SlideShare a Scribd company logo
1 of 5
Download to read offline
PMP – 49 Processes (Chart prepared by Anand Bobade)
Initiating (2) Planning (24) Executing (8) Monitoring & Controlling (11) Closing (2)
Chap 4-Project Integration
Management (7)
Chap 5-Project Scope
Management (6)
Chap6-Project Schedule
Management (6)
Develop Project
Charter
Develop Project
Management plan
Direct and Manage
Project work
Manage Knowledge
Monitor & Control
Project Work
Perform Integrated
change Control
Close Project or
phase
Plan scope
management
Collect
Requirements
Define Scope Create WBS
Validate Scope
Control Scope
Plan Schedule
management
Define Activities
Sequence
Activities
Estimate Activity
Duration
DevelopSchedule
Control Schedule
Chap7-Project Cost
Management (4)
Chap8-Project Quality
Management (3)
Chap 9- Resource
Management (6)
Chap10-Project Comm.
Management(3)
Plan Cost
management
Estimate Cost
Determine Budget
Control Cost
Plan Quality
management
Manage Quality Control Quality
Plan Resource
management
Estimate Activity
Resources
Acquire
Resources
DevelopTeam
Manage Team
Control Resources
Plan Communication
Manage
Communication
Monitor
Communication
Chap 11-Project Risk
Management(7)
Chap 12 - Project
Procurement Manag. (3)
Chap 13 - Project
Stakeholder Manag. (4)
Anand Bobade (nmbobade@gmail.com, 055 5932004)
❑https://ae.linkedin.com/in/anandbobade
❑http://www.slideshare.net/anandbobade
❑Conduct online training, Corporate Training & weekend workshops.
Plan Risk
management
Identify Risk
Perform Qualitative
Risk Analysis
Perform
Quantitative Risk
Analysis
Plan Risk Response
Implement Risk
Response
Monitor Risk
Plan Procurement
Management
Conduct Procurement Control Procurement
Identify
Stakeholders
Plan Stakeholder
Engagement
Manage Stakeholder
Engagement
Monitor Stakeholder
Engagement
Links to all 49 processes Presentations Links to YouTube videos
Chap 4 - Integration:
https://www.slideshare.net/anandbobade/chap-40-project-integration-management-overview
https://www.slideshare.net/anandbobade/chap-41-develop-project-charter
https://www.slideshare.net/anandbobade/chap-42-develop-project-management-plan
https://www.slideshare.net/anandbobade/chap-43-direct-and-manage-project-work
https://www.slideshare.net/anandbobade/pmp-chap44project-integration-management-manageknowledge
https://www.slideshare.net/anandbobade/chap-45-monitor-and-control-project-work
https://www.slideshare.net/anandbobade/chap-46-perform-integrated-change-control
https://www.slideshare.net/anandbobade/chap-47-project-or-phase-close
https://youtu.be/NdzADFfoRxA
https://youtu.be/t3SDco3qVcM
https://youtu.be/jeI9yQcLVGc
https://youtu.be/V6hONGx0D0A
https://youtu.be/VLTHz_P4EvM
https://youtu.be/N4Fz-OsIjTg
https://youtu.be/Jv9Y9EjActo
https://youtu.be/egi7ot2yB3w
Chap 5 - Scope:
https://www.slideshare.net/anandbobade/pmp-chap-50-scope-management-overview
https://www.slideshare.net/anandbobade/chap-51-plan-scope-management
https://www.slideshare.net/anandbobade/chap-52-collect-requirements
https://www.slideshare.net/anandbobade/chap-53-define-scope
https://www.slideshare.net/anandbobade/chap-54-create-wbs
https://www.slideshare.net/anandbobade/chap-55-validate-scope
https://www.slideshare.net/anandbobade/chap-56-control-scope
https://youtu.be/9u6f2NXlGnI
https://youtu.be/uLVUppKclUI
https://youtu.be/ngu-IMGCeSE
https://youtu.be/WByDRHROjZw
https://youtu.be/-Nu8ENRZ09M
https://youtu.be/Q5OhVv-x4eo
https://youtu.be/1g39Jpmw-94
Chap 6: Schedule:
https://www.slideshare.net/anandbobade/chap-60-schedule-management-overview
https://www.slideshare.net/anandbobade/chap-61-plan-schedule-management
https://www.slideshare.net/anandbobade/chap-62-define-activity
https://www.slideshare.net/anandbobade/chap-63-sequence-activity
https://www.slideshare.net/anandbobade/chap-64-estimate-activity-duration
https://www.slideshare.net/anandbobade/chap-65-define-schedule
https://www.slideshare.net/anandbobade/chap-66-control-schedule
Chap 7: Cost:
https://www.slideshare.net/anandbobade/chap-70-project-cost-management-overview
https://www.slideshare.net/anandbobade/chap-71-plan-cost-management
https://www.slideshare.net/anandbobade/chap-72-estimate-cost
https://www.slideshare.net/anandbobade/chap-73-determine-budget
https://www.slideshare.net/anandbobade/chap-74-control-cost
Chap 8: Quality:
https://www.slideshare.net/anandbobade/chap-80-quality-management-overview
https://www.slideshare.net/anandbobade/chap-81-plan-quality-management
https://www.slideshare.net/anandbobade/chap-82-manage-quality
https://www.slideshare.net/anandbobade/chap-83-control-quality
https://youtu.be/8zteKSxDyt4
https://youtu.be/tL32SJV-dWA
https://youtu.be/6laO93g0e6o
https://youtu.be/EnC0E_QXPdo
Chap 9: Resource:
https://www.slideshare.net/anandbobade/chap-90-project-resource-management-overview
https://www.slideshare.net/anandbobade/chap-91-pan-resource-management
https://www.slideshare.net/anandbobade/chap-92-estimate-activity-resource
https://www.slideshare.net/anandbobade/chap-93-acquire-resources
https://www.slideshare.net/anandbobade/chap-94-develop-team
https://www.slideshare.net/anandbobade/chap-95-manage-team
https://www.slideshare.net/anandbobade/chap-96-control-resources
Chap 10: Communication:
https://www.slideshare.net/anandbobade/chap-100-project-communication-management-overview
https://www.slideshare.net/anandbobade/chap-101-plan-communication-management
https://www.slideshare.net/anandbobade/chap-102-manage-communication
https://www.slideshare.net/anandbobade/chap-103-monitor-communication
Chap 11 – Risk:
https://www.slideshare.net/anandbobade/chap-110-project-risk-management-overview-143496876
https://www.slideshare.net/anandbobade/chap-111-plan-risk-management-143497221
https://www.slideshare.net/anandbobade/chap-112-identify-risks-143497237
https://www.slideshare.net/anandbobade/chap-113-perform-qualitative-risk-analysis
https://www.slideshare.net/anandbobade/chap-114-perform-quantitative-risk-analysis
https://www.slideshare.net/anandbobade/chap-115-plan-risk-response-143497289
https://www.slideshare.net/anandbobade/chap-116-implement-risk-response-143497303
https://www.slideshare.net/anandbobade/chap-117-monitor-risks-143497342
Chap 12 – Procurement:
https://www.slideshare.net/anandbobade/chap-120-procurement-management-overview
https://www.slideshare.net/anandbobade/chap-121-plan-procurement-management
https://www.slideshare.net/anandbobade/chap-122-conduct-procurement
https://www.slideshare.net/anandbobade/chap-123-control-procurement
Chap 13 - Stakeholder
https://www.slideshare.net/anandbobade/chap-130-project-stakeholder-management-overview-141174203
https://www.slideshare.net/anandbobade/chap-131-identify-stakeholders
https://www.slideshare.net/anandbobade/chap-132-plan-stakeholder-engagement-141174396
https://www.slideshare.net/anandbobade/chap-133-manage-stakeholder
https://www.slideshare.net/anandbobade/chap-134-monitor-stakeholder
https://youtu.be/Vhjc6T9R4d8
https://youtu.be/QjNzwwSXlBY
https://youtu.be/29Xt2r1ufZQ
https://youtu.be/ZrNg-NiJVfk
https://youtu.be/bXX5t1Jjh_M

More Related Content

What's hot

PMP Chapter 1 of 6 introduction (Based on PMBOK 6th edition)
PMP Chapter 1 of 6  introduction (Based on PMBOK 6th edition)PMP Chapter 1 of 6  introduction (Based on PMBOK 6th edition)
PMP Chapter 1 of 6 introduction (Based on PMBOK 6th edition)Shamil Habet
 
PMP® Training Video | PMBOK® Guide Sixth Edition Training | PMP® Certificatio...
PMP® Training Video | PMBOK® Guide Sixth Edition Training | PMP® Certificatio...PMP® Training Video | PMBOK® Guide Sixth Edition Training | PMP® Certificatio...
PMP® Training Video | PMBOK® Guide Sixth Edition Training | PMP® Certificatio...Edureka!
 
Chap 9.1 Pan Resource Management
Chap 9.1   Pan Resource ManagementChap 9.1   Pan Resource Management
Chap 9.1 Pan Resource ManagementAnand Bobade
 
Chap 4.2 Develop Project Management plan
Chap 4.2 Develop Project Management planChap 4.2 Develop Project Management plan
Chap 4.2 Develop Project Management planAnand Bobade
 
Project Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation training
Project Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation trainingProject Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation training
Project Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation trainingJustAcademy
 
Project Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Professional PMI-PMP Based on PMBOK 6th EditionProject Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Professional PMI-PMP Based on PMBOK 6th EditionJohn Khateeb
 
PMP Chapter 2 of 6 Initiating Process Group (2- Processes) (Based on PMBOK 6...
PMP Chapter 2 of 6  Initiating Process Group (2- Processes) (Based on PMBOK 6...PMP Chapter 2 of 6  Initiating Process Group (2- Processes) (Based on PMBOK 6...
PMP Chapter 2 of 6 Initiating Process Group (2- Processes) (Based on PMBOK 6...Shamil Habet
 
Chap 5.2 Collect requirements
Chap 5.2 Collect requirementsChap 5.2 Collect requirements
Chap 5.2 Collect requirementsAnand Bobade
 
Chap 4.7 Project or Phase Close
Chap 4.7 Project or Phase CloseChap 4.7 Project or Phase Close
Chap 4.7 Project or Phase CloseAnand Bobade
 
PMP Chap 2- Org. Influence and Project Life Cycle
PMP Chap 2- Org. Influence and Project Life CyclePMP Chap 2- Org. Influence and Project Life Cycle
PMP Chap 2- Org. Influence and Project Life CycleAnand Bobade
 
Chap 8.0 Quality Management Overview
Chap 8.0 Quality Management OverviewChap 8.0 Quality Management Overview
Chap 8.0 Quality Management OverviewAnand Bobade
 
Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7Saad Merie
 
PMP Chap 7 - Project Cost Management - Part 2
PMP Chap 7 - Project Cost Management - Part 2PMP Chap 7 - Project Cost Management - Part 2
PMP Chap 7 - Project Cost Management - Part 2Anand Bobade
 
Project Management Tutorial | PMP Certification | Edureka
Project Management Tutorial | PMP Certification | EdurekaProject Management Tutorial | PMP Certification | Edureka
Project Management Tutorial | PMP Certification | EdurekaEdureka!
 
Agile Project Management for PMP's
Agile Project Management for PMP'sAgile Project Management for PMP's
Agile Project Management for PMP'sVersionOne
 
Chap 11.2 Identify Risks
Chap 11.2 Identify RisksChap 11.2 Identify Risks
Chap 11.2 Identify RisksAnand Bobade
 
Chap 5.3 define scope
Chap 5.3 define scopeChap 5.3 define scope
Chap 5.3 define scopeAnand Bobade
 

What's hot (20)

Pmbok6 to 7 transformation
Pmbok6 to 7 transformationPmbok6 to 7 transformation
Pmbok6 to 7 transformation
 
PMP Chapter 1 of 6 introduction (Based on PMBOK 6th edition)
PMP Chapter 1 of 6  introduction (Based on PMBOK 6th edition)PMP Chapter 1 of 6  introduction (Based on PMBOK 6th edition)
PMP Chapter 1 of 6 introduction (Based on PMBOK 6th edition)
 
PMP® Training Video | PMBOK® Guide Sixth Edition Training | PMP® Certificatio...
PMP® Training Video | PMBOK® Guide Sixth Edition Training | PMP® Certificatio...PMP® Training Video | PMBOK® Guide Sixth Edition Training | PMP® Certificatio...
PMP® Training Video | PMBOK® Guide Sixth Edition Training | PMP® Certificatio...
 
Chap 9.1 Pan Resource Management
Chap 9.1   Pan Resource ManagementChap 9.1   Pan Resource Management
Chap 9.1 Pan Resource Management
 
Chap 4.2 Develop Project Management plan
Chap 4.2 Develop Project Management planChap 4.2 Develop Project Management plan
Chap 4.2 Develop Project Management plan
 
PMBOK 7th Edition What is Changing?
PMBOK 7th Edition What is Changing?PMBOK 7th Edition What is Changing?
PMBOK 7th Edition What is Changing?
 
Project Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation training
Project Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation trainingProject Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation training
Project Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation training
 
Project Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Professional PMI-PMP Based on PMBOK 6th EditionProject Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Professional PMI-PMP Based on PMBOK 6th Edition
 
PMP Chapter 2 of 6 Initiating Process Group (2- Processes) (Based on PMBOK 6...
PMP Chapter 2 of 6  Initiating Process Group (2- Processes) (Based on PMBOK 6...PMP Chapter 2 of 6  Initiating Process Group (2- Processes) (Based on PMBOK 6...
PMP Chapter 2 of 6 Initiating Process Group (2- Processes) (Based on PMBOK 6...
 
Chap 5.2 Collect requirements
Chap 5.2 Collect requirementsChap 5.2 Collect requirements
Chap 5.2 Collect requirements
 
Chap 4.7 Project or Phase Close
Chap 4.7 Project or Phase CloseChap 4.7 Project or Phase Close
Chap 4.7 Project or Phase Close
 
PMP Chap 2- Org. Influence and Project Life Cycle
PMP Chap 2- Org. Influence and Project Life CyclePMP Chap 2- Org. Influence and Project Life Cycle
PMP Chap 2- Org. Influence and Project Life Cycle
 
Chap 8.0 Quality Management Overview
Chap 8.0 Quality Management OverviewChap 8.0 Quality Management Overview
Chap 8.0 Quality Management Overview
 
Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7
 
PMP Chap 7 - Project Cost Management - Part 2
PMP Chap 7 - Project Cost Management - Part 2PMP Chap 7 - Project Cost Management - Part 2
PMP Chap 7 - Project Cost Management - Part 2
 
Project Management Tutorial | PMP Certification | Edureka
Project Management Tutorial | PMP Certification | EdurekaProject Management Tutorial | PMP Certification | Edureka
Project Management Tutorial | PMP Certification | Edureka
 
Project Management Concepts
Project Management ConceptsProject Management Concepts
Project Management Concepts
 
Agile Project Management for PMP's
Agile Project Management for PMP'sAgile Project Management for PMP's
Agile Project Management for PMP's
 
Chap 11.2 Identify Risks
Chap 11.2 Identify RisksChap 11.2 Identify Risks
Chap 11.2 Identify Risks
 
Chap 5.3 define scope
Chap 5.3 define scopeChap 5.3 define scope
Chap 5.3 define scope
 

Similar to PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Youtube videos

Knowledge Area and 47 Processes Chart
Knowledge Area and 47 Processes ChartKnowledge Area and 47 Processes Chart
Knowledge Area and 47 Processes ChartAnand Bobade
 
PMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesPMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesMohamed Loey
 
PMBoK ed.5 brief overview
PMBoK ed.5 brief overviewPMBoK ed.5 brief overview
PMBoK ed.5 brief overviewOleksiy Rudenko
 
Project Management Processes
Project Management ProcessesProject Management Processes
Project Management ProcessesJoshua Render
 
Pmppmbok6 190414215021
Pmppmbok6 190414215021Pmppmbok6 190414215021
Pmppmbok6 190414215021GarrettDeLucca
 
Pmbok Training for pmo
Pmbok Training for pmoPmbok Training for pmo
Pmbok Training for pmoErin Jones
 
All4pm 4판5판-비교
All4pm 4판5판-비교All4pm 4판5판-비교
All4pm 4판5판-비교환성 용
 
5.1 Plan Scope Management
5.1 Plan Scope Management5.1 Plan Scope Management
5.1 Plan Scope ManagementDavidMcLachlan1
 
Project management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasProject management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasMazen Zbib
 
PMP 47 process definitions
PMP 47 process definitionsPMP 47 process definitions
PMP 47 process definitionsAnand Bobade
 
Innovate vancouver project management book
Innovate vancouver   project management bookInnovate vancouver   project management book
Innovate vancouver project management bookInnovate Vancouver
 
Changes to Sixth Edition of PMBOK
Changes to Sixth Edition of PMBOKChanges to Sixth Edition of PMBOK
Changes to Sixth Edition of PMBOKAtul Gaur PMP
 
PMBoK V5 changes
PMBoK V5 changesPMBoK V5 changes
PMBoK V5 changesPeg Duggan
 

Similar to PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Youtube videos (20)

Knowledge Area and 47 Processes Chart
Knowledge Area and 47 Processes ChartKnowledge Area and 47 Processes Chart
Knowledge Area and 47 Processes Chart
 
PMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesPMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management Processes
 
Pmp itto
Pmp ittoPmp itto
Pmp itto
 
49ProcessesPMI
49ProcessesPMI49ProcessesPMI
49ProcessesPMI
 
PMBoK ed.5 brief overview
PMBoK ed.5 brief overviewPMBoK ed.5 brief overview
PMBoK ed.5 brief overview
 
Project Management Processes
Project Management ProcessesProject Management Processes
Project Management Processes
 
Pmppmbok6 190414215021
Pmppmbok6 190414215021Pmppmbok6 190414215021
Pmppmbok6 190414215021
 
Knowledge areas
Knowledge areasKnowledge areas
Knowledge areas
 
PMP Material
PMP MaterialPMP Material
PMP Material
 
process groups and knowledge areas
process groups and knowledge areasprocess groups and knowledge areas
process groups and knowledge areas
 
Pmbok Training for pmo
Pmbok Training for pmoPmbok Training for pmo
Pmbok Training for pmo
 
Nine Things-in-the-PMBoK
Nine Things-in-the-PMBoKNine Things-in-the-PMBoK
Nine Things-in-the-PMBoK
 
All4pm 4판5판-비교
All4pm 4판5판-비교All4pm 4판5판-비교
All4pm 4판5판-비교
 
5.1 Plan Scope Management
5.1 Plan Scope Management5.1 Plan Scope Management
5.1 Plan Scope Management
 
Project management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasProject management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areas
 
PMP 47 process definitions
PMP 47 process definitionsPMP 47 process definitions
PMP 47 process definitions
 
Pmi processes
Pmi processesPmi processes
Pmi processes
 
Innovate vancouver project management book
Innovate vancouver   project management bookInnovate vancouver   project management book
Innovate vancouver project management book
 
Changes to Sixth Edition of PMBOK
Changes to Sixth Edition of PMBOKChanges to Sixth Edition of PMBOK
Changes to Sixth Edition of PMBOK
 
PMBoK V5 changes
PMBoK V5 changesPMBoK V5 changes
PMBoK V5 changes
 

More from Anand Bobade

Chap 12.3 Control Procurement
Chap 12.3 Control ProcurementChap 12.3 Control Procurement
Chap 12.3 Control ProcurementAnand Bobade
 
Chap 12.2 Conduct Procurement
Chap 12.2 Conduct ProcurementChap 12.2 Conduct Procurement
Chap 12.2 Conduct ProcurementAnand Bobade
 
Chap 12.1 Plan Procurement Management
Chap 12.1 Plan Procurement ManagementChap 12.1 Plan Procurement Management
Chap 12.1 Plan Procurement ManagementAnand Bobade
 
Chap 12.0 Procurement Management overview
Chap 12.0   Procurement Management overviewChap 12.0   Procurement Management overview
Chap 12.0 Procurement Management overviewAnand Bobade
 
Chap 11.7 Monitor Risks
Chap 11.7 Monitor RisksChap 11.7 Monitor Risks
Chap 11.7 Monitor RisksAnand Bobade
 
Chap 10.3 Monitor Communication
Chap 10.3 Monitor CommunicationChap 10.3 Monitor Communication
Chap 10.3 Monitor CommunicationAnand Bobade
 
Chap 10.2 Manage Communication
Chap 10.2  Manage CommunicationChap 10.2  Manage Communication
Chap 10.2 Manage CommunicationAnand Bobade
 
Chap 10.1 Plan Communication Management
Chap 10.1  Plan Communication ManagementChap 10.1  Plan Communication Management
Chap 10.1 Plan Communication ManagementAnand Bobade
 
Chap 9.6 Control Resources
Chap 9.6  Control ResourcesChap 9.6  Control Resources
Chap 9.6 Control ResourcesAnand Bobade
 
Chap 9.5 Manage Team
Chap 9.5  Manage TeamChap 9.5  Manage Team
Chap 9.5 Manage TeamAnand Bobade
 
Chap 9.4 Develop Team
Chap 9.4  Develop TeamChap 9.4  Develop Team
Chap 9.4 Develop TeamAnand Bobade
 
Chap 9.3 Acquire Resources
Chap 9.3   Acquire ResourcesChap 9.3   Acquire Resources
Chap 9.3 Acquire ResourcesAnand Bobade
 
Chap 9.2 Estimate Activity Resource
Chap 9.2   Estimate Activity ResourceChap 9.2   Estimate Activity Resource
Chap 9.2 Estimate Activity ResourceAnand Bobade
 
Chap 9.0 Project Resource Management overview
Chap 9.0   Project Resource Management overviewChap 9.0   Project Resource Management overview
Chap 9.0 Project Resource Management overviewAnand Bobade
 
Chap 7.4 Control Cost
Chap 7.4   Control CostChap 7.4   Control Cost
Chap 7.4 Control CostAnand Bobade
 
Chap 7.2 Estimate Cost
Chap 7.2 Estimate CostChap 7.2 Estimate Cost
Chap 7.2 Estimate CostAnand Bobade
 
Chap 7.3 Determine budget
Chap 7.3   Determine budgetChap 7.3   Determine budget
Chap 7.3 Determine budgetAnand Bobade
 
Chap 7.1 Plan Cost Management
Chap 7.1  Plan Cost ManagementChap 7.1  Plan Cost Management
Chap 7.1 Plan Cost ManagementAnand Bobade
 
Chap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management OverviewChap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management OverviewAnand Bobade
 
Chap 6.6 Control Schedule
Chap 6.6 Control ScheduleChap 6.6 Control Schedule
Chap 6.6 Control ScheduleAnand Bobade
 

More from Anand Bobade (20)

Chap 12.3 Control Procurement
Chap 12.3 Control ProcurementChap 12.3 Control Procurement
Chap 12.3 Control Procurement
 
Chap 12.2 Conduct Procurement
Chap 12.2 Conduct ProcurementChap 12.2 Conduct Procurement
Chap 12.2 Conduct Procurement
 
Chap 12.1 Plan Procurement Management
Chap 12.1 Plan Procurement ManagementChap 12.1 Plan Procurement Management
Chap 12.1 Plan Procurement Management
 
Chap 12.0 Procurement Management overview
Chap 12.0   Procurement Management overviewChap 12.0   Procurement Management overview
Chap 12.0 Procurement Management overview
 
Chap 11.7 Monitor Risks
Chap 11.7 Monitor RisksChap 11.7 Monitor Risks
Chap 11.7 Monitor Risks
 
Chap 10.3 Monitor Communication
Chap 10.3 Monitor CommunicationChap 10.3 Monitor Communication
Chap 10.3 Monitor Communication
 
Chap 10.2 Manage Communication
Chap 10.2  Manage CommunicationChap 10.2  Manage Communication
Chap 10.2 Manage Communication
 
Chap 10.1 Plan Communication Management
Chap 10.1  Plan Communication ManagementChap 10.1  Plan Communication Management
Chap 10.1 Plan Communication Management
 
Chap 9.6 Control Resources
Chap 9.6  Control ResourcesChap 9.6  Control Resources
Chap 9.6 Control Resources
 
Chap 9.5 Manage Team
Chap 9.5  Manage TeamChap 9.5  Manage Team
Chap 9.5 Manage Team
 
Chap 9.4 Develop Team
Chap 9.4  Develop TeamChap 9.4  Develop Team
Chap 9.4 Develop Team
 
Chap 9.3 Acquire Resources
Chap 9.3   Acquire ResourcesChap 9.3   Acquire Resources
Chap 9.3 Acquire Resources
 
Chap 9.2 Estimate Activity Resource
Chap 9.2   Estimate Activity ResourceChap 9.2   Estimate Activity Resource
Chap 9.2 Estimate Activity Resource
 
Chap 9.0 Project Resource Management overview
Chap 9.0   Project Resource Management overviewChap 9.0   Project Resource Management overview
Chap 9.0 Project Resource Management overview
 
Chap 7.4 Control Cost
Chap 7.4   Control CostChap 7.4   Control Cost
Chap 7.4 Control Cost
 
Chap 7.2 Estimate Cost
Chap 7.2 Estimate CostChap 7.2 Estimate Cost
Chap 7.2 Estimate Cost
 
Chap 7.3 Determine budget
Chap 7.3   Determine budgetChap 7.3   Determine budget
Chap 7.3 Determine budget
 
Chap 7.1 Plan Cost Management
Chap 7.1  Plan Cost ManagementChap 7.1  Plan Cost Management
Chap 7.1 Plan Cost Management
 
Chap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management OverviewChap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management Overview
 
Chap 6.6 Control Schedule
Chap 6.6 Control ScheduleChap 6.6 Control Schedule
Chap 6.6 Control Schedule
 

Recently uploaded

Management 11th Edition - Chapter 13 - Managing Teams
Management 11th Edition - Chapter 13 - Managing TeamsManagement 11th Edition - Chapter 13 - Managing Teams
Management 11th Edition - Chapter 13 - Managing Teamsshakkardaddy
 
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Giuseppe De Simone
 
How Technologies will change the relationship with Human Resources
How Technologies will change the relationship with Human ResourcesHow Technologies will change the relationship with Human Resources
How Technologies will change the relationship with Human ResourcesMassimo Canducci
 
Management 11th Edition - Chapter 9 - Strategic Management
Management 11th Edition - Chapter 9 - Strategic ManagementManagement 11th Edition - Chapter 9 - Strategic Management
Management 11th Edition - Chapter 9 - Strategic Managementshakkardaddy
 
The Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data InsightsThe Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data InsightsCIToolkit
 
Exploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram AnalysisExploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram AnalysisCIToolkit
 
BoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & Engineering
BoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & EngineeringBoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & Engineering
BoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & EngineeringBusiness of Software Conference
 
Choosing the best strategy qspm matrix.pptx
Choosing the best strategy qspm matrix.pptxChoosing the best strategy qspm matrix.pptx
Choosing the best strategy qspm matrix.pptxMadan Karki
 
Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...
Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...
Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...Nagarjuna Reddy Aturi
 
HOTEL MANAGEMENT SYSTEM PPT PRESENTATION
HOTEL MANAGEMENT SYSTEM PPT PRESENTATIONHOTEL MANAGEMENT SYSTEM PPT PRESENTATION
HOTEL MANAGEMENT SYSTEM PPT PRESENTATIONsivani14565220
 
Management 11th Edition - Chapter 11 - Adaptive Organizational Design
Management 11th Edition - Chapter 11 - Adaptive Organizational DesignManagement 11th Edition - Chapter 11 - Adaptive Organizational Design
Management 11th Edition - Chapter 11 - Adaptive Organizational Designshakkardaddy
 
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsDigital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsHannah Smith
 
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsMind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsCIToolkit
 
Adapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingAdapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingCIToolkit
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionCIToolkit
 
Shaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingShaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingGiuseppe De Simone
 
Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...
Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...
Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...Conny Dethloff
 
Operations Management -- Sustainability and Supply Chain Management.pdf
Operations Management -- Sustainability and Supply Chain Management.pdfOperations Management -- Sustainability and Supply Chain Management.pdf
Operations Management -- Sustainability and Supply Chain Management.pdfcoolsnoopy1
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentCIToolkit
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsCIToolkit
 

Recently uploaded (20)

Management 11th Edition - Chapter 13 - Managing Teams
Management 11th Edition - Chapter 13 - Managing TeamsManagement 11th Edition - Chapter 13 - Managing Teams
Management 11th Edition - Chapter 13 - Managing Teams
 
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
 
How Technologies will change the relationship with Human Resources
How Technologies will change the relationship with Human ResourcesHow Technologies will change the relationship with Human Resources
How Technologies will change the relationship with Human Resources
 
Management 11th Edition - Chapter 9 - Strategic Management
Management 11th Edition - Chapter 9 - Strategic ManagementManagement 11th Edition - Chapter 9 - Strategic Management
Management 11th Edition - Chapter 9 - Strategic Management
 
The Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data InsightsThe Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data Insights
 
Exploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram AnalysisExploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram Analysis
 
BoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & Engineering
BoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & EngineeringBoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & Engineering
BoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & Engineering
 
Choosing the best strategy qspm matrix.pptx
Choosing the best strategy qspm matrix.pptxChoosing the best strategy qspm matrix.pptx
Choosing the best strategy qspm matrix.pptx
 
Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...
Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...
Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...
 
HOTEL MANAGEMENT SYSTEM PPT PRESENTATION
HOTEL MANAGEMENT SYSTEM PPT PRESENTATIONHOTEL MANAGEMENT SYSTEM PPT PRESENTATION
HOTEL MANAGEMENT SYSTEM PPT PRESENTATION
 
Management 11th Edition - Chapter 11 - Adaptive Organizational Design
Management 11th Edition - Chapter 11 - Adaptive Organizational DesignManagement 11th Edition - Chapter 11 - Adaptive Organizational Design
Management 11th Edition - Chapter 11 - Adaptive Organizational Design
 
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsDigital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
 
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsMind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
 
Adapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingAdapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-Making
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem Resolution
 
Shaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingShaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful Thinking
 
Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...
Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...
Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...
 
Operations Management -- Sustainability and Supply Chain Management.pdf
Operations Management -- Sustainability and Supply Chain Management.pdfOperations Management -- Sustainability and Supply Chain Management.pdf
Operations Management -- Sustainability and Supply Chain Management.pdf
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
 

PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Youtube videos

  • 1. PMP – 49 Processes (Chart prepared by Anand Bobade) Initiating (2) Planning (24) Executing (8) Monitoring & Controlling (11) Closing (2) Chap 4-Project Integration Management (7) Chap 5-Project Scope Management (6) Chap6-Project Schedule Management (6) Develop Project Charter Develop Project Management plan Direct and Manage Project work Manage Knowledge Monitor & Control Project Work Perform Integrated change Control Close Project or phase Plan scope management Collect Requirements Define Scope Create WBS Validate Scope Control Scope Plan Schedule management Define Activities Sequence Activities Estimate Activity Duration DevelopSchedule Control Schedule
  • 2. Chap7-Project Cost Management (4) Chap8-Project Quality Management (3) Chap 9- Resource Management (6) Chap10-Project Comm. Management(3) Plan Cost management Estimate Cost Determine Budget Control Cost Plan Quality management Manage Quality Control Quality Plan Resource management Estimate Activity Resources Acquire Resources DevelopTeam Manage Team Control Resources Plan Communication Manage Communication Monitor Communication
  • 3. Chap 11-Project Risk Management(7) Chap 12 - Project Procurement Manag. (3) Chap 13 - Project Stakeholder Manag. (4) Anand Bobade (nmbobade@gmail.com, 055 5932004) ❑https://ae.linkedin.com/in/anandbobade ❑http://www.slideshare.net/anandbobade ❑Conduct online training, Corporate Training & weekend workshops. Plan Risk management Identify Risk Perform Qualitative Risk Analysis Perform Quantitative Risk Analysis Plan Risk Response Implement Risk Response Monitor Risk Plan Procurement Management Conduct Procurement Control Procurement Identify Stakeholders Plan Stakeholder Engagement Manage Stakeholder Engagement Monitor Stakeholder Engagement
  • 4. Links to all 49 processes Presentations Links to YouTube videos Chap 4 - Integration: https://www.slideshare.net/anandbobade/chap-40-project-integration-management-overview https://www.slideshare.net/anandbobade/chap-41-develop-project-charter https://www.slideshare.net/anandbobade/chap-42-develop-project-management-plan https://www.slideshare.net/anandbobade/chap-43-direct-and-manage-project-work https://www.slideshare.net/anandbobade/pmp-chap44project-integration-management-manageknowledge https://www.slideshare.net/anandbobade/chap-45-monitor-and-control-project-work https://www.slideshare.net/anandbobade/chap-46-perform-integrated-change-control https://www.slideshare.net/anandbobade/chap-47-project-or-phase-close https://youtu.be/NdzADFfoRxA https://youtu.be/t3SDco3qVcM https://youtu.be/jeI9yQcLVGc https://youtu.be/V6hONGx0D0A https://youtu.be/VLTHz_P4EvM https://youtu.be/N4Fz-OsIjTg https://youtu.be/Jv9Y9EjActo https://youtu.be/egi7ot2yB3w Chap 5 - Scope: https://www.slideshare.net/anandbobade/pmp-chap-50-scope-management-overview https://www.slideshare.net/anandbobade/chap-51-plan-scope-management https://www.slideshare.net/anandbobade/chap-52-collect-requirements https://www.slideshare.net/anandbobade/chap-53-define-scope https://www.slideshare.net/anandbobade/chap-54-create-wbs https://www.slideshare.net/anandbobade/chap-55-validate-scope https://www.slideshare.net/anandbobade/chap-56-control-scope https://youtu.be/9u6f2NXlGnI https://youtu.be/uLVUppKclUI https://youtu.be/ngu-IMGCeSE https://youtu.be/WByDRHROjZw https://youtu.be/-Nu8ENRZ09M https://youtu.be/Q5OhVv-x4eo https://youtu.be/1g39Jpmw-94 Chap 6: Schedule: https://www.slideshare.net/anandbobade/chap-60-schedule-management-overview https://www.slideshare.net/anandbobade/chap-61-plan-schedule-management https://www.slideshare.net/anandbobade/chap-62-define-activity https://www.slideshare.net/anandbobade/chap-63-sequence-activity https://www.slideshare.net/anandbobade/chap-64-estimate-activity-duration https://www.slideshare.net/anandbobade/chap-65-define-schedule https://www.slideshare.net/anandbobade/chap-66-control-schedule Chap 7: Cost: https://www.slideshare.net/anandbobade/chap-70-project-cost-management-overview https://www.slideshare.net/anandbobade/chap-71-plan-cost-management https://www.slideshare.net/anandbobade/chap-72-estimate-cost https://www.slideshare.net/anandbobade/chap-73-determine-budget https://www.slideshare.net/anandbobade/chap-74-control-cost Chap 8: Quality: https://www.slideshare.net/anandbobade/chap-80-quality-management-overview https://www.slideshare.net/anandbobade/chap-81-plan-quality-management https://www.slideshare.net/anandbobade/chap-82-manage-quality https://www.slideshare.net/anandbobade/chap-83-control-quality https://youtu.be/8zteKSxDyt4 https://youtu.be/tL32SJV-dWA https://youtu.be/6laO93g0e6o https://youtu.be/EnC0E_QXPdo Chap 9: Resource: https://www.slideshare.net/anandbobade/chap-90-project-resource-management-overview https://www.slideshare.net/anandbobade/chap-91-pan-resource-management https://www.slideshare.net/anandbobade/chap-92-estimate-activity-resource https://www.slideshare.net/anandbobade/chap-93-acquire-resources https://www.slideshare.net/anandbobade/chap-94-develop-team
  • 5. https://www.slideshare.net/anandbobade/chap-95-manage-team https://www.slideshare.net/anandbobade/chap-96-control-resources Chap 10: Communication: https://www.slideshare.net/anandbobade/chap-100-project-communication-management-overview https://www.slideshare.net/anandbobade/chap-101-plan-communication-management https://www.slideshare.net/anandbobade/chap-102-manage-communication https://www.slideshare.net/anandbobade/chap-103-monitor-communication Chap 11 – Risk: https://www.slideshare.net/anandbobade/chap-110-project-risk-management-overview-143496876 https://www.slideshare.net/anandbobade/chap-111-plan-risk-management-143497221 https://www.slideshare.net/anandbobade/chap-112-identify-risks-143497237 https://www.slideshare.net/anandbobade/chap-113-perform-qualitative-risk-analysis https://www.slideshare.net/anandbobade/chap-114-perform-quantitative-risk-analysis https://www.slideshare.net/anandbobade/chap-115-plan-risk-response-143497289 https://www.slideshare.net/anandbobade/chap-116-implement-risk-response-143497303 https://www.slideshare.net/anandbobade/chap-117-monitor-risks-143497342 Chap 12 – Procurement: https://www.slideshare.net/anandbobade/chap-120-procurement-management-overview https://www.slideshare.net/anandbobade/chap-121-plan-procurement-management https://www.slideshare.net/anandbobade/chap-122-conduct-procurement https://www.slideshare.net/anandbobade/chap-123-control-procurement Chap 13 - Stakeholder https://www.slideshare.net/anandbobade/chap-130-project-stakeholder-management-overview-141174203 https://www.slideshare.net/anandbobade/chap-131-identify-stakeholders https://www.slideshare.net/anandbobade/chap-132-plan-stakeholder-engagement-141174396 https://www.slideshare.net/anandbobade/chap-133-manage-stakeholder https://www.slideshare.net/anandbobade/chap-134-monitor-stakeholder https://youtu.be/Vhjc6T9R4d8 https://youtu.be/QjNzwwSXlBY https://youtu.be/29Xt2r1ufZQ https://youtu.be/ZrNg-NiJVfk https://youtu.be/bXX5t1Jjh_M