Trainer: Anand Bobade
PMP
PMBOK 6th Edition, 2019, All rights reserved.
Chapter 7 –
Project Cost Management
Plan Cost
management
Estimate Cost
Determine Budget Control Cost
SIXTH EDITION
By: Anand Bobade (nmbobade@gmail.com)PMBOK 6edition @ All rights reserved .
Overview
Trends & emerging practices
Tailoring consideration
Considerations for agile/adaptive
Cost Management Definition
Cost Management Processes
Cost related terminologies
Project Cost Management Knowledge area
By: Anand Bobade (nmbobade@gmail.com)PMBOK 6edition @ All rights reserved .
Provide cost management framework.
Develop a cost estimates.
Finalize budget including contingency reserves.
Prepare cost baseline
Control project cost.
Introduction
By: Anand Bobade (nmbobade@gmail.com)PMBOK 6edition @ All rights reserved .
EVM Extended to include ES (Earned Schedule),
• Earned Schedule (ES):
• The measure of work performed in terms of schedule as on status date.
• This is basically Earned Value (EV) in terms of duration worth of work.
• Actual Time (AT):
• The realized time or actual time as on status date.
• Planned Duration (PD):
• The total planned duration when the project started.
SV (Schedule Variance) = ES-AT > 0, means ahead of schedule,
SPI (Schedule Performance Index) = ES/AT, which is efficiency of work achievement
Trends & emerging practices
Earned value
management
Variance Analysis
By: Anand Bobade (nmbobade@gmail.com)PMBOK 6edition @ All rights reserved .
Earned value
management
Knowledge
management
(Financial database)
Estimating &
budgeting policies
Agile approach for
costing
Governance of costs
Tailoring consideration
By: Anand Bobade (nmbobade@gmail.com)PMBOK 6edition @ All rights reserved .
Use lightweight estimation when scope is not finalized, for fast and
high level forecast of labor cost
Use detailed estimation for short term horizons
Strict budgeting for high variability projects will require frequent cost
adjustments
Considerations for agile/adaptive environments
By: Anand Bobade (nmbobade@gmail.com)PMBOK 6edition @ All rights reserved .
It includes processes involved in estimating, budgeting, & controlling
costs, so that project can be completed within approved budget.
Estimating
Budgeting
Controlling
Project Cost Management Definition
within
Approved budget
PM must make sure their projects are well defined, have
accurate time, cost estimates & have a realistic budget.
By: Anand Bobade (nmbobade@gmail.com)PMBOK 6edition @ All rights reserved .
Plan Cost Management:
• Establishes the Policies, procedures, and documentation for
planning, managing, expending, controlling project costs.
Estimate Cost:
• Developing an APPROXIMATION of the monetary resources
needed to complete project activities.
Determine Budget:
• AGGREGATING the estimated costs of individual activities or
WP to establish cost baseline.
Control Cost:
• MONITORING the status to update costs and managing
changes to the cost baseline
Cost Management Processes
By: Anand Bobade (nmbobade@gmail.com)PMBOK 6edition @ All rights reserved .
Direct Cost
•Charged directly to the Project
Indirect Cost
•Company cost incurred across multiple projects
Fixed Cost
•Do not change
Variable cost
•Vary depending on the output
Opportunity Cost:
•The potential cost in choosing one project over another.
Sunk cost
•Already incurred cost
Key Terms
By: Anand Bobade (nmbobade@gmail.com)PMBOK 6edition @ All rights reserved .
Costs that can be directly related
to producing the deliverable of
the project.
E.g., Salaries, hardware &
software purchased for the
project.
Direct costs
Costs that are not directly
related to deliverable of the
project, but are indirectly related
to performing project.
E.g., Rent, Electricity, Internet
and office supplies.
Indirect costs
Key Terms-> Direct & Indirect cost
By: Anand Bobade (nmbobade@gmail.com)PMBOK 6edition @ All rights reserved .
Variable Costs:
• Change with the amount of Production.
• E.g., cost of input material changes as per volume of production.
If you want to increase the production volume, you will need
to increase input materials, resulting in increased input cost.
Key Terms-> Variable Cost:
By: Anand Bobade (nmbobade@gmail.com)PMBOK 6edition @ All rights reserved .
Fixed Costs:
• Do not change with production.
• E.g., Rent, initial setup costs, monthly salary.
Initial factory setup cost & machines cost stays same,
irrespective of factory is fully used to its potential or not.
Key terms -> Fixed Cost
By: Anand Bobade (nmbobade@gmail.com)PMBOK 6edition @ All rights reserved .
Sunk cost:
• Money that has been spent in the past.
• When deciding what projects to invest in, you should not include sunk costs.
• Sunk costs should be forgotten.
E.g., Advertisement , Marketing study & Research
Key terms -> Sunk Cost
By: Anand Bobade (nmbobade@gmail.com)PMBOK 6edition @ All rights reserved .
Opportunity Cost:
• The cost given up by selecting one project over another.
• The cost of project which was not chosen.
Key terms -> Opportunity cost
Project 1: Build resort
Cost: $20 million
Project 2: Build a hotel.
Cost: $22 million
If you decide to build a
resort
The opportunity cost of not
building hotel is $22 million
By: Anand Bobade (nmbobade@gmail.com)PMBOK 6edition @ All rights reserved .
• Money that has been spent in
the past;
• When deciding what projects
to invest in or continue, you
should not include sunk costs.
• Sunk costs should be
forgotten
Sunk cost
The cost given up by selecting
one project over another.
Opportunity Cost:
Sunk Cost Vs. Opportunity cost
By: Anand Bobade (nmbobade@gmail.com)PMBOK 6edition @ All rights reserved .
Cash flow:
• Refers to the movement of cash into or out of the project.
• Can restrict/delay execution of the project.
Cost Categories Q1 Q2 Q3 Q4
Money Received 100,000 200,000 200,000 100,000
Expenses
Vendor1 Payment 0 100,000 100,000 75,000
Vendor1 Payment 0 150,000 100,000 75,000
Money spent 0 250,000 200,000 150,000
Cash Flow 100K -50K 0 -50K
Cash Balance 100K 300K-
250K=50K
250K-
200K=50K
150K-150K=0
Key Terms-> Cash flow
By: Anand Bobade (nmbobade@gmail.com)PMBOK 6edition @ All rights reserved .

More Related Content

What's hot

What's hot (20)

Chap 9.4 Develop Team
Chap 9.4  Develop TeamChap 9.4  Develop Team
Chap 9.4 Develop Team
 
Chap 9.1 Pan Resource Management
Chap 9.1   Pan Resource ManagementChap 9.1   Pan Resource Management
Chap 9.1 Pan Resource Management
 
Pmp chap 11 - project risk management v0.1
Pmp   chap 11 - project risk management v0.1Pmp   chap 11 - project risk management v0.1
Pmp chap 11 - project risk management v0.1
 
PMP Chap 12 - Project Procurement Management Details - Part 1
PMP   Chap 12 - Project Procurement Management Details - Part 1PMP   Chap 12 - Project Procurement Management Details - Part 1
PMP Chap 12 - Project Procurement Management Details - Part 1
 
PMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementPMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality Management
 
PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1
 
Chap 9.5 Manage Team
Chap 9.5  Manage TeamChap 9.5  Manage Team
Chap 9.5 Manage Team
 
PMP chap 1 - PMP Introduction (PMBOK 6)
PMP chap 1 - PMP  Introduction (PMBOK 6)PMP chap 1 - PMP  Introduction (PMBOK 6)
PMP chap 1 - PMP Introduction (PMBOK 6)
 
PMP Chap 5 - Project Scope Management - Part1
PMP Chap 5 - Project Scope Management - Part1PMP Chap 5 - Project Scope Management - Part1
PMP Chap 5 - Project Scope Management - Part1
 
Pmp chap 11 - project risk management - Part 2
Pmp   chap 11 - project risk management - Part 2Pmp   chap 11 - project risk management - Part 2
Pmp chap 11 - project risk management - Part 2
 
Chap 12.1 Plan Procurement Management
Chap 12.1 Plan Procurement ManagementChap 12.1 Plan Procurement Management
Chap 12.1 Plan Procurement Management
 
Chap 7.3 Determine budget
Chap 7.3   Determine budgetChap 7.3   Determine budget
Chap 7.3 Determine budget
 
Chap 8.2 Manage Quality
Chap 8.2 Manage QualityChap 8.2 Manage Quality
Chap 8.2 Manage Quality
 
Chap 12.2 Conduct Procurement
Chap 12.2 Conduct ProcurementChap 12.2 Conduct Procurement
Chap 12.2 Conduct Procurement
 
PMP Chap 3 - Project Management Processes
PMP Chap 3 - Project Management ProcessesPMP Chap 3 - Project Management Processes
PMP Chap 3 - Project Management Processes
 
PMP Chap 6 - Project Time management - Part2
PMP Chap 6 - Project Time management - Part2PMP Chap 6 - Project Time management - Part2
PMP Chap 6 - Project Time management - Part2
 
PMP Chap 2- Org. Influence and Project Life Cycle
PMP Chap 2- Org. Influence and Project Life CyclePMP Chap 2- Org. Influence and Project Life Cycle
PMP Chap 2- Org. Influence and Project Life Cycle
 
Chap 8.1 Plan quality management
Chap 8.1 Plan quality managementChap 8.1 Plan quality management
Chap 8.1 Plan quality management
 
Chap 5.4 Create WBS
Chap 5.4 Create WBSChap 5.4 Create WBS
Chap 5.4 Create WBS
 
Chap 6.6 Control Schedule
Chap 6.6 Control ScheduleChap 6.6 Control Schedule
Chap 6.6 Control Schedule
 

Similar to Chap 7.0 Project Cost Management Overview

D08 Quantify Project Value
D08 Quantify Project ValueD08 Quantify Project Value
D08 Quantify Project Value
Leanleaders.org
 
D08 Quantify Project Value
D08 Quantify Project ValueD08 Quantify Project Value
D08 Quantify Project Value
Leanleaders.org
 
Resume of Vaishnav Mithun_New
Resume of Vaishnav Mithun_NewResume of Vaishnav Mithun_New
Resume of Vaishnav Mithun_New
Vaishnav Mithun
 
L06 cost management
L06 cost managementL06 cost management
L06 cost management
Asa Chan
 

Similar to Chap 7.0 Project Cost Management Overview (20)

PMP Chap 5.0 Scope Management Overview
PMP Chap 5.0 Scope Management OverviewPMP Chap 5.0 Scope Management Overview
PMP Chap 5.0 Scope Management Overview
 
Chap 5.3 define scope
Chap 5.3 define scopeChap 5.3 define scope
Chap 5.3 define scope
 
Chap 12.0 Procurement Management overview
Chap 12.0   Procurement Management overviewChap 12.0   Procurement Management overview
Chap 12.0 Procurement Management overview
 
D08 Quantify Project Value
D08 Quantify Project ValueD08 Quantify Project Value
D08 Quantify Project Value
 
D08 Quantify Project Value
D08 Quantify Project ValueD08 Quantify Project Value
D08 Quantify Project Value
 
Chap 5.6 Control Scope
Chap 5.6 Control ScopeChap 5.6 Control Scope
Chap 5.6 Control Scope
 
PMP Session 3
PMP Session 3PMP Session 3
PMP Session 3
 
4. PAE AcFn621Ch-4a Project Alaysis and Selection.ppt
4. PAE AcFn621Ch-4a Project Alaysis and Selection.ppt4. PAE AcFn621Ch-4a Project Alaysis and Selection.ppt
4. PAE AcFn621Ch-4a Project Alaysis and Selection.ppt
 
Resume of Vaishnav Mithun_New
Resume of Vaishnav Mithun_NewResume of Vaishnav Mithun_New
Resume of Vaishnav Mithun_New
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
8. implementation (2) cost management
8. implementation (2)   cost management8. implementation (2)   cost management
8. implementation (2) cost management
 
PMP Preparation - 07 Cost Management
PMP Preparation - 07 Cost ManagementPMP Preparation - 07 Cost Management
PMP Preparation - 07 Cost Management
 
Managing Project Success
Managing Project SuccessManaging Project Success
Managing Project Success
 
Pmp inititating process group
Pmp inititating process groupPmp inititating process group
Pmp inititating process group
 
L06 cost management
L06 cost managementL06 cost management
L06 cost management
 
Project Management - Getting the basics right
Project Management - Getting the basics right Project Management - Getting the basics right
Project Management - Getting the basics right
 
Using of Target Costing in Different Industry : Auto, IT and Banking
Using of Target Costing in Different Industry : Auto, IT and BankingUsing of Target Costing in Different Industry : Auto, IT and Banking
Using of Target Costing in Different Industry : Auto, IT and Banking
 
project selection.pptx
project selection.pptxproject selection.pptx
project selection.pptx
 
Project Selection
Project SelectionProject Selection
Project Selection
 
Chap 5.1 Plan Scope Management
Chap 5.1 Plan Scope ManagementChap 5.1 Plan Scope Management
Chap 5.1 Plan Scope Management
 

More from Anand Bobade

PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
Anand Bobade
 

More from Anand Bobade (16)

PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
 
Chap 11.7 Monitor Risks
Chap 11.7 Monitor RisksChap 11.7 Monitor Risks
Chap 11.7 Monitor Risks
 
Chap 10.3 Monitor Communication
Chap 10.3 Monitor CommunicationChap 10.3 Monitor Communication
Chap 10.3 Monitor Communication
 
Chap 10.2 Manage Communication
Chap 10.2  Manage CommunicationChap 10.2  Manage Communication
Chap 10.2 Manage Communication
 
Chap 10.1 Plan Communication Management
Chap 10.1  Plan Communication ManagementChap 10.1  Plan Communication Management
Chap 10.1 Plan Communication Management
 
Chap 9.6 Control Resources
Chap 9.6  Control ResourcesChap 9.6  Control Resources
Chap 9.6 Control Resources
 
Chap 9.3 Acquire Resources
Chap 9.3   Acquire ResourcesChap 9.3   Acquire Resources
Chap 9.3 Acquire Resources
 
Chap 9.2 Estimate Activity Resource
Chap 9.2   Estimate Activity ResourceChap 9.2   Estimate Activity Resource
Chap 9.2 Estimate Activity Resource
 
Chap 9.0 Project Resource Management overview
Chap 9.0   Project Resource Management overviewChap 9.0   Project Resource Management overview
Chap 9.0 Project Resource Management overview
 
Chap 6.5 Define Schedule
Chap 6.5 Define ScheduleChap 6.5 Define Schedule
Chap 6.5 Define Schedule
 
Chap 6.4 Estimate Activity Duration
Chap 6.4 Estimate Activity DurationChap 6.4 Estimate Activity Duration
Chap 6.4 Estimate Activity Duration
 
Chap 6.3 Sequence Activity
Chap 6.3 Sequence ActivityChap 6.3 Sequence Activity
Chap 6.3 Sequence Activity
 
Chap 6.2 Define Activity
Chap 6.2 Define ActivityChap 6.2 Define Activity
Chap 6.2 Define Activity
 
Chap 6.1 Plan Schedule Management
Chap 6.1 Plan Schedule ManagementChap 6.1 Plan Schedule Management
Chap 6.1 Plan Schedule Management
 
Chap 6.0 Schedule Management Overview
Chap 6.0 Schedule Management OverviewChap 6.0 Schedule Management Overview
Chap 6.0 Schedule Management Overview
 
Chap 5.5 validate scope
Chap 5.5 validate scopeChap 5.5 validate scope
Chap 5.5 validate scope
 

Recently uploaded

Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Riyadh +966572737505 get cytotec
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
alinstan901
 

Recently uploaded (20)

BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
Disrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdfDisrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdf
 
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdfImagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
Discover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdfDiscover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdf
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic management
 
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote SpeakerLeadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
 
Empowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdfEmpowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdf
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg PartnershipUnlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
 
Peak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian DugmorePeak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian Dugmore
 
LoveLocalGov - Chris Twigg, Inner Circle
LoveLocalGov - Chris Twigg, Inner CircleLoveLocalGov - Chris Twigg, Inner Circle
LoveLocalGov - Chris Twigg, Inner Circle
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
situational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima Ssituational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima S
 
Becoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette ThompsonBecoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette Thompson
 

Chap 7.0 Project Cost Management Overview

  • 1. Trainer: Anand Bobade PMP PMBOK 6th Edition, 2019, All rights reserved. Chapter 7 – Project Cost Management Plan Cost management Estimate Cost Determine Budget Control Cost SIXTH EDITION
  • 2. By: Anand Bobade (nmbobade@gmail.com)PMBOK 6edition @ All rights reserved . Overview Trends & emerging practices Tailoring consideration Considerations for agile/adaptive Cost Management Definition Cost Management Processes Cost related terminologies Project Cost Management Knowledge area
  • 3. By: Anand Bobade (nmbobade@gmail.com)PMBOK 6edition @ All rights reserved . Provide cost management framework. Develop a cost estimates. Finalize budget including contingency reserves. Prepare cost baseline Control project cost. Introduction
  • 4. By: Anand Bobade (nmbobade@gmail.com)PMBOK 6edition @ All rights reserved . EVM Extended to include ES (Earned Schedule), • Earned Schedule (ES): • The measure of work performed in terms of schedule as on status date. • This is basically Earned Value (EV) in terms of duration worth of work. • Actual Time (AT): • The realized time or actual time as on status date. • Planned Duration (PD): • The total planned duration when the project started. SV (Schedule Variance) = ES-AT > 0, means ahead of schedule, SPI (Schedule Performance Index) = ES/AT, which is efficiency of work achievement Trends & emerging practices Earned value management Variance Analysis
  • 5. By: Anand Bobade (nmbobade@gmail.com)PMBOK 6edition @ All rights reserved . Earned value management Knowledge management (Financial database) Estimating & budgeting policies Agile approach for costing Governance of costs Tailoring consideration
  • 6. By: Anand Bobade (nmbobade@gmail.com)PMBOK 6edition @ All rights reserved . Use lightweight estimation when scope is not finalized, for fast and high level forecast of labor cost Use detailed estimation for short term horizons Strict budgeting for high variability projects will require frequent cost adjustments Considerations for agile/adaptive environments
  • 7. By: Anand Bobade (nmbobade@gmail.com)PMBOK 6edition @ All rights reserved . It includes processes involved in estimating, budgeting, & controlling costs, so that project can be completed within approved budget. Estimating Budgeting Controlling Project Cost Management Definition within Approved budget PM must make sure their projects are well defined, have accurate time, cost estimates & have a realistic budget.
  • 8. By: Anand Bobade (nmbobade@gmail.com)PMBOK 6edition @ All rights reserved . Plan Cost Management: • Establishes the Policies, procedures, and documentation for planning, managing, expending, controlling project costs. Estimate Cost: • Developing an APPROXIMATION of the monetary resources needed to complete project activities. Determine Budget: • AGGREGATING the estimated costs of individual activities or WP to establish cost baseline. Control Cost: • MONITORING the status to update costs and managing changes to the cost baseline Cost Management Processes
  • 9. By: Anand Bobade (nmbobade@gmail.com)PMBOK 6edition @ All rights reserved . Direct Cost •Charged directly to the Project Indirect Cost •Company cost incurred across multiple projects Fixed Cost •Do not change Variable cost •Vary depending on the output Opportunity Cost: •The potential cost in choosing one project over another. Sunk cost •Already incurred cost Key Terms
  • 10. By: Anand Bobade (nmbobade@gmail.com)PMBOK 6edition @ All rights reserved . Costs that can be directly related to producing the deliverable of the project. E.g., Salaries, hardware & software purchased for the project. Direct costs Costs that are not directly related to deliverable of the project, but are indirectly related to performing project. E.g., Rent, Electricity, Internet and office supplies. Indirect costs Key Terms-> Direct & Indirect cost
  • 11. By: Anand Bobade (nmbobade@gmail.com)PMBOK 6edition @ All rights reserved . Variable Costs: • Change with the amount of Production. • E.g., cost of input material changes as per volume of production. If you want to increase the production volume, you will need to increase input materials, resulting in increased input cost. Key Terms-> Variable Cost:
  • 12. By: Anand Bobade (nmbobade@gmail.com)PMBOK 6edition @ All rights reserved . Fixed Costs: • Do not change with production. • E.g., Rent, initial setup costs, monthly salary. Initial factory setup cost & machines cost stays same, irrespective of factory is fully used to its potential or not. Key terms -> Fixed Cost
  • 13. By: Anand Bobade (nmbobade@gmail.com)PMBOK 6edition @ All rights reserved . Sunk cost: • Money that has been spent in the past. • When deciding what projects to invest in, you should not include sunk costs. • Sunk costs should be forgotten. E.g., Advertisement , Marketing study & Research Key terms -> Sunk Cost
  • 14. By: Anand Bobade (nmbobade@gmail.com)PMBOK 6edition @ All rights reserved . Opportunity Cost: • The cost given up by selecting one project over another. • The cost of project which was not chosen. Key terms -> Opportunity cost Project 1: Build resort Cost: $20 million Project 2: Build a hotel. Cost: $22 million If you decide to build a resort The opportunity cost of not building hotel is $22 million
  • 15. By: Anand Bobade (nmbobade@gmail.com)PMBOK 6edition @ All rights reserved . • Money that has been spent in the past; • When deciding what projects to invest in or continue, you should not include sunk costs. • Sunk costs should be forgotten Sunk cost The cost given up by selecting one project over another. Opportunity Cost: Sunk Cost Vs. Opportunity cost
  • 16. By: Anand Bobade (nmbobade@gmail.com)PMBOK 6edition @ All rights reserved . Cash flow: • Refers to the movement of cash into or out of the project. • Can restrict/delay execution of the project. Cost Categories Q1 Q2 Q3 Q4 Money Received 100,000 200,000 200,000 100,000 Expenses Vendor1 Payment 0 100,000 100,000 75,000 Vendor1 Payment 0 150,000 100,000 75,000 Money spent 0 250,000 200,000 150,000 Cash Flow 100K -50K 0 -50K Cash Balance 100K 300K- 250K=50K 250K- 200K=50K 150K-150K=0 Key Terms-> Cash flow
  • 17. By: Anand Bobade (nmbobade@gmail.com)PMBOK 6edition @ All rights reserved .