diploma QS (UTM), BSc. QS (Glasgow Caledonian University), M.Eng. Construction (UTM), PhD Facilities Management (UTM) ● matnaim@utm.my ● amn871969@yahoo.com ● C04-308 ● 019-7573760 www.utm.my innovative ● entrepreneurial ● global 1
  • 2. MEASUREMENT OF QUANTITIES Assumption No. 1: Total land area = 10m x 10m Project Title: Construction and completion of guard house Owner: Panicsonic Sdn Bhd Architect: A to Z Sdn Bhd Drawing Title: Ground beam and foundation plan ------------------------------------------------------------------------- Drawn by: Sheila Checked by: Aaron www.utm.my innovative ● entrepreneurial ● global 2
  • 3. MEASUREMENT OF QUANTITIES www.utm.my innovative ● entrepreneurial ● global 3
  • 4. MEASUREMENT OF QUANTITIES Construction Method 1. Preliminaries (Initial site works) - % of total cost 2. Site clearance and earthwork 3. Foundation construction (E.g. Piling and footing) 4. Work below lowest floor finish 5. Frame 6. Staircase 7. Upper Floor 8. Roof 9. Wall and partition 10. Door and window 11. Finishes 12. Sundries (Built-in furniture) 13. Building services (M&E, ICT etc) 14. External works (Water reticulation, landscape etc) www.utm.my innovative ● entrepreneurial ● global 4
  • 5. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 1) Site clearance 1.1) Clear the site including grubbing of Area of the site: trees, shrubs and demolish any 10 x 10 = 100m2 existing structure and cart away and dump to the specified location. 10.00 10.00 ---------- 100.00 100 m2 ---------- www.utm.my innovative ● entrepreneurial ● global 5
  • 6. MEASUREMENT OF QUANTITIES www.utm.my innovative ● entrepreneurial ● global 6
  • 7. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 2) Foundation 2.1) Piling including all related works Area of the building: Length = 3048 + 3048 = 6096 6.10 Width = 3048 + 3048 = 6096 6.10 ---------- 37.21 37 m2 ---------- www.utm.my innovative ● entrepreneurial ● global 7
  • 8. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 2) Foundation 2.2) Excavation for pile cap Size of pile cap = 1219 x 1219 Depth of excavation: 9/1.22 1524 + 50 (lean concrete) = 1574 1.22 1.57 ---------- 21.03 21 m3 ---------- Excavation and Lean concrete as base for pile cap www.utm.my innovative ● entrepreneurial ● global 8
  • 9. MEASUREMENT OF QUANTITIES www.utm.my innovative ● entrepreneurial ● global 9
  • 10. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 2) Foundation 2.3) Reinforced concrete Grade 30 for Size of pile cap: pile cap Length = 1219 Width = 1219 9/1.22 Thickness = 305 1.22 0.31 ---------- 4.15 4 m3 ---------- Concrete for pile cap www.utm.my innovative ● entrepreneurial ● global 10
  • 11. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 2) Foundation 2.4) 50mm thick lean concrete Grade Size of pile cap: 15 for pile cap Length = 1219 Width = 1219 9 / 1.22 1.22 ---------- 13.40 13 m2 ---------- Excavation and Lean concrete as base for pile cap www.utm.my innovative ● entrepreneurial ● global 11
  • 12. MEASUREMENT OF QUANTITIES www.utm.my innovative ● entrepreneurial ● global 12
  • 13. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 2) Foundation 2.5) Formwork for pile cap Size of pile cap: Length = 1219 9 / 4 /1.22 Width = 1219 0.31 Thickness = 305 ---------- 13.62 14 m2 9/2/1.22 ---------- 0.31 6.81 9/2/1.50 0.31 8.37 15.18 15m2 Formwork for pile cap www.utm.my innovative ● entrepreneurial ● global 13
  • 14. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 2) Foundation 2.6) Reinforcement bar Y12 for pile cap Length: a c 9/2/ 12/ 1.53 ---------- b 330.48m x 0.89 kg/m = 294.13kg = a + b + c – cover ---------- = 305 + 1219 + 305 – 6(50) = 294 kg = 1829 – 300 = 1529 No. of bars: = (b/100) + 1 = ((1219 – 2(50)cover )/100 )+1 = 12 nos. www.utm.my innovative ● entrepreneurial ● global 14
  • 15. MEASUREMENT OF QUANTITIES @100 c/c www.utm.my innovative ● entrepreneurial ● global 15
  • 16. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF Taker off : Checked by: 3.1) Column stump Size of column stump: 3.1.1) Reinforced concrete Grade 30 Length = 229 for column stump Width = 229 Height = 1524 – 305 thickness of pile 9/0.23 cap – (351/2) Half of beam’s 0.23 thickness 1.04 = 1043.50 ---------- 0.50 1 m3 ---------- www.utm.my innovative ● entrepreneurial ● global 16
  • 17. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.1) Column stump Size of column stump: 3.1.2) Formwork for column stump Length = 229 Width = 229 9/4/0.23 Height = 1524 – 305 thickness of pile 1.04 cap – (351/2) Half of beam’s ---------- thickness 8.61 9 m2 = 1043.50 ---------- www.utm.my innovative ● entrepreneurial ● global 17
  • 18. MEASUREMENT OF QUANTITIES Height of column stump @100 c/c www.utm.my innovative ● entrepreneurial ● global 18
  • 19. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.1) Column stump Length = a + half beam’s thickness – 3.1.3) Reinforcement bar Y12 for cover + 2 laps column stump lap 9/4/2.97 ---------- a 106.92m x 0.89kg/m = 95.16kg ---------- lap 95kg = 1524 + (351/2) – 50 + (660x2) = 2969.50 www.utm.my innovative ● entrepreneurial ● global 19
  • 20. MEASUREMENT OF QUANTITIES General Notes www.utm.my innovative ● entrepreneurial ● global 20
  • 21. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.1) Column stump Length of link: (length of CS– 2cover) x 3.1.4) R6 link in for column stump 4 +hook Hook 9/6/0.62 ---------- 33.48m x 0.22kg/m = 7.36kg =(229-100)+(229-100)+(229-100)+(229- ---------- 100)+100=616 7kg No. of link: Height of column stump = 1043.50 =(1043.50/229)+1 = 6 nos. www.utm.my innovative ● entrepreneurial ● global 21
  • 22. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.2) Ground beam Size of ground beam: 3.2.1) Excavation for ground beam Length=3048+3048=6096 Width = 229 2/3/6.10 Thickness = 351 0.23 0.35 ---------- 2.95m3 ---------- 3m3 Excavation for ground beam www.utm.my innovative ● entrepreneurial ● global 22
  • 23. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.2) Ground beam Size of ground beam: 3.2.2) Reinforced concrete Grade 30 for Length=3048+3048=6096 ground beam Width = 229 Thickness = 351 2/3/6.10 0.23 0.35 ---------- 2.95m3 ---------- 3m3 RC for ground beam www.utm.my innovative ● entrepreneurial ● global 23
  • 24. MEASUREMENT OF QUANTITIES Assumption No. 1: Total land area = 10m x 10m Project Title: Construction and completion of guard house Owner: Panicsonic Sdn Bhd Architect: A to Z Sdn Bhd Drawing Title: Ground beam and foundation plan ------------------------------------------------------------------------- Drawn by: Sheila Checked by: Aaron www.utm.my innovative ● entrepreneurial ● global 24
  • 25. MEASUREMENT OF QUANTITIES Height of column stump @100 c/c www.utm.my innovative ● entrepreneurial ● global 25
  • 26. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.2) Ground beam Size of ground beam: 3.2.3) Formwork for ground beam Length=3048+3048=6096 Width = 229 Thickness = 351 2/3/2/6.10 0.35 ---------- 25.62 26m2 ---------- Installation of reinforcement bar and formwork for ground beam www.utm.my innovative ● entrepreneurial ● global 26
  • 27. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.2) Ground beam Length = (length–2cover)+(2bend- 3.2.4) Reinforcement bar Y10 for 2cover) ground beam =(6096-(2x50))+(2x351)-(4x50) = 6498 2/3/4/6.50 ---------- 156.00m x 0.62kg/m = 96.72kg ---------- 97kg www.utm.my innovative ● entrepreneurial ● global 27
  • 28. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.2) Ground beam Length of stirrup: 3.2.5) R6 stirrup for ground beam Hook 2/3/28/0.86 ---------- =(229-100)+(351-100)+(229-100)+(351- 144.48m x 0.22kg/m = 31.79kg 100)+100 ---------- =860 32kg No. of stirrup: Length of grd beam= 6096 =(6096/229)+1 = 28 nos. www.utm.my innovative ● entrepreneurial ● global 28
  • 29. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.3) Ground slab Area of slab = length x width 3.3.1) Excavation for ground slab Depth of excavation = 500mm 6.10 6.10 BRC A8 150mm thick concrete slab 0.50 ---------- 18.61m3 19 m3 ---------- 50mm thick sand 300mm thick hardcore DPM Installation of formwork,Damp Proof Membrane (DPM) and BRC wire mesh for ground slab www.utm.my innovative ● entrepreneurial ● global 29
  • 30. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.3) Ground slab Area of slab = length x width 3.3.2) Reinforced concrete G30 in Depth of excavation = 500mm ground slab 150mm thick BRC A8 concrete slab 6.10 6.10 0.15 50mm thick ---------- sand 5.58m3 300mm thick hardcore ---------- 6 m3 DPM www.utm.my innovative ● entrepreneurial ● global 30
  • 31. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.3) Ground slab Area of slab = length x width 3.3.3) Formwork for ground slab Depth of excavation = 500mm 4/6.10 BRC A8 150mm thick concrete slab 0.15 ---------- 3.66m2 50mm thick ---------- sand 4 m2 300mm thick hardcore DPM www.utm.my innovative ● entrepreneurial ● global 31
  • 32. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.3) Ground slab Area of slab = length x width 3.3.4) BRC A8 for ground slab Depth of excavation = 500mm 150mm thick BRC A8 6.10 concrete slab 6.10 ---------- 50mm thick 37.21m2 sand ---------- 300mm thick hardcore 37 m2 DPM www.utm.my innovative ● entrepreneurial ● global 32
  • 33. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.3) Ground slab Area of slab = length x width 3.3.5) DPM for ground slab Depth of excavation = 500mm 150mm thick BRC A8 6.10 concrete slab 6.10 ---------- 50mm thick 37.21m2 sand ---------- 300mm thick hardcore 37 m2 DPM www.utm.my innovative ● entrepreneurial ● global 33
  • 34. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.3) Ground slab Area of slab = length x width 3.3.6) 50mm sand blinding for ground Depth of excavation = 500mm slab 150mm thick BRC A8 6.10 concrete slab 6.10 ---------- 50mm thick 37.21m2 sand ---------- 300mm thick hardcore 37 m2 DPM www.utm.my innovative ● entrepreneurial ● global 34
  • 35. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.3) Ground slab Area of slab = length x width 3.3.7) Hardcore for ground slab Depth of excavation = 500mm 6.10 BRC A8 150mm thick concrete slab 6.10 0.30 ---------- 50mm thick 11.16m3 sand ---------- 300mm thick hardcore 11 m3 DPM www.utm.my innovative ● entrepreneurial ● global 35
  • 36. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 4) FRAME Taker off : Checked by: 4.1) Column Size of column: 4.1.1) Reinforced concrete Grade 30 Length = 229 for column Width = 229 Height = Height of the wall 9/0.23 = 3000mm 0.23 3.00 ---------- 1.43 1 m3 ---------- Installation of reinforcement bar and formwork for column www.utm.my innovative ● entrepreneurial ● global 36
  • 37. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 4) FRAME 4.1) Column Size of column: 4.1.2) Formwork for column Length = 229 Width = 229 9/4/0.23 Height = 3000 3.00 ---------- 24.84 25 m2 ---------- www.utm.my innovative ● entrepreneurial ● global 37
  • 38. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 4) FRAME 4.1) Column Length = height of column + half of roof 4.1.3) Reinforcement bar Y12 for beam + 1 lap + bend column bend 9/4/4.50 ---------- Height of wall 162.00m x 0.89kg/m = 144.18kg ---------- 144kg lap = 3000+ (0.5x351) + 660 + 660 = 4495.5 www.utm.my innovative ● entrepreneurial ● global 38
  • 39. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 4) FRAME 4.1) Column Length of link: (length of CS– 2cover) x 4.1.4) R6 link in for column 4 +hook Hook 9/14/0.82 ---------- 103.32m x 0.22kg/m = 22.73kg =(229-50)+(229-50)+(229-50)+(229- ---------- 50)+100=816 23kg No. of link: Height of column = 3000 =(3000/229)+1 = 14 nos. www.utm.my innovative ● entrepreneurial ● global 39
  • 40. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 4) FRAME 4.2) Roof beam Size of roof beam: 4.2.1) Reinforced concrete Grade 30 for Length=3048+3048=6096 roof beam Width = 229 Thickness = 351 2/3/6.10 0.23 0.35 ---------- 2.95m3 ---------- 3m3 www.utm.my innovative ● entrepreneurial ● global 40
  • 41. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 4) FRAME 4.2) Roof beam Size of roof beam: 4.2.2) Formwork for roof beam Length=3048+3048=6096 Width = 229 Side Thickness = 351 2/3/6.10 Soffit 0.93 ---------- 34.04 34m2 ---------- = 351 + 229 + 351 = 931 www.utm.my innovative ● entrepreneurial ● global 41
  • 42. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 4) FRAME 4.2) Roof beam Length = (length–2cover)+(2bend- 4.2.3) Reinforcement bar Y10 for roof 2cover) beam =(6096-(2x50))+(2x351)-(4x50) = 6498 2/3/4/6.50 ---------- 156.00m x 0.62kg/m = 96.72kg ---------- 97kg www.utm.my innovative ● entrepreneurial ● global 42
  • 43. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 4) FRAME 3.2) Roof beam Length of stirrup: 3.2.5) R6 stirrup for roof beam Hook 2/3/28/1.06 ---------- =(229-50)+(351-50)+(229-50)+(351- 178.08m x 0.22kg/m = 39.18kg 50)+100 ---------- =1060 39kg No. of stirrup: Length of beam= 6096 =(6096/229)+1 = 28 nos. www.utm.my innovative ● entrepreneurial ● global 43
  • 44. MEASUREMENT OF QUANTITIES Assumption No. 1: Total land area = 10m x 10m Project Title: Construction and completion of guard house Owner: Panicsonic Sdn Bhd Architect: A to Z Sdn Bhd Drawing Title: Ground beam and foundation plan ------------------------------------------------------------------------- Drawn by: Sheila Checked by: Aaron www.utm.my innovative ● entrepreneurial ● global 44
  • 45. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 5) ROOF = area of roof =axbx2 a 3m 5.1) Roof trusses and covering 2/8.50 5.20 a = 42482 + 30002 ---------- 88.40m2 88 m2 Front and rear elevation ---------- a = 5200 b = 6096 + 1200 + b 1200 b = 8496 Right and left elevation www.utm.my innovative ● entrepreneurial ● global 45
  • 46. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 6) DOOR and WINDOW Door can be measured either a 3m 6.1) Single leaf panel door size 2100 x 900 in m2 or including frame and painting number. If enumerated then need to state type and size 2 2 nos. Front and rear elevation ---------- b Right and left elevation www.utm.my innovative ● entrepreneurial ● global 46
  • 47. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 6) DOOR and WINDOW Window can be measured either a 3m 6.2) Adjustable louvres window 1200 x 600 in m2 or including frame , painting and glass number. If enumerated then need to state type and size 6 6 nos. Front and rear elevation ---------- b Right and left elevation www.utm.my innovative ● entrepreneurial ● global 47
  • 48. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 7) WALL AND PARTITION a 3m 7.1) Half brickwall in comon brick 4/ 6.10 3.00 73.20 Less opening (e.g. door and window) Front and rear elevation 2/2.10 0.90 3.78 (door) 65 m2 b 6/1.20 0.60 4.32 (window) Brickwall 65.10 Right and left elevation www.utm.my innovative ● entrepreneurial ● global 48
  • 49. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 8) FINISHES Area of plastering and panting = a 3m 8.1) Plastering and painting Area of wall x 2 2/ 65m2 130m2 Area of ceiling = area of slab 8.2) Floor Finishes – cement render Front and rear elevation 37 m2 b 8.3) Ceiling 37m2 Brickwall Right and left elevation www.utm.my innovative ● entrepreneurial ● global 49
  • 50. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 9) SUNDRIES a 3m 9.1) Built-in counter size 1800mm x 900mm x 725mm(h). 1 1 no. Front and rear elevation b Brickwall Right and left elevation www.utm.my innovative ● entrepreneurial ● global 50