SlideShare a Scribd company logo
1 of 60
We will be starting momentarily. For Audio Please Dial: Conference  Call 888.481.3032 Passcode 75892620# Press *6 to mute phone on/off
Create useful work spaces without jeopardizing your budget.
Stylish Options for smart settings: Clear or frosted glass Pass-thru tiles Fabric-wrapped corner pieces Tackable fabric panels Create the space your facility needs: Reception areas Meeting rooms Private offices Touchdown spaces
Panel Statement of Line Page 206 Interworks is our easy, simple and quick solution. The Interworks panel system is priced at all fabric grade levels. Interworks has a metal top cap and a polymer hinge. The glass panel is ¼” thick. The door is 1 7/16” thick. Traxx and Tiles integrate with this product. Tackable Acoustical Panel Glass Panel Tackable Sectional Panel  Stackable Panels Privacy Panels Hinged Doors Tackboards
Connectors and Trim Statement of Line Page 207 The connector is made up of a polymer hinge that (2) ship with each panel. Extra hinges are recommended to be placed at the end of a run for reconfigurations. End trims are required. End caps are for  panels manufactured prior to August 31, 2009. Finish channels simply make a clean directional connection. The polymer hinge actually makes the connection. Trim Top Caps End Caps Finish Channels Wall-Mount Connectors End Trim Traxx Starter Kit
Power and Data Statement of Line Page 208 Panels ship with a power distribution if specified. Jumper cables are used to continue power from one panel to another. The base power entry can enter from the side, at a connection or end of run. The electrical system is 8-wire. All power runs in the base of the panel. Data runs at the top with the capability of holding 8 wires at the base. Think of managing cords below the surface. Duplex Receptacles Base Power Entry Power Distribution Assemblies Jumper Cables New York City Electrical Ceiling Power Entry Hardwire Electrical Power/ Data Poles Data  Components Data Channels Vertical Cable Manages
Interworks EQ Overview Page 209 The current 11P model number panel was introduced on August 31, 2009. The crowned top cap profile is available only painted . Panel Thickness is 2” An in-line connector must be specified between two panels sold in sets of two. Panel has hinge connection Wirewaycovers offer variations in  punch options. You can add stack to change heights
Interworks EQ Acoustical Panel Details Page 210 The hinge is a continuous flexiform polymer hinge. Side rails provide slots at 1” increments for mounting components. Cable routing offers 8 data cables to be routed at the bottom of the panel, that is 4 per side. The sides of the panel are not finished. Image taken from the pricelist.
Interworks EQ Acoustical Panel Details Page 210 Panel is created from  1 ¼” steel tubing.  The center of the frame is open with two sheets of tackable fiberglass. Panel includes: Top cap Wireway covers Panel hinges Glides and carpet grippers Frame with tiles NRC rating .65 STC rating 15
Interworks EQ Sectional Frames Page 212 Sectional Frames Include: Top cap Wireway covers Panel Hinges Glides and Carpet Grippers Frame with Tiles The mid-wireway panel is a type of sectional panel. Image taken from installation instructions.
Interworks EQ  Mid-Wireway Panel  Page 210 This panel is only available in a powered option. The panel ships with a harness at the base and mid-height including the jumper Power can not pass from one panel at mid-height to another. Tiles ship with the frame. The power components can also be added at a later point if you have an existing sectional frame.
Interworks EQ Sectional Panel Page 213 Two tiles are required for each segment however tiles shipped in place,  can be moved. The sizes indicated must be used in the location specified. Fabric is tackable. The glass tile  has an even frame on all four sides which is similar to stack. Metal is embossed or plain front. Image taken from the pricelist.
Interworks EQ Stackable Panel Page 214 Two stack panels can go on top of any one panel. Only the first stack panel is load-bearing. Stack height cannot exceed 80” A change at height cannot occur at a connector. Data cables can be placed inside the stack panel. 10P and 11Pbase models must match 10P and 11P stack models. A full end-trim is required.
Interworks EQ Privacy Panels Page 215 Privacy Panels are for visual privacy only as it does not lock or latch. Doors should always open inside a station. The privacy panel is non-handed and reversible. Privacy Panels Include: Top attachment bracket Base pivot bracket Caster Image taken from the pricelist.
Interworks EQ Hinge Door Page 216 Hinge Door Includes: Frame and threshold Top cap Panel Hinges In-line connector caps A 42” door is required to meet ADA.  A locking lever is also available. The door is 1 7/16” thick. Be sure to use the stabilizer brackets to reinforce the connection. Image taken from the pricelist.
Interworks EQ Finish Channels and Trim Top Caps Page 217 A finish channel is necessary to complete a directional turn. An XTC1 connector top cap is required in finishing a 4-way transition. A finish channel includes: Fabric Channel Finish channel top    cap Metal base cover Alignment clip Image taken from the pricelist and installation instructions.
Interworks EQ Finish Channels and Trim  Top Caps Cont… Page 217 Note the new hi-lo at a connector. In some instances you may be required to specify two parts for a hi-lo condition. Image taken from installation instructions.
Interworks EQ Power & Data Channels Page 217 When the height is dropped or raised the cables at the top of the panel must transition. The openings provided by the data channel allows for the flow of cabling to continue A finish channel is not required where a data channel is used at a directional transition. These images were taken from the pricelist.
Interworks EQ Traxx Starter Panel  Page 218 Interworks EQ offers a connection with Traxx that can go from all points within the space plan offering the greatest flexibility in reconfiguration. Interworks EQ offers a full height end trim to finish exposed edges of Traxx. It is not recommend to wall-start the start and end points of Traxx. Image taken from installation instructions.
Traxx with Interworks EQ Page 218 The Interworks connection is more clean given the polymer hinge panel connection. When joining Interworks EQ to Traxx be sure to use the tiles specified for this connection as tiles will not need to be modified in the field if the wrong height is selected.
Traxx with Interworks EQ  in CAP You can start the Interworks panel from the edge of Traxx based on the full end trim. Image was taken from CAP.
Panel spacing with Traxx in CAP In this instance a different panel type was used. Interworks EQ is a 2” thick panel so the dimension would need to be considered for general planning purposes. Image was taken from CAP.
Interworks EQ Application Guidelines For Panel Configurations without Components Page 219 Image taken from the pricelist.
Interworks EQ Application Guidelines For Panel Configurations without Overhead Storage Page 220 Remember to follow minimum wing width rules noted on each page. See page 251 For supplemental brackets. Image taken from the pricelist.
Interworks EQ  Supplemental Brackets Page 273 & 274 These brackets are recommend for use when panels join without a worksurface. Supplemental brackets are suggested  but not required.
Interworks EQ Application Guidelines For Panel Configurations with Overhead Storage Page 221 Remember to follow minimum wing width rules noted on each page. See page 251 For supplemental brackets.
Interworks EQ Application Guidelines For X-Configurations Page 222 Remember to follow minimum wing width rules noted on each page.
Interworks EQ Application Guidelines For 120⁰ V- and Y- Configurations Page 223 Do not exceed maximum number of panels in a run. Remember to follow minimum wing width rules noted on each page.
Interworks EQ Application Guidelines For Wall- and Traxx-Mounted Panel Configurations Page 224 Do not exceed maximum number of panels in a run. Remember to follow minimum wing width rules noted on each page.
Interworks EQ Application Guidelines  For Stackable Panels Page 225 Maximum stack height is 80”. Two stackable panels can go on top of any one panel. You cannot change height at a connector. If placing overheads on one side it is required to use the stackable load brackets from page 251.
Interworks EQ Tackboards Page 275 Interworks EQ panels are fully tackable. Tackboards are available as either  15” or 19” high. 15” tackboards with 62’ panels 19” tackboards with 66” panels. You have the option of specifying the tackboards with  panel fabric (Grade A, B, COM)or seating fabric (Grade 1 or 2). Up to two tackboards may be mounted on one panel.
Interworks EQ Trim Caps Page 280 & 281 Interworks EQ trim caps are applied based on directional transitions to conceal gaps.
Interworks EQ Power and Data Overview Page 226 When mixing the electrical system with generation one consult you Product Specifer for specification tips.
Interworks EQ Power Distribution Assemblies and Receptacles Page  227 Power Distributions match the same size as the panel. You can add a power distribution to a non-powered panel. Interworks EQ is an 8-wire system.
Interworks EQ Jumpers Page  227 Jumpers are used to continue power from panel to the next. Mid-height jumpers are included with the mid-height powered panel. 18” wide panels have no electrical access however they can accept pass-thru jumpers cables.
Interworks EQ Floor Power Entry Page  228 A base feed specification is specified based on the point of entry. A finished base plate will ship for a clean connection.
Interworks EQ Ceiling Power Entry and Power/ Data Poles Page  228 The Ceiling Power Entry is specified separate from the ceiling power/ data pole. An extended can be specified for the power/ data pole through customer care. A finish channel is not required when a power/ data pole is used.
Interworks EQ Hardwire Components Page  229 A side feed plate is offered however you can insert the power entry from the end, corner and straight position.
Interworks EQ New York City Power Assemblies Page  230 The power entry is not available for 18” and 24” wide panels only 30” to 60”. Duplex receptacles cannot enter into this power entry however data ports can be added. All panels are purchased non-powered. Mid-Wireway panels are not available for New York.
Interworks EQ  8-wire Electrical System Page 231 & 232 .
Interworks EQ Cable Management Page  233 The panel is designed to hold all data at the top and all electrical at the bottom. Eight cables can be run at the bottom of the panel, 4 per side. You can not place data cables at the top of a stack panel. When adding stack on top of a monolithic panel you are encapsulating the data within the panel. Data channels allow cables to drop at a lower panel.
Interworks EQ Worksurface Brackets Important: Brackets must be specified separately. 1 3/16” surfaces need support every 48” 1 9/16” surfaces need support every 60” Cantilevers are handed. Flat brackets are sold individually however must be used in pairs with a cantilever when located at the seam of two surfaces. Edge brackets at corner locations are not specific to hand of bracket.
Interworks EQ Application and Support Page 332 & 333 (Footprint)
Interworks EQ Cantilever Page 450 (Footprint) Important: Brackets must be specified separately. Cantilevers are handed. Flat brackets are sold individually however must be used in pairs with a cantilever when located at the seam of two surfaces. Consider placing pedestal fillers behind pedestals to fill gap.
Interworks EQ Edge Support Brackets Page 449 (Footprint) Important: Brackets must be specified separately. Edge brackets at corner locations are not specific to hand of bracket. It is not recommended to place edge brackets in the center of runs this image simply conveys all possible locations.
Interworks EQ Overhead Brackets Overview Wood/ Laminate overheads cannot be hung on Interworks EQ. Overhead Brackets Page 520 (Footprint) Ganging Brackets Page 523 (Footprint) .
Interworks EQ Flat and Bevel Profile Overhead Brackets Page 524 (Footprint) You will not find a bracket for this overhead is apart of the construction. Ganging brackets are sold  in a quantity of 4. .
Interworks EQ Lunar Profile Overhead Brackets Page 524 & 526 (Footprint) A set of overhead brackets is need for each overhead regardless of width. Ganging brackets are sold individually .
Kimball Office Resources Dealer Sales Manager Customer Care/ By Design 800.482.1818  Product Technical Support 800.481.6696 Product Specifier Alibia de Vente Market Education 770.265.4006 or Alibia.devente@kimball.com
www.kimballoffice.com
www.kimballoffice.com Working with multi-generations of Interworks EQ panels can be solved in most cases by knowing just a few tips.
Interworks EQ Comparisons Previous generation model number  started with 10P New generation of panels start with 11P. You cannot combine new and old generation stack however panels will remain easily attached side-by-side. New -11P Sectional /  Old - 10P Sectional  Old -10P Monolithic / New - 11P Monolithic
Interworks EQ  Is it 10P or 11P? Close up of where the two rails meet. The horizontal rail is for holding the tiles in only and not supporting worksurfaces or components. The corner details between the monolithic panels and sectional show a crisp corner detail. The frame detail on sectional / stack glass has an even frame on all side. New varied height 3-way model number. Full End trim  and hi-lo trim is required not as you will notice connection points on the frame is removed. . Old 10P Stacking on 10P Sectional. New - 11P Frame Profile          Old - 10P Frame Profile
Interworks EQ  List Price Comparison This price has not been confirmed  as of 8-19-09.
Interworks EQ Sectional Panel Frames  Planning Page 212 & 213 of the January 15, 2010 rules remain applicable. The 10P model required tiles to be ordered as a separate line item (left). The 11P model is specified based on tile position from the top location down. Image taken from previous and current installation instructions. Previous Generation  - 10P Sectional Current - 11P Sectional
Interworks EQ Sectional Panel The 54” panel which had a 6” sectional tile segment was discontinued. The 54” sectional panel shown on the right with the 20” segment at top remains available. Image taken from the October 2009 electronic pricelist.
Interworks EQ Stackable Panel Two stack panels can go on top of any one panel manufactured after 2.26.07. Only the first stack panel is load-bearing. Stack height cannot exceed 80” A change at height cannot occur at a connector. Data cables cannotbe placed inside a 10Pstack panel. 10P and 11Pbase models must match 10P and 11P stack models. A full end-trim is required.
Interworks EQ  Supplemental Brackets Page 273 & 274 These brackets are recommend for use when panels join without a worksurface. Supplemental brackets are suggested  but not required. This image conveys 10P models numbers. The bracket spacer is not required for 11P panels unless joined.
www.kimballoffice.com

More Related Content

What's hot

School Buildings of the Future
School Buildings of the FutureSchool Buildings of the Future
School Buildings of the FutureEdel Fox
 
Restoration, extension and upgradation of protected structures
Restoration, extension and upgradation of protected structuresRestoration, extension and upgradation of protected structures
Restoration, extension and upgradation of protected structuresEdel Fox
 
Leisure Centre
Leisure CentreLeisure Centre
Leisure CentreEdel Fox
 
Design Portfolio by Aaron Kaira
Design Portfolio by Aaron KairaDesign Portfolio by Aaron Kaira
Design Portfolio by Aaron KairaAaron Kaira
 
The Culver Hotel Book
The Culver Hotel BookThe Culver Hotel Book
The Culver Hotel BookJohn Chavez
 
Enclosures
EnclosuresEnclosures
Enclosuresaescotom
 
Barndoorhardware.com presents Coburn Sliding Systems
Barndoorhardware.com presents Coburn Sliding SystemsBarndoorhardware.com presents Coburn Sliding Systems
Barndoorhardware.com presents Coburn Sliding SystemsBarn Door Hardware
 

What's hot (7)

School Buildings of the Future
School Buildings of the FutureSchool Buildings of the Future
School Buildings of the Future
 
Restoration, extension and upgradation of protected structures
Restoration, extension and upgradation of protected structuresRestoration, extension and upgradation of protected structures
Restoration, extension and upgradation of protected structures
 
Leisure Centre
Leisure CentreLeisure Centre
Leisure Centre
 
Design Portfolio by Aaron Kaira
Design Portfolio by Aaron KairaDesign Portfolio by Aaron Kaira
Design Portfolio by Aaron Kaira
 
The Culver Hotel Book
The Culver Hotel BookThe Culver Hotel Book
The Culver Hotel Book
 
Enclosures
EnclosuresEnclosures
Enclosures
 
Barndoorhardware.com presents Coburn Sliding Systems
Barndoorhardware.com presents Coburn Sliding SystemsBarndoorhardware.com presents Coburn Sliding Systems
Barndoorhardware.com presents Coburn Sliding Systems
 

Viewers also liked

2012 Traxx Specification Presentation
2012 Traxx Specification Presentation2012 Traxx Specification Presentation
2012 Traxx Specification PresentationAlibia de Vente
 
La crisi irris[OLTA] | Robi Veltroni
La crisi irris[OLTA] | Robi VeltroniLa crisi irris[OLTA] | Robi Veltroni
La crisi irris[OLTA] | Robi VeltroniOfficina Turistica
 
2011-02 ClickAsiaSummit Metrics, Analysis, Action!
2011-02 ClickAsiaSummit Metrics, Analysis, Action!2011-02 ClickAsiaSummit Metrics, Analysis, Action!
2011-02 ClickAsiaSummit Metrics, Analysis, Action!Gillian Muessig
 
Presentación de Gian Fulgoni en IAB Conecta 2012
Presentación de Gian Fulgoni en IAB Conecta 2012Presentación de Gian Fulgoni en IAB Conecta 2012
Presentación de Gian Fulgoni en IAB Conecta 2012IAB México
 
2012 01 imj summit ahmedabad what are they thinking?
2012 01 imj summit ahmedabad what are they thinking?2012 01 imj summit ahmedabad what are they thinking?
2012 01 imj summit ahmedabad what are they thinking?Gillian Muessig
 
Jfs mobile v1
Jfs mobile v1Jfs mobile v1
Jfs mobile v1Ian Cole
 
Gifts For You
Gifts For YouGifts For You
Gifts For YouEddie OOI
 
解读信息设计
解读信息设计解读信息设计
解读信息设计dasiyjun
 
Presentación Sherrill Mane
Presentación Sherrill Mane Presentación Sherrill Mane
Presentación Sherrill Mane IAB México
 
The Hollinters Go Camping
The Hollinters Go CampingThe Hollinters Go Camping
The Hollinters Go CampingHeather B.
 
2010 Contemporary Casegoods Specification
2010 Contemporary Casegoods Specification2010 Contemporary Casegoods Specification
2010 Contemporary Casegoods SpecificationAlibia de Vente
 
Docker San Diego 2015-03-25
Docker San Diego 2015-03-25Docker San Diego 2015-03-25
Docker San Diego 2015-03-25Casey Bisson
 
J-Day Kraków: Listen to the sounds of your application
J-Day Kraków: Listen to the sounds of your applicationJ-Day Kraków: Listen to the sounds of your application
J-Day Kraków: Listen to the sounds of your applicationMaciej Bilas
 

Viewers also liked (20)

2012 Traxx Specification Presentation
2012 Traxx Specification Presentation2012 Traxx Specification Presentation
2012 Traxx Specification Presentation
 
La crisi irris[OLTA] | Robi Veltroni
La crisi irris[OLTA] | Robi VeltroniLa crisi irris[OLTA] | Robi Veltroni
La crisi irris[OLTA] | Robi Veltroni
 
2011-02 ClickAsiaSummit Metrics, Analysis, Action!
2011-02 ClickAsiaSummit Metrics, Analysis, Action!2011-02 ClickAsiaSummit Metrics, Analysis, Action!
2011-02 ClickAsiaSummit Metrics, Analysis, Action!
 
Presentación de Gian Fulgoni en IAB Conecta 2012
Presentación de Gian Fulgoni en IAB Conecta 2012Presentación de Gian Fulgoni en IAB Conecta 2012
Presentación de Gian Fulgoni en IAB Conecta 2012
 
2012 01 imj summit ahmedabad what are they thinking?
2012 01 imj summit ahmedabad what are they thinking?2012 01 imj summit ahmedabad what are they thinking?
2012 01 imj summit ahmedabad what are they thinking?
 
Jfs mobile v1
Jfs mobile v1Jfs mobile v1
Jfs mobile v1
 
Gifts For You
Gifts For YouGifts For You
Gifts For You
 
解读信息设计
解读信息设计解读信息设计
解读信息设计
 
Just for today waldman and spuhler
Just for today waldman and spuhlerJust for today waldman and spuhler
Just for today waldman and spuhler
 
20120710 ure corporate presentation (july 2012)
20120710 ure corporate presentation  (july 2012)20120710 ure corporate presentation  (july 2012)
20120710 ure corporate presentation (july 2012)
 
Presentación Sherrill Mane
Presentación Sherrill Mane Presentación Sherrill Mane
Presentación Sherrill Mane
 
Aim Final Plans Book
Aim Final Plans BookAim Final Plans Book
Aim Final Plans Book
 
20120808 ure corporate presentation (august 2012 final)
20120808 ure corporate presentation  (august 2012 final)20120808 ure corporate presentation  (august 2012 final)
20120808 ure corporate presentation (august 2012 final)
 
The Hollinters Go Camping
The Hollinters Go CampingThe Hollinters Go Camping
The Hollinters Go Camping
 
E mail-tiu-ru
E mail-tiu-ruE mail-tiu-ru
E mail-tiu-ru
 
2010 Contemporary Casegoods Specification
2010 Contemporary Casegoods Specification2010 Contemporary Casegoods Specification
2010 Contemporary Casegoods Specification
 
Docker San Diego 2015-03-25
Docker San Diego 2015-03-25Docker San Diego 2015-03-25
Docker San Diego 2015-03-25
 
Social media for biz
Social media for biz Social media for biz
Social media for biz
 
J-Day Kraków: Listen to the sounds of your application
J-Day Kraków: Listen to the sounds of your applicationJ-Day Kraków: Listen to the sounds of your application
J-Day Kraków: Listen to the sounds of your application
 
Ur-Energy March 2013 Corporate Presentation
Ur-Energy March 2013 Corporate PresentationUr-Energy March 2013 Corporate Presentation
Ur-Energy March 2013 Corporate Presentation
 

Similar to 2010 Interworks EQ

Mayline Technology Furniture
Mayline   Technology FurnitureMayline   Technology Furniture
Mayline Technology FurnitureJoshua Long
 
Ehouse Specification Sample
Ehouse Specification SampleEhouse Specification Sample
Ehouse Specification SampleBlas Bigotti
 
Lv panel specification
Lv panel specificationLv panel specification
Lv panel specificationSajeewa Lakmal
 
Estap 2012-2013 catalogue all pages
Estap 2012-2013 catalogue all pagesEstap 2012-2013 catalogue all pages
Estap 2012-2013 catalogue all pagesEMRAHKEBABCI99
 
Data tele standards-2
Data tele standards-2Data tele standards-2
Data tele standards-2grantlerc
 
Excel Balers Difference 2 R Series
Excel Balers Difference   2 R SeriesExcel Balers Difference   2 R Series
Excel Balers Difference 2 R Seriesrbowlin
 
Company Profile NEW 2014
Company Profile NEW 2014Company Profile NEW 2014
Company Profile NEW 2014Arjun Reddiar
 
cable railing
cable railingcable railing
cable railingDan Cary
 
2010 Xsite Checklist (.doc)
2010 Xsite Checklist (.doc)2010 Xsite Checklist (.doc)
2010 Xsite Checklist (.doc)Alibia de Vente
 
Winter Panel Complete Guide
Winter Panel Complete GuideWinter Panel Complete Guide
Winter Panel Complete GuideWinterPanelChile
 
DCD London 2016 - OCP Data Center Project Engineering Workshop Presentation D...
DCD London 2016 - OCP Data Center Project Engineering Workshop Presentation D...DCD London 2016 - OCP Data Center Project Engineering Workshop Presentation D...
DCD London 2016 - OCP Data Center Project Engineering Workshop Presentation D...Inflectiontech Ltd
 
DCD London 2016 Open Compute Project data center project engineering worksho...
DCD London 2016  Open Compute Project data center project engineering worksho...DCD London 2016  Open Compute Project data center project engineering worksho...
DCD London 2016 Open Compute Project data center project engineering worksho...Inflectiontech Ltd
 

Similar to 2010 Interworks EQ (20)

2010 Xsite
2010 Xsite2010 Xsite
2010 Xsite
 
Mayline Technology Furniture
Mayline   Technology FurnitureMayline   Technology Furniture
Mayline Technology Furniture
 
Ehouse Specification Sample
Ehouse Specification SampleEhouse Specification Sample
Ehouse Specification Sample
 
Electrical Trunking.ppt
Electrical Trunking.pptElectrical Trunking.ppt
Electrical Trunking.ppt
 
Lv panel specification
Lv panel specificationLv panel specification
Lv panel specification
 
Estap 2012-2013 catalogue all pages
Estap 2012-2013 catalogue all pagesEstap 2012-2013 catalogue all pages
Estap 2012-2013 catalogue all pages
 
Data tele standards-2
Data tele standards-2Data tele standards-2
Data tele standards-2
 
Excel Balers Difference 2 R Series
Excel Balers Difference   2 R SeriesExcel Balers Difference   2 R Series
Excel Balers Difference 2 R Series
 
Company Profile NEW 2014
Company Profile NEW 2014Company Profile NEW 2014
Company Profile NEW 2014
 
2010 Xsite Checklist
2010 Xsite Checklist2010 Xsite Checklist
2010 Xsite Checklist
 
cable railing
cable railingcable railing
cable railing
 
2010 Xsite Checklist (.doc)
2010 Xsite Checklist (.doc)2010 Xsite Checklist (.doc)
2010 Xsite Checklist (.doc)
 
Winter Panel Complete Guide
Winter Panel Complete GuideWinter Panel Complete Guide
Winter Panel Complete Guide
 
2010 Traxx
2010 Traxx2010 Traxx
2010 Traxx
 
Indoor floormount network rack | Unisol
Indoor floormount network rack | UnisolIndoor floormount network rack | Unisol
Indoor floormount network rack | Unisol
 
DCD London 2016 - OCP Data Center Project Engineering Workshop Presentation D...
DCD London 2016 - OCP Data Center Project Engineering Workshop Presentation D...DCD London 2016 - OCP Data Center Project Engineering Workshop Presentation D...
DCD London 2016 - OCP Data Center Project Engineering Workshop Presentation D...
 
DCD London 2016 Open Compute Project data center project engineering worksho...
DCD London 2016  Open Compute Project data center project engineering worksho...DCD London 2016  Open Compute Project data center project engineering worksho...
DCD London 2016 Open Compute Project data center project engineering worksho...
 
Ipad:tablet cc1 user manual
Ipad:tablet cc1 user manualIpad:tablet cc1 user manual
Ipad:tablet cc1 user manual
 
DALTECNIC
DALTECNICDALTECNIC
DALTECNIC
 
Ipad:tablet cc1 user manual
Ipad:tablet cc1 user manualIpad:tablet cc1 user manual
Ipad:tablet cc1 user manual
 

More from Alibia de Vente

More from Alibia de Vente (16)

2016 Traxx Checklist
2016 Traxx Checklist2016 Traxx Checklist
2016 Traxx Checklist
 
2016 Traxx Presentation
2016 Traxx Presentation2016 Traxx Presentation
2016 Traxx Presentation
 
Neo con e tool overview
Neo con e tool overviewNeo con e tool overview
Neo con e tool overview
 
2012 Hum Specification Presentation
2012 Hum Specification Presentation2012 Hum Specification Presentation
2012 Hum Specification Presentation
 
Electrical and Panel Systems
Electrical and Panel SystemsElectrical and Panel Systems
Electrical and Panel Systems
 
Brackets
BracketsBrackets
Brackets
 
Lateral Filing
Lateral FilingLateral Filing
Lateral Filing
 
2010 Hum
2010 Hum2010 Hum
2010 Hum
 
2010 Traditional Casegoods Specification
2010 Traditional Casegoods Specification2010 Traditional Casegoods Specification
2010 Traditional Casegoods Specification
 
2010 Transitional Casegoods Specification
2010 Transitional Casegoods Specification2010 Transitional Casegoods Specification
2010 Transitional Casegoods Specification
 
2010 Xsite Checklist
2010 Xsite Checklist2010 Xsite Checklist
2010 Xsite Checklist
 
2007 Electrical Regions
2007 Electrical Regions2007 Electrical Regions
2007 Electrical Regions
 
2008 Electrical & Data
2008 Electrical & Data2008 Electrical & Data
2008 Electrical & Data
 
Traxx Checklist (word)
Traxx Checklist (word)Traxx Checklist (word)
Traxx Checklist (word)
 
Xsite Checklist
Xsite ChecklistXsite Checklist
Xsite Checklist
 
Xsite Checklist
Xsite ChecklistXsite Checklist
Xsite Checklist
 

Recently uploaded

昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书zdzoqco
 
西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造kbdhl05e
 
Call Girls Meghani Nagar 7397865700 Independent Call Girls
Call Girls Meghani Nagar 7397865700  Independent Call GirlsCall Girls Meghani Nagar 7397865700  Independent Call Girls
Call Girls Meghani Nagar 7397865700 Independent Call Girlsssuser7cb4ff
 
Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.Mookuthi
 
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degreeyuu sss
 
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一F dds
 
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCRdollysharma2066
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVAAnastasiya Kudinova
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxmapanig881
 
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...Amil baba
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一Fi L
 
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`dajasot375
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubaikojalkojal131
 
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一z xss
 
FiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfFiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfShivakumar Viswanathan
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Rndexperts
 
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一lvtagr7
 
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024CristobalHeraud
 

Recently uploaded (20)

昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
 
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
 
西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造
 
Call Girls Meghani Nagar 7397865700 Independent Call Girls
Call Girls Meghani Nagar 7397865700  Independent Call GirlsCall Girls Meghani Nagar 7397865700  Independent Call Girls
Call Girls Meghani Nagar 7397865700 Independent Call Girls
 
Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.
 
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
 
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
 
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptx
 
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
 
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
 
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
 
FiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfFiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdf
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025
 
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
 
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
 

2010 Interworks EQ

  • 1. We will be starting momentarily. For Audio Please Dial: Conference Call 888.481.3032 Passcode 75892620# Press *6 to mute phone on/off
  • 2. Create useful work spaces without jeopardizing your budget.
  • 3. Stylish Options for smart settings: Clear or frosted glass Pass-thru tiles Fabric-wrapped corner pieces Tackable fabric panels Create the space your facility needs: Reception areas Meeting rooms Private offices Touchdown spaces
  • 4. Panel Statement of Line Page 206 Interworks is our easy, simple and quick solution. The Interworks panel system is priced at all fabric grade levels. Interworks has a metal top cap and a polymer hinge. The glass panel is ¼” thick. The door is 1 7/16” thick. Traxx and Tiles integrate with this product. Tackable Acoustical Panel Glass Panel Tackable Sectional Panel Stackable Panels Privacy Panels Hinged Doors Tackboards
  • 5. Connectors and Trim Statement of Line Page 207 The connector is made up of a polymer hinge that (2) ship with each panel. Extra hinges are recommended to be placed at the end of a run for reconfigurations. End trims are required. End caps are for panels manufactured prior to August 31, 2009. Finish channels simply make a clean directional connection. The polymer hinge actually makes the connection. Trim Top Caps End Caps Finish Channels Wall-Mount Connectors End Trim Traxx Starter Kit
  • 6. Power and Data Statement of Line Page 208 Panels ship with a power distribution if specified. Jumper cables are used to continue power from one panel to another. The base power entry can enter from the side, at a connection or end of run. The electrical system is 8-wire. All power runs in the base of the panel. Data runs at the top with the capability of holding 8 wires at the base. Think of managing cords below the surface. Duplex Receptacles Base Power Entry Power Distribution Assemblies Jumper Cables New York City Electrical Ceiling Power Entry Hardwire Electrical Power/ Data Poles Data Components Data Channels Vertical Cable Manages
  • 7. Interworks EQ Overview Page 209 The current 11P model number panel was introduced on August 31, 2009. The crowned top cap profile is available only painted . Panel Thickness is 2” An in-line connector must be specified between two panels sold in sets of two. Panel has hinge connection Wirewaycovers offer variations in punch options. You can add stack to change heights
  • 8. Interworks EQ Acoustical Panel Details Page 210 The hinge is a continuous flexiform polymer hinge. Side rails provide slots at 1” increments for mounting components. Cable routing offers 8 data cables to be routed at the bottom of the panel, that is 4 per side. The sides of the panel are not finished. Image taken from the pricelist.
  • 9. Interworks EQ Acoustical Panel Details Page 210 Panel is created from 1 ¼” steel tubing. The center of the frame is open with two sheets of tackable fiberglass. Panel includes: Top cap Wireway covers Panel hinges Glides and carpet grippers Frame with tiles NRC rating .65 STC rating 15
  • 10. Interworks EQ Sectional Frames Page 212 Sectional Frames Include: Top cap Wireway covers Panel Hinges Glides and Carpet Grippers Frame with Tiles The mid-wireway panel is a type of sectional panel. Image taken from installation instructions.
  • 11. Interworks EQ Mid-Wireway Panel Page 210 This panel is only available in a powered option. The panel ships with a harness at the base and mid-height including the jumper Power can not pass from one panel at mid-height to another. Tiles ship with the frame. The power components can also be added at a later point if you have an existing sectional frame.
  • 12. Interworks EQ Sectional Panel Page 213 Two tiles are required for each segment however tiles shipped in place, can be moved. The sizes indicated must be used in the location specified. Fabric is tackable. The glass tile has an even frame on all four sides which is similar to stack. Metal is embossed or plain front. Image taken from the pricelist.
  • 13. Interworks EQ Stackable Panel Page 214 Two stack panels can go on top of any one panel. Only the first stack panel is load-bearing. Stack height cannot exceed 80” A change at height cannot occur at a connector. Data cables can be placed inside the stack panel. 10P and 11Pbase models must match 10P and 11P stack models. A full end-trim is required.
  • 14. Interworks EQ Privacy Panels Page 215 Privacy Panels are for visual privacy only as it does not lock or latch. Doors should always open inside a station. The privacy panel is non-handed and reversible. Privacy Panels Include: Top attachment bracket Base pivot bracket Caster Image taken from the pricelist.
  • 15. Interworks EQ Hinge Door Page 216 Hinge Door Includes: Frame and threshold Top cap Panel Hinges In-line connector caps A 42” door is required to meet ADA. A locking lever is also available. The door is 1 7/16” thick. Be sure to use the stabilizer brackets to reinforce the connection. Image taken from the pricelist.
  • 16. Interworks EQ Finish Channels and Trim Top Caps Page 217 A finish channel is necessary to complete a directional turn. An XTC1 connector top cap is required in finishing a 4-way transition. A finish channel includes: Fabric Channel Finish channel top cap Metal base cover Alignment clip Image taken from the pricelist and installation instructions.
  • 17. Interworks EQ Finish Channels and Trim Top Caps Cont… Page 217 Note the new hi-lo at a connector. In some instances you may be required to specify two parts for a hi-lo condition. Image taken from installation instructions.
  • 18. Interworks EQ Power & Data Channels Page 217 When the height is dropped or raised the cables at the top of the panel must transition. The openings provided by the data channel allows for the flow of cabling to continue A finish channel is not required where a data channel is used at a directional transition. These images were taken from the pricelist.
  • 19. Interworks EQ Traxx Starter Panel Page 218 Interworks EQ offers a connection with Traxx that can go from all points within the space plan offering the greatest flexibility in reconfiguration. Interworks EQ offers a full height end trim to finish exposed edges of Traxx. It is not recommend to wall-start the start and end points of Traxx. Image taken from installation instructions.
  • 20. Traxx with Interworks EQ Page 218 The Interworks connection is more clean given the polymer hinge panel connection. When joining Interworks EQ to Traxx be sure to use the tiles specified for this connection as tiles will not need to be modified in the field if the wrong height is selected.
  • 21. Traxx with Interworks EQ in CAP You can start the Interworks panel from the edge of Traxx based on the full end trim. Image was taken from CAP.
  • 22. Panel spacing with Traxx in CAP In this instance a different panel type was used. Interworks EQ is a 2” thick panel so the dimension would need to be considered for general planning purposes. Image was taken from CAP.
  • 23. Interworks EQ Application Guidelines For Panel Configurations without Components Page 219 Image taken from the pricelist.
  • 24. Interworks EQ Application Guidelines For Panel Configurations without Overhead Storage Page 220 Remember to follow minimum wing width rules noted on each page. See page 251 For supplemental brackets. Image taken from the pricelist.
  • 25. Interworks EQ Supplemental Brackets Page 273 & 274 These brackets are recommend for use when panels join without a worksurface. Supplemental brackets are suggested but not required.
  • 26. Interworks EQ Application Guidelines For Panel Configurations with Overhead Storage Page 221 Remember to follow minimum wing width rules noted on each page. See page 251 For supplemental brackets.
  • 27. Interworks EQ Application Guidelines For X-Configurations Page 222 Remember to follow minimum wing width rules noted on each page.
  • 28. Interworks EQ Application Guidelines For 120⁰ V- and Y- Configurations Page 223 Do not exceed maximum number of panels in a run. Remember to follow minimum wing width rules noted on each page.
  • 29. Interworks EQ Application Guidelines For Wall- and Traxx-Mounted Panel Configurations Page 224 Do not exceed maximum number of panels in a run. Remember to follow minimum wing width rules noted on each page.
  • 30. Interworks EQ Application Guidelines For Stackable Panels Page 225 Maximum stack height is 80”. Two stackable panels can go on top of any one panel. You cannot change height at a connector. If placing overheads on one side it is required to use the stackable load brackets from page 251.
  • 31. Interworks EQ Tackboards Page 275 Interworks EQ panels are fully tackable. Tackboards are available as either 15” or 19” high. 15” tackboards with 62’ panels 19” tackboards with 66” panels. You have the option of specifying the tackboards with panel fabric (Grade A, B, COM)or seating fabric (Grade 1 or 2). Up to two tackboards may be mounted on one panel.
  • 32. Interworks EQ Trim Caps Page 280 & 281 Interworks EQ trim caps are applied based on directional transitions to conceal gaps.
  • 33. Interworks EQ Power and Data Overview Page 226 When mixing the electrical system with generation one consult you Product Specifer for specification tips.
  • 34. Interworks EQ Power Distribution Assemblies and Receptacles Page 227 Power Distributions match the same size as the panel. You can add a power distribution to a non-powered panel. Interworks EQ is an 8-wire system.
  • 35. Interworks EQ Jumpers Page 227 Jumpers are used to continue power from panel to the next. Mid-height jumpers are included with the mid-height powered panel. 18” wide panels have no electrical access however they can accept pass-thru jumpers cables.
  • 36. Interworks EQ Floor Power Entry Page 228 A base feed specification is specified based on the point of entry. A finished base plate will ship for a clean connection.
  • 37. Interworks EQ Ceiling Power Entry and Power/ Data Poles Page 228 The Ceiling Power Entry is specified separate from the ceiling power/ data pole. An extended can be specified for the power/ data pole through customer care. A finish channel is not required when a power/ data pole is used.
  • 38. Interworks EQ Hardwire Components Page 229 A side feed plate is offered however you can insert the power entry from the end, corner and straight position.
  • 39. Interworks EQ New York City Power Assemblies Page 230 The power entry is not available for 18” and 24” wide panels only 30” to 60”. Duplex receptacles cannot enter into this power entry however data ports can be added. All panels are purchased non-powered. Mid-Wireway panels are not available for New York.
  • 40. Interworks EQ 8-wire Electrical System Page 231 & 232 .
  • 41. Interworks EQ Cable Management Page 233 The panel is designed to hold all data at the top and all electrical at the bottom. Eight cables can be run at the bottom of the panel, 4 per side. You can not place data cables at the top of a stack panel. When adding stack on top of a monolithic panel you are encapsulating the data within the panel. Data channels allow cables to drop at a lower panel.
  • 42. Interworks EQ Worksurface Brackets Important: Brackets must be specified separately. 1 3/16” surfaces need support every 48” 1 9/16” surfaces need support every 60” Cantilevers are handed. Flat brackets are sold individually however must be used in pairs with a cantilever when located at the seam of two surfaces. Edge brackets at corner locations are not specific to hand of bracket.
  • 43. Interworks EQ Application and Support Page 332 & 333 (Footprint)
  • 44. Interworks EQ Cantilever Page 450 (Footprint) Important: Brackets must be specified separately. Cantilevers are handed. Flat brackets are sold individually however must be used in pairs with a cantilever when located at the seam of two surfaces. Consider placing pedestal fillers behind pedestals to fill gap.
  • 45. Interworks EQ Edge Support Brackets Page 449 (Footprint) Important: Brackets must be specified separately. Edge brackets at corner locations are not specific to hand of bracket. It is not recommended to place edge brackets in the center of runs this image simply conveys all possible locations.
  • 46. Interworks EQ Overhead Brackets Overview Wood/ Laminate overheads cannot be hung on Interworks EQ. Overhead Brackets Page 520 (Footprint) Ganging Brackets Page 523 (Footprint) .
  • 47. Interworks EQ Flat and Bevel Profile Overhead Brackets Page 524 (Footprint) You will not find a bracket for this overhead is apart of the construction. Ganging brackets are sold in a quantity of 4. .
  • 48. Interworks EQ Lunar Profile Overhead Brackets Page 524 & 526 (Footprint) A set of overhead brackets is need for each overhead regardless of width. Ganging brackets are sold individually .
  • 49. Kimball Office Resources Dealer Sales Manager Customer Care/ By Design 800.482.1818 Product Technical Support 800.481.6696 Product Specifier Alibia de Vente Market Education 770.265.4006 or Alibia.devente@kimball.com
  • 50.
  • 52. www.kimballoffice.com Working with multi-generations of Interworks EQ panels can be solved in most cases by knowing just a few tips.
  • 53. Interworks EQ Comparisons Previous generation model number started with 10P New generation of panels start with 11P. You cannot combine new and old generation stack however panels will remain easily attached side-by-side. New -11P Sectional / Old - 10P Sectional Old -10P Monolithic / New - 11P Monolithic
  • 54. Interworks EQ Is it 10P or 11P? Close up of where the two rails meet. The horizontal rail is for holding the tiles in only and not supporting worksurfaces or components. The corner details between the monolithic panels and sectional show a crisp corner detail. The frame detail on sectional / stack glass has an even frame on all side. New varied height 3-way model number. Full End trim and hi-lo trim is required not as you will notice connection points on the frame is removed. . Old 10P Stacking on 10P Sectional. New - 11P Frame Profile Old - 10P Frame Profile
  • 55. Interworks EQ List Price Comparison This price has not been confirmed as of 8-19-09.
  • 56. Interworks EQ Sectional Panel Frames Planning Page 212 & 213 of the January 15, 2010 rules remain applicable. The 10P model required tiles to be ordered as a separate line item (left). The 11P model is specified based on tile position from the top location down. Image taken from previous and current installation instructions. Previous Generation - 10P Sectional Current - 11P Sectional
  • 57. Interworks EQ Sectional Panel The 54” panel which had a 6” sectional tile segment was discontinued. The 54” sectional panel shown on the right with the 20” segment at top remains available. Image taken from the October 2009 electronic pricelist.
  • 58. Interworks EQ Stackable Panel Two stack panels can go on top of any one panel manufactured after 2.26.07. Only the first stack panel is load-bearing. Stack height cannot exceed 80” A change at height cannot occur at a connector. Data cables cannotbe placed inside a 10Pstack panel. 10P and 11Pbase models must match 10P and 11P stack models. A full end-trim is required.
  • 59. Interworks EQ Supplemental Brackets Page 273 & 274 These brackets are recommend for use when panels join without a worksurface. Supplemental brackets are suggested but not required. This image conveys 10P models numbers. The bracket spacer is not required for 11P panels unless joined.

Editor's Notes

  1. End Caps are discontinued.End Trim are required.
  2. Panel Details:The Tackable Acoustical (Monolithic) panels now meet the GSA Noise Reduction Coefficient (NRC) requirement of .65 for Acoustical panels, improved from .35 NRC. The Sound Transmission Coefficient (STC) stays the same at 15.The Sectional panels NRC improved to .60 with an STC of 14.Sectional panels are now tackable.Sectional panels have a Class A fire ratingsame as Monolithic.Sectional panels are in process of becoming SCS certifiedStacking panels now have the capacity to run cables and remain load bearing.
  3. You could re-fabric the panel by ordering a new monolithic tile as a service part. Glass panels are also available.
  4. 10P Stack panels can not be added to panels manufactured after 2.26.07.Stack is available in 12”, 14” and 18” panel heights.The width of the stack panel must match the width of the lower panel.Stack panels are available in either fabric or glass.
  5. While this page is not listed in the pricelist it is relative to discuss in this section.
  6. Only the first stack is load bearing.
  7. Note 22 cables and 11 in passing.
  8. Images on the web reflect the new images of the product. Get Images on KOP have a variety of new and old images. Anything with 09 is a current image.Replace the image of the EQ panel when available as this is the old model number.You will find the comprehensive pricelist includesthe new Interworks EQ information.
  9. Why change?Improvement in tackable acoustical (monolithic) and sectional tiles attachment to the frames - Enhancing sustainability and installationFactory installation of the sectional tiles to the frames – Eliminating over 80% of frame and tile packaging, and reducing overall waste being disposed of during installation – 15 tons per year – and installation time Enhanced application of panel fabrics - Elimination of potential for fraying, tear-through, "window framing," or stringsTop cap clip eliminated – simplifying the component for easier installation Extruded aluminum tubing frame replaced by 1¼" steel tubing, panel core is open, and the Styrofoam and pressboard in panels and sections and have been replaced with fiberglass – improving sustainabilityThe design of glass panels and tiles has also been improved with a consistent frame size on all four sides.
  10. Old Model Numbers are 10PNew Model Numbers are 11P
  11. Some service may cost more based on consolidated model numbers. Service parts can be found on kimballoffice.com when you sign in. Not all service parts will work interchangeably given there are slight differences with 10P and 11P model numbers. Example: top cap
  12. 10P Stack panels can not be added to panels manufactured after 2.26.07.Stack is available in 12”, 14” and 18” panel heights.The width of the stack panel must match the width of the lower panel.Stack panels are available in either fabric or glass.