DIESEL LOCOMODERNISATION WORKS, PATIALA
Company Profile
 Diesel Loco modernization Works was conceived with a view to provide

  maintenance supports to zonal railways for the maintenance of over 4500

  diesels locomotive, which are in services.

 DMW believes that product quality has to be built in during manufacturing.

  In accordance with the belief, the quality assurance system forms integral

  part of workshop activities.

 With quality as its strength factor, DMW is surely and steadily notching up

  its market share.
Salient Features:
 Workshop area (Sq m)            837936

 Covered area in shops (Sq m)    87578

 Township area (Sq m)            1416800

 Electrical Energy Consumption   161.01

    (Lakhs of units/year)
Strategy Followed In Planning Of DCW
 Each workshop has a major area functioning under middle management level
  officers, who are totally answerable for their performance.
 Layout of workshops is such that there is a smooth flow of jobs from one
  workshop to another.
 Fully integrated with CNC, NC and NON-CNC machines to overcome the
  demand.
 Machines are placed according to group technology so that final job comes out
  as single.
 Inspection and testing is done 100% with very accurate instruments for good
  quality.
Project Objective

  Diesel-Loco Modernisation Works was setup in the year 1981 to extend the
  service life of Diesel Locomotives of the Indian Railways and significantly raise
  the level of their availability.
 Manufacture and supply of high quality components and sub-assemblies as
  spares.
 Manufacture of Components hitherto imported achieving import
  substitution and timely availability
 Rebuilding Locomotives and power packs and turning them out in state- of-the-
  art condition. Retrofitting the locomotives with systems
Diesel Locomodernisation Works Layout
DMW Is Divided In Two Parts-
 Phase 1- Phase 1 was sanctioned in May 1982 and that of Phase 2 in June 1986.
  For phase 1 group of shops covering an area of 47,000sq.m has been provided
  in which 734 items of different machinery & plant have been installed.

 Phase 2- Construction of Phase 2 group of shops, where rebuilding of diesel
  loco per annual is to be undertaken was taken up in 1986-87 at an estimated cost
  of 46.63 crores. For this purpose covered area of 25,000sq.m and 298 different
  items of machinery and seven plants have been provided. Facilities for
  rebuilding of power packs & diesel locomotives are provided in various shops
Various Shops in DMW Are: -
 P.M.S                  Plant Maintenance Shop

 T.R                    Tool Room

 L.M.S                  Light Machine Shop

 C.B.S                  Carbon Brush Shop

 H.T.S                  Heat Treatment Shop

 V.M.S                  Vehicle Maintenance Shop

 T.M.S                  Traction Machine Shop

 M.R.S                  Main Receiving Shop
 H.M.S   Heavy Machine Shop

 C.L.S   Cylinder Linear Shop

 P.P.S   Power Pack Shop

 B.S     Bogie Shop

 S.S.S   Super Structure Shop

 L.R.S   Locomotive Rebuilding Shop
Manufacturing Shops-
  Phase 1 shops are also known as Manufacturing shops. There are total
  seven shops which come under manufacturing . These shops manufacture
  small and heavy parts of loco. The various shops are described as follows:-

 Light Machine Shop

  About 300 spare parts required by DMW and Zonal Railways for
  locomotive   maintenance    including   Camshafts,    Gears,   Valve   gear
  components, Equaliser beams, Axles, Armature shafts, Axle box housings,
  Gas inlet casings, etc. are manufactured in the Light Machine Shop.
This shop is also known as for Manufacture of Rail-cum-Road Vehicle. Here
various tools and components of locomotives are produced with various
machines. Most of the machines are controlled by CNC’s.
 Heat Treatment Shop

  Requisite heat treatment that is induction hardening, case carburizing etc. is
  carried out in the Heat Treatment Shop to develop optimum properties in the
  finished components.
 Carbon Brush Shop

 The Carbon Brush Shop manufactures 14 types of carbon brushes required
  for Traction Generators, Traction Motors and Auxiliary Electrical Machines.
  Recently carbon brush CB-48 has been developed for fans of ICF coaches.
 Heavy Machine Shop

 Engine Blocks of diesel locomotives and Traction Motor Magnet Frames are
  machined in this shop. Precision machining of the Blocks is carried out on
  CNC Horizontal Boring & Milling Machine of PAMA, Italy make CNC
  machine.
 Traction Machine Shop

  A wide variety of Traction Motors, Traction Generators and Alternators are
  rewound / remanufactured in this shop. Facilities include 500 T Hydraulic
  Press for shafting/deshafting, Glass Bead Blasting Machine, Vacuum
  Impregnation Plant, HYT Lathe, Dynamic Balancing Machine, etc.
Locomotive rebuilding shops

  Phase 2 comprises of Loco-rebuilding Shops. There are total five shops.
  During Locomotive Rebuilding, besides upgrading output to 3100 HP, the
  locomotive is also modernized to incorporate numerous improvements in
  locomotive technology.

 Power Pack Shop

  All the Power Packs from incoming locomotives are sent to the Power Pack
  Shop for remanufacturing. In this shop the power pack is wholly dismantled
  and rebuilt, tested and then sent to LRS for fitment on the LOCO.
The main functions of this shop are-

 Dismantling, Reconditioning and assembly of power pack.

 Load testing, specific fuel consumption testing and other types.
Engine view
 Locomotive Rebuilding Shop

a)   Locomotive rebuilding facilities include dismantling, repairs and
     reassembly of the complete Locomotive including under frame.
b)   A manipulator has been developed for ensuring downhand welding during
     the repair of under frame and chasis.
c)   Remanufacturing facilities for auxiliary machines and electronic control
     harness are also available.
d)   Air Brake and Paint Shops constitute the supporting activity areas for
     locomotive rebuilding.
e)   Power and control cables are renewed and control equipment is
     remanufactured.
Loco Assembly
 Bogie Shop

  The locomotive bogies are rebuilt with new wheel sets, suspension bearings
  and remanufactured traction motors. Separate shop has been set up for
  machining of wheel sets and assembly of locomotive bogies.
Support shops
  Above activities are adequately supported by competent workforce of staff
  and supervisors of Plant Maintenance Shop, Tool Room, Main Receiving
  Station and other support shops.

 Electronics Lab
• There is a full-fledged Electronic Lab which has been set up to cater to
  maintenance need of highly sophisticated CNC machines and component /
  subassembly level trouble shooting of PCBs, Servo Drives, Microprocessor
  based controllers and electronic units.

• A saving of Rs.1.17 Cr. has been achieved in 2005-06 due to repair of
  PCBs.
Activities and Products Of DMW
 Mid life rebuilding/ reconditioning of WDM2 ALCO locomotive.
  Upgrading them from 2600HP to 3100HP and 3300 HP.

 Incorporating various modifications to enhance the efficiency, reliability,
  safety of locomotive.

 Manufacture of various type of carbon brushes used on traction machines of
  WDM2, WDM3A, YDM4, WDG4, WDM3C, DMU.

 Rewinding/ reconditioning of traction motors, traction generator & traction
  alternators of locomotives.

 Reconditioning of engine block of ALCO locomotives, power pack and
  supply of New Power packs.
 WDM3A Diesel locomotive rebuild at DMW
Machines and technology used in DMW
 PAMA Machine

 This machine is the most important machine of DMW. This machine is
  located here only in all over India.

 This machine is a part of Heavy Machine Shop (H.M.S.).

 It is used for cutting and boring purposes in a tool.

 Mainly an engine block is manufactured and repaired in this machine. One
  engine block can be repaired three times in this machine.

 The main description can be given as PAMA Horizontal Boring and Milling
  Machine (with speed RAM).
 View Of PAMA Machine
 CNC Machines
 Computer Numeric Control machines is a closed loop machine.

 As the name depicts these machines use computer for their operation.

 Computer Numeric Control machines are controlled by a set of different
  ISO codes that helps in proper controlling of the machine.

 In modern CNC systems, end-to-end component design is highly automated
  using CAD/CAM programs.
 Block Diagram Of CNC Machine
 Vertical Rotary Mill

  This machine is CNC operated machine. Vertical Rotary mill is located in
  LMS shop. It is used mainly for boring and milling of the tools.

 It needs a total power of 35 KW for its operation.

 It is worth Rs 17.09322 lacs.

 The main components used are- Main Bearing Cap, Connecting Rods,
  Casing Lop, Support V/L.

 The maximum capacity of it per day is around 45.

 It has three axis :– X – Rotating, Y - Horizontal. Forward and backward
  direction, Z - Vertical. Up and down direction.
 View Of Vertical Rotary Mill
 Electronic Lab Equipment

Some of the sophisticated workstations and testing equipment in the Lab are:
 X-Y, Y-T, 3-Channel Recorders.

 Dual Channel 100 MHz Oscilloscope with DMM.

 5½ Digit Bench Programmable Digital Multimeter.

 Function Generator with Arbitrary waveform generation.

 PCB Test Station

 Automatic Test Equipment (ICT).

 Universal PROM / EPROM Programmer.

 Digital / Analog IC Tester.

 Surface Mount Component Repair Station.
 PCB Test Station and Universal PROM / EPROM Programmer
Result And Conclusion
 The Indian Railway is the most widely used transport system in India. The
  production of the parts and units of rails forms an important and integral
  part of the proper functioning of the railway system in India.

 Its World's largest manufacturer of ALCO diesel loco spares such as Gears,
  Cams, Con rods, Pins, Carbon Brushes etc.

 DCW manufactures large components such as traction motors and
  locomotive power packs, rebuilds engine blocks, traction generators, etc.

 They have more recently been upgrading WDM-2 locos to WDM-2C class.
View of New Diesel Electric Locomotive
View of Rebuilt Diesel Electric Locomotive
Diesel loco modernization

More Related Content

What's hot

diesel locomotive works training report by somesh dwivedi
diesel locomotive works training report by somesh dwivedidiesel locomotive works training report by somesh dwivedi
diesel locomotive works training report by somesh dwivedisomesh dwivedi
 
Diesel locomotive technology
Diesel locomotive technologyDiesel locomotive technology
Diesel locomotive technologyRajneesh Budania
 
Diesel locomotive works, varanasi
Diesel locomotive works, varanasiDiesel locomotive works, varanasi
Diesel locomotive works, varanasiShubham​ Yadav
 
Diesel locomotive works - Truck Machine Shop
Diesel locomotive works - Truck Machine ShopDiesel locomotive works - Truck Machine Shop
Diesel locomotive works - Truck Machine ShopGaurav Mishra
 
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHEDINTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHEDPruthvi Raj
 
Project Report -Trainee Engineer At Diesel Locomotive Shed, Indian Railways
Project Report -Trainee Engineer At Diesel Locomotive Shed, Indian RailwaysProject Report -Trainee Engineer At Diesel Locomotive Shed, Indian Railways
Project Report -Trainee Engineer At Diesel Locomotive Shed, Indian RailwaysAditya Bhattacharjee
 
presentation on diesel locomotive works (dlw)
presentation on diesel locomotive works (dlw)presentation on diesel locomotive works (dlw)
presentation on diesel locomotive works (dlw)shubham vishwakarma
 
Railway carriage workshop Ajmer
Railway carriage workshop AjmerRailway carriage workshop Ajmer
Railway carriage workshop AjmerBhupesh Jangid
 
Diesel Locomotive Works (DLW)
 Diesel Locomotive Works (DLW) Diesel Locomotive Works (DLW)
Diesel Locomotive Works (DLW)Neha Gethe
 
Training report of Electric Loco Shed
Training report of Electric Loco ShedTraining report of Electric Loco Shed
Training report of Electric Loco ShedAarti Ojha
 
Summer training repoart on dlw ,varanasi
Summer training repoart on dlw ,varanasiSummer training repoart on dlw ,varanasi
Summer training repoart on dlw ,varanasiARJUN MAURYA
 
indian railway gorakhpur training report for mechanical engineering 2016
indian railway gorakhpur training report for mechanical engineering 2016 indian railway gorakhpur training report for mechanical engineering 2016
indian railway gorakhpur training report for mechanical engineering 2016 Kishan Bharti
 
PPT on Indian railway (LHB coaches)
PPT on Indian  railway (LHB coaches)PPT on Indian  railway (LHB coaches)
PPT on Indian railway (LHB coaches)kalyan kumar
 
Project Report on railway workshop Jhansi
Project Report on railway workshop JhansiProject Report on railway workshop Jhansi
Project Report on railway workshop JhansiVirendra Kumar Gautam
 

What's hot (20)

diesel locomotive works training report by somesh dwivedi
diesel locomotive works training report by somesh dwivedidiesel locomotive works training report by somesh dwivedi
diesel locomotive works training report by somesh dwivedi
 
Training report
Training reportTraining report
Training report
 
Diesel locomotive technology
Diesel locomotive technologyDiesel locomotive technology
Diesel locomotive technology
 
Diesel locomotive works, varanasi
Diesel locomotive works, varanasiDiesel locomotive works, varanasi
Diesel locomotive works, varanasi
 
Diesel locomotive works - Truck Machine Shop
Diesel locomotive works - Truck Machine ShopDiesel locomotive works - Truck Machine Shop
Diesel locomotive works - Truck Machine Shop
 
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHEDINTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
 
Project Report -Trainee Engineer At Diesel Locomotive Shed, Indian Railways
Project Report -Trainee Engineer At Diesel Locomotive Shed, Indian RailwaysProject Report -Trainee Engineer At Diesel Locomotive Shed, Indian Railways
Project Report -Trainee Engineer At Diesel Locomotive Shed, Indian Railways
 
presentation on diesel locomotive works (dlw)
presentation on diesel locomotive works (dlw)presentation on diesel locomotive works (dlw)
presentation on diesel locomotive works (dlw)
 
Railway carriage workshop Ajmer
Railway carriage workshop AjmerRailway carriage workshop Ajmer
Railway carriage workshop Ajmer
 
Dlw training
Dlw trainingDlw training
Dlw training
 
Dlw locomotive workshop
Dlw locomotive workshopDlw locomotive workshop
Dlw locomotive workshop
 
Diesel Locomotive Works (DLW)
 Diesel Locomotive Works (DLW) Diesel Locomotive Works (DLW)
Diesel Locomotive Works (DLW)
 
introuduction DLW varanaesi
introuduction DLW varanaesiintrouduction DLW varanaesi
introuduction DLW varanaesi
 
Training report of Electric Loco Shed
Training report of Electric Loco ShedTraining report of Electric Loco Shed
Training report of Electric Loco Shed
 
Summer training repoart on dlw ,varanasi
Summer training repoart on dlw ,varanasiSummer training repoart on dlw ,varanasi
Summer training repoart on dlw ,varanasi
 
INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)
INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)
INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)
 
indian railway gorakhpur training report for mechanical engineering 2016
indian railway gorakhpur training report for mechanical engineering 2016 indian railway gorakhpur training report for mechanical engineering 2016
indian railway gorakhpur training report for mechanical engineering 2016
 
PPT on Indian railway (LHB coaches)
PPT on Indian  railway (LHB coaches)PPT on Indian  railway (LHB coaches)
PPT on Indian railway (LHB coaches)
 
Project Report on railway workshop Jhansi
Project Report on railway workshop JhansiProject Report on railway workshop Jhansi
Project Report on railway workshop Jhansi
 
BLW SUMMER TRAINING REPORT
BLW SUMMER TRAINING REPORTBLW SUMMER TRAINING REPORT
BLW SUMMER TRAINING REPORT
 

Similar to Diesel loco modernization

Dlw summer training presentation
Dlw summer training presentationDlw summer training presentation
Dlw summer training presentationVarun Mishra
 
Dlw varanasi training ppt
Dlw varanasi training pptDlw varanasi training ppt
Dlw varanasi training pptPraveen Tiwari
 
INDUSTRIAL TRAINING(PPT) DLW,Varanasi
INDUSTRIAL TRAINING(PPT) DLW,VaranasiINDUSTRIAL TRAINING(PPT) DLW,Varanasi
INDUSTRIAL TRAINING(PPT) DLW,Varanasiak3793
 
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaPresentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaArjun Gaur
 
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaPresentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaArjun Gaur
 
Summer traning dlw repoart
Summer  traning dlw repoartSummer  traning dlw repoart
Summer traning dlw repoartARJUN MAURYA
 
central Railway project report
central Railway project report central Railway project report
central Railway project report akshay ghanwat
 
DLW, Varanasi Summer Training Report- CIVIL Branch
DLW, Varanasi Summer Training Report- CIVIL BranchDLW, Varanasi Summer Training Report- CIVIL Branch
DLW, Varanasi Summer Training Report- CIVIL BranchRahul Gupta
 
Bangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants OverviewBangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants OverviewRidwanul Hoque
 
A Project on manufacturing of Rear Wheel Drum
A Project on manufacturing of Rear Wheel DrumA Project on manufacturing of Rear Wheel Drum
A Project on manufacturing of Rear Wheel DrumAkshay Chhabria
 
DLW vocational training report
DLW vocational training reportDLW vocational training report
DLW vocational training reportPrashantSharma897
 
Automotive Repair Facilities for Surface Mining
Automotive Repair Facilities for Surface MiningAutomotive Repair Facilities for Surface Mining
Automotive Repair Facilities for Surface MiningCharles Jojo Besitan
 
Diesel Locomotive Works Training, Varanasi Presentation ppt
Diesel Locomotive Works Training, Varanasi Presentation pptDiesel Locomotive Works Training, Varanasi Presentation ppt
Diesel Locomotive Works Training, Varanasi Presentation pptSarvesh Mishra
 
Dlw summer trainning project electrical branch by shubhang pandey
Dlw summer trainning project electrical branch by shubhang pandeyDlw summer trainning project electrical branch by shubhang pandey
Dlw summer trainning project electrical branch by shubhang pandeyshubhangpandey5
 
railway internship presentation
railway internship presentationrailway internship presentation
railway internship presentationahmedalvi01
 
Facility layout with Escorts Ltd
Facility layout with Escorts LtdFacility layout with Escorts Ltd
Facility layout with Escorts LtdANUJ CHAUDHARY
 
Varroc Corporate Presentation - Forging Division
Varroc Corporate Presentation - Forging DivisionVarroc Corporate Presentation - Forging Division
Varroc Corporate Presentation - Forging DivisionChetan Mangaonkar
 

Similar to Diesel loco modernization (20)

Dlw summer training presentation
Dlw summer training presentationDlw summer training presentation
Dlw summer training presentation
 
Dlw varanasi training ppt
Dlw varanasi training pptDlw varanasi training ppt
Dlw varanasi training ppt
 
INDUSTRIAL TRAINING(PPT) DLW,Varanasi
INDUSTRIAL TRAINING(PPT) DLW,VaranasiINDUSTRIAL TRAINING(PPT) DLW,Varanasi
INDUSTRIAL TRAINING(PPT) DLW,Varanasi
 
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaPresentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
 
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaPresentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
 
Summer traning dlw repoart
Summer  traning dlw repoartSummer  traning dlw repoart
Summer traning dlw repoart
 
central Railway project report
central Railway project report central Railway project report
central Railway project report
 
DLW, Varanasi Summer Training Report- CIVIL Branch
DLW, Varanasi Summer Training Report- CIVIL BranchDLW, Varanasi Summer Training Report- CIVIL Branch
DLW, Varanasi Summer Training Report- CIVIL Branch
 
Bangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants OverviewBangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants Overview
 
A Project on manufacturing of Rear Wheel Drum
A Project on manufacturing of Rear Wheel DrumA Project on manufacturing of Rear Wheel Drum
A Project on manufacturing of Rear Wheel Drum
 
DLW vocational training report
DLW vocational training reportDLW vocational training report
DLW vocational training report
 
Automotive Repair Facilities for Surface Mining
Automotive Repair Facilities for Surface MiningAutomotive Repair Facilities for Surface Mining
Automotive Repair Facilities for Surface Mining
 
Diesel Locomotive Works Training, Varanasi Presentation ppt
Diesel Locomotive Works Training, Varanasi Presentation pptDiesel Locomotive Works Training, Varanasi Presentation ppt
Diesel Locomotive Works Training, Varanasi Presentation ppt
 
Dlw summer trainning project electrical branch by shubhang pandey
Dlw summer trainning project electrical branch by shubhang pandeyDlw summer trainning project electrical branch by shubhang pandey
Dlw summer trainning project electrical branch by shubhang pandey
 
Prince ppt
Prince pptPrince ppt
Prince ppt
 
railway internship presentation
railway internship presentationrailway internship presentation
railway internship presentation
 
Dlw report
Dlw  report Dlw  report
Dlw report
 
AXLE HOUSING
AXLE HOUSINGAXLE HOUSING
AXLE HOUSING
 
Facility layout with Escorts Ltd
Facility layout with Escorts LtdFacility layout with Escorts Ltd
Facility layout with Escorts Ltd
 
Varroc Corporate Presentation - Forging Division
Varroc Corporate Presentation - Forging DivisionVarroc Corporate Presentation - Forging Division
Varroc Corporate Presentation - Forging Division
 

Recently uploaded

UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfNirmal Dwivedi
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Association for Project Management
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentationcamerronhm
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxnegromaestrong
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxcallscotland1987
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfSherif Taha
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxAmanpreet Kaur
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 

Recently uploaded (20)

UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 

Diesel loco modernization

  • 2. Company Profile  Diesel Loco modernization Works was conceived with a view to provide maintenance supports to zonal railways for the maintenance of over 4500 diesels locomotive, which are in services.  DMW believes that product quality has to be built in during manufacturing. In accordance with the belief, the quality assurance system forms integral part of workshop activities.  With quality as its strength factor, DMW is surely and steadily notching up its market share.
  • 3. Salient Features:  Workshop area (Sq m) 837936  Covered area in shops (Sq m) 87578  Township area (Sq m) 1416800  Electrical Energy Consumption 161.01 (Lakhs of units/year)
  • 4. Strategy Followed In Planning Of DCW  Each workshop has a major area functioning under middle management level officers, who are totally answerable for their performance.  Layout of workshops is such that there is a smooth flow of jobs from one workshop to another.  Fully integrated with CNC, NC and NON-CNC machines to overcome the demand.  Machines are placed according to group technology so that final job comes out as single.  Inspection and testing is done 100% with very accurate instruments for good quality.
  • 5. Project Objective Diesel-Loco Modernisation Works was setup in the year 1981 to extend the service life of Diesel Locomotives of the Indian Railways and significantly raise the level of their availability.  Manufacture and supply of high quality components and sub-assemblies as spares.  Manufacture of Components hitherto imported achieving import substitution and timely availability  Rebuilding Locomotives and power packs and turning them out in state- of-the- art condition. Retrofitting the locomotives with systems
  • 7. DMW Is Divided In Two Parts-  Phase 1- Phase 1 was sanctioned in May 1982 and that of Phase 2 in June 1986. For phase 1 group of shops covering an area of 47,000sq.m has been provided in which 734 items of different machinery & plant have been installed.  Phase 2- Construction of Phase 2 group of shops, where rebuilding of diesel loco per annual is to be undertaken was taken up in 1986-87 at an estimated cost of 46.63 crores. For this purpose covered area of 25,000sq.m and 298 different items of machinery and seven plants have been provided. Facilities for rebuilding of power packs & diesel locomotives are provided in various shops
  • 8. Various Shops in DMW Are: -  P.M.S Plant Maintenance Shop  T.R Tool Room  L.M.S Light Machine Shop  C.B.S Carbon Brush Shop  H.T.S Heat Treatment Shop  V.M.S Vehicle Maintenance Shop  T.M.S Traction Machine Shop  M.R.S Main Receiving Shop
  • 9.  H.M.S Heavy Machine Shop  C.L.S Cylinder Linear Shop  P.P.S Power Pack Shop  B.S Bogie Shop  S.S.S Super Structure Shop  L.R.S Locomotive Rebuilding Shop
  • 10. Manufacturing Shops- Phase 1 shops are also known as Manufacturing shops. There are total seven shops which come under manufacturing . These shops manufacture small and heavy parts of loco. The various shops are described as follows:-  Light Machine Shop About 300 spare parts required by DMW and Zonal Railways for locomotive maintenance including Camshafts, Gears, Valve gear components, Equaliser beams, Axles, Armature shafts, Axle box housings, Gas inlet casings, etc. are manufactured in the Light Machine Shop.
  • 11. This shop is also known as for Manufacture of Rail-cum-Road Vehicle. Here various tools and components of locomotives are produced with various machines. Most of the machines are controlled by CNC’s.
  • 12.  Heat Treatment Shop Requisite heat treatment that is induction hardening, case carburizing etc. is carried out in the Heat Treatment Shop to develop optimum properties in the finished components.
  • 13.  Carbon Brush Shop The Carbon Brush Shop manufactures 14 types of carbon brushes required for Traction Generators, Traction Motors and Auxiliary Electrical Machines. Recently carbon brush CB-48 has been developed for fans of ICF coaches.
  • 14.  Heavy Machine Shop Engine Blocks of diesel locomotives and Traction Motor Magnet Frames are machined in this shop. Precision machining of the Blocks is carried out on CNC Horizontal Boring & Milling Machine of PAMA, Italy make CNC machine.
  • 15.  Traction Machine Shop A wide variety of Traction Motors, Traction Generators and Alternators are rewound / remanufactured in this shop. Facilities include 500 T Hydraulic Press for shafting/deshafting, Glass Bead Blasting Machine, Vacuum Impregnation Plant, HYT Lathe, Dynamic Balancing Machine, etc.
  • 16. Locomotive rebuilding shops Phase 2 comprises of Loco-rebuilding Shops. There are total five shops. During Locomotive Rebuilding, besides upgrading output to 3100 HP, the locomotive is also modernized to incorporate numerous improvements in locomotive technology.  Power Pack Shop All the Power Packs from incoming locomotives are sent to the Power Pack Shop for remanufacturing. In this shop the power pack is wholly dismantled and rebuilt, tested and then sent to LRS for fitment on the LOCO.
  • 17. The main functions of this shop are-  Dismantling, Reconditioning and assembly of power pack.  Load testing, specific fuel consumption testing and other types.
  • 19.  Locomotive Rebuilding Shop a) Locomotive rebuilding facilities include dismantling, repairs and reassembly of the complete Locomotive including under frame. b) A manipulator has been developed for ensuring downhand welding during the repair of under frame and chasis. c) Remanufacturing facilities for auxiliary machines and electronic control harness are also available. d) Air Brake and Paint Shops constitute the supporting activity areas for locomotive rebuilding. e) Power and control cables are renewed and control equipment is remanufactured.
  • 21.  Bogie Shop The locomotive bogies are rebuilt with new wheel sets, suspension bearings and remanufactured traction motors. Separate shop has been set up for machining of wheel sets and assembly of locomotive bogies.
  • 22. Support shops Above activities are adequately supported by competent workforce of staff and supervisors of Plant Maintenance Shop, Tool Room, Main Receiving Station and other support shops.  Electronics Lab
  • 23. • There is a full-fledged Electronic Lab which has been set up to cater to maintenance need of highly sophisticated CNC machines and component / subassembly level trouble shooting of PCBs, Servo Drives, Microprocessor based controllers and electronic units. • A saving of Rs.1.17 Cr. has been achieved in 2005-06 due to repair of PCBs.
  • 24. Activities and Products Of DMW  Mid life rebuilding/ reconditioning of WDM2 ALCO locomotive. Upgrading them from 2600HP to 3100HP and 3300 HP.  Incorporating various modifications to enhance the efficiency, reliability, safety of locomotive.  Manufacture of various type of carbon brushes used on traction machines of WDM2, WDM3A, YDM4, WDG4, WDM3C, DMU.  Rewinding/ reconditioning of traction motors, traction generator & traction alternators of locomotives.  Reconditioning of engine block of ALCO locomotives, power pack and supply of New Power packs.
  • 25.  WDM3A Diesel locomotive rebuild at DMW
  • 26. Machines and technology used in DMW  PAMA Machine  This machine is the most important machine of DMW. This machine is located here only in all over India.  This machine is a part of Heavy Machine Shop (H.M.S.).  It is used for cutting and boring purposes in a tool.  Mainly an engine block is manufactured and repaired in this machine. One engine block can be repaired three times in this machine.  The main description can be given as PAMA Horizontal Boring and Milling Machine (with speed RAM).
  • 27.  View Of PAMA Machine
  • 28.  CNC Machines  Computer Numeric Control machines is a closed loop machine.  As the name depicts these machines use computer for their operation.  Computer Numeric Control machines are controlled by a set of different ISO codes that helps in proper controlling of the machine.  In modern CNC systems, end-to-end component design is highly automated using CAD/CAM programs.
  • 29.  Block Diagram Of CNC Machine
  • 30.  Vertical Rotary Mill This machine is CNC operated machine. Vertical Rotary mill is located in LMS shop. It is used mainly for boring and milling of the tools.  It needs a total power of 35 KW for its operation.  It is worth Rs 17.09322 lacs.  The main components used are- Main Bearing Cap, Connecting Rods, Casing Lop, Support V/L.  The maximum capacity of it per day is around 45.  It has three axis :– X – Rotating, Y - Horizontal. Forward and backward direction, Z - Vertical. Up and down direction.
  • 31.  View Of Vertical Rotary Mill
  • 32.  Electronic Lab Equipment Some of the sophisticated workstations and testing equipment in the Lab are:  X-Y, Y-T, 3-Channel Recorders.  Dual Channel 100 MHz Oscilloscope with DMM.  5½ Digit Bench Programmable Digital Multimeter.  Function Generator with Arbitrary waveform generation.  PCB Test Station  Automatic Test Equipment (ICT).  Universal PROM / EPROM Programmer.  Digital / Analog IC Tester.  Surface Mount Component Repair Station.
  • 33.  PCB Test Station and Universal PROM / EPROM Programmer
  • 34. Result And Conclusion  The Indian Railway is the most widely used transport system in India. The production of the parts and units of rails forms an important and integral part of the proper functioning of the railway system in India.  Its World's largest manufacturer of ALCO diesel loco spares such as Gears, Cams, Con rods, Pins, Carbon Brushes etc.  DCW manufactures large components such as traction motors and locomotive power packs, rebuilds engine blocks, traction generators, etc.  They have more recently been upgrading WDM-2 locos to WDM-2C class.
  • 35. View of New Diesel Electric Locomotive
  • 36. View of Rebuilt Diesel Electric Locomotive