Analysis & Rates
T he capacity of doing work by an artisan or skilled labour in the form of quantity of work per day is known as the task work or out
turn of the labour.
T he out-turn of work per artisan varies to some extent according to the nature, size, height, situation, location, etc., In bigger ci ties
where specialized and experienced labour is available the out-turn is greater than small towns and country sides. In well organized
work less labour is required.
T he following may be taken as the approximate quantity of work or out turn or task for an average artisan per day.
SNo. Particulars of items Quantity Perday
1. Brick work in lime or cement mortar in
foundati on and plinth
1.25cum (45cuft)per mason
2. Brick work in lime or cement mortar in
superstructure
1.00cum (35cuft)per mason
3. Brick work in mud mortar in foundation
and plinth
1.50cum (55cuft)per mason
4. Brick work in mud mortar in
superstructure
1.25cum (45cuft)per mason
5. Brick in cement or lime mortar in arches 0.55 cum (20cuft)per mason
6. Brick in cement or lime mortar in jack
arches
0.55 cum (20cuft)per mason
7. Half brick wall in partition 5.00sqm (50sqft)per mason
8. Coursed rubble stone masonry in lime
cement mortar including dressing
0.80cum (30 cuft)per mason
9. Random rubble stone masonry in lime
or cement mortar
1.00cum (35cuft)per mason
10. Ashlars masonry in lime or cement
mortar
0.40cum (15cuft)per mason
11. Stone arch work 0.40cum (15cuft)per mason
12. Lime concrete in foundati on or floor 8.50cum (300cuft )per mason
13. Lime concrete in roof terracing 6.00cum (200cuft )per mason
14. Lime concrete 1:2;4 5.00cum (175cuft )per mason
15. RB work 1.00cum (35cuft)per mason
16. RCC work 3.00cum (125cuft )per mason
17. 12mm (1/2) plastering with cement or
lime mortar
8.00sqm (80sqft)per mason
18. Pointing with cement or lime mortar 10.00sqm (100sqft )per mason
19. White washing or colour washing coats 70.00sqm (700sqft)per white
washer
20. White washing or colour washing coats 200.00sqm (2000sqft)per white
washer
21. Painting or varnishing doors or windows
one coat
25sqm (250sqft )per painter
22. Coal tarring or soligum painting one
coat
35.00sqm (350sqft )per painter
23. Painting large surface one coat 35.00sqm (350sqft )per painter
24. Distemperi ng one coat 35.00sqm (350sqft )per painter
25. 2.5cm(1’) CC floor 7.50sqm (75sqft)per painter
26. Flag store floor laying with lime or
cement mortar excluding LC
10.00sqm (100sqft )per painter
27. Brick on edge in floor lime or cement
mortar excluding LC
7.00sqm (70sqft)per painter
28. Brick bat floor as in above 8.00sqm (80sqft)per painter
29. Timber framing sal or teak wood 0.07cum (2.5cuft)perc arpent er
30. Timber framing sal or country wood 0.15cum (5cuft)per carpenter
31. Door and window shutters paneled or
glazed
0.15sqm (7sqft) per carpenter
32. Door and window shutters paneled or
battened
0.80sqm (0.80sqft )perc arpent er
33. Sawing hard wood 4.00sqm (40sqft) per pair of
sawers
34. Sawing soft wood 6.00sqm (60sqft) per pair of
sawers
35. Single allahabad tiling or mangalore
tiling
6.00sqm (60sqft) per tile layer
36. Double allahabad tiling 4.00sqm (40sqft) per tile layer
37. Breaking of brick ballest 40mm (11/2”)
gauge
0.75cum (35cuft)per labourer
or breaker
38. Breaking of brick ballest 25mm (1”)
gauge
0.55cum (20cuft)per labourer
or breaker
39. Breaking of stone ballest 40mm (11/2”)
gauge
0.40cum (10cuft)per labourer
or breaker
40. Breaking of stone ballest 25mm (1”)
gauge
0.25cum (10cuft)per labourer
or breaker
41. Ashlar stone dressing 0.70cum (25cuft)perst onec utt er
42. Flag stone dressing 1.50sqm (25sqft)perst onec utt er
43. Earthwork in excavati on in ordinary soil 3.00cum (100cuft)per belder
mazdoor
44. Earthwork in excavati on in hard soil 2.00cum (75cuft)per belder
mazdoor
45. Excavation in soil 1.00cum (35cuft)per belder
mazdoor
46. Number of bricks laid by a mason in
brick work upto a height of 3m(10”)
600 bricks per mason
47. Amount of work done by a mazdoor
helper per day
Mix 3.00cum (100cuft)mortar per
mazdoor
Deliver brick 4000 nos to a distance of 15m
(50”) per mazdoor
Deliver mortar 5.5cum (200cuft ) per mazdoor
48. Scaffolding cost for single storey
building
Re.0.50per
cum
(Rest.1.5%cuft) of
brick work.
Items 46,47 and 48 are based on the committee report on rates and cost government of India.
LABOUR (MAZDOOR) REQUIRED FOR DIFFERENT WORKS
Extracts from the report on productivity projects in building industries issued by National Building O rganisation are given b elow:-
a) Earthwork per 28.30 cum (12000cu ft)
1) Excavation in foundations, trenches etc., in ordinary soil including disposal
up to 30m (100’) and lift of 1.5m(5ft) –5 beldars and 4 mazdoors can do
28.30 cum (1000cuft ) per day.
2) Refilling excavated earth in foundations, pointh etc, including consolidation
in 15cm(6”) layers-3 beldars, 2 mazdoors and Β½ bhisti can do 28.30 cum
(1000cuft) per day.
3) Disposal of surplus earth within a lead of 30m (100’)-1 mazdoor can do
2.83cum (100 cuft) per day.
b) Cement concrete work per 2.83 cum (100cuft)
laying cement concrete – 2 beldars, 3 mazdoors, ΒΎ bhisti and ΒΌ mason, can do
2.83 cum (100 cuft) per day.
c) R C C work:-
1) Laying reinforced concrete – 3 beldars, 3 mazdoors, 1Β½ Bhisti and Β½ mason
can do 2.83 cum (100cuft) per day.
2) Centering and shuttering for flat surfaces – 4 beldars and 4 carpenters (II
class) can do 9.6sqm(96s qft ) per day.
3)Reinforcement work for R C C –1 blacksmith or fitter and 1 beldar can bend
and place in position 1 quintal (2 cwt) of steel per day.
d) Stone work per 2.83 cum (100cuft) -
Random rubble masonry with blue stone in foundations -3 masons, 3 beldars, 2
mazdoors and 1/4bhisti can do 2.83 cum (100cuft 0 per day
e) Brick work per 2.83 cum (100cuft)-
First class brick work in 1:4 cement mortar in superstructure partition walls,
junctions of roof, parapet walls and string course – 2Β½masons,4Β½ mazdoors
and 1/2 bhisti can do 2.83 cum (100cuft) per day.
F) Wood work :-
1) For the frames of doors and windows –2 carpenters and 1 beldar can work
0.18 cum (6.40cuft) of wood equivalent to door frames 7.5cm x 10m of 1.2m
x 2.1m (3’x4’of 3’x11’x7’)siz e per day.
2) For paneled, glazed, etc, shutters -15 carpenters and 4 beldars can make
and fix 4 shutters 40 mm thick of size 2.00m x 1.15m (1 Β½ thick of size of
6’-9x 3’-9’) per day. Quantity of wood per shutter – 0.075 cum, ie2.66 cuft.
g) Iron work :-
1) Fixing 40mm x 3mm=38cm(1 Β½ β€œ x Β½ β€˜x 15”0 flat iron holdfasts -1 blacksmith
(II class), I mason and I beldar can fix 36 holdfasts per day.
2) Fixing 16mm dia. 5/3” dia) M S rods –1 blacksmith (II class), 2 carpenters
(II class) and 3 mazdoors can fix 16.5m (54rft) per day.
h) Flooring: -
4cm thick (1 1/2 β€œ)thick cement concrete flooring of 40sqm (400sqft) require 5
masons, 4 beldars, 3 mazdoors and 1 bhisti per day for mixing laying and
finishing.
I) Finishing :-
1) Plastering with any mortar 12mm (5”) thick – 3 masons, 3 mazdoors and 1
bhisti can plaster 40sqm (400a ft) per day.
2)White washing or colour washing (3 coats) – 1 white washer and 1 mazdoor
can do 60sqm (600sqft) per day.
3) Painting two coats such as chocolate, red, grey, etc on wood are steel –3
Painters and 2 mazdoors can paint 10sqm (100sqft ) per day.
LOAD FOR A TWO –BULLOCKS CART
Quantity or Number
Sl# Particulars of materials On Kachcha
Road
On Pucca Road
1. Brick 19 cm x 9cm x 9cm 275nos 400nos
2. Brick ballast 0.85 cum (30cuft) 1.10 cum
(40cuft)
3. Stone ballast 0.70 cum (25 cuft) 1.00 cum
(35cuft)
4. Kankar 0.85 cum (30cuft) 1.10 cum
(40cuft)
5. Sand surkhi 0.85 cum (30cuft) 1.10 cum
(40cuft)
6. Lime 1.10 cum (40cuft) 1.40 cum
(50cuft)
7. Tiles Allahabad or Mangalore 275nos 400nos
8. Cement 15bags 20 bags
9. Steel 0.75 tonne 1 tonne
Note; A bullock ……..carry about one tonne load. The average speed for a bullock
cart may be taken as 3.20km (2 units) per hour and ΒΎ hour may be allowed for loading
and unloading. Taking 8 hours working per day, the number of trips per day, can be
calculated.
LOAD FOR TRUCKS
ON PUCCA METALLED ROAD –
Trucks3 tonners 5 tonners8 tonners diesel truck
Brick or Allahbad tiles or
Mangalore tiles1000nos 1500nos 2000nos
Cement, steel and other
Heavy materials 3 tonne 5 tonne8 tonne
Other materials –
Ballast, Kankar, grit
Sand coal, etc., 2.8cum 4.20cum5.6c um
(100cuft ) (150cuft )(200cuft )
On kachcha earthen road the load will be less by 33 per cent.
MATERIALS FOR DIFFERENT ITEMS OF WORKS
The requirem ent of materials for different items of works is as given below: -
Sl# Particulars Quantity
1. Bricks (9” x 4 Β½ β€œ x3” or 20 cm x
10cm x 10cm nominal size) for
brick work
1350 nos for
100cuft
50000 nos per %
cum (500nos.per
cum)
2. Dry mortar for brick work 30% 30cuft for 100 cuft 30cum for 100
cum
3. Stone for rubble stone masonry
125%
125cuft for 100
cuft
125cum for 100
cum
4. Dry mortar for rubble stone
masonry 42%
42cuft for 100 cuft 42cum for 100
cum
5. Bricks for brick ballast for lime
concrete
1050cuft for 100
cuft
37000cum for 100
cum
6. Brick bats or brick ballast for lime
concrete
150cuft for 100
cuft
150cum for 100
cum
7. Brick ballast for lime concrete 100cuft for 100
cuft
100cum for 100
cum
Sl# Particulars Quantity
8. Dry mortar for lime concrete I
foundati on and floor 35%
35cuft for 100cuft 35cum for 100
cum
9. Dry mortar for lime concrete in roof
terracing 45%
45cuft for 100cuft 45cum for 100
cum
10. Materials for cement concrete 1:2:4
Ballast or grit 88% 88cuft for 100cuft 88cum for 100
cum
Sand 44% 44cuft for 100cuft 44cum for 100
cum
Cement 22% 22cuft for 100cuft 22cum (60
bags)for 100 cum
11. Materials for 2.5cm (1”)cc 1:2:4
floor
Stone grit 8cuft for 100sqft 2.40cum for 100
cum
Sand 4cuft for 100sqft 1.20cum for 100
cum
Cement 2 ΒΌcuft (2 bags)
for 100cuft
0.08cum (24
bags)for 100 cum
12. Bricks for R B work 1200 nos for
100cuft
42000nos/%
cum(420 mps.[er
ci,)
13. Dry mortar for R B work 45% 45cuft for 100cuft 45cum for 100
cum
14. Dry mortar for 12mm (1/2)
plastering
6cuft for 100sqft 2.00cum for 100
sqm
15. Dry mortar for pointing in brickwork 2cuft for 100sqft 0.60cum for 100
sqm
16. Lime for white washing one coat 1kg for 100sqft 10kg for 100 sqm
17. Dry distemper for ist coat 0.65 kg for 100sqft 6 Β½ kg for 100
sqm
18. Dry distemper for 2nd coat 0.50 kg for 100sqft 5kg for 100 sqm
19. Snow-Cem for Ist coat 3kg for 100sqft 30kg for 100 sqm
20. Snow-Cem for 2nd coat 2kg for 100sqft 20kg for 100 sqm
21. Paint ready mixed for painting one
coat
1/3gl.for 100sqft 10ltr for 100 sqm
22. Paint (stiff) for painting one coat 1kg for 100sqft 10kg for 100 sqm
23. Bricks (20 x 10 x 10cm) for brick
floor or half brick wall
500 nos for
100sqft
5000nos.for
100sqm
24. Dry mortar for brick floor or half
brick wall
12cuft for 100sqft 3.20 cum for 100
sqm
25. Bricks (9” x 4 Β½ β€œ x3”) for brick flat
work
350 nos for
100sqft
3500nos.for
100sqm
26. Dry mortar for brick flat floor 8cuft for 100sqft 2.25cum for 100
cum
27. Bricks (9” x 4 Β½ β€œ x3”) required for
honey comb wall
325 nos for
100sqft
3250 nos.for
100sqm
28. Dry mortar for honey comb wall 8cuft for 100sqft 2.5cum for 100
cum
29. Materials for 2cm (3/4”)thick damp
proof course of 1:2 cement mortar
Cement 3cuft (2.5bags) for
100sqft
0.90cum (27
bags)for 100 cum
Sand 6cuft for 100sqft 1.80cum for 100
cum
Compound or impermo @ 1kg per
bag of cement
2.5kg for 100sqft 27kg for 100 sqm
30. Materials for 2.5cm (1”)cc 1:1 Β½ :3
damp proof course
Stone grit 8cuft for 100sqft 2.25cum for 100
cum
Sand coarse 4cuft for 100sqft 1.13cum for 100
cum
Cement 2 Β½ cuft (2 Β½
bags) for 100sqft
0.75cum for
(221/2bags)for100
cum
Compound or impermo @ 1kg per
bag of cement
21/2 kg for 100sqft 22Β½ kg for 100
sqm
31. Bitumen or asphalt for painting on
D P C or on roof – 1s t coat
15 kg for 100sqft 150 kg for 100
sqm
2nd coat 10 kg for 100sqft 100 kg for 100
sqm
32. G G I sheet for roof 128sqft for 100sqft 128 sqmfor
100sqm
33. A G corrugated sheet for roof 115sqft for 100sqft 115 sqmfor
100sqm
34. Timber for paneled door shutter
4cm (1 ½”) thick
15cuft for 100sqft 4.5 cum for 100
cum
35. Timber for battend door shutter
4cm (1 ½”) thick
13cuft for 100sqft 4.0 cum for 100
cum
36. Timber for paneled & glazed
shutter 4cm (1 ½”) thick
11cuft for 100sqft 3.0 cum for 100
cum
Timber for fully glazed shutter 4cm
(1 ½”) thick
8cuft for 100sqft 2.0 cum for 100
cum

More Related Content

What's hot

Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works ALI HYDER GADHI
Β 
Heavy Construction Equipment Productivity
Heavy Construction Equipment Productivity Heavy Construction Equipment Productivity
Heavy Construction Equipment Productivity SSudhaVelan
Β 
Estimating and-costing book
Estimating and-costing bookEstimating and-costing book
Estimating and-costing bookThomas Britto
Β 
021 Construction Productivity (PART 1)
021 Construction Productivity (PART 1)021 Construction Productivity (PART 1)
021 Construction Productivity (PART 1)Dr Fereidoun Dejahang
Β 
civil datas for estimate
civil datas for estimatecivil datas for estimate
civil datas for estimatealwin prabakar
Β 
Rate analysis road work in Estimation & Rate Analyisis
Rate analysis road work in Estimation & Rate AnalyisisRate analysis road work in Estimation & Rate Analyisis
Rate analysis road work in Estimation & Rate AnalyisisJaptyesh Singh
Β 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculationZIyeeTan
Β 
ESTIMATING AND COSTING
ESTIMATING AND COSTINGESTIMATING AND COSTING
ESTIMATING AND COSTINGNamrata Agnihotri
Β 
Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveyingAwanish Shukla
Β 
Estimating and costing
Estimating and costingEstimating and costing
Estimating and costingAyushHajare
Β 
Rate analysis brief
Rate analysis briefRate analysis brief
Rate analysis briefsonali parashar
Β 
Construction productivity
Construction productivityConstruction productivity
Construction productivitySunil Manjeri
Β 
Construction Productivity
Construction ProductivityConstruction Productivity
Construction ProductivitySunil Manjeri
Β 

What's hot (20)

Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works
Β 
Heavy Construction Equipment Productivity
Heavy Construction Equipment Productivity Heavy Construction Equipment Productivity
Heavy Construction Equipment Productivity
Β 
Estimating and-costing book
Estimating and-costing bookEstimating and-costing book
Estimating and-costing book
Β 
021 Construction Productivity (PART 1)
021 Construction Productivity (PART 1)021 Construction Productivity (PART 1)
021 Construction Productivity (PART 1)
Β 
civil datas for estimate
civil datas for estimatecivil datas for estimate
civil datas for estimate
Β 
Rate analysis road work in Estimation & Rate Analyisis
Rate analysis road work in Estimation & Rate AnalyisisRate analysis road work in Estimation & Rate Analyisis
Rate analysis road work in Estimation & Rate Analyisis
Β 
Analysis of rates
Analysis of ratesAnalysis of rates
Analysis of rates
Β 
Preliminary estimate
Preliminary estimatePreliminary estimate
Preliminary estimate
Β 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
Β 
Estimation
Estimation    Estimation
Estimation
Β 
ESTIMATING AND COSTING
ESTIMATING AND COSTINGESTIMATING AND COSTING
ESTIMATING AND COSTING
Β 
Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveying
Β 
Estimating and costing
Estimating and costingEstimating and costing
Estimating and costing
Β 
Types of estimates
Types of estimatesTypes of estimates
Types of estimates
Β 
Rate analysis brief
Rate analysis briefRate analysis brief
Rate analysis brief
Β 
Is 7272 1 (1)
Is 7272 1 (1)Is 7272 1 (1)
Is 7272 1 (1)
Β 
Rate analysis
Rate analysisRate analysis
Rate analysis
Β 
Estimating and-costing
Estimating and-costingEstimating and-costing
Estimating and-costing
Β 
Construction productivity
Construction productivityConstruction productivity
Construction productivity
Β 
Construction Productivity
Construction ProductivityConstruction Productivity
Construction Productivity
Β 

Viewers also liked

Estimation and costing
Estimation and costingEstimation and costing
Estimation and costingGanesh Murugan
Β 
estimation and quantity surveying
estimation and quantity surveyingestimation and quantity surveying
estimation and quantity surveyingsooricivil
Β 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYINGlizwi nyandu
Β 
Material required for different items of civil building works
Material required for different items of civil  building worksMaterial required for different items of civil  building works
Material required for different items of civil building worksALI HYDER GADHI
Β 
Bihar Schedule of Rates ne 01-16-07-2012
Bihar Schedule of Rates ne 01-16-07-2012Bihar Schedule of Rates ne 01-16-07-2012
Bihar Schedule of Rates ne 01-16-07-2012Shyam Singh
Β 
232365141 1-qs-techinical-data
232365141 1-qs-techinical-data232365141 1-qs-techinical-data
232365141 1-qs-techinical-datahlksd
Β 
ANALYSS OF RATES-VOLUME-I
ANALYSS OF RATES-VOLUME-IANALYSS OF RATES-VOLUME-I
ANALYSS OF RATES-VOLUME-IAlok Kumar
Β 
Top 10 project quantity surveyor interview questions and answers
Top 10 project quantity surveyor interview questions and answersTop 10 project quantity surveyor interview questions and answers
Top 10 project quantity surveyor interview questions and answersmitchellparker911
Β 
Estimation and costing of a commercial building
Estimation and costing of a commercial buildingEstimation and costing of a commercial building
Estimation and costing of a commercial buildinglckr117
Β 
Estimation of a residential building
Estimation of a residential buildingEstimation of a residential building
Estimation of a residential buildingVardhaman Sethia
Β 
Building estimation methods
Building estimation methodsBuilding estimation methods
Building estimation methodsSimarpreet Singh
Β 
Estimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkEstimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkDaniel Ross
Β 

Viewers also liked (12)

Estimation and costing
Estimation and costingEstimation and costing
Estimation and costing
Β 
estimation and quantity surveying
estimation and quantity surveyingestimation and quantity surveying
estimation and quantity surveying
Β 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYING
Β 
Material required for different items of civil building works
Material required for different items of civil  building worksMaterial required for different items of civil  building works
Material required for different items of civil building works
Β 
Bihar Schedule of Rates ne 01-16-07-2012
Bihar Schedule of Rates ne 01-16-07-2012Bihar Schedule of Rates ne 01-16-07-2012
Bihar Schedule of Rates ne 01-16-07-2012
Β 
232365141 1-qs-techinical-data
232365141 1-qs-techinical-data232365141 1-qs-techinical-data
232365141 1-qs-techinical-data
Β 
ANALYSS OF RATES-VOLUME-I
ANALYSS OF RATES-VOLUME-IANALYSS OF RATES-VOLUME-I
ANALYSS OF RATES-VOLUME-I
Β 
Top 10 project quantity surveyor interview questions and answers
Top 10 project quantity surveyor interview questions and answersTop 10 project quantity surveyor interview questions and answers
Top 10 project quantity surveyor interview questions and answers
Β 
Estimation and costing of a commercial building
Estimation and costing of a commercial buildingEstimation and costing of a commercial building
Estimation and costing of a commercial building
Β 
Estimation of a residential building
Estimation of a residential buildingEstimation of a residential building
Estimation of a residential building
Β 
Building estimation methods
Building estimation methodsBuilding estimation methods
Building estimation methods
Β 
Estimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkEstimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction Work
Β 

Similar to Analysis of rates for labour and material

Interview questions
Interview questionsInterview questions
Interview questionsJostin P Jose
Β 
Building materials, Basic civil engineering ,unit-1
Building materials, Basic civil engineering ,unit-1Building materials, Basic civil engineering ,unit-1
Building materials, Basic civil engineering ,unit-1Parimal Jha
Β 
rate analysis for structural buildingsppt 1.pptx
rate analysis for structural buildingsppt 1.pptxrate analysis for structural buildingsppt 1.pptx
rate analysis for structural buildingsppt 1.pptxAyan Sengupta
Β 
72747160 estimation
72747160 estimation72747160 estimation
72747160 estimationimaduddin91
Β 
80623277 cost-estimator
80623277 cost-estimator80623277 cost-estimator
80623277 cost-estimatorimaduddin91
Β 
SPECIFICATIONS FOR ADDL HOUSING PROJECT.pptx
SPECIFICATIONS FOR ADDL HOUSING PROJECT.pptxSPECIFICATIONS FOR ADDL HOUSING PROJECT.pptx
SPECIFICATIONS FOR ADDL HOUSING PROJECT.pptxswethasekhar5
Β 
Curabond Portfolio
Curabond Portfolio Curabond Portfolio
Curabond Portfolio Laura Matthews
Β 
Office building new
Office building newOffice building new
Office building newTHABREZ SHAMS
Β 
Materials%20required%20for%20different%20items%20of%20work
Materials%20required%20for%20different%20items%20of%20workMaterials%20required%20for%20different%20items%20of%20work
Materials%20required%20for%20different%20items%20of%20workAnu Bhadauria
Β 
12724469 wtp-cost-estimate
12724469 wtp-cost-estimate12724469 wtp-cost-estimate
12724469 wtp-cost-estimateimaduddin91
Β 
SANITARY CONstrcyion power point for health students
SANITARY CONstrcyion power point for health studentsSANITARY CONstrcyion power point for health students
SANITARY CONstrcyion power point for health studentsyeabT
Β 
Tutorial brickwork
Tutorial brickworkTutorial brickwork
Tutorial brickworkTimun Loh
Β 
Structural clay products (Conventional & Fly ash bricks)
Structural clay products (Conventional & Fly ash bricks)Structural clay products (Conventional & Fly ash bricks)
Structural clay products (Conventional & Fly ash bricks)A Makwana
Β 
New Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxNew Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxQAQCGCC
Β 

Similar to Analysis of rates for labour and material (20)

EQS - RATE ANALYSIS.pdf
EQS -  RATE ANALYSIS.pdfEQS -  RATE ANALYSIS.pdf
EQS - RATE ANALYSIS.pdf
Β 
Bricks
BricksBricks
Bricks
Β 
Interview questions
Interview questionsInterview questions
Interview questions
Β 
Building materials, Basic civil engineering ,unit-1
Building materials, Basic civil engineering ,unit-1Building materials, Basic civil engineering ,unit-1
Building materials, Basic civil engineering ,unit-1
Β 
rate analysis for structural buildingsppt 1.pptx
rate analysis for structural buildingsppt 1.pptxrate analysis for structural buildingsppt 1.pptx
rate analysis for structural buildingsppt 1.pptx
Β 
72747160 estimation
72747160 estimation72747160 estimation
72747160 estimation
Β 
80623277 cost-estimator
80623277 cost-estimator80623277 cost-estimator
80623277 cost-estimator
Β 
SPECIFICATIONS FOR ADDL HOUSING PROJECT.pptx
SPECIFICATIONS FOR ADDL HOUSING PROJECT.pptxSPECIFICATIONS FOR ADDL HOUSING PROJECT.pptx
SPECIFICATIONS FOR ADDL HOUSING PROJECT.pptx
Β 
Curabond Portfolio
Curabond Portfolio Curabond Portfolio
Curabond Portfolio
Β 
RR Nagar
RR NagarRR Nagar
RR Nagar
Β 
Office building new
Office building newOffice building new
Office building new
Β 
Materials%20required%20for%20different%20items%20of%20work
Materials%20required%20for%20different%20items%20of%20workMaterials%20required%20for%20different%20items%20of%20work
Materials%20required%20for%20different%20items%20of%20work
Β 
12724469 wtp-cost-estimate
12724469 wtp-cost-estimate12724469 wtp-cost-estimate
12724469 wtp-cost-estimate
Β 
Flooring
FlooringFlooring
Flooring
Β 
SANITARY CONstrcyion power point for health students
SANITARY CONstrcyion power point for health studentsSANITARY CONstrcyion power point for health students
SANITARY CONstrcyion power point for health students
Β 
UNIT 2.pptx
UNIT 2.pptxUNIT 2.pptx
UNIT 2.pptx
Β 
Tutorial brickwork
Tutorial brickworkTutorial brickwork
Tutorial brickwork
Β 
Structural clay products (Conventional & Fly ash bricks)
Structural clay products (Conventional & Fly ash bricks)Structural clay products (Conventional & Fly ash bricks)
Structural clay products (Conventional & Fly ash bricks)
Β 
Module 2
Module 2Module 2
Module 2
Β 
New Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxNew Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptx
Β 

More from ALI HYDER GADHI

National Fund for Mohenjodaro , its status, functions and detail of deposits
National Fund for Mohenjodaro , its status,    functions and detail of deposits National Fund for Mohenjodaro , its status,    functions and detail of deposits
National Fund for Mohenjodaro , its status, functions and detail of deposits ALI HYDER GADHI
Β 
Conservation methods 13 2-2013
Conservation methods 13 2-2013Conservation methods 13 2-2013
Conservation methods 13 2-2013ALI HYDER GADHI
Β 
General Contract Conditions as incorporated by SPPRA /PPPRA
General Contract Conditions as incorporated by SPPRA /PPPRA General Contract Conditions as incorporated by SPPRA /PPPRA
General Contract Conditions as incorporated by SPPRA /PPPRA ALI HYDER GADHI
Β 
Monsoon Preparations Survey for Archaeological Ruins Mohenjodaro
 Monsoon Preparations Survey for  Archaeological Ruins Mohenjodaro  Monsoon Preparations Survey for  Archaeological Ruins Mohenjodaro
Monsoon Preparations Survey for Archaeological Ruins Mohenjodaro ALI HYDER GADHI
Β 
Urban renewal, conservation & regeneration of arabic cities
Urban renewal, conservation & regeneration of arabic citiesUrban renewal, conservation & regeneration of arabic cities
Urban renewal, conservation & regeneration of arabic citiesALI HYDER GADHI
Β 
Conservation and revitalization of historic buildings
Conservation and revitalization of historic buildingsConservation and revitalization of historic buildings
Conservation and revitalization of historic buildingsALI HYDER GADHI
Β 
Mohen jo Daro Indus valley by ALI HYDER GADHI BALOCH
Mohen jo Daro  Indus valley by ALI HYDER GADHI BALOCH Mohen jo Daro  Indus valley by ALI HYDER GADHI BALOCH
Mohen jo Daro Indus valley by ALI HYDER GADHI BALOCH ALI HYDER GADHI
Β 
Emergency Measures adopted before monsoon, during and after rainfall at World...
Emergency Measures adopted before monsoon, during and after rainfall at World...Emergency Measures adopted before monsoon, during and after rainfall at World...
Emergency Measures adopted before monsoon, during and after rainfall at World...ALI HYDER GADHI
Β 
History of Conservation and Preservation of Cultural Property
 History of Conservation and Preservation of Cultural Property  History of Conservation and Preservation of Cultural Property
History of Conservation and Preservation of Cultural Property ALI HYDER GADHI
Β 
2nd day presentation mohanlal
2nd day presentation   mohanlal2nd day presentation   mohanlal
2nd day presentation mohanlalALI HYDER GADHI
Β 
Group a workshop on c h
Group a workshop on c hGroup a workshop on c h
Group a workshop on c hALI HYDER GADHI
Β 
Conservation terminologies for site and monuments
Conservation terminologies for site and monumentsConservation terminologies for site and monuments
Conservation terminologies for site and monumentsALI HYDER GADHI
Β 

More from ALI HYDER GADHI (12)

National Fund for Mohenjodaro , its status, functions and detail of deposits
National Fund for Mohenjodaro , its status,    functions and detail of deposits National Fund for Mohenjodaro , its status,    functions and detail of deposits
National Fund for Mohenjodaro , its status, functions and detail of deposits
Β 
Conservation methods 13 2-2013
Conservation methods 13 2-2013Conservation methods 13 2-2013
Conservation methods 13 2-2013
Β 
General Contract Conditions as incorporated by SPPRA /PPPRA
General Contract Conditions as incorporated by SPPRA /PPPRA General Contract Conditions as incorporated by SPPRA /PPPRA
General Contract Conditions as incorporated by SPPRA /PPPRA
Β 
Monsoon Preparations Survey for Archaeological Ruins Mohenjodaro
 Monsoon Preparations Survey for  Archaeological Ruins Mohenjodaro  Monsoon Preparations Survey for  Archaeological Ruins Mohenjodaro
Monsoon Preparations Survey for Archaeological Ruins Mohenjodaro
Β 
Urban renewal, conservation & regeneration of arabic cities
Urban renewal, conservation & regeneration of arabic citiesUrban renewal, conservation & regeneration of arabic cities
Urban renewal, conservation & regeneration of arabic cities
Β 
Conservation and revitalization of historic buildings
Conservation and revitalization of historic buildingsConservation and revitalization of historic buildings
Conservation and revitalization of historic buildings
Β 
Mohen jo Daro Indus valley by ALI HYDER GADHI BALOCH
Mohen jo Daro  Indus valley by ALI HYDER GADHI BALOCH Mohen jo Daro  Indus valley by ALI HYDER GADHI BALOCH
Mohen jo Daro Indus valley by ALI HYDER GADHI BALOCH
Β 
Emergency Measures adopted before monsoon, during and after rainfall at World...
Emergency Measures adopted before monsoon, during and after rainfall at World...Emergency Measures adopted before monsoon, during and after rainfall at World...
Emergency Measures adopted before monsoon, during and after rainfall at World...
Β 
History of Conservation and Preservation of Cultural Property
 History of Conservation and Preservation of Cultural Property  History of Conservation and Preservation of Cultural Property
History of Conservation and Preservation of Cultural Property
Β 
2nd day presentation mohanlal
2nd day presentation   mohanlal2nd day presentation   mohanlal
2nd day presentation mohanlal
Β 
Group a workshop on c h
Group a workshop on c hGroup a workshop on c h
Group a workshop on c h
Β 
Conservation terminologies for site and monuments
Conservation terminologies for site and monumentsConservation terminologies for site and monuments
Conservation terminologies for site and monuments
Β 

Recently uploaded

IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
Β 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
Β 
πŸ”9953056974πŸ”!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
πŸ”9953056974πŸ”!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...πŸ”9953056974πŸ”!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
πŸ”9953056974πŸ”!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...9953056974 Low Rate Call Girls In Saket, Delhi NCR
Β 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
Β 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
Β 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction managementMariconPadriquez1
Β 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
Β 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
Β 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
Β 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
Β 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
Β 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
Β 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitterShivangiSharma879191
Β 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
Β 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
Β 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
Β 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
Β 

Recently uploaded (20)

IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
Β 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Β 
πŸ”9953056974πŸ”!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
πŸ”9953056974πŸ”!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...πŸ”9953056974πŸ”!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
πŸ”9953056974πŸ”!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
Β 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
Β 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
Β 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Β 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction management
Β 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
Β 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
Β 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
Β 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Β 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
Β 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
Β 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Β 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
Β 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
Β 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
Β 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
Β 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
Β 
young call girls in Green ParkπŸ” 9953056974 πŸ” escort Service
young call girls in Green ParkπŸ” 9953056974 πŸ” escort Serviceyoung call girls in Green ParkπŸ” 9953056974 πŸ” escort Service
young call girls in Green ParkπŸ” 9953056974 πŸ” escort Service
Β 

Analysis of rates for labour and material

  • 1. Analysis & Rates T he capacity of doing work by an artisan or skilled labour in the form of quantity of work per day is known as the task work or out turn of the labour. T he out-turn of work per artisan varies to some extent according to the nature, size, height, situation, location, etc., In bigger ci ties where specialized and experienced labour is available the out-turn is greater than small towns and country sides. In well organized work less labour is required. T he following may be taken as the approximate quantity of work or out turn or task for an average artisan per day. SNo. Particulars of items Quantity Perday 1. Brick work in lime or cement mortar in foundati on and plinth 1.25cum (45cuft)per mason 2. Brick work in lime or cement mortar in superstructure 1.00cum (35cuft)per mason 3. Brick work in mud mortar in foundation and plinth 1.50cum (55cuft)per mason 4. Brick work in mud mortar in superstructure 1.25cum (45cuft)per mason 5. Brick in cement or lime mortar in arches 0.55 cum (20cuft)per mason 6. Brick in cement or lime mortar in jack arches 0.55 cum (20cuft)per mason 7. Half brick wall in partition 5.00sqm (50sqft)per mason 8. Coursed rubble stone masonry in lime cement mortar including dressing 0.80cum (30 cuft)per mason 9. Random rubble stone masonry in lime or cement mortar 1.00cum (35cuft)per mason 10. Ashlars masonry in lime or cement mortar 0.40cum (15cuft)per mason 11. Stone arch work 0.40cum (15cuft)per mason 12. Lime concrete in foundati on or floor 8.50cum (300cuft )per mason 13. Lime concrete in roof terracing 6.00cum (200cuft )per mason 14. Lime concrete 1:2;4 5.00cum (175cuft )per mason 15. RB work 1.00cum (35cuft)per mason 16. RCC work 3.00cum (125cuft )per mason 17. 12mm (1/2) plastering with cement or lime mortar 8.00sqm (80sqft)per mason 18. Pointing with cement or lime mortar 10.00sqm (100sqft )per mason 19. White washing or colour washing coats 70.00sqm (700sqft)per white washer 20. White washing or colour washing coats 200.00sqm (2000sqft)per white washer 21. Painting or varnishing doors or windows one coat 25sqm (250sqft )per painter 22. Coal tarring or soligum painting one coat 35.00sqm (350sqft )per painter 23. Painting large surface one coat 35.00sqm (350sqft )per painter 24. Distemperi ng one coat 35.00sqm (350sqft )per painter 25. 2.5cm(1’) CC floor 7.50sqm (75sqft)per painter 26. Flag store floor laying with lime or cement mortar excluding LC 10.00sqm (100sqft )per painter 27. Brick on edge in floor lime or cement mortar excluding LC 7.00sqm (70sqft)per painter 28. Brick bat floor as in above 8.00sqm (80sqft)per painter 29. Timber framing sal or teak wood 0.07cum (2.5cuft)perc arpent er 30. Timber framing sal or country wood 0.15cum (5cuft)per carpenter
  • 2. 31. Door and window shutters paneled or glazed 0.15sqm (7sqft) per carpenter 32. Door and window shutters paneled or battened 0.80sqm (0.80sqft )perc arpent er 33. Sawing hard wood 4.00sqm (40sqft) per pair of sawers 34. Sawing soft wood 6.00sqm (60sqft) per pair of sawers 35. Single allahabad tiling or mangalore tiling 6.00sqm (60sqft) per tile layer 36. Double allahabad tiling 4.00sqm (40sqft) per tile layer 37. Breaking of brick ballest 40mm (11/2”) gauge 0.75cum (35cuft)per labourer or breaker 38. Breaking of brick ballest 25mm (1”) gauge 0.55cum (20cuft)per labourer or breaker 39. Breaking of stone ballest 40mm (11/2”) gauge 0.40cum (10cuft)per labourer or breaker 40. Breaking of stone ballest 25mm (1”) gauge 0.25cum (10cuft)per labourer or breaker 41. Ashlar stone dressing 0.70cum (25cuft)perst onec utt er 42. Flag stone dressing 1.50sqm (25sqft)perst onec utt er 43. Earthwork in excavati on in ordinary soil 3.00cum (100cuft)per belder mazdoor 44. Earthwork in excavati on in hard soil 2.00cum (75cuft)per belder mazdoor 45. Excavation in soil 1.00cum (35cuft)per belder mazdoor 46. Number of bricks laid by a mason in brick work upto a height of 3m(10”) 600 bricks per mason 47. Amount of work done by a mazdoor helper per day Mix 3.00cum (100cuft)mortar per mazdoor Deliver brick 4000 nos to a distance of 15m (50”) per mazdoor Deliver mortar 5.5cum (200cuft ) per mazdoor 48. Scaffolding cost for single storey building Re.0.50per cum (Rest.1.5%cuft) of brick work. Items 46,47 and 48 are based on the committee report on rates and cost government of India. LABOUR (MAZDOOR) REQUIRED FOR DIFFERENT WORKS Extracts from the report on productivity projects in building industries issued by National Building O rganisation are given b elow:- a) Earthwork per 28.30 cum (12000cu ft) 1) Excavation in foundations, trenches etc., in ordinary soil including disposal up to 30m (100’) and lift of 1.5m(5ft) –5 beldars and 4 mazdoors can do 28.30 cum (1000cuft ) per day. 2) Refilling excavated earth in foundations, pointh etc, including consolidation
  • 3. in 15cm(6”) layers-3 beldars, 2 mazdoors and Β½ bhisti can do 28.30 cum (1000cuft) per day. 3) Disposal of surplus earth within a lead of 30m (100’)-1 mazdoor can do 2.83cum (100 cuft) per day. b) Cement concrete work per 2.83 cum (100cuft) laying cement concrete – 2 beldars, 3 mazdoors, ΒΎ bhisti and ΒΌ mason, can do 2.83 cum (100 cuft) per day. c) R C C work:- 1) Laying reinforced concrete – 3 beldars, 3 mazdoors, 1Β½ Bhisti and Β½ mason can do 2.83 cum (100cuft) per day. 2) Centering and shuttering for flat surfaces – 4 beldars and 4 carpenters (II class) can do 9.6sqm(96s qft ) per day. 3)Reinforcement work for R C C –1 blacksmith or fitter and 1 beldar can bend and place in position 1 quintal (2 cwt) of steel per day. d) Stone work per 2.83 cum (100cuft) - Random rubble masonry with blue stone in foundations -3 masons, 3 beldars, 2 mazdoors and 1/4bhisti can do 2.83 cum (100cuft 0 per day e) Brick work per 2.83 cum (100cuft)- First class brick work in 1:4 cement mortar in superstructure partition walls, junctions of roof, parapet walls and string course – 2Β½masons,4Β½ mazdoors and 1/2 bhisti can do 2.83 cum (100cuft) per day. F) Wood work :- 1) For the frames of doors and windows –2 carpenters and 1 beldar can work 0.18 cum (6.40cuft) of wood equivalent to door frames 7.5cm x 10m of 1.2m x 2.1m (3’x4’of 3’x11’x7’)siz e per day. 2) For paneled, glazed, etc, shutters -15 carpenters and 4 beldars can make and fix 4 shutters 40 mm thick of size 2.00m x 1.15m (1 Β½ thick of size of 6’-9x 3’-9’) per day. Quantity of wood per shutter – 0.075 cum, ie2.66 cuft. g) Iron work :- 1) Fixing 40mm x 3mm=38cm(1 Β½ β€œ x Β½ β€˜x 15”0 flat iron holdfasts -1 blacksmith (II class), I mason and I beldar can fix 36 holdfasts per day. 2) Fixing 16mm dia. 5/3” dia) M S rods –1 blacksmith (II class), 2 carpenters (II class) and 3 mazdoors can fix 16.5m (54rft) per day. h) Flooring: - 4cm thick (1 1/2 β€œ)thick cement concrete flooring of 40sqm (400sqft) require 5 masons, 4 beldars, 3 mazdoors and 1 bhisti per day for mixing laying and finishing. I) Finishing :- 1) Plastering with any mortar 12mm (5”) thick – 3 masons, 3 mazdoors and 1 bhisti can plaster 40sqm (400a ft) per day. 2)White washing or colour washing (3 coats) – 1 white washer and 1 mazdoor can do 60sqm (600sqft) per day.
  • 4. 3) Painting two coats such as chocolate, red, grey, etc on wood are steel –3 Painters and 2 mazdoors can paint 10sqm (100sqft ) per day. LOAD FOR A TWO –BULLOCKS CART Quantity or Number Sl# Particulars of materials On Kachcha Road On Pucca Road 1. Brick 19 cm x 9cm x 9cm 275nos 400nos 2. Brick ballast 0.85 cum (30cuft) 1.10 cum (40cuft) 3. Stone ballast 0.70 cum (25 cuft) 1.00 cum (35cuft) 4. Kankar 0.85 cum (30cuft) 1.10 cum (40cuft) 5. Sand surkhi 0.85 cum (30cuft) 1.10 cum (40cuft) 6. Lime 1.10 cum (40cuft) 1.40 cum (50cuft) 7. Tiles Allahabad or Mangalore 275nos 400nos 8. Cement 15bags 20 bags 9. Steel 0.75 tonne 1 tonne Note; A bullock ……..carry about one tonne load. The average speed for a bullock cart may be taken as 3.20km (2 units) per hour and ΒΎ hour may be allowed for loading and unloading. Taking 8 hours working per day, the number of trips per day, can be calculated. LOAD FOR TRUCKS ON PUCCA METALLED ROAD – Trucks3 tonners 5 tonners8 tonners diesel truck Brick or Allahbad tiles or Mangalore tiles1000nos 1500nos 2000nos Cement, steel and other Heavy materials 3 tonne 5 tonne8 tonne Other materials – Ballast, Kankar, grit Sand coal, etc., 2.8cum 4.20cum5.6c um (100cuft ) (150cuft )(200cuft ) On kachcha earthen road the load will be less by 33 per cent. MATERIALS FOR DIFFERENT ITEMS OF WORKS The requirem ent of materials for different items of works is as given below: - Sl# Particulars Quantity
  • 5. 1. Bricks (9” x 4 Β½ β€œ x3” or 20 cm x 10cm x 10cm nominal size) for brick work 1350 nos for 100cuft 50000 nos per % cum (500nos.per cum) 2. Dry mortar for brick work 30% 30cuft for 100 cuft 30cum for 100 cum 3. Stone for rubble stone masonry 125% 125cuft for 100 cuft 125cum for 100 cum 4. Dry mortar for rubble stone masonry 42% 42cuft for 100 cuft 42cum for 100 cum 5. Bricks for brick ballast for lime concrete 1050cuft for 100 cuft 37000cum for 100 cum 6. Brick bats or brick ballast for lime concrete 150cuft for 100 cuft 150cum for 100 cum 7. Brick ballast for lime concrete 100cuft for 100 cuft 100cum for 100 cum Sl# Particulars Quantity 8. Dry mortar for lime concrete I foundati on and floor 35% 35cuft for 100cuft 35cum for 100 cum 9. Dry mortar for lime concrete in roof terracing 45% 45cuft for 100cuft 45cum for 100 cum 10. Materials for cement concrete 1:2:4 Ballast or grit 88% 88cuft for 100cuft 88cum for 100 cum Sand 44% 44cuft for 100cuft 44cum for 100 cum Cement 22% 22cuft for 100cuft 22cum (60 bags)for 100 cum 11. Materials for 2.5cm (1”)cc 1:2:4 floor Stone grit 8cuft for 100sqft 2.40cum for 100 cum Sand 4cuft for 100sqft 1.20cum for 100 cum Cement 2 ΒΌcuft (2 bags) for 100cuft 0.08cum (24 bags)for 100 cum 12. Bricks for R B work 1200 nos for 100cuft 42000nos/% cum(420 mps.[er ci,) 13. Dry mortar for R B work 45% 45cuft for 100cuft 45cum for 100 cum 14. Dry mortar for 12mm (1/2) plastering 6cuft for 100sqft 2.00cum for 100 sqm 15. Dry mortar for pointing in brickwork 2cuft for 100sqft 0.60cum for 100 sqm 16. Lime for white washing one coat 1kg for 100sqft 10kg for 100 sqm 17. Dry distemper for ist coat 0.65 kg for 100sqft 6 Β½ kg for 100 sqm 18. Dry distemper for 2nd coat 0.50 kg for 100sqft 5kg for 100 sqm 19. Snow-Cem for Ist coat 3kg for 100sqft 30kg for 100 sqm 20. Snow-Cem for 2nd coat 2kg for 100sqft 20kg for 100 sqm 21. Paint ready mixed for painting one coat 1/3gl.for 100sqft 10ltr for 100 sqm
  • 6. 22. Paint (stiff) for painting one coat 1kg for 100sqft 10kg for 100 sqm 23. Bricks (20 x 10 x 10cm) for brick floor or half brick wall 500 nos for 100sqft 5000nos.for 100sqm 24. Dry mortar for brick floor or half brick wall 12cuft for 100sqft 3.20 cum for 100 sqm 25. Bricks (9” x 4 Β½ β€œ x3”) for brick flat work 350 nos for 100sqft 3500nos.for 100sqm 26. Dry mortar for brick flat floor 8cuft for 100sqft 2.25cum for 100 cum 27. Bricks (9” x 4 Β½ β€œ x3”) required for honey comb wall 325 nos for 100sqft 3250 nos.for 100sqm 28. Dry mortar for honey comb wall 8cuft for 100sqft 2.5cum for 100 cum 29. Materials for 2cm (3/4”)thick damp proof course of 1:2 cement mortar Cement 3cuft (2.5bags) for 100sqft 0.90cum (27 bags)for 100 cum Sand 6cuft for 100sqft 1.80cum for 100 cum Compound or impermo @ 1kg per bag of cement 2.5kg for 100sqft 27kg for 100 sqm 30. Materials for 2.5cm (1”)cc 1:1 Β½ :3 damp proof course Stone grit 8cuft for 100sqft 2.25cum for 100 cum Sand coarse 4cuft for 100sqft 1.13cum for 100 cum Cement 2 Β½ cuft (2 Β½ bags) for 100sqft 0.75cum for (221/2bags)for100 cum Compound or impermo @ 1kg per bag of cement 21/2 kg for 100sqft 22Β½ kg for 100 sqm 31. Bitumen or asphalt for painting on D P C or on roof – 1s t coat 15 kg for 100sqft 150 kg for 100 sqm 2nd coat 10 kg for 100sqft 100 kg for 100 sqm 32. G G I sheet for roof 128sqft for 100sqft 128 sqmfor 100sqm 33. A G corrugated sheet for roof 115sqft for 100sqft 115 sqmfor 100sqm 34. Timber for paneled door shutter 4cm (1 ½”) thick 15cuft for 100sqft 4.5 cum for 100 cum 35. Timber for battend door shutter 4cm (1 ½”) thick 13cuft for 100sqft 4.0 cum for 100 cum 36. Timber for paneled & glazed shutter 4cm (1 ½”) thick 11cuft for 100sqft 3.0 cum for 100 cum Timber for fully glazed shutter 4cm (1 ½”) thick 8cuft for 100sqft 2.0 cum for 100 cum