PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Chapter 9 –
Project Resource Management
PMP
Trainer: Anand BobadePMBOK 6th Edition, 2019, All rights reserved.
Estimate Activity
Resources
SIXTH EDITION
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
9.2 Estimate activity resources
Overview
Estimate Activity resource Process definition
Estimate Activity resource: ITTO
Why is Alternative Analysis?
What is Bottom up estimation?
What is resource breakdown structure?
Review
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Resource Management processes
Plan Resource
management
Estimate Activity
Resources
Acquire Resources
Develop Team Manage Team Control Resources
P P P
MCE E
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Estimate Activity resource -> Introduction
Human resources Material
Equipment Supplies
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Complexity Resource Skills
Resource
availability
History of
performing
similar task
Estimate Activity resource -> Key Factors
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Estimating type & quantities of material, human resources,
equipment or supplies required to perform each activity.
Develop more accurate cost and duration estimates.
Estimate Activity resource -> Definition
Type &
Quantities
Material
Human resources
Equipment
Supplies
Estimating
Project
Activities
Perform
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Estimate activity resources -> ITTO
Expert Judgment
Bottom up estimating
Analogous estimating
Parametric estimating
Data analysis
PMIS
Meetings
Project Management
Plan
Project documents
Enterprise
environmental factors
Organizational process
assets
Resource
requirements
Basis of estimates
Resource breakdown
structure
Project document
updates
Inputs Tools & Techniques Outputs
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Estimate Activity Resources -> Input
Project Management
Plan
Project documents
Enterprise
environmental factors
Organizational process
assets
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project
Management Plan
Estimate Activity Resources -> Input -> PMP
Resource Management
plan
Scope baseline
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project documents
Estimate Activity Resources -> Input -> Project documents
Activity list Activity attributes Cost estimates Resource calendars Assumption log Risk register
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project documents
Activity list:
A list of all activities that will be performed on project & a
description of each activity
Activity ID WBS
Id
Name Description
501 W50 Compare Furniture brands
502 W50 Find showrooms
503 W50 Get Quotes
504 W50 Compare Quotes
Estimate Activity Resources->Input->Project doc’s-> Activity list:
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project documents
Activity attributes:
• Provide additional information about activities.
• During the initial stages of the project, they include
• Activity identifier (ID), WBS ID, Activity label or name etc
Activity
description
Predecessor
activities
Successor
activities
Logical
relationships
Leads and lags
Resource
requirements
Imposed
dates
Constraints
Assumptions
Person
responsible
Geographic
area or place
Calendar
Estimate Activity Resources->Input->Project doc’s-> Activity attributes:
When Completed
they may include
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project documents
Resource calendars:
•Identifies working days & shifts on which each specific resource is available.
•Details about when & how long identified project resource will be available
Estimate Activity Resources->Input->Project doc’s-> Resource calendars
•Resource may be material, human resources, equipment etcRemember:
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project documents
Risk Register:
• Risk events may impact resource selection and availability.
• Risks related to activity sequencing, dependencies.
Estimate Activity Resources->Input->Project doc’s-> Risk Register
# Risk Probability Imp
act
Urgenc
y
Category Risk Level Risk Response
1 Continually changing
requirements
3 4 Low Scope High
2 Project involves the use
of new technology
2 3 Normal Solution Medium
3 Inexperience team
members
2 4 Immedi
ate
Resource Medium
4 Unstable organizational
environment
1 5 Immedi
ate
EEF Medium
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project documents
Cost estimates:
• Provides probable costs required to complete activities / project
work. (summary or detail)
Estimate Activity Resources->Input->Project doc’s-> Cost estimates
Estimate Cost
(Project Cost Manag.)
Estimate Activity
resources-
Resource type / Quantity can be decided
based on cost.
make or buy / Manual or automated
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Organizational
process assets
Policies and procedures regarding staffing
Policies and procedures relating to rental and purchase
Historical information - types of resources used for similar work on previous projects
Estimate Activity Resources -> Input->OPA
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Enterprise
environmental factors
Resource
location availability and skills.
Estimate Activity Resources -> Input->EEF
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Expert Judgment
Bottom up
estimating
Analogous
estimating
Parametric
estimating
Data analysis PMIS Meetings
Estimate Activity resources -> Tools & Techniques
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Mr. Expert
Expert
Judgment
Specialized knowledge in resource planning & estimating can provide such
expertise
Can help in choosing right resource
Identify activity resource requirement
Can perform or contribute in estimating & alternative analysis
Estimate Activity resources -> T&T -> Expert Judgment
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Data analysis
Alternative Analysis:
• Many schedule activities have alternative methods of
accomplishment.
Various levels of
resource capability
or skills
Different size or
type of machines
Different tools
(hand versus
automated)
Make- rent-or-buy
decisions regarding
the resource
Analyses
focus on:
Any group or person
with specialized
knowledge in
resource planning
and estimating can
provide such
expertise
Estimate Activity resources->T&T-> Data analysis
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Data analysis
Alternative Analysis:
•Example: Road construction work - Expert helping PM identifying
resource requirements through alternative analysis
Estimate Activity resources->T&T-> Data analysis
Build Manually
•Less cost
•More human
resources
•Slow delivery
Use machines
•More cost
•Less human resources
•Resource capabilities
•Faster delivery
•Machines availability
21
• Manual work may cost less as cheap human resources are available but
may need more time to complete project.
Cost
• Machine developed road will give better quality hence maintenance
cost will be less. Also, delivery will be faster.
Quality:
• Machines may not be available. Bringing machines to the location may
not be possible. Human resource to operate may not be available.
Risk:
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Bottom up
estimating
Estimating resources or cost by aggregating estimates of lower-level components of WBS.
Activities are broken into smaller activities which can be
estimated.
There resource needs are estimated.
Resources are assigned to each activity.
These estimates are aggregated into a total quantity of
resources.
Estimate Activity resources->T&T-> Bottom up estimate
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
PMIS
Optimizing Resource utilization
Resource breakdown structure Resource availability
Resource rate
Resource calendar
PMIS has capability to:
Plan, organize & manage the resource pools
Develop resource estimates
Can automatically resolve scheduling
conflicts
Can help perform workload analysis
Can help optimize resource utilization
Estimate Activity resources->T&T-> PMIS
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Resource
requirements
Basis of estimates
Resource
breakdown
structure
Project document
updates
Estimate Activity resources -> Outputs
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Resource
requirements
The types and quantities of resources required for each activity in a work package.
Aggregated to determine the estimated resources for each work package and each work period.
Resource
Type/
Activity
Resource
Quantity/
Activity
Resource
for Work
Package
Estimate Activity Resource->Outputs-> Resource Requirements
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Resource
breakdown
structure
Hierarchical representation of resources by category and type.
RBS is useful for organizing & reporting project schedule data with resource utilization information.
Construction Project
Labor
Managers
Manager1
Manager2
Workers
Worker1
Worker2
Worker3
Material
Building
Office setup
Equipment
Desktop
Laptop
Printer
Projector
Supplies
Printer
Cartridges
Papers
Stationary
Estimate Activity resources -> Outputs-> RBS
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Estimate Activity resources->Outputs->Project document update
•Attribute for new activities
•Change in attributes of older activities
Activity
attributes
•Resource related RiskRisk register
•Update Project & recourse calendar
Resource
Calendars
Activity attributes Assumption log Lessons learned register
Project document
updates
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Estimate Activity resources -> Review
Why to estimate activity resources?
What is Alternative Analysis?
What is published estimation data?
What is Bottom up estimation?
What is resource breakdown structure?
What is PMIS?
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)

More Related Content

What's hot

PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2Anand Bobade
 
Chap 12.1 Plan Procurement Management
Chap 12.1 Plan Procurement ManagementChap 12.1 Plan Procurement Management
Chap 12.1 Plan Procurement ManagementAnand Bobade
 
Chap 5.4 Create WBS
Chap 5.4 Create WBSChap 5.4 Create WBS
Chap 5.4 Create WBSAnand Bobade
 
Pmp chap 11 - project risk management - Part 2
Pmp   chap 11 - project risk management - Part 2Pmp   chap 11 - project risk management - Part 2
Pmp chap 11 - project risk management - Part 2Anand Bobade
 
PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1Anand Bobade
 
Chap 4.5 Monitor and Control Project Work
Chap 4.5 Monitor and Control Project WorkChap 4.5 Monitor and Control Project Work
Chap 4.5 Monitor and Control Project WorkAnand Bobade
 
PMP Chap 7 - Project Cost Management - Part 1
PMP Chap 7 - Project Cost Management - Part 1PMP Chap 7 - Project Cost Management - Part 1
PMP Chap 7 - Project Cost Management - Part 1Anand Bobade
 
PMP Chap 5 - Project Scope Management - Part 2
PMP Chap 5 - Project Scope Management - Part 2PMP Chap 5 - Project Scope Management - Part 2
PMP Chap 5 - Project Scope Management - Part 2Anand Bobade
 
PMP Chap 6 - Project Time management - Part2
PMP Chap 6 - Project Time management - Part2PMP Chap 6 - Project Time management - Part2
PMP Chap 6 - Project Time management - Part2Anand Bobade
 
Chap 12.3 Control Procurement
Chap 12.3 Control ProcurementChap 12.3 Control Procurement
Chap 12.3 Control ProcurementAnand Bobade
 
PMP Chap 7 - Project Cost Management - Part 2
PMP Chap 7 - Project Cost Management - Part 2PMP Chap 7 - Project Cost Management - Part 2
PMP Chap 7 - Project Cost Management - Part 2Anand Bobade
 
Chap 7.4 Control Cost
Chap 7.4   Control CostChap 7.4   Control Cost
Chap 7.4 Control CostAnand Bobade
 
Chap 5.6 Control Scope
Chap 5.6 Control ScopeChap 5.6 Control Scope
Chap 5.6 Control ScopeAnand Bobade
 
PMP Chap 2- Org. Influence and Project Life Cycle
PMP Chap 2- Org. Influence and Project Life CyclePMP Chap 2- Org. Influence and Project Life Cycle
PMP Chap 2- Org. Influence and Project Life CycleAnand Bobade
 
Chap 9.5 Manage Team
Chap 9.5  Manage TeamChap 9.5  Manage Team
Chap 9.5 Manage TeamAnand Bobade
 
PMP chap 1 - PMP Introduction (PMBOK 6)
PMP chap 1 - PMP  Introduction (PMBOK 6)PMP chap 1 - PMP  Introduction (PMBOK 6)
PMP chap 1 - PMP Introduction (PMBOK 6)Anand Bobade
 
Chap 6.5 Define Schedule
Chap 6.5 Define ScheduleChap 6.5 Define Schedule
Chap 6.5 Define ScheduleAnand Bobade
 
Chap 4.7 Project or Phase Close
Chap 4.7 Project or Phase CloseChap 4.7 Project or Phase Close
Chap 4.7 Project or Phase CloseAnand Bobade
 
Chap 8.3 Control Quality
Chap 8.3  Control QualityChap 8.3  Control Quality
Chap 8.3 Control QualityAnand Bobade
 
PMP Chap9 - Project Human Resource management
PMP Chap9 - Project Human Resource managementPMP Chap9 - Project Human Resource management
PMP Chap9 - Project Human Resource managementAnand Bobade
 

What's hot (20)

PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2
 
Chap 12.1 Plan Procurement Management
Chap 12.1 Plan Procurement ManagementChap 12.1 Plan Procurement Management
Chap 12.1 Plan Procurement Management
 
Chap 5.4 Create WBS
Chap 5.4 Create WBSChap 5.4 Create WBS
Chap 5.4 Create WBS
 
Pmp chap 11 - project risk management - Part 2
Pmp   chap 11 - project risk management - Part 2Pmp   chap 11 - project risk management - Part 2
Pmp chap 11 - project risk management - Part 2
 
PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1
 
Chap 4.5 Monitor and Control Project Work
Chap 4.5 Monitor and Control Project WorkChap 4.5 Monitor and Control Project Work
Chap 4.5 Monitor and Control Project Work
 
PMP Chap 7 - Project Cost Management - Part 1
PMP Chap 7 - Project Cost Management - Part 1PMP Chap 7 - Project Cost Management - Part 1
PMP Chap 7 - Project Cost Management - Part 1
 
PMP Chap 5 - Project Scope Management - Part 2
PMP Chap 5 - Project Scope Management - Part 2PMP Chap 5 - Project Scope Management - Part 2
PMP Chap 5 - Project Scope Management - Part 2
 
PMP Chap 6 - Project Time management - Part2
PMP Chap 6 - Project Time management - Part2PMP Chap 6 - Project Time management - Part2
PMP Chap 6 - Project Time management - Part2
 
Chap 12.3 Control Procurement
Chap 12.3 Control ProcurementChap 12.3 Control Procurement
Chap 12.3 Control Procurement
 
PMP Chap 7 - Project Cost Management - Part 2
PMP Chap 7 - Project Cost Management - Part 2PMP Chap 7 - Project Cost Management - Part 2
PMP Chap 7 - Project Cost Management - Part 2
 
Chap 7.4 Control Cost
Chap 7.4   Control CostChap 7.4   Control Cost
Chap 7.4 Control Cost
 
Chap 5.6 Control Scope
Chap 5.6 Control ScopeChap 5.6 Control Scope
Chap 5.6 Control Scope
 
PMP Chap 2- Org. Influence and Project Life Cycle
PMP Chap 2- Org. Influence and Project Life CyclePMP Chap 2- Org. Influence and Project Life Cycle
PMP Chap 2- Org. Influence and Project Life Cycle
 
Chap 9.5 Manage Team
Chap 9.5  Manage TeamChap 9.5  Manage Team
Chap 9.5 Manage Team
 
PMP chap 1 - PMP Introduction (PMBOK 6)
PMP chap 1 - PMP  Introduction (PMBOK 6)PMP chap 1 - PMP  Introduction (PMBOK 6)
PMP chap 1 - PMP Introduction (PMBOK 6)
 
Chap 6.5 Define Schedule
Chap 6.5 Define ScheduleChap 6.5 Define Schedule
Chap 6.5 Define Schedule
 
Chap 4.7 Project or Phase Close
Chap 4.7 Project or Phase CloseChap 4.7 Project or Phase Close
Chap 4.7 Project or Phase Close
 
Chap 8.3 Control Quality
Chap 8.3  Control QualityChap 8.3  Control Quality
Chap 8.3 Control Quality
 
PMP Chap9 - Project Human Resource management
PMP Chap9 - Project Human Resource managementPMP Chap9 - Project Human Resource management
PMP Chap9 - Project Human Resource management
 

Similar to Chap 9.2 Estimate Activity Resource

Chap 6.4 Estimate Activity Duration
Chap 6.4 Estimate Activity DurationChap 6.4 Estimate Activity Duration
Chap 6.4 Estimate Activity DurationAnand Bobade
 
Chap 6.2 Define Activity
Chap 6.2 Define ActivityChap 6.2 Define Activity
Chap 6.2 Define ActivityAnand Bobade
 
Chap 6.1 Plan Schedule Management
Chap 6.1 Plan Schedule ManagementChap 6.1 Plan Schedule Management
Chap 6.1 Plan Schedule ManagementAnand Bobade
 
Chap 6.6 Control Schedule
Chap 6.6 Control ScheduleChap 6.6 Control Schedule
Chap 6.6 Control ScheduleAnand Bobade
 
Chap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project workChap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project workAnand Bobade
 
Chap 5.2 Collect requirements
Chap 5.2 Collect requirementsChap 5.2 Collect requirements
Chap 5.2 Collect requirementsAnand Bobade
 
Chap 4.1- Develop Project Charter
Chap 4.1- Develop Project CharterChap 4.1- Develop Project Charter
Chap 4.1- Develop Project CharterAnand Bobade
 
Chap 7.2 Estimate Cost
Chap 7.2 Estimate CostChap 7.2 Estimate Cost
Chap 7.2 Estimate CostAnand Bobade
 
Chap 5.1 Plan Scope Management
Chap 5.1 Plan Scope ManagementChap 5.1 Plan Scope Management
Chap 5.1 Plan Scope ManagementAnand Bobade
 
Chap 6.3 Sequence Activity
Chap 6.3 Sequence ActivityChap 6.3 Sequence Activity
Chap 6.3 Sequence ActivityAnand Bobade
 
Chap 13.1 Identify stakeholders
Chap 13.1 Identify stakeholdersChap 13.1 Identify stakeholders
Chap 13.1 Identify stakeholdersAnand Bobade
 
Chap 6.0 Schedule Management Overview
Chap 6.0 Schedule Management OverviewChap 6.0 Schedule Management Overview
Chap 6.0 Schedule Management OverviewAnand Bobade
 
Chap 5.3 define scope
Chap 5.3 define scopeChap 5.3 define scope
Chap 5.3 define scopeAnand Bobade
 
Chap 10.2 Manage Communication
Chap 10.2  Manage CommunicationChap 10.2  Manage Communication
Chap 10.2 Manage CommunicationAnand Bobade
 
Chap 7.3 Determine budget
Chap 7.3   Determine budgetChap 7.3   Determine budget
Chap 7.3 Determine budgetAnand Bobade
 
Chap 4.2 Develop Project Management plan
Chap 4.2 Develop Project Management planChap 4.2 Develop Project Management plan
Chap 4.2 Develop Project Management planAnand Bobade
 
Chap 11.7 Monitor Risks
Chap 11.7 Monitor RisksChap 11.7 Monitor Risks
Chap 11.7 Monitor RisksAnand Bobade
 
Chap 8.1 Plan quality management
Chap 8.1 Plan quality managementChap 8.1 Plan quality management
Chap 8.1 Plan quality managementAnand Bobade
 
Chap 4.6 Perform Integrated Change Control
Chap 4.6 Perform Integrated Change ControlChap 4.6 Perform Integrated Change Control
Chap 4.6 Perform Integrated Change ControlAnand Bobade
 
PMBOK-5th ed: PMP- Flashcards Part1/5
PMBOK-5th ed: PMP- Flashcards Part1/5PMBOK-5th ed: PMP- Flashcards Part1/5
PMBOK-5th ed: PMP- Flashcards Part1/5Anand Bobade
 

Similar to Chap 9.2 Estimate Activity Resource (20)

Chap 6.4 Estimate Activity Duration
Chap 6.4 Estimate Activity DurationChap 6.4 Estimate Activity Duration
Chap 6.4 Estimate Activity Duration
 
Chap 6.2 Define Activity
Chap 6.2 Define ActivityChap 6.2 Define Activity
Chap 6.2 Define Activity
 
Chap 6.1 Plan Schedule Management
Chap 6.1 Plan Schedule ManagementChap 6.1 Plan Schedule Management
Chap 6.1 Plan Schedule Management
 
Chap 6.6 Control Schedule
Chap 6.6 Control ScheduleChap 6.6 Control Schedule
Chap 6.6 Control Schedule
 
Chap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project workChap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project work
 
Chap 5.2 Collect requirements
Chap 5.2 Collect requirementsChap 5.2 Collect requirements
Chap 5.2 Collect requirements
 
Chap 4.1- Develop Project Charter
Chap 4.1- Develop Project CharterChap 4.1- Develop Project Charter
Chap 4.1- Develop Project Charter
 
Chap 7.2 Estimate Cost
Chap 7.2 Estimate CostChap 7.2 Estimate Cost
Chap 7.2 Estimate Cost
 
Chap 5.1 Plan Scope Management
Chap 5.1 Plan Scope ManagementChap 5.1 Plan Scope Management
Chap 5.1 Plan Scope Management
 
Chap 6.3 Sequence Activity
Chap 6.3 Sequence ActivityChap 6.3 Sequence Activity
Chap 6.3 Sequence Activity
 
Chap 13.1 Identify stakeholders
Chap 13.1 Identify stakeholdersChap 13.1 Identify stakeholders
Chap 13.1 Identify stakeholders
 
Chap 6.0 Schedule Management Overview
Chap 6.0 Schedule Management OverviewChap 6.0 Schedule Management Overview
Chap 6.0 Schedule Management Overview
 
Chap 5.3 define scope
Chap 5.3 define scopeChap 5.3 define scope
Chap 5.3 define scope
 
Chap 10.2 Manage Communication
Chap 10.2  Manage CommunicationChap 10.2  Manage Communication
Chap 10.2 Manage Communication
 
Chap 7.3 Determine budget
Chap 7.3   Determine budgetChap 7.3   Determine budget
Chap 7.3 Determine budget
 
Chap 4.2 Develop Project Management plan
Chap 4.2 Develop Project Management planChap 4.2 Develop Project Management plan
Chap 4.2 Develop Project Management plan
 
Chap 11.7 Monitor Risks
Chap 11.7 Monitor RisksChap 11.7 Monitor Risks
Chap 11.7 Monitor Risks
 
Chap 8.1 Plan quality management
Chap 8.1 Plan quality managementChap 8.1 Plan quality management
Chap 8.1 Plan quality management
 
Chap 4.6 Perform Integrated Change Control
Chap 4.6 Perform Integrated Change ControlChap 4.6 Perform Integrated Change Control
Chap 4.6 Perform Integrated Change Control
 
PMBOK-5th ed: PMP- Flashcards Part1/5
PMBOK-5th ed: PMP- Flashcards Part1/5PMBOK-5th ed: PMP- Flashcards Part1/5
PMBOK-5th ed: PMP- Flashcards Part1/5
 

More from Anand Bobade

PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...Anand Bobade
 
Chap 12.0 Procurement Management overview
Chap 12.0   Procurement Management overviewChap 12.0   Procurement Management overview
Chap 12.0 Procurement Management overviewAnand Bobade
 
Chap 10.3 Monitor Communication
Chap 10.3 Monitor CommunicationChap 10.3 Monitor Communication
Chap 10.3 Monitor CommunicationAnand Bobade
 
Chap 10.1 Plan Communication Management
Chap 10.1  Plan Communication ManagementChap 10.1  Plan Communication Management
Chap 10.1 Plan Communication ManagementAnand Bobade
 
Chap 7.1 Plan Cost Management
Chap 7.1  Plan Cost ManagementChap 7.1  Plan Cost Management
Chap 7.1 Plan Cost ManagementAnand Bobade
 
Chap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management OverviewChap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management OverviewAnand Bobade
 
Chap 5.5 validate scope
Chap 5.5 validate scopeChap 5.5 validate scope
Chap 5.5 validate scopeAnand Bobade
 

More from Anand Bobade (7)

PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
 
Chap 12.0 Procurement Management overview
Chap 12.0   Procurement Management overviewChap 12.0   Procurement Management overview
Chap 12.0 Procurement Management overview
 
Chap 10.3 Monitor Communication
Chap 10.3 Monitor CommunicationChap 10.3 Monitor Communication
Chap 10.3 Monitor Communication
 
Chap 10.1 Plan Communication Management
Chap 10.1  Plan Communication ManagementChap 10.1  Plan Communication Management
Chap 10.1 Plan Communication Management
 
Chap 7.1 Plan Cost Management
Chap 7.1  Plan Cost ManagementChap 7.1  Plan Cost Management
Chap 7.1 Plan Cost Management
 
Chap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management OverviewChap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management Overview
 
Chap 5.5 validate scope
Chap 5.5 validate scopeChap 5.5 validate scope
Chap 5.5 validate scope
 

Recently uploaded

Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证jdkhjh
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionCIToolkit
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)jennyeacort
 
Management and managerial skills training manual.pdf
Management and managerial skills training manual.pdfManagement and managerial skills training manual.pdf
Management and managerial skills training manual.pdffillmonipdc
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramCIToolkit
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsCIToolkit
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Reviewthomas851723
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 
Motivational theories an leadership skills
Motivational theories an leadership skillsMotivational theories an leadership skills
Motivational theories an leadership skillskristinalimarenko7
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchRashtriya Kisan Manch
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentationcraig524401
 

Recently uploaded (18)

Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem Resolution
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
 
Management and managerial skills training manual.pdf
Management and managerial skills training manual.pdfManagement and managerial skills training manual.pdf
Management and managerial skills training manual.pdf
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Review
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 
Motivational theories an leadership skills
Motivational theories an leadership skillsMotivational theories an leadership skills
Motivational theories an leadership skills
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentation
 

Chap 9.2 Estimate Activity Resource

  • 1. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Chapter 9 – Project Resource Management PMP Trainer: Anand BobadePMBOK 6th Edition, 2019, All rights reserved. Estimate Activity Resources SIXTH EDITION
  • 2. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) 9.2 Estimate activity resources Overview Estimate Activity resource Process definition Estimate Activity resource: ITTO Why is Alternative Analysis? What is Bottom up estimation? What is resource breakdown structure? Review
  • 3. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Resource Management processes Plan Resource management Estimate Activity Resources Acquire Resources Develop Team Manage Team Control Resources P P P MCE E
  • 4. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Estimate Activity resource -> Introduction Human resources Material Equipment Supplies
  • 5. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Complexity Resource Skills Resource availability History of performing similar task Estimate Activity resource -> Key Factors
  • 6. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Estimating type & quantities of material, human resources, equipment or supplies required to perform each activity. Develop more accurate cost and duration estimates. Estimate Activity resource -> Definition Type & Quantities Material Human resources Equipment Supplies Estimating Project Activities Perform
  • 7. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Estimate activity resources -> ITTO Expert Judgment Bottom up estimating Analogous estimating Parametric estimating Data analysis PMIS Meetings Project Management Plan Project documents Enterprise environmental factors Organizational process assets Resource requirements Basis of estimates Resource breakdown structure Project document updates Inputs Tools & Techniques Outputs
  • 8. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Estimate Activity Resources -> Input Project Management Plan Project documents Enterprise environmental factors Organizational process assets
  • 9. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project Management Plan Estimate Activity Resources -> Input -> PMP Resource Management plan Scope baseline
  • 10. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project documents Estimate Activity Resources -> Input -> Project documents Activity list Activity attributes Cost estimates Resource calendars Assumption log Risk register
  • 11. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project documents Activity list: A list of all activities that will be performed on project & a description of each activity Activity ID WBS Id Name Description 501 W50 Compare Furniture brands 502 W50 Find showrooms 503 W50 Get Quotes 504 W50 Compare Quotes Estimate Activity Resources->Input->Project doc’s-> Activity list:
  • 12. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project documents Activity attributes: • Provide additional information about activities. • During the initial stages of the project, they include • Activity identifier (ID), WBS ID, Activity label or name etc Activity description Predecessor activities Successor activities Logical relationships Leads and lags Resource requirements Imposed dates Constraints Assumptions Person responsible Geographic area or place Calendar Estimate Activity Resources->Input->Project doc’s-> Activity attributes: When Completed they may include
  • 13. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project documents Resource calendars: •Identifies working days & shifts on which each specific resource is available. •Details about when & how long identified project resource will be available Estimate Activity Resources->Input->Project doc’s-> Resource calendars •Resource may be material, human resources, equipment etcRemember:
  • 14. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project documents Risk Register: • Risk events may impact resource selection and availability. • Risks related to activity sequencing, dependencies. Estimate Activity Resources->Input->Project doc’s-> Risk Register # Risk Probability Imp act Urgenc y Category Risk Level Risk Response 1 Continually changing requirements 3 4 Low Scope High 2 Project involves the use of new technology 2 3 Normal Solution Medium 3 Inexperience team members 2 4 Immedi ate Resource Medium 4 Unstable organizational environment 1 5 Immedi ate EEF Medium
  • 15. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project documents Cost estimates: • Provides probable costs required to complete activities / project work. (summary or detail) Estimate Activity Resources->Input->Project doc’s-> Cost estimates Estimate Cost (Project Cost Manag.) Estimate Activity resources- Resource type / Quantity can be decided based on cost. make or buy / Manual or automated
  • 16. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Organizational process assets Policies and procedures regarding staffing Policies and procedures relating to rental and purchase Historical information - types of resources used for similar work on previous projects Estimate Activity Resources -> Input->OPA
  • 17. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Enterprise environmental factors Resource location availability and skills. Estimate Activity Resources -> Input->EEF
  • 18. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Expert Judgment Bottom up estimating Analogous estimating Parametric estimating Data analysis PMIS Meetings Estimate Activity resources -> Tools & Techniques
  • 19. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Mr. Expert Expert Judgment Specialized knowledge in resource planning & estimating can provide such expertise Can help in choosing right resource Identify activity resource requirement Can perform or contribute in estimating & alternative analysis Estimate Activity resources -> T&T -> Expert Judgment
  • 20. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Data analysis Alternative Analysis: • Many schedule activities have alternative methods of accomplishment. Various levels of resource capability or skills Different size or type of machines Different tools (hand versus automated) Make- rent-or-buy decisions regarding the resource Analyses focus on: Any group or person with specialized knowledge in resource planning and estimating can provide such expertise Estimate Activity resources->T&T-> Data analysis
  • 21. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Data analysis Alternative Analysis: •Example: Road construction work - Expert helping PM identifying resource requirements through alternative analysis Estimate Activity resources->T&T-> Data analysis Build Manually •Less cost •More human resources •Slow delivery Use machines •More cost •Less human resources •Resource capabilities •Faster delivery •Machines availability 21 • Manual work may cost less as cheap human resources are available but may need more time to complete project. Cost • Machine developed road will give better quality hence maintenance cost will be less. Also, delivery will be faster. Quality: • Machines may not be available. Bringing machines to the location may not be possible. Human resource to operate may not be available. Risk:
  • 22. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Bottom up estimating Estimating resources or cost by aggregating estimates of lower-level components of WBS. Activities are broken into smaller activities which can be estimated. There resource needs are estimated. Resources are assigned to each activity. These estimates are aggregated into a total quantity of resources. Estimate Activity resources->T&T-> Bottom up estimate
  • 23. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) PMIS Optimizing Resource utilization Resource breakdown structure Resource availability Resource rate Resource calendar PMIS has capability to: Plan, organize & manage the resource pools Develop resource estimates Can automatically resolve scheduling conflicts Can help perform workload analysis Can help optimize resource utilization Estimate Activity resources->T&T-> PMIS
  • 24. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Resource requirements Basis of estimates Resource breakdown structure Project document updates Estimate Activity resources -> Outputs
  • 25. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Resource requirements The types and quantities of resources required for each activity in a work package. Aggregated to determine the estimated resources for each work package and each work period. Resource Type/ Activity Resource Quantity/ Activity Resource for Work Package Estimate Activity Resource->Outputs-> Resource Requirements
  • 26. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Resource breakdown structure Hierarchical representation of resources by category and type. RBS is useful for organizing & reporting project schedule data with resource utilization information. Construction Project Labor Managers Manager1 Manager2 Workers Worker1 Worker2 Worker3 Material Building Office setup Equipment Desktop Laptop Printer Projector Supplies Printer Cartridges Papers Stationary Estimate Activity resources -> Outputs-> RBS
  • 27. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Estimate Activity resources->Outputs->Project document update •Attribute for new activities •Change in attributes of older activities Activity attributes •Resource related RiskRisk register •Update Project & recourse calendar Resource Calendars Activity attributes Assumption log Lessons learned register Project document updates
  • 28. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Estimate Activity resources -> Review Why to estimate activity resources? What is Alternative Analysis? What is published estimation data? What is Bottom up estimation? What is resource breakdown structure? What is PMIS?
  • 29. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)