 Well foundation is the most commonly adopted
foundation for major bridges in India. Since then many
major bridges across wide rivers have been founded on
wells.
 Well foundation is preferable to pile foundation when
foundation has to resist large lateral forces.
 The construction principles of well foundation are similar
to the conventional wells sunk for underground water.
 But relatively rigid and engineering behaviour.
 Well foundations have
been used in India for
centuries.
 The famous Taj Mahal at
Agra stands on well
foundation.
 To know the construction of well foundation.
 To know the different types and shapes of well
foundations.
 To know which type of well foundation is suitable for
different types of soil strata.
 Wells have different shapes and accordingly
they are named as:-
1. Circular well,
2. Double D well,
3. Twin circular well,
4. Double octagonal well,
5. Rectangular well.
 .
Well
Open caisson
or well
Box Caisson
Pneumatic
Caisson
 Open caisson or well: The top and bottom of the caisson is open
during construction. It may have any shape in plan.
 Box caisson: It is open at the top but closed at the bottom.
 Pneumatic caisson: It has a working chamber at the bottom of the
caisson which is kept dry by forcing out water under pressure, thus
permitting excavation under dry conditions.
 .
Well foundation construction in bouldery
bed strata
Andhra Pradesh
Pasighat Bridge
The Important Factors of the bridge were as follows..
 Length of the bridge - 704 mts.
 Foundation:-
i. Type -Circular Well.
ii. Outer Diameter -11.7 mtrs.
iii. Inner Dia. -6.64 mtrs
iv. Steining thickness -2.53 mtrs.
v. Well curb height -4.5 mtrs.
vi. Angle of cutting edge -33 degrees.
vii. Grade for steining concrte -M25
Boulder dredged during well sinking
Pasighat Bridge
 The construction in flowing water was carried out by
means of heavy machinery like dozers , dump trucks
and excavators , etc.
 Pneumatic sinking and conventional sinking method is
adopted for construction purpose.
 Sand was taken from the river and cleaned before
transportation and then is used as sand filling.
1. The sinking of the well becames very
difficult due to the presence of large size of
boulders in the strata.
2. Basically there were difficulties in finally
deciding the foundation level on such
strata.
3. Due to heavy rainfall in the area a
considrably reduced working period was
available in the region.
 In case of sinking process of pneumatic caisson ,
workers under pressure may suffer from
“Decompression sickness”(Caisson disease).due to
rapid change in pressure.
 Construction of the Brooklyn Bridge, which was built with
the help of caissons, resulted in numerous workers
being either killed or permanently injured by caisson
disease during its construction, including the designer's
son and Chief Engineer of the project.
 Construction of a well foundation in bouldery bed strata
calls for a dedicated effort on the part of the executives.
 The data of the soil strata encountered at the site must
be kept in detail for each meter and if required a review
of the foundation must be carried out , based on actual
soil parameters obtained during sinking.
 M.N Som. , S.C Das , Theory and practice of foundation
design , Ashok.k.Ghosh,New Delhi,2006.
 P.C.Varghese,Foundation Engineering,
Ashok.k.Ghosh,New Delhi,2005.
 Bowles, J.E. ,Foundation Analysis And Design(International
Student Edition) ,Mc-Greww hill,Singapore,1988.
 Saha G.P. “Analysis and Design of Varanasi Bridge
Well Foundations – A Conceptual Approach” Journal
of Indian Roads Congress Vol. 54-2. Paper
presented in the Annual Session of IRC in November
1993.
 Dhiman.R.K. , “Well foundation construction in bouldery bed -
A case study” international association of bridges and
structural engineers (IABSE),Punjab,1999.
 Dr.Priti Maheshwari , “NPTEL”,IIT Roorkee , http://nptel.ac.in
 Dr.Kousik.Deb,“Myopencoures”,IIT
Kharaghpur,http://myopencourses.com/video/well-foundation
 Wikipedia,http://en.wikipedia.org/wiki/Caisson.
Thank youThank youThank you

More Related Content

What's hot

Design and construction of well foundations
Design and construction of well foundationsDesign and construction of well foundations
Design and construction of well foundationsDar Hilal
 
1)methods of exploration
1)methods of exploration1)methods of exploration
1)methods of explorationjagadish108
 
Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)Make Mannan
 
1. Pile foundations (SL 1-143).pdf
1. Pile foundations (SL 1-143).pdf1. Pile foundations (SL 1-143).pdf
1. Pile foundations (SL 1-143).pdfKRSrikrishnaSetty
 
Modes of failure of retaining walls
Modes of failure of retaining wallsModes of failure of retaining walls
Modes of failure of retaining wallsRitesh Chinchawade
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSKHUSHBU SHAH
 
SOIL EXPLORATION
SOIL EXPLORATIONSOIL EXPLORATION
SOIL EXPLORATIONserinsara
 
Shear strength of soil
Shear strength of soilShear strength of soil
Shear strength of soilAditya Mistry
 
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONSPILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONSShivananda Roy
 

What's hot (20)

Design and construction of well foundations
Design and construction of well foundationsDesign and construction of well foundations
Design and construction of well foundations
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
1)methods of exploration
1)methods of exploration1)methods of exploration
1)methods of exploration
 
Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)
 
1. Pile foundations (SL 1-143).pdf
1. Pile foundations (SL 1-143).pdf1. Pile foundations (SL 1-143).pdf
1. Pile foundations (SL 1-143).pdf
 
Bearing capacity of soil
Bearing capacity of soilBearing capacity of soil
Bearing capacity of soil
 
Modes of failure of retaining walls
Modes of failure of retaining wallsModes of failure of retaining walls
Modes of failure of retaining walls
 
Soil Nailing
Soil NailingSoil Nailing
Soil Nailing
 
Caissons
Caissons Caissons
Caissons
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONS
 
SOIL EXPLORATION
SOIL EXPLORATIONSOIL EXPLORATION
SOIL EXPLORATION
 
Retaining walls
Retaining wallsRetaining walls
Retaining walls
 
Retaining wall
 Retaining wall  Retaining wall
Retaining wall
 
Well Foundation
Well FoundationWell Foundation
Well Foundation
 
Shear strength of soil
Shear strength of soilShear strength of soil
Shear strength of soil
 
Well foundations notes
 Well foundations notes Well foundations notes
Well foundations notes
 
Plate load test
Plate load testPlate load test
Plate load test
 
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONSPILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
 
Under reamed piles
Under reamed pilesUnder reamed piles
Under reamed piles
 
Earth pressure
Earth pressureEarth pressure
Earth pressure
 

Similar to Well foundation ppt

1619929813526_College Deep Well Foundation Project.pptx
1619929813526_College Deep Well Foundation Project.pptx1619929813526_College Deep Well Foundation Project.pptx
1619929813526_College Deep Well Foundation Project.pptxAkshayGhorpade19
 
Deep foundation construction in bouldery bed an over view
Deep foundation construction in bouldery bed an over viewDeep foundation construction in bouldery bed an over view
Deep foundation construction in bouldery bed an over viewR K DHIMAN
 
Coffer Dams and Caissons
Coffer Dams and CaissonsCoffer Dams and Caissons
Coffer Dams and CaissonsRizwan Samor
 
19021 d2004 well foundation design ppt
19021 d2004 well foundation design ppt19021 d2004 well foundation design ppt
19021 d2004 well foundation design pptBala Balaji
 
special foundation techniques
 special foundation techniques special foundation techniques
special foundation techniquesShrideviAnil
 
Megastructures design pdf
Megastructures design pdfMegastructures design pdf
Megastructures design pdfSaqib Imran
 
TUNNEL ENGINEERING basics of tunnel types .pdf
TUNNEL ENGINEERING basics of tunnel types .pdfTUNNEL ENGINEERING basics of tunnel types .pdf
TUNNEL ENGINEERING basics of tunnel types .pdfAmanKumar48018
 
Case study on pile foundation review
Case study on pile foundation reviewCase study on pile foundation review
Case study on pile foundation reviewRajankumar416
 
20150421031337318
2015042103133731820150421031337318
20150421031337318James Prs
 
Bridges in Hilly areas seminar
Bridges in Hilly areas seminarBridges in Hilly areas seminar
Bridges in Hilly areas seminarAbhinav Pateriya
 
Construction methods and equipments
Construction methods and equipmentsConstruction methods and equipments
Construction methods and equipmentsR VIJAYAKUMAR
 
MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702Dr. BASWESHWAR JIRWANKAR
 
Tunneling exploration
Tunneling explorationTunneling exploration
Tunneling explorationjamali husain
 
well foundation of six lane new ganga bridge near kacchi dargah in district P...
well foundation of six lane new ganga bridge near kacchi dargah in district P...well foundation of six lane new ganga bridge near kacchi dargah in district P...
well foundation of six lane new ganga bridge near kacchi dargah in district P...Arman Hashmi
 
Notes on introduction and design of caissons
Notes on introduction and design of caissonsNotes on introduction and design of caissons
Notes on introduction and design of caissonsVICTOR A. KIPLAGAT
 
CTM_tutorial3 (1).pdf
CTM_tutorial3 (1).pdfCTM_tutorial3 (1).pdf
CTM_tutorial3 (1).pdfPramodLimbore
 
Ecg533 rock-tunnel-engineering
Ecg533 rock-tunnel-engineeringEcg533 rock-tunnel-engineering
Ecg533 rock-tunnel-engineeringJunaida Wally
 

Similar to Well foundation ppt (20)

Well foundation pdf
Well foundation pdfWell foundation pdf
Well foundation pdf
 
1619929813526_College Deep Well Foundation Project.pptx
1619929813526_College Deep Well Foundation Project.pptx1619929813526_College Deep Well Foundation Project.pptx
1619929813526_College Deep Well Foundation Project.pptx
 
Deep foundation construction in bouldery bed an over view
Deep foundation construction in bouldery bed an over viewDeep foundation construction in bouldery bed an over view
Deep foundation construction in bouldery bed an over view
 
Coffer Dams and Caissons
Coffer Dams and CaissonsCoffer Dams and Caissons
Coffer Dams and Caissons
 
19021 d2004 well foundation design ppt
19021 d2004 well foundation design ppt19021 d2004 well foundation design ppt
19021 d2004 well foundation design ppt
 
special foundation techniques
 special foundation techniques special foundation techniques
special foundation techniques
 
Megastructures design pdf
Megastructures design pdfMegastructures design pdf
Megastructures design pdf
 
TUNNEL ENGINEERING basics of tunnel types .pdf
TUNNEL ENGINEERING basics of tunnel types .pdfTUNNEL ENGINEERING basics of tunnel types .pdf
TUNNEL ENGINEERING basics of tunnel types .pdf
 
Case study on pile foundation review
Case study on pile foundation reviewCase study on pile foundation review
Case study on pile foundation review
 
20150421031337318
2015042103133731820150421031337318
20150421031337318
 
Bridges in Hilly areas seminar
Bridges in Hilly areas seminarBridges in Hilly areas seminar
Bridges in Hilly areas seminar
 
Construction methods and equipments
Construction methods and equipmentsConstruction methods and equipments
Construction methods and equipments
 
CULVERTS.pdf
CULVERTS.pdfCULVERTS.pdf
CULVERTS.pdf
 
MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702
 
Tunneling exploration
Tunneling explorationTunneling exploration
Tunneling exploration
 
well foundation of six lane new ganga bridge near kacchi dargah in district P...
well foundation of six lane new ganga bridge near kacchi dargah in district P...well foundation of six lane new ganga bridge near kacchi dargah in district P...
well foundation of six lane new ganga bridge near kacchi dargah in district P...
 
Notes on introduction and design of caissons
Notes on introduction and design of caissonsNotes on introduction and design of caissons
Notes on introduction and design of caissons
 
CTM_tutorial3 (1).pdf
CTM_tutorial3 (1).pdfCTM_tutorial3 (1).pdf
CTM_tutorial3 (1).pdf
 
Ecg533 rock-tunnel-engineering
Ecg533 rock-tunnel-engineeringEcg533 rock-tunnel-engineering
Ecg533 rock-tunnel-engineering
 
any
anyany
any
 

Recently uploaded

The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 

Recently uploaded (20)

The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 

Well foundation ppt

  • 1.
  • 2.  Well foundation is the most commonly adopted foundation for major bridges in India. Since then many major bridges across wide rivers have been founded on wells.  Well foundation is preferable to pile foundation when foundation has to resist large lateral forces.
  • 3.  The construction principles of well foundation are similar to the conventional wells sunk for underground water.  But relatively rigid and engineering behaviour.
  • 4.  Well foundations have been used in India for centuries.  The famous Taj Mahal at Agra stands on well foundation.
  • 5.  To know the construction of well foundation.  To know the different types and shapes of well foundations.  To know which type of well foundation is suitable for different types of soil strata.
  • 6.  Wells have different shapes and accordingly they are named as:- 1. Circular well, 2. Double D well, 3. Twin circular well, 4. Double octagonal well, 5. Rectangular well.
  • 8. Well Open caisson or well Box Caisson Pneumatic Caisson
  • 9.  Open caisson or well: The top and bottom of the caisson is open during construction. It may have any shape in plan.  Box caisson: It is open at the top but closed at the bottom.  Pneumatic caisson: It has a working chamber at the bottom of the caisson which is kept dry by forcing out water under pressure, thus permitting excavation under dry conditions.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.  .
  • 15.
  • 16. Well foundation construction in bouldery bed strata
  • 18. The Important Factors of the bridge were as follows..  Length of the bridge - 704 mts.  Foundation:- i. Type -Circular Well. ii. Outer Diameter -11.7 mtrs. iii. Inner Dia. -6.64 mtrs iv. Steining thickness -2.53 mtrs. v. Well curb height -4.5 mtrs. vi. Angle of cutting edge -33 degrees. vii. Grade for steining concrte -M25
  • 19. Boulder dredged during well sinking Pasighat Bridge
  • 20.  The construction in flowing water was carried out by means of heavy machinery like dozers , dump trucks and excavators , etc.  Pneumatic sinking and conventional sinking method is adopted for construction purpose.  Sand was taken from the river and cleaned before transportation and then is used as sand filling.
  • 21. 1. The sinking of the well becames very difficult due to the presence of large size of boulders in the strata. 2. Basically there were difficulties in finally deciding the foundation level on such strata. 3. Due to heavy rainfall in the area a considrably reduced working period was available in the region.
  • 22.  In case of sinking process of pneumatic caisson , workers under pressure may suffer from “Decompression sickness”(Caisson disease).due to rapid change in pressure.  Construction of the Brooklyn Bridge, which was built with the help of caissons, resulted in numerous workers being either killed or permanently injured by caisson disease during its construction, including the designer's son and Chief Engineer of the project.
  • 23.
  • 24.  Construction of a well foundation in bouldery bed strata calls for a dedicated effort on the part of the executives.  The data of the soil strata encountered at the site must be kept in detail for each meter and if required a review of the foundation must be carried out , based on actual soil parameters obtained during sinking.
  • 25.  M.N Som. , S.C Das , Theory and practice of foundation design , Ashok.k.Ghosh,New Delhi,2006.  P.C.Varghese,Foundation Engineering, Ashok.k.Ghosh,New Delhi,2005.  Bowles, J.E. ,Foundation Analysis And Design(International Student Edition) ,Mc-Greww hill,Singapore,1988.  Saha G.P. “Analysis and Design of Varanasi Bridge Well Foundations – A Conceptual Approach” Journal of Indian Roads Congress Vol. 54-2. Paper presented in the Annual Session of IRC in November 1993.
  • 26.  Dhiman.R.K. , “Well foundation construction in bouldery bed - A case study” international association of bridges and structural engineers (IABSE),Punjab,1999.  Dr.Priti Maheshwari , “NPTEL”,IIT Roorkee , http://nptel.ac.in  Dr.Kousik.Deb,“Myopencoures”,IIT Kharaghpur,http://myopencourses.com/video/well-foundation  Wikipedia,http://en.wikipedia.org/wiki/Caisson.