WHAT IS PLUMBING ?
• The art and science of creating and maintaining sanitary conditions in
buildings
Or
The art and science of installing, repairing and servicing of pipes, fixtures and
appurtenances necessary for bringing in water supply, distributing it within
and removing the liquid and water-borne wastes.
It includes fresh water pipes; fixtures and fixture traps; soil and waste pipes;
vent pipes; building drain and building sewer; storm drainage pipes, their
devices, appurtenances and connections to all within or adjacent to the
building.
• The word Plumbing is originated from the Latin word PLUMBUM for Lead
as pipes were made for lead. But now a days pipes are lead free, as lead is
not good for health.
• "Plumbing" often denotes the supply and waste system of an individual
building, distinguishing it from water supply and sewage systems that serve
a group of buildings.
OBJECTIVES OF PLUMBING
Before an engineer is set out to design the plumbing services of any
project, it is necessary that he has well defined aims and objectives
in order to install an efficient and economical plumbing system.
•Plumbing is an important part of any type of building, as it may be
residential, commercial, industry etc.
•To provide the fresh water for drinking, cooking, washing utensils.
•Plumbing also plays an important role in the removal of waterborne
waste.
•Adequate pressure of water should be received for water storage
tanks for bathing, flushing system.
•While plumbing in residential building minimum number of fixtures
should be used.
•All sanitary drainage system should be connected to the nearest
public sewer system.
•The drainage system should be so designed as to guard against
fouling, deposit of solids and clogging.
The Basic Plumbing Components of any building:
1.Water supply distributing pipes
2.Fixture and fixture traps
3.Soil, waste and vent pipes
4.Storm water drainage
PLUMBING WORK DETAIL
After the one hand plaster for plumbing work the wall of buildings
cut by means of grinder. The fresh water pipes from water tank are
made concealed in walls. The drainage pipes are done in open.
Where plumbing work is done :-
1.In Kitchen :- For Cooking, Washing utensils, Drinking water.
In kitchen there are two points from pipe. In one point water coming
from the overhead water tank & and in second point water from
municipality or from bore well done.
2.In Bathroom :- For Bathing
In bathroom there are 4 points of pipe. Three points are in triangle
shape where water taps are fitted and in one point overhead shower is
fitted.
3.In Toilets :- For flushing, for drainage.
In toilets there are around 3 points, one for flushing, one for taking
water. If there is an European sheet for flushing FLUSH TANK is used,
Push Shower, Zet Spary connection is done from that point.
For Ventilation purpose of system vent pipe is used.
PLUMBING WORK DETAIL
The Middle Class Peoples make the plumbing system very
economical. They do the nominal plumbing work which can fulfill
their needs of plumbing.
But the Higher Class People makes there bathroom very lavishe.
They include the Bath tub, Shower panel, Steamer, Jacuzzi etc.
For the Shower Panel installed in bathroom the special Pressure
Pump is used for water pressure. If pressure pump is not installed
then shower panel cannot work. In our area peoples don’t use this
system, as it is costly and the main reason for not using this is
HARD WATER which is present in bore wells.
Fittings and Fixtures in Plumbing
ELBOW EQUAL TEE CUPLER
UNION F.A.P.T M.A.P.T
Fresh Water Fitting
Fresh Water Fitting
REDUCING TEE BRASS ELBOW END CAP
REDUCING TEE
BALL VALUE TANK NIPPLE
Fresh Water Fitting
STEP OVER BEND
LONG BEND 45° ELBOW
Waste Water Fitting
PLAIN BEND DOOR BEND PLAIN TEE
DOOR TEE CUPLER 45° BEND
Waste Water Fitting
REDUCING TEE NAHANI TRAP REDUCER
SINGLE Y DOUBLE Y VENT COWL
Waste Water Fitting
MULTITRAP P-TRAP
Plumbing Fixtures
WALL MIXTURE
SHOWER
BIB COCK
PILLAR COCK ANGLE COCK
Plumbing Fixtures
SINK COCK SWAN NECK
DIVERTER
• Smooth joints
• Avoid noise transmission
• Avoid formation of air locks
• Avoid unsightly arrangement
• Economy in labour and materials
• No piping under wastewater pipes
• Gradual size and direction changes
• Maximum pressure of water should be obtained from pipes
• Good adhesive should be used for joining the pipes
• No back-flow towards the source of supply
• Wholesome water supply for drinking and culinary purposes
• The level of W.C. should not be less than the bathroom level, if is less
then water from bathroom will come in W.C. and will kill the bacteria and
no gases will form and the sludge will settle down there only.
• No cross-connection between pure and contaminated water pipes
• Sufficient strength of pipes underground or under traffic loads or frost
• Insulating pipe should be used for supplying hot water from solar heater.
POINTS TO BE CONSIDERED
WHY INSPECTION CHAMBER ?
All underground drainage systems must have access points, to
enable the drains to be inspected on a regular basis and to be
cleaned in the event of a blockage. The most common form of
access is an inspection chamber, often still referred to as a
manhole. In times gone by, manholes were actually large, bricked
up chambers that had iron steps built into the wall, enabling a
person to physically climb down into the drainage system. The main
difference between one of these old manholes and a plastic
inspection chamber is that inspection chambers do not permit
physical entrance into the drains.
When should you use one?
You should use an inspection chamber whenever a branch pipe
joins a main drainage. By these chamber we can inspect the
drainage line and can know where there is blockage in drainage
line.
•The inspection chamber
made of concrete are known as
concrete chamber.
•The use of these chamber is
very less due to its construction
cost, maintenance.
•As the inner surface is rough
the deposition of waste gets
started.
•Increasing of these chamber
is very tough job.
•The position of these can not
be changed once fixed.
WHY INSPECTION CHAMBER ?
CONCRETE CHAMBER
• These type of inspection
chambers are used now a
days.
• These are very economical
then concrete chamber.
• These are light weighted
chamber. The inner surface of
these chambers are smooth,
deposition doesn’t takes
place.
• The position of these
chambers can be easily
changed, when required.
• Height of these chambers can
be easily increased as per
requirement.
WHY INSPECTION CHAMBER ?
PVC CHAMBER
Riser
• The durability of a plumbing system is dependent on the quality of its
component parts and the assembly skills of those who install it. No
plumbing system, however well designed, can be expected to operate safely
or hygienically if the products or materials used are unsatisfactory. The
inverse is also true if the best-quality products or materials are used but are
installed incorrectly, the system will be a failure.
• There are two families of materials available for water pipework systems:
metallic and non-metallic materials. Of these the most commonly used
materials for drinking-water supply piping are,
• Galvanized Iron Pipe & fitting (G.I.)
• Poly Vinyl Chloride (PVC)
• Chlorinated PolyVinyl Chloride (CPVC)
• Soil Waste and Rain Water (SWR)
• Poly Propylene Random (PPR)
• Bendable Multi-Layer Composite Pipe
• Foamcore Pipes
MATERIAL AVAILABLE IN
MARKET
• The tank placed at the top of a residential building for supplying
and storing water coming from bore well or municipality is
overhead tank.
• There are two types of overhead water tank used by peoples for
storing water.
1.Cement and Brick Water tank
2.Ready-made Water tank
OVERHEAD WATER TANK
•These tanks can be made in
any architectural shape.
•The construction cost of
these tank is very high.
•Chemicals should be added
or applied to these tank for water
proofing.
•The place of these tank
cannot be changed.
•Cracks are formed in these
tanks.
•Load on slab gets increased
due to water pressure in tank.
CEMENT & BRICK OVERHEAD TANK
READY-MADE WATER TANK
•The installation of these tank
is very easy.
•Position of these tank can be
easily changed.
•These are light in weight.
•Repairing of these tank is
very easy.
•It is very economical.
•The load of water is not much
on slab as in construction water
tank.
• These solar water heater is of
plate type.
• The temperature of water in
solar does not exceed after a
fixed temp
• If height of water tank is not
greater than of solar special
tank of required capacity
should be provided.
• Due to hard water special
solar for hard water should be
used.
• Insulating tank is fitted in solar
by which there is no loss of
temperature of water.
SOLAR WATER HEATER
•Now a days, special type of
pipe is available in market which
is used for L.P.G. gas fitting in
residential building.
•These is a composite pipe
consisting of two type of layer.
•Composite Piping System is
manufactured from high grade
Virgin Polyethylene and
Aluminum.
•The Polymer is effectively
bonded in the inside and outside
of the Aluminum core by melt
adhesive. This Aluminum Core
is 100% leak proof for both
liquids and gases making it an
ideal pipe for transporting gases
and liquids.
L.P.G GAS PIPE & FITTING
Plumbing

More Related Content

What's hot

Presentation plumbing
Presentation plumbingPresentation plumbing
Presentation plumbingLiguidliguid
 
Types of fittings and materials in plumbing
Types of fittings and materials in plumbingTypes of fittings and materials in plumbing
Types of fittings and materials in plumbingHoneyGrace Gonzales
 
Sanitary Fittings - Building services
Sanitary Fittings -  Building servicesSanitary Fittings -  Building services
Sanitary Fittings - Building servicesFaizan Ahmad
 
Sanitation and plumbing
Sanitation and plumbing Sanitation and plumbing
Sanitation and plumbing Hansa katare
 
Plumbing_architecture_corporate interiors
Plumbing_architecture_corporate interiorsPlumbing_architecture_corporate interiors
Plumbing_architecture_corporate interiorsAkshay Bhatia
 
WATER SUPPLY AND PLUMBING SERVICES
WATER SUPPLY AND PLUMBING SERVICESWATER SUPPLY AND PLUMBING SERVICES
WATER SUPPLY AND PLUMBING SERVICESRIDDHESH VARIK
 
04 plumbing fixtures II
04 plumbing fixtures   II04 plumbing fixtures   II
04 plumbing fixtures IIHena Dutt
 
Introduction to plumbing part 1
Introduction to plumbing part 1Introduction to plumbing part 1
Introduction to plumbing part 1vigyanashram
 
08 Building Water Supply and Sanitary Fixtures
08 Building Water Supply and Sanitary Fixtures08 Building Water Supply and Sanitary Fixtures
08 Building Water Supply and Sanitary Fixturesakashpadole
 
Plumbing fixtures
Plumbing fixturesPlumbing fixtures
Plumbing fixturessuzain ali
 
Pipes, fittings-fixtures and appliance
Pipes, fittings-fixtures and appliancePipes, fittings-fixtures and appliance
Pipes, fittings-fixtures and applianceHarsha Singh
 
WATER SUPPLY AND DRAINAGE SERVICE FOR BUILDING
WATER SUPPLY AND DRAINAGE SERVICE FOR BUILDINGWATER SUPPLY AND DRAINAGE SERVICE FOR BUILDING
WATER SUPPLY AND DRAINAGE SERVICE FOR BUILDINGKaran Patel
 

What's hot (20)

plumbing
plumbingplumbing
plumbing
 
Presentation plumbing
Presentation plumbingPresentation plumbing
Presentation plumbing
 
HOUSE DRAINAGE
 HOUSE DRAINAGE HOUSE DRAINAGE
HOUSE DRAINAGE
 
Types of fittings and materials in plumbing
Types of fittings and materials in plumbingTypes of fittings and materials in plumbing
Types of fittings and materials in plumbing
 
Sanitary Fittings - Building services
Sanitary Fittings -  Building servicesSanitary Fittings -  Building services
Sanitary Fittings - Building services
 
Sanitation and plumbing
Sanitation and plumbing Sanitation and plumbing
Sanitation and plumbing
 
Plumbing_architecture_corporate interiors
Plumbing_architecture_corporate interiorsPlumbing_architecture_corporate interiors
Plumbing_architecture_corporate interiors
 
Plumbing system
Plumbing systemPlumbing system
Plumbing system
 
plumber
plumberplumber
plumber
 
WATER SUPPLY AND PLUMBING SERVICES
WATER SUPPLY AND PLUMBING SERVICESWATER SUPPLY AND PLUMBING SERVICES
WATER SUPPLY AND PLUMBING SERVICES
 
04 plumbing fixtures II
04 plumbing fixtures   II04 plumbing fixtures   II
04 plumbing fixtures II
 
Introduction to plumbing part 1
Introduction to plumbing part 1Introduction to plumbing part 1
Introduction to plumbing part 1
 
Basic Plumbing System
Basic Plumbing System Basic Plumbing System
Basic Plumbing System
 
House plumbing
House plumbingHouse plumbing
House plumbing
 
Plumbing presentation
Plumbing presentationPlumbing presentation
Plumbing presentation
 
08 Building Water Supply and Sanitary Fixtures
08 Building Water Supply and Sanitary Fixtures08 Building Water Supply and Sanitary Fixtures
08 Building Water Supply and Sanitary Fixtures
 
Plumbing fixtures
Plumbing fixturesPlumbing fixtures
Plumbing fixtures
 
Pipes, fittings-fixtures and appliance
Pipes, fittings-fixtures and appliancePipes, fittings-fixtures and appliance
Pipes, fittings-fixtures and appliance
 
Plumbing
PlumbingPlumbing
Plumbing
 
WATER SUPPLY AND DRAINAGE SERVICE FOR BUILDING
WATER SUPPLY AND DRAINAGE SERVICE FOR BUILDINGWATER SUPPLY AND DRAINAGE SERVICE FOR BUILDING
WATER SUPPLY AND DRAINAGE SERVICE FOR BUILDING
 

Viewers also liked

Drainage System For a Building
Drainage System For a BuildingDrainage System For a Building
Drainage System For a BuildingAroh Thombre
 
Plumbing in Architecture
Plumbing in ArchitecturePlumbing in Architecture
Plumbing in ArchitectureSneha Nagarajan
 
Drainage system
Drainage systemDrainage system
Drainage systemNikhil Jp
 
Plan symbols
Plan symbolsPlan symbols
Plan symbolsgopaltry
 
automation in plumbing (building automation system)
automation in plumbing (building automation system)automation in plumbing (building automation system)
automation in plumbing (building automation system)Chandan Waratkar
 
New York City Department of Buildings Filing rep course_104
New York City Department of Buildings Filing rep course_104New York City Department of Buildings Filing rep course_104
New York City Department of Buildings Filing rep course_104Safe Rise
 
Contemporary price sheet
Contemporary price sheetContemporary price sheet
Contemporary price sheetMohammad Tajim
 
Презентація "Методика складання та змісту плану зонування м.Києва"
Презентація "Методика складання та змісту плану зонування м.Києва"Презентація "Методика складання та змісту плану зонування м.Києва"
Презентація "Методика складання та змісту плану зонування м.Києва"Yegor Shulyk
 
S13c18 chapter 18-different blocks in the model village (auto cad drawings).
S13c18 chapter 18-different blocks in the model village (auto cad drawings).S13c18 chapter 18-different blocks in the model village (auto cad drawings).
S13c18 chapter 18-different blocks in the model village (auto cad drawings).Shivu P
 
2878-CR-201 TYPICAL ROAD SECTION
2878-CR-201 TYPICAL ROAD SECTION2878-CR-201 TYPICAL ROAD SECTION
2878-CR-201 TYPICAL ROAD SECTIONReza Bassawon
 
Construction Photo Essay Project
Construction Photo Essay ProjectConstruction Photo Essay Project
Construction Photo Essay ProjectTimothy Shih
 

Viewers also liked (17)

Sanitary and water supply
Sanitary and water supplySanitary and water supply
Sanitary and water supply
 
Drainage System For a Building
Drainage System For a BuildingDrainage System For a Building
Drainage System For a Building
 
Plumbing in Architecture
Plumbing in ArchitecturePlumbing in Architecture
Plumbing in Architecture
 
Building services
Building servicesBuilding services
Building services
 
Drainage system
Drainage systemDrainage system
Drainage system
 
Plan symbols
Plan symbolsPlan symbols
Plan symbols
 
Grade8 plumbing
Grade8 plumbingGrade8 plumbing
Grade8 plumbing
 
House Drainage System
House Drainage SystemHouse Drainage System
House Drainage System
 
Water distribution system
Water distribution systemWater distribution system
Water distribution system
 
automation in plumbing (building automation system)
automation in plumbing (building automation system)automation in plumbing (building automation system)
automation in plumbing (building automation system)
 
New York City Department of Buildings Filing rep course_104
New York City Department of Buildings Filing rep course_104New York City Department of Buildings Filing rep course_104
New York City Department of Buildings Filing rep course_104
 
Contemporary price sheet
Contemporary price sheetContemporary price sheet
Contemporary price sheet
 
Презентація "Методика складання та змісту плану зонування м.Києва"
Презентація "Методика складання та змісту плану зонування м.Києва"Презентація "Методика складання та змісту плану зонування м.Києва"
Презентація "Методика складання та змісту плану зонування м.Києва"
 
Color
ColorColor
Color
 
S13c18 chapter 18-different blocks in the model village (auto cad drawings).
S13c18 chapter 18-different blocks in the model village (auto cad drawings).S13c18 chapter 18-different blocks in the model village (auto cad drawings).
S13c18 chapter 18-different blocks in the model village (auto cad drawings).
 
2878-CR-201 TYPICAL ROAD SECTION
2878-CR-201 TYPICAL ROAD SECTION2878-CR-201 TYPICAL ROAD SECTION
2878-CR-201 TYPICAL ROAD SECTION
 
Construction Photo Essay Project
Construction Photo Essay ProjectConstruction Photo Essay Project
Construction Photo Essay Project
 

Similar to Plumbing

How to install plumbing system of new house
How to install plumbing system of new houseHow to install plumbing system of new house
How to install plumbing system of new housebuiltify
 
Domestic sewage
Domestic sewageDomestic sewage
Domestic sewageNIKAMVN
 
Water supply .pptx building services year
Water supply .pptx building services yearWater supply .pptx building services year
Water supply .pptx building services yearNthabiseng47
 
Planning and design of building services in multi Story
Planning and design of building services in multi Story Planning and design of building services in multi Story
Planning and design of building services in multi Story Vj NiroSh
 
Black Orange Modern Construction Presentation .pptx
Black Orange Modern Construction Presentation .pptxBlack Orange Modern Construction Presentation .pptx
Black Orange Modern Construction Presentation .pptxChristianPaulSSisonS
 
housedrainagesystem-PPT.pptx
housedrainagesystem-PPT.pptxhousedrainagesystem-PPT.pptx
housedrainagesystem-PPT.pptxMood Naik
 
PLUMBING.pptrfffjedkkxfmk3eldokwndktookedfm
PLUMBING.pptrfffjedkkxfmk3eldokwndktookedfmPLUMBING.pptrfffjedkkxfmk3eldokwndktookedfm
PLUMBING.pptrfffjedkkxfmk3eldokwndktookedfmMcKevinVargas
 
Selection of Pumps and Pipe drainage
Selection of Pumps and Pipe drainageSelection of Pumps and Pipe drainage
Selection of Pumps and Pipe drainageJessy Mariaraj
 
Services report - plumbing, electrical and hvac
Services report - plumbing, electrical and hvacServices report - plumbing, electrical and hvac
Services report - plumbing, electrical and hvacYashna Garg
 
Water Distribution Basics (1).ppt
Water Distribution Basics (1).pptWater Distribution Basics (1).ppt
Water Distribution Basics (1).pptChristopherArce4
 
APPURTENANCES.pptx
APPURTENANCES.pptxAPPURTENANCES.pptx
APPURTENANCES.pptxrazay1
 
building services in a building
building services in a buildingbuilding services in a building
building services in a buildingBarsha
 
Sem 2 bs1 cold water supply 1
Sem 2 bs1 cold water supply   1Sem 2 bs1 cold water supply   1
Sem 2 bs1 cold water supply 1Est
 
BUILDING SERVICES- water supply, plumbing.ppt
BUILDING SERVICES- water supply, plumbing.pptBUILDING SERVICES- water supply, plumbing.ppt
BUILDING SERVICES- water supply, plumbing.pptDr. Akshay Wayal
 
WATER SUPPLY AND DRAINAGE SERVICE FOR BUILDING
WATER SUPPLY AND DRAINAGE SERVICE FOR BUILDINGWATER SUPPLY AND DRAINAGE SERVICE FOR BUILDING
WATER SUPPLY AND DRAINAGE SERVICE FOR BUILDINGhitendra pendam
 
Unit ii introduction to water supply scheme
Unit  ii introduction to water supply schemeUnit  ii introduction to water supply scheme
Unit ii introduction to water supply schemeMadhukarJadhav8
 
Plumbing services in high rise building and group housing
Plumbing services in high rise building and group housingPlumbing services in high rise building and group housing
Plumbing services in high rise building and group housingRohit Bhatt
 

Similar to Plumbing (20)

How to install plumbing system of new house
How to install plumbing system of new houseHow to install plumbing system of new house
How to install plumbing system of new house
 
Domestic sewage
Domestic sewageDomestic sewage
Domestic sewage
 
Water supply .pptx building services year
Water supply .pptx building services yearWater supply .pptx building services year
Water supply .pptx building services year
 
Planning and design of building services in multi Story
Planning and design of building services in multi Story Planning and design of building services in multi Story
Planning and design of building services in multi Story
 
Black Orange Modern Construction Presentation .pptx
Black Orange Modern Construction Presentation .pptxBlack Orange Modern Construction Presentation .pptx
Black Orange Modern Construction Presentation .pptx
 
Iimt college of polytechic, ppt
Iimt college of polytechic,   pptIimt college of polytechic,   ppt
Iimt college of polytechic, ppt
 
housedrainagesystem-PPT.pptx
housedrainagesystem-PPT.pptxhousedrainagesystem-PPT.pptx
housedrainagesystem-PPT.pptx
 
PLUMBING.pptrfffjedkkxfmk3eldokwndktookedfm
PLUMBING.pptrfffjedkkxfmk3eldokwndktookedfmPLUMBING.pptrfffjedkkxfmk3eldokwndktookedfm
PLUMBING.pptrfffjedkkxfmk3eldokwndktookedfm
 
Selection of Pumps and Pipe drainage
Selection of Pumps and Pipe drainageSelection of Pumps and Pipe drainage
Selection of Pumps and Pipe drainage
 
Services report - plumbing, electrical and hvac
Services report - plumbing, electrical and hvacServices report - plumbing, electrical and hvac
Services report - plumbing, electrical and hvac
 
Water Distribution Basics (1).ppt
Water Distribution Basics (1).pptWater Distribution Basics (1).ppt
Water Distribution Basics (1).ppt
 
APPURTENANCES.pptx
APPURTENANCES.pptxAPPURTENANCES.pptx
APPURTENANCES.pptx
 
building services in a building
building services in a buildingbuilding services in a building
building services in a building
 
Sem 2 bs1 cold water supply 1
Sem 2 bs1 cold water supply   1Sem 2 bs1 cold water supply   1
Sem 2 bs1 cold water supply 1
 
Water supply.pdf
Water supply.pdfWater supply.pdf
Water supply.pdf
 
pipes and fittings
pipes and fittingspipes and fittings
pipes and fittings
 
BUILDING SERVICES- water supply, plumbing.ppt
BUILDING SERVICES- water supply, plumbing.pptBUILDING SERVICES- water supply, plumbing.ppt
BUILDING SERVICES- water supply, plumbing.ppt
 
WATER SUPPLY AND DRAINAGE SERVICE FOR BUILDING
WATER SUPPLY AND DRAINAGE SERVICE FOR BUILDINGWATER SUPPLY AND DRAINAGE SERVICE FOR BUILDING
WATER SUPPLY AND DRAINAGE SERVICE FOR BUILDING
 
Unit ii introduction to water supply scheme
Unit  ii introduction to water supply schemeUnit  ii introduction to water supply scheme
Unit ii introduction to water supply scheme
 
Plumbing services in high rise building and group housing
Plumbing services in high rise building and group housingPlumbing services in high rise building and group housing
Plumbing services in high rise building and group housing
 

Recently uploaded

Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 

Recently uploaded (20)

Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 

Plumbing

  • 1. Plumbing Works Done in Residential Buildings AMMAR RIZVI P.S.G.V.P.Mandal’s D. N. Patel College Of Engineering Guidance :- Prof. S. I. Chopda
  • 2. WHAT IS PLUMBING ? • The art and science of creating and maintaining sanitary conditions in buildings Or The art and science of installing, repairing and servicing of pipes, fixtures and appurtenances necessary for bringing in water supply, distributing it within and removing the liquid and water-borne wastes. It includes fresh water pipes; fixtures and fixture traps; soil and waste pipes; vent pipes; building drain and building sewer; storm drainage pipes, their devices, appurtenances and connections to all within or adjacent to the building. • The word Plumbing is originated from the Latin word PLUMBUM for Lead as pipes were made for lead. But now a days pipes are lead free, as lead is not good for health. • "Plumbing" often denotes the supply and waste system of an individual building, distinguishing it from water supply and sewage systems that serve a group of buildings.
  • 3. OBJECTIVES OF PLUMBING Before an engineer is set out to design the plumbing services of any project, it is necessary that he has well defined aims and objectives in order to install an efficient and economical plumbing system. •Plumbing is an important part of any type of building, as it may be residential, commercial, industry etc. •To provide the fresh water for drinking, cooking, washing utensils. •Plumbing also plays an important role in the removal of waterborne waste. •Adequate pressure of water should be received for water storage tanks for bathing, flushing system. •While plumbing in residential building minimum number of fixtures should be used. •All sanitary drainage system should be connected to the nearest public sewer system. •The drainage system should be so designed as to guard against fouling, deposit of solids and clogging.
  • 4.
  • 5. The Basic Plumbing Components of any building: 1.Water supply distributing pipes 2.Fixture and fixture traps 3.Soil, waste and vent pipes 4.Storm water drainage
  • 6. PLUMBING WORK DETAIL After the one hand plaster for plumbing work the wall of buildings cut by means of grinder. The fresh water pipes from water tank are made concealed in walls. The drainage pipes are done in open. Where plumbing work is done :- 1.In Kitchen :- For Cooking, Washing utensils, Drinking water. In kitchen there are two points from pipe. In one point water coming from the overhead water tank & and in second point water from municipality or from bore well done. 2.In Bathroom :- For Bathing In bathroom there are 4 points of pipe. Three points are in triangle shape where water taps are fitted and in one point overhead shower is fitted. 3.In Toilets :- For flushing, for drainage. In toilets there are around 3 points, one for flushing, one for taking water. If there is an European sheet for flushing FLUSH TANK is used, Push Shower, Zet Spary connection is done from that point. For Ventilation purpose of system vent pipe is used.
  • 7. PLUMBING WORK DETAIL The Middle Class Peoples make the plumbing system very economical. They do the nominal plumbing work which can fulfill their needs of plumbing. But the Higher Class People makes there bathroom very lavishe. They include the Bath tub, Shower panel, Steamer, Jacuzzi etc. For the Shower Panel installed in bathroom the special Pressure Pump is used for water pressure. If pressure pump is not installed then shower panel cannot work. In our area peoples don’t use this system, as it is costly and the main reason for not using this is HARD WATER which is present in bore wells.
  • 8. Fittings and Fixtures in Plumbing
  • 9. ELBOW EQUAL TEE CUPLER UNION F.A.P.T M.A.P.T Fresh Water Fitting
  • 10. Fresh Water Fitting REDUCING TEE BRASS ELBOW END CAP REDUCING TEE BALL VALUE TANK NIPPLE
  • 11. Fresh Water Fitting STEP OVER BEND LONG BEND 45° ELBOW
  • 12. Waste Water Fitting PLAIN BEND DOOR BEND PLAIN TEE DOOR TEE CUPLER 45° BEND
  • 13. Waste Water Fitting REDUCING TEE NAHANI TRAP REDUCER SINGLE Y DOUBLE Y VENT COWL
  • 15. Plumbing Fixtures WALL MIXTURE SHOWER BIB COCK PILLAR COCK ANGLE COCK
  • 16. Plumbing Fixtures SINK COCK SWAN NECK DIVERTER
  • 17. • Smooth joints • Avoid noise transmission • Avoid formation of air locks • Avoid unsightly arrangement • Economy in labour and materials • No piping under wastewater pipes • Gradual size and direction changes • Maximum pressure of water should be obtained from pipes • Good adhesive should be used for joining the pipes • No back-flow towards the source of supply • Wholesome water supply for drinking and culinary purposes • The level of W.C. should not be less than the bathroom level, if is less then water from bathroom will come in W.C. and will kill the bacteria and no gases will form and the sludge will settle down there only. • No cross-connection between pure and contaminated water pipes • Sufficient strength of pipes underground or under traffic loads or frost • Insulating pipe should be used for supplying hot water from solar heater. POINTS TO BE CONSIDERED
  • 18. WHY INSPECTION CHAMBER ? All underground drainage systems must have access points, to enable the drains to be inspected on a regular basis and to be cleaned in the event of a blockage. The most common form of access is an inspection chamber, often still referred to as a manhole. In times gone by, manholes were actually large, bricked up chambers that had iron steps built into the wall, enabling a person to physically climb down into the drainage system. The main difference between one of these old manholes and a plastic inspection chamber is that inspection chambers do not permit physical entrance into the drains. When should you use one? You should use an inspection chamber whenever a branch pipe joins a main drainage. By these chamber we can inspect the drainage line and can know where there is blockage in drainage line.
  • 19. •The inspection chamber made of concrete are known as concrete chamber. •The use of these chamber is very less due to its construction cost, maintenance. •As the inner surface is rough the deposition of waste gets started. •Increasing of these chamber is very tough job. •The position of these can not be changed once fixed. WHY INSPECTION CHAMBER ? CONCRETE CHAMBER
  • 20. • These type of inspection chambers are used now a days. • These are very economical then concrete chamber. • These are light weighted chamber. The inner surface of these chambers are smooth, deposition doesn’t takes place. • The position of these chambers can be easily changed, when required. • Height of these chambers can be easily increased as per requirement. WHY INSPECTION CHAMBER ? PVC CHAMBER Riser
  • 21. • The durability of a plumbing system is dependent on the quality of its component parts and the assembly skills of those who install it. No plumbing system, however well designed, can be expected to operate safely or hygienically if the products or materials used are unsatisfactory. The inverse is also true if the best-quality products or materials are used but are installed incorrectly, the system will be a failure. • There are two families of materials available for water pipework systems: metallic and non-metallic materials. Of these the most commonly used materials for drinking-water supply piping are, • Galvanized Iron Pipe & fitting (G.I.) • Poly Vinyl Chloride (PVC) • Chlorinated PolyVinyl Chloride (CPVC) • Soil Waste and Rain Water (SWR) • Poly Propylene Random (PPR) • Bendable Multi-Layer Composite Pipe • Foamcore Pipes MATERIAL AVAILABLE IN MARKET
  • 22. • The tank placed at the top of a residential building for supplying and storing water coming from bore well or municipality is overhead tank. • There are two types of overhead water tank used by peoples for storing water. 1.Cement and Brick Water tank 2.Ready-made Water tank OVERHEAD WATER TANK
  • 23. •These tanks can be made in any architectural shape. •The construction cost of these tank is very high. •Chemicals should be added or applied to these tank for water proofing. •The place of these tank cannot be changed. •Cracks are formed in these tanks. •Load on slab gets increased due to water pressure in tank. CEMENT & BRICK OVERHEAD TANK
  • 24. READY-MADE WATER TANK •The installation of these tank is very easy. •Position of these tank can be easily changed. •These are light in weight. •Repairing of these tank is very easy. •It is very economical. •The load of water is not much on slab as in construction water tank.
  • 25. • These solar water heater is of plate type. • The temperature of water in solar does not exceed after a fixed temp • If height of water tank is not greater than of solar special tank of required capacity should be provided. • Due to hard water special solar for hard water should be used. • Insulating tank is fitted in solar by which there is no loss of temperature of water. SOLAR WATER HEATER
  • 26. •Now a days, special type of pipe is available in market which is used for L.P.G. gas fitting in residential building. •These is a composite pipe consisting of two type of layer. •Composite Piping System is manufactured from high grade Virgin Polyethylene and Aluminum. •The Polymer is effectively bonded in the inside and outside of the Aluminum core by melt adhesive. This Aluminum Core is 100% leak proof for both liquids and gases making it an ideal pipe for transporting gases and liquids. L.P.G GAS PIPE & FITTING