Control Schedule
PMPChapter 6 –
Project Schedule Management
SIXTH EDITION
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
6.6 Control Schedule
Control Schedule Definition
Control Schedule & Integrated change Control
Control Schedule : ITTO
What is performance review?
What are schedule forecast?
Data flow diagram
Review
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Schedule Management processes
Plan Schedule
management
Define Activities Sequence Activities
Estimate Activity
Duration
Develop Schedule Control Schedule
P P P
MCP P
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
6.6 Control Schedule
• The current status of the project scheduleDetermine
• If the project schedule has changedMonitor
• The factors that create schedule changesInfluence
• The actual changes as they occur & minimize RisksManaging
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
If any agile approach is utilized, control schedule is concerned with
below:
Conducting retrospective reviews for correcting processes and improving
planning/estimates etc.
Reprioritizing the remaining work plan (backlog)
Determining the rate at which the deliverables are produced, validated, and
accepted (velocity) in given time per iteration
Managing the actual changes as they occur.
Determine status of schedule by comparing total amount of work delivered &
accepted, against estimates of work completed for elapsed time cycle
Control Schedule
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Monitoring the status of project activities to update project
progress & manage changes to schedule baseline to achieve plan.
It provides the means to recognize the deviation from the plan,
& take corrective & preventive actions & thus minimize the risk.
Control Schedule-> Definition
Monitoring status
of Project activities
Update
project
progress
Manage schedule
baseline changes
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Control Schedule -> ITTO
Critical path method
Data analysis
Schedule Compression
PMIS
Resource optimization
Leads and Lags
Project Management
plan
Project Documents
Work performance data
Organizational process
assets
Work performance
information
Schedule forecasts
Change Request
PMP update
Project Documents
updates
Inputs Tools & Techniques Outputs
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project Management
plan
Project Documents
Work performance
data
Organizational
process assets
Control Schedule -> Input
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project
Management plan
Control Schedule -> Input -> PMP
Schedule
Management plan
Schedule baseline Scope baseline
Performance
measurement
baseline
Following project PMP’s/baselines may used as input:
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project Documents
Control Schedule -> Input -> Project documents
Lessons Learned Registers Project Calendar Project schedule Resource Calendar Schedule data
Following project documents will used as input.
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Work performance
data
It is the raw data of the project’s status.
Actual cost Actual duration
The raw observations & measurements identified during
execution of activities.
Control Schedule -> Input->WPD
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Organizational
process assets
Schedule control related organizational policies
Schedule control tools
Monitoring & reporting methods used in organization
Control Schedule -> Input ->OPA
6.7 I T&T O
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Critical path
method
Data analysis
Schedule
Compression
PMIS
Resource
optimization
Leads and Lags
Control Schedule -> Tools & Techniques
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Data analysis
Following Data analysis tools will be used:
Earn Value analysis Iteration burn down charts Performance reviews
Trend analysis Variance analysis What is scenario analysis
Control Schedule -> T&T -> Data analysis
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Data analysis
Iteration burn down charts:
• Tracks the work that remains to be completed in the iteration backlog
• Used to analyse the variance with respect to an ideal burn down
• A forecast trend line can be used to predict likely variance to take appropriate
actions
Control Schedule -> T&T -> Data analysis
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Control Schedule -> T&T -> Data analysis
Data analysis
Performance review:
• It measure, compare, & analyze schedule performance
• E.g., Actual start & finish dates, % complete & remaining duration for work in progress.
• Determine any Deviation from the plan
• Help take corrective & preventive action
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Control Schedule -> T&T -> Data analysis
Data analysis
Trend Analysis
•Examines project performance over time
•Determine whether performance is improving or deteriorating.
•Valuable for understanding current performance & for comparison to future
performance goals.
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Control Schedule -> T&T -> Data analysis
Data analysis
Earn value management
• Schedule & Cost performance measurements
• As per PMI this is best technique to measure project
performance.
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Data analysis
What-If Scenario Analysis:
•Process of evaluating scenarios in order to
predict their effect
•This is achieved by performing Network analysis
•Used to assess the feasibility of project schedule
under adverse conditions,
•Also used in preparing contingency & response
plans.
Simulation:
•Calculating multiple project durations with
different sets of activity assumptions.
•Uses probability distributions constructed from 3
Point estimates to account for uncertainty.
•Common simulation technique is Monte Carlo
Control Schedule -> T&T -> Data analysis
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
PMIS
Software used for project planning, scheduling, resource allocation, change management
, communication etc.
Control costs and
schedule
Baseline Comparison
SV, SPI and CV, CPI
Cash flow management
Monitor & Inform
Schedule progress
Missed milestones
Changes to Critical path
Also used for collaboration and communication.
Project
planning
Task
management
Document sharing
and collaboration
Calendar and
contact sharing
Risk and issue
management
Control Schedule->T&T-> PMIS
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
PMIS
Software used for project planning, scheduling, resource allocation, change management
, communication etc.
Example,
Microsoft Project
Control Schedule->T&T->Project Management software
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Leads & lags
Lead: It is amount of time where successor activity can be
advanced w.r.t. predecessor activity.
Lag: It is amount of time whereby a successor activity will
be delayed w.r.t. a predecessor activity.
Control Schedule->T&T-> Leads & lags
Business Requirement
(BRS)
System Requirement
(SRS)
Sign Contract
Team On-
board
Lead
1 week
Lag
3 week
Business Requirement
(BRS – 4 weeks)
System Requirement
(SRS – 4 weeks)
W1 W2 W3 W4 W5 W6 W7 W8 W1 W2 W3 W4 W5 W6 W7 W8
Sign Contract
Team On-
board
6.6 I T&T O
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Schedule
Compression
Reduce schedule duration without reducing project scope.
Adhere to schedule constraints, imposed dates, or other schedule objectives.
Crashing Fast tracking
Control Schedule->T&T-> Schedule Compression
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Schedule
Compression
Crashing:
Shorten schedule duration for least cost by adding resources.
Fast tracking:
Activities done in sequence are performed in parallel for at
least some portion of their duration.
Control Schedule->T&T-> Schedule Compression
BRS (1 BA) SRS (1 SA)
BRS (2 BA) SRS (2 SA)
Design Testing
Design
Testing
W1 W2 W3 W4 W5 W6 W7 W8
Crashed by
adding
resources
W1 W2 W3 W4 W5 W6 W7 W8
Fast tracked by
executing activities
in parallel
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Resource optimization
Technique
How to allocate resources in a way to bring maximum output.
Resource Levelling:
• Start and finish dates are adjusted based
on resource constraints.
• Goal is to balance demand for resources
with the available supply.
Resource Smoothing:
• Adjusts schedule activities.
• Ensure requirements for resources do not
exceed certain predefined resource limits.
• May not be able to optimize all resources.
Control Schedule->T&T-> Resource optimization
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Control Schedule->T&T-> Resource optimization
Resource Smoothing:
• Critical path is not changed & completion date is same
• Activities may be delayed within their free & total float.
Resource Levelling:
• Notice Change in Duration (Critical path changed)
• Timelines extended to adjust resource constraint
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Schedule forecasts
Work performance
information
Change Request
PMP update
Project Documents
updates
Control Schedule -> Output
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Schedule forecasts
Predictions of projects future conditions & events
Projects execution data is constantly analysed which results in WPI.
Forecasts are updated and reissued based on WPI.
Performance
review
Trend Analysis
EVM WPI
Control Schedule->Output->Schedule Forecast
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Work performance
information
The calculated SV and SPI for the WBS components (Control account, work package)
Documented and communicated to stakeholders
Control Schedule->Output->WPI
SV
SPI
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Modifications to the project scope or project schedule may result in change requests
Schedule baseline Scope baseline Components of PMP.
Control Schedule->Output->Change Request
6.7 I T&T O
Change Request
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project Documents
Following project documents will be updated:
Project schedule Schedule data Basis of estimates
Resource Calendar Assumption log Risk Register
Lessons Learned
Registers
Control Schedule -> Output -> Project document updates
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Control Schedule -> Output -> PMP updates
PMP update
Schedule baseline
Schedule
Management plan
Cost baseline
Performance
measurement
baseline
Following PMP subsidiary plans/base lines will be updated:
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Control Schedule -> Review
How to control schedule?
Schedule performance review?
Schedule forecast?
Schedule Compression (Crashing
& Fast Tracking)
Scheduling tool
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)

More Related Content

What's hot

Chap 7.4 Control Cost
Chap 7.4   Control CostChap 7.4   Control Cost
Chap 7.4 Control CostAnand Bobade
 
Chap 4.7 Project or Phase Close
Chap 4.7 Project or Phase CloseChap 4.7 Project or Phase Close
Chap 4.7 Project or Phase CloseAnand Bobade
 
PMP Chap 7 - Project Cost Management - Part 2
PMP Chap 7 - Project Cost Management - Part 2PMP Chap 7 - Project Cost Management - Part 2
PMP Chap 7 - Project Cost Management - Part 2Anand Bobade
 
Chap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management OverviewChap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management OverviewAnand Bobade
 
Chap 9.6 Control Resources
Chap 9.6  Control ResourcesChap 9.6  Control Resources
Chap 9.6 Control ResourcesAnand Bobade
 
Pmp chap 11 - project risk management - Part 2
Pmp   chap 11 - project risk management - Part 2Pmp   chap 11 - project risk management - Part 2
Pmp chap 11 - project risk management - Part 2Anand Bobade
 
Chap 13.4 Monitor stakeholder
Chap 13.4 Monitor stakeholderChap 13.4 Monitor stakeholder
Chap 13.4 Monitor stakeholderAnand Bobade
 
Chap 6.2 Define Activity
Chap 6.2 Define ActivityChap 6.2 Define Activity
Chap 6.2 Define ActivityAnand Bobade
 
Pmp chap 11 - project risk management v0.1
Pmp   chap 11 - project risk management v0.1Pmp   chap 11 - project risk management v0.1
Pmp chap 11 - project risk management v0.1Anand Bobade
 
Chap 5.6 Control Scope
Chap 5.6 Control ScopeChap 5.6 Control Scope
Chap 5.6 Control ScopeAnand Bobade
 
Chap 4.5 Monitor and Control Project Work
Chap 4.5 Monitor and Control Project WorkChap 4.5 Monitor and Control Project Work
Chap 4.5 Monitor and Control Project WorkAnand Bobade
 
Chap 5.3 define scope
Chap 5.3 define scopeChap 5.3 define scope
Chap 5.3 define scopeAnand Bobade
 
Chap 6.0 Schedule Management Overview
Chap 6.0 Schedule Management OverviewChap 6.0 Schedule Management Overview
Chap 6.0 Schedule Management OverviewAnand Bobade
 
Chap 9.1 Pan Resource Management
Chap 9.1   Pan Resource ManagementChap 9.1   Pan Resource Management
Chap 9.1 Pan Resource ManagementAnand Bobade
 
Chap 7.1 Plan Cost Management
Chap 7.1  Plan Cost ManagementChap 7.1  Plan Cost Management
Chap 7.1 Plan Cost ManagementAnand Bobade
 
Chap 8.2 Manage Quality
Chap 8.2 Manage QualityChap 8.2 Manage Quality
Chap 8.2 Manage QualityAnand Bobade
 
Chap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project workChap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project workAnand Bobade
 
Chap 9.4 Develop Team
Chap 9.4  Develop TeamChap 9.4  Develop Team
Chap 9.4 Develop TeamAnand Bobade
 
PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1Anand Bobade
 
Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6Agus Suhanto
 

What's hot (20)

Chap 7.4 Control Cost
Chap 7.4   Control CostChap 7.4   Control Cost
Chap 7.4 Control Cost
 
Chap 4.7 Project or Phase Close
Chap 4.7 Project or Phase CloseChap 4.7 Project or Phase Close
Chap 4.7 Project or Phase Close
 
PMP Chap 7 - Project Cost Management - Part 2
PMP Chap 7 - Project Cost Management - Part 2PMP Chap 7 - Project Cost Management - Part 2
PMP Chap 7 - Project Cost Management - Part 2
 
Chap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management OverviewChap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management Overview
 
Chap 9.6 Control Resources
Chap 9.6  Control ResourcesChap 9.6  Control Resources
Chap 9.6 Control Resources
 
Pmp chap 11 - project risk management - Part 2
Pmp   chap 11 - project risk management - Part 2Pmp   chap 11 - project risk management - Part 2
Pmp chap 11 - project risk management - Part 2
 
Chap 13.4 Monitor stakeholder
Chap 13.4 Monitor stakeholderChap 13.4 Monitor stakeholder
Chap 13.4 Monitor stakeholder
 
Chap 6.2 Define Activity
Chap 6.2 Define ActivityChap 6.2 Define Activity
Chap 6.2 Define Activity
 
Pmp chap 11 - project risk management v0.1
Pmp   chap 11 - project risk management v0.1Pmp   chap 11 - project risk management v0.1
Pmp chap 11 - project risk management v0.1
 
Chap 5.6 Control Scope
Chap 5.6 Control ScopeChap 5.6 Control Scope
Chap 5.6 Control Scope
 
Chap 4.5 Monitor and Control Project Work
Chap 4.5 Monitor and Control Project WorkChap 4.5 Monitor and Control Project Work
Chap 4.5 Monitor and Control Project Work
 
Chap 5.3 define scope
Chap 5.3 define scopeChap 5.3 define scope
Chap 5.3 define scope
 
Chap 6.0 Schedule Management Overview
Chap 6.0 Schedule Management OverviewChap 6.0 Schedule Management Overview
Chap 6.0 Schedule Management Overview
 
Chap 9.1 Pan Resource Management
Chap 9.1   Pan Resource ManagementChap 9.1   Pan Resource Management
Chap 9.1 Pan Resource Management
 
Chap 7.1 Plan Cost Management
Chap 7.1  Plan Cost ManagementChap 7.1  Plan Cost Management
Chap 7.1 Plan Cost Management
 
Chap 8.2 Manage Quality
Chap 8.2 Manage QualityChap 8.2 Manage Quality
Chap 8.2 Manage Quality
 
Chap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project workChap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project work
 
Chap 9.4 Develop Team
Chap 9.4  Develop TeamChap 9.4  Develop Team
Chap 9.4 Develop Team
 
PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1
 
Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6
 

Similar to PMBOK 6 Control Schedule Guide

Chap 6.1 Plan Schedule Management
Chap 6.1 Plan Schedule ManagementChap 6.1 Plan Schedule Management
Chap 6.1 Plan Schedule ManagementAnand Bobade
 
Chap 4.6 Perform Integrated Change Control
Chap 4.6 Perform Integrated Change ControlChap 4.6 Perform Integrated Change Control
Chap 4.6 Perform Integrated Change ControlAnand Bobade
 
Chap 6.3 Sequence Activity
Chap 6.3 Sequence ActivityChap 6.3 Sequence Activity
Chap 6.3 Sequence ActivityAnand Bobade
 
PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1Anand Bobade
 
Chap 11.7 Monitor Risks
Chap 11.7 Monitor RisksChap 11.7 Monitor Risks
Chap 11.7 Monitor RisksAnand Bobade
 
Chap 5.1 Plan Scope Management
Chap 5.1 Plan Scope ManagementChap 5.1 Plan Scope Management
Chap 5.1 Plan Scope ManagementAnand Bobade
 
Chap 8.3 Control Quality
Chap 8.3  Control QualityChap 8.3  Control Quality
Chap 8.3 Control QualityAnand Bobade
 
Chap 9.2 Estimate Activity Resource
Chap 9.2   Estimate Activity ResourceChap 9.2   Estimate Activity Resource
Chap 9.2 Estimate Activity ResourceAnand Bobade
 
Chap 7.3 Determine budget
Chap 7.3   Determine budgetChap 7.3   Determine budget
Chap 7.3 Determine budgetAnand Bobade
 
Enterprise DataWarehousing + Management Information
Enterprise DataWarehousing + Management InformationEnterprise DataWarehousing + Management Information
Enterprise DataWarehousing + Management InformationAjay Kumar Uppal
 
AWIN presentation it's only logical-a scheduling overview
AWIN presentation it's only logical-a scheduling overviewAWIN presentation it's only logical-a scheduling overview
AWIN presentation it's only logical-a scheduling overviewDanielle Murphy
 
Chap 10.3 Monitor Communication
Chap 10.3 Monitor CommunicationChap 10.3 Monitor Communication
Chap 10.3 Monitor CommunicationAnand Bobade
 
Chap 8.1 Plan quality management
Chap 8.1 Plan quality managementChap 8.1 Plan quality management
Chap 8.1 Plan quality managementAnand Bobade
 
PMP Key Exam Concepts WPD, WPI & WPR
PMP Key Exam Concepts WPD, WPI & WPRPMP Key Exam Concepts WPD, WPI & WPR
PMP Key Exam Concepts WPD, WPI & WPRAnand Bobade
 
Schedule Development
Schedule DevelopmentSchedule Development
Schedule DevelopmentChris Carson
 
Chap 12.1 Plan Procurement Management
Chap 12.1 Plan Procurement ManagementChap 12.1 Plan Procurement Management
Chap 12.1 Plan Procurement ManagementAnand Bobade
 
5.Production Scheduling and Sequencing.pptx
5.Production Scheduling and Sequencing.pptx5.Production Scheduling and Sequencing.pptx
5.Production Scheduling and Sequencing.pptxvirshit
 

Similar to PMBOK 6 Control Schedule Guide (20)

Chap 6.1 Plan Schedule Management
Chap 6.1 Plan Schedule ManagementChap 6.1 Plan Schedule Management
Chap 6.1 Plan Schedule Management
 
Chap 4.6 Perform Integrated Change Control
Chap 4.6 Perform Integrated Change ControlChap 4.6 Perform Integrated Change Control
Chap 4.6 Perform Integrated Change Control
 
Chap 6.3 Sequence Activity
Chap 6.3 Sequence ActivityChap 6.3 Sequence Activity
Chap 6.3 Sequence Activity
 
PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1
 
Chap 11.7 Monitor Risks
Chap 11.7 Monitor RisksChap 11.7 Monitor Risks
Chap 11.7 Monitor Risks
 
Chap 5.1 Plan Scope Management
Chap 5.1 Plan Scope ManagementChap 5.1 Plan Scope Management
Chap 5.1 Plan Scope Management
 
6.5 Develop Schedule
6.5 Develop Schedule6.5 Develop Schedule
6.5 Develop Schedule
 
Chap 8.3 Control Quality
Chap 8.3  Control QualityChap 8.3  Control Quality
Chap 8.3 Control Quality
 
Session 8 4th edition PMP
Session 8 4th edition PMPSession 8 4th edition PMP
Session 8 4th edition PMP
 
Chap 9.2 Estimate Activity Resource
Chap 9.2   Estimate Activity ResourceChap 9.2   Estimate Activity Resource
Chap 9.2 Estimate Activity Resource
 
Chap 7.3 Determine budget
Chap 7.3   Determine budgetChap 7.3   Determine budget
Chap 7.3 Determine budget
 
Enterprise DataWarehousing + Management Information
Enterprise DataWarehousing + Management InformationEnterprise DataWarehousing + Management Information
Enterprise DataWarehousing + Management Information
 
AWIN presentation it's only logical-a scheduling overview
AWIN presentation it's only logical-a scheduling overviewAWIN presentation it's only logical-a scheduling overview
AWIN presentation it's only logical-a scheduling overview
 
Chap 10.3 Monitor Communication
Chap 10.3 Monitor CommunicationChap 10.3 Monitor Communication
Chap 10.3 Monitor Communication
 
Chap 8.1 Plan quality management
Chap 8.1 Plan quality managementChap 8.1 Plan quality management
Chap 8.1 Plan quality management
 
PMP Key Exam Concepts WPD, WPI & WPR
PMP Key Exam Concepts WPD, WPI & WPRPMP Key Exam Concepts WPD, WPI & WPR
PMP Key Exam Concepts WPD, WPI & WPR
 
Schedule Development
Schedule DevelopmentSchedule Development
Schedule Development
 
Chap 12.1 Plan Procurement Management
Chap 12.1 Plan Procurement ManagementChap 12.1 Plan Procurement Management
Chap 12.1 Plan Procurement Management
 
5.Production Scheduling and Sequencing.pptx
5.Production Scheduling and Sequencing.pptx5.Production Scheduling and Sequencing.pptx
5.Production Scheduling and Sequencing.pptx
 
4-ProjectPlanning.ppt
4-ProjectPlanning.ppt4-ProjectPlanning.ppt
4-ProjectPlanning.ppt
 

More from Anand Bobade

PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...Anand Bobade
 
Chap 12.3 Control Procurement
Chap 12.3 Control ProcurementChap 12.3 Control Procurement
Chap 12.3 Control ProcurementAnand Bobade
 
Chap 12.2 Conduct Procurement
Chap 12.2 Conduct ProcurementChap 12.2 Conduct Procurement
Chap 12.2 Conduct ProcurementAnand Bobade
 
Chap 12.0 Procurement Management overview
Chap 12.0   Procurement Management overviewChap 12.0   Procurement Management overview
Chap 12.0 Procurement Management overviewAnand Bobade
 
Chap 10.2 Manage Communication
Chap 10.2  Manage CommunicationChap 10.2  Manage Communication
Chap 10.2 Manage CommunicationAnand Bobade
 
Chap 10.1 Plan Communication Management
Chap 10.1  Plan Communication ManagementChap 10.1  Plan Communication Management
Chap 10.1 Plan Communication ManagementAnand Bobade
 
Chap 9.5 Manage Team
Chap 9.5  Manage TeamChap 9.5  Manage Team
Chap 9.5 Manage TeamAnand Bobade
 
Chap 9.0 Project Resource Management overview
Chap 9.0   Project Resource Management overviewChap 9.0   Project Resource Management overview
Chap 9.0 Project Resource Management overviewAnand Bobade
 
Chap 5.5 validate scope
Chap 5.5 validate scopeChap 5.5 validate scope
Chap 5.5 validate scopeAnand Bobade
 

More from Anand Bobade (9)

PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
 
Chap 12.3 Control Procurement
Chap 12.3 Control ProcurementChap 12.3 Control Procurement
Chap 12.3 Control Procurement
 
Chap 12.2 Conduct Procurement
Chap 12.2 Conduct ProcurementChap 12.2 Conduct Procurement
Chap 12.2 Conduct Procurement
 
Chap 12.0 Procurement Management overview
Chap 12.0   Procurement Management overviewChap 12.0   Procurement Management overview
Chap 12.0 Procurement Management overview
 
Chap 10.2 Manage Communication
Chap 10.2  Manage CommunicationChap 10.2  Manage Communication
Chap 10.2 Manage Communication
 
Chap 10.1 Plan Communication Management
Chap 10.1  Plan Communication ManagementChap 10.1  Plan Communication Management
Chap 10.1 Plan Communication Management
 
Chap 9.5 Manage Team
Chap 9.5  Manage TeamChap 9.5  Manage Team
Chap 9.5 Manage Team
 
Chap 9.0 Project Resource Management overview
Chap 9.0   Project Resource Management overviewChap 9.0   Project Resource Management overview
Chap 9.0 Project Resource Management overview
 
Chap 5.5 validate scope
Chap 5.5 validate scopeChap 5.5 validate scope
Chap 5.5 validate scope
 

Recently uploaded

How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionCIToolkit
 
Choosing the best strategy qspm matrix.pptx
Choosing the best strategy qspm matrix.pptxChoosing the best strategy qspm matrix.pptx
Choosing the best strategy qspm matrix.pptxMadan Karki
 
Shaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingShaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingGiuseppe De Simone
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchRashtriya Kisan Manch
 
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsDigital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsHannah Smith
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 
Chapter 1 Performance Management HRM.ppt
Chapter 1 Performance Management HRM.pptChapter 1 Performance Management HRM.ppt
Chapter 1 Performance Management HRM.ppt2020102713
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsCIToolkit
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...CIToolkit
 
The Final Activity in Project Management
The Final Activity in Project ManagementThe Final Activity in Project Management
The Final Activity in Project ManagementCIToolkit
 
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Giuseppe De Simone
 
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsMind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsCIToolkit
 
THE LEADERSHIP TO CHANGE THE WOLRD THIS IS YOUR HOUR PURSUES YOUR GIFT, TALEN...
THE LEADERSHIP TO CHANGE THE WOLRD THIS IS YOUR HOUR PURSUES YOUR GIFT, TALEN...THE LEADERSHIP TO CHANGE THE WOLRD THIS IS YOUR HOUR PURSUES YOUR GIFT, TALEN...
THE LEADERSHIP TO CHANGE THE WOLRD THIS IS YOUR HOUR PURSUES YOUR GIFT, TALEN...PROF. PAUL ALLIEU KAMARA
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentCIToolkit
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证jdkhjh
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramCIToolkit
 

Recently uploaded (18)

How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem Resolution
 
Choosing the best strategy qspm matrix.pptx
Choosing the best strategy qspm matrix.pptxChoosing the best strategy qspm matrix.pptx
Choosing the best strategy qspm matrix.pptx
 
Shaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingShaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful Thinking
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
 
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsDigital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 
Chapter 1 Performance Management HRM.ppt
Chapter 1 Performance Management HRM.pptChapter 1 Performance Management HRM.ppt
Chapter 1 Performance Management HRM.ppt
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
 
The Final Activity in Project Management
The Final Activity in Project ManagementThe Final Activity in Project Management
The Final Activity in Project Management
 
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
 
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsMind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
 
THE LEADERSHIP TO CHANGE THE WOLRD THIS IS YOUR HOUR PURSUES YOUR GIFT, TALEN...
THE LEADERSHIP TO CHANGE THE WOLRD THIS IS YOUR HOUR PURSUES YOUR GIFT, TALEN...THE LEADERSHIP TO CHANGE THE WOLRD THIS IS YOUR HOUR PURSUES YOUR GIFT, TALEN...
THE LEADERSHIP TO CHANGE THE WOLRD THIS IS YOUR HOUR PURSUES YOUR GIFT, TALEN...
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
 

PMBOK 6 Control Schedule Guide

  • 1. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Trainer: Anand BobadePMBOK 6th Edition, 2019, All rights reserved. Control Schedule PMPChapter 6 – Project Schedule Management SIXTH EDITION
  • 2. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) 6.6 Control Schedule Control Schedule Definition Control Schedule & Integrated change Control Control Schedule : ITTO What is performance review? What are schedule forecast? Data flow diagram Review
  • 3. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Schedule Management processes Plan Schedule management Define Activities Sequence Activities Estimate Activity Duration Develop Schedule Control Schedule P P P MCP P
  • 4. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) 6.6 Control Schedule • The current status of the project scheduleDetermine • If the project schedule has changedMonitor • The factors that create schedule changesInfluence • The actual changes as they occur & minimize RisksManaging
  • 5. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) If any agile approach is utilized, control schedule is concerned with below: Conducting retrospective reviews for correcting processes and improving planning/estimates etc. Reprioritizing the remaining work plan (backlog) Determining the rate at which the deliverables are produced, validated, and accepted (velocity) in given time per iteration Managing the actual changes as they occur. Determine status of schedule by comparing total amount of work delivered & accepted, against estimates of work completed for elapsed time cycle Control Schedule
  • 6. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Monitoring the status of project activities to update project progress & manage changes to schedule baseline to achieve plan. It provides the means to recognize the deviation from the plan, & take corrective & preventive actions & thus minimize the risk. Control Schedule-> Definition Monitoring status of Project activities Update project progress Manage schedule baseline changes
  • 7. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Control Schedule -> ITTO Critical path method Data analysis Schedule Compression PMIS Resource optimization Leads and Lags Project Management plan Project Documents Work performance data Organizational process assets Work performance information Schedule forecasts Change Request PMP update Project Documents updates Inputs Tools & Techniques Outputs
  • 8. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project Management plan Project Documents Work performance data Organizational process assets Control Schedule -> Input
  • 9. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project Management plan Control Schedule -> Input -> PMP Schedule Management plan Schedule baseline Scope baseline Performance measurement baseline Following project PMP’s/baselines may used as input:
  • 10. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project Documents Control Schedule -> Input -> Project documents Lessons Learned Registers Project Calendar Project schedule Resource Calendar Schedule data Following project documents will used as input.
  • 11. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Work performance data It is the raw data of the project’s status. Actual cost Actual duration The raw observations & measurements identified during execution of activities. Control Schedule -> Input->WPD
  • 12. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Organizational process assets Schedule control related organizational policies Schedule control tools Monitoring & reporting methods used in organization Control Schedule -> Input ->OPA 6.7 I T&T O
  • 13. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Critical path method Data analysis Schedule Compression PMIS Resource optimization Leads and Lags Control Schedule -> Tools & Techniques
  • 14. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Data analysis Following Data analysis tools will be used: Earn Value analysis Iteration burn down charts Performance reviews Trend analysis Variance analysis What is scenario analysis Control Schedule -> T&T -> Data analysis
  • 15. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Data analysis Iteration burn down charts: • Tracks the work that remains to be completed in the iteration backlog • Used to analyse the variance with respect to an ideal burn down • A forecast trend line can be used to predict likely variance to take appropriate actions Control Schedule -> T&T -> Data analysis
  • 16. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Control Schedule -> T&T -> Data analysis Data analysis Performance review: • It measure, compare, & analyze schedule performance • E.g., Actual start & finish dates, % complete & remaining duration for work in progress. • Determine any Deviation from the plan • Help take corrective & preventive action
  • 17. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Control Schedule -> T&T -> Data analysis Data analysis Trend Analysis •Examines project performance over time •Determine whether performance is improving or deteriorating. •Valuable for understanding current performance & for comparison to future performance goals.
  • 18. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Control Schedule -> T&T -> Data analysis Data analysis Earn value management • Schedule & Cost performance measurements • As per PMI this is best technique to measure project performance.
  • 19. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Data analysis What-If Scenario Analysis: •Process of evaluating scenarios in order to predict their effect •This is achieved by performing Network analysis •Used to assess the feasibility of project schedule under adverse conditions, •Also used in preparing contingency & response plans. Simulation: •Calculating multiple project durations with different sets of activity assumptions. •Uses probability distributions constructed from 3 Point estimates to account for uncertainty. •Common simulation technique is Monte Carlo Control Schedule -> T&T -> Data analysis
  • 20. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) PMIS Software used for project planning, scheduling, resource allocation, change management , communication etc. Control costs and schedule Baseline Comparison SV, SPI and CV, CPI Cash flow management Monitor & Inform Schedule progress Missed milestones Changes to Critical path Also used for collaboration and communication. Project planning Task management Document sharing and collaboration Calendar and contact sharing Risk and issue management Control Schedule->T&T-> PMIS
  • 21. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) PMIS Software used for project planning, scheduling, resource allocation, change management , communication etc. Example, Microsoft Project Control Schedule->T&T->Project Management software
  • 22. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Leads & lags Lead: It is amount of time where successor activity can be advanced w.r.t. predecessor activity. Lag: It is amount of time whereby a successor activity will be delayed w.r.t. a predecessor activity. Control Schedule->T&T-> Leads & lags Business Requirement (BRS) System Requirement (SRS) Sign Contract Team On- board Lead 1 week Lag 3 week Business Requirement (BRS – 4 weeks) System Requirement (SRS – 4 weeks) W1 W2 W3 W4 W5 W6 W7 W8 W1 W2 W3 W4 W5 W6 W7 W8 Sign Contract Team On- board 6.6 I T&T O
  • 23. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Schedule Compression Reduce schedule duration without reducing project scope. Adhere to schedule constraints, imposed dates, or other schedule objectives. Crashing Fast tracking Control Schedule->T&T-> Schedule Compression
  • 24. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Schedule Compression Crashing: Shorten schedule duration for least cost by adding resources. Fast tracking: Activities done in sequence are performed in parallel for at least some portion of their duration. Control Schedule->T&T-> Schedule Compression BRS (1 BA) SRS (1 SA) BRS (2 BA) SRS (2 SA) Design Testing Design Testing W1 W2 W3 W4 W5 W6 W7 W8 Crashed by adding resources W1 W2 W3 W4 W5 W6 W7 W8 Fast tracked by executing activities in parallel
  • 25. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Resource optimization Technique How to allocate resources in a way to bring maximum output. Resource Levelling: • Start and finish dates are adjusted based on resource constraints. • Goal is to balance demand for resources with the available supply. Resource Smoothing: • Adjusts schedule activities. • Ensure requirements for resources do not exceed certain predefined resource limits. • May not be able to optimize all resources. Control Schedule->T&T-> Resource optimization
  • 26. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Control Schedule->T&T-> Resource optimization Resource Smoothing: • Critical path is not changed & completion date is same • Activities may be delayed within their free & total float. Resource Levelling: • Notice Change in Duration (Critical path changed) • Timelines extended to adjust resource constraint
  • 27. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Schedule forecasts Work performance information Change Request PMP update Project Documents updates Control Schedule -> Output
  • 28. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Schedule forecasts Predictions of projects future conditions & events Projects execution data is constantly analysed which results in WPI. Forecasts are updated and reissued based on WPI. Performance review Trend Analysis EVM WPI Control Schedule->Output->Schedule Forecast
  • 29. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Work performance information The calculated SV and SPI for the WBS components (Control account, work package) Documented and communicated to stakeholders Control Schedule->Output->WPI SV SPI
  • 30. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Modifications to the project scope or project schedule may result in change requests Schedule baseline Scope baseline Components of PMP. Control Schedule->Output->Change Request 6.7 I T&T O Change Request
  • 31. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project Documents Following project documents will be updated: Project schedule Schedule data Basis of estimates Resource Calendar Assumption log Risk Register Lessons Learned Registers Control Schedule -> Output -> Project document updates
  • 32. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Control Schedule -> Output -> PMP updates PMP update Schedule baseline Schedule Management plan Cost baseline Performance measurement baseline Following PMP subsidiary plans/base lines will be updated:
  • 33. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Control Schedule -> Review How to control schedule? Schedule performance review? Schedule forecast? Schedule Compression (Crashing & Fast Tracking) Scheduling tool
  • 34. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)