PMP Exam Changes - 2016
What You Need To Know?
By: Anand Bobade (nmbobade@gmail.com)
Highlights
PMI has changed the examination content
as a result of a Role Delineation Study
New and reworded tasks within the
domains.
This will be introduced Nov 2016.
The end result will be new set of questions
to fit these new/revised tasks.
What is Changed?
Initiating
13%
Planning
24%
Executing
31%
Monitoring &
Controlling
25%
Closing
7%
Exam Weightage Per Domain
The task within each domain have new additions (Initiating, Planning,
Execution)
the required knowledge and skills, and tools and techniques must be in
place to support these tasks.
Domain – Task addition/Changes
Initiating
13%
3 Tasks Added
Task 2 - Identify Key Deliverables
Task 7 - Conduct Benefit Analysis
Task 8 - Inform Stakeholders
Domain – Task addition/Changes
Initiating
13%
1 Task added
Task 13 - Develop Stakeholder Management Plan
Planning
24
Domain – Task addition/Changes
Executing
31%
2 Tasks Added
Task 6 - Manage Flood of Information
Task 7 - Maintain Stakeholders Relationship
Domain – Task addition/Changes
Monitoring &
Controlling
25%
2 Tasks Added
Task 6 - Capture, analysis & Manage lesson learned
Task 7 - Monitor Procurement Activity
By: Anand Bobade (nmbobade@gmail.com)
Visit Slide Share website & you will find other Knowledge area presentation… Please share!!

More Related Content

What's hot

Project integration management
Project integration management Project integration management
Project integration management
KU Leuven
 

What's hot (20)

PMP Key Exam Concepts - Formulas
PMP Key Exam Concepts - FormulasPMP Key Exam Concepts - Formulas
PMP Key Exam Concepts - Formulas
 
PMP Chap 5 - Project Scope Management - Part 2
PMP Chap 5 - Project Scope Management - Part 2PMP Chap 5 - Project Scope Management - Part 2
PMP Chap 5 - Project Scope Management - Part 2
 
Memorizing 47 processes v2
Memorizing 47 processes v2Memorizing 47 processes v2
Memorizing 47 processes v2
 
Chap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project workChap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project work
 
PMBOK-5th ed: PMP- Flashcards Part1/5
PMBOK-5th ed: PMP- Flashcards Part1/5PMBOK-5th ed: PMP- Flashcards Part1/5
PMBOK-5th ed: PMP- Flashcards Part1/5
 
Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7
 
Project Scope Management - PMBOK 5th Edition
Project Scope Management - PMBOK 5th EditionProject Scope Management - PMBOK 5th Edition
Project Scope Management - PMBOK 5th Edition
 
Chap 4.6 Perform Integrated Change Control
Chap 4.6 Perform Integrated Change ControlChap 4.6 Perform Integrated Change Control
Chap 4.6 Perform Integrated Change Control
 
Project integration management
Project integration management Project integration management
Project integration management
 
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
 
PMP Flash Card
PMP Flash CardPMP Flash Card
PMP Flash Card
 
Chap 11.7 Monitor Risks
Chap 11.7 Monitor RisksChap 11.7 Monitor Risks
Chap 11.7 Monitor Risks
 
Chap 5.6 Control Scope
Chap 5.6 Control ScopeChap 5.6 Control Scope
Chap 5.6 Control Scope
 
Practical project management based on PMBOK5
Practical project management based on PMBOK5Practical project management based on PMBOK5
Practical project management based on PMBOK5
 
Chap 5.5 validate scope
Chap 5.5 validate scopeChap 5.5 validate scope
Chap 5.5 validate scope
 
Chap 4.7 Project or Phase Close
Chap 4.7 Project or Phase CloseChap 4.7 Project or Phase Close
Chap 4.7 Project or Phase Close
 
PM Flashcards
PM FlashcardsPM Flashcards
PM Flashcards
 
PMPProcessGroupTasks
PMPProcessGroupTasksPMPProcessGroupTasks
PMPProcessGroupTasks
 
05 project scope management
05 project scope management05 project scope management
05 project scope management
 
Chap 7.4 Control Cost
Chap 7.4   Control CostChap 7.4   Control Cost
Chap 7.4 Control Cost
 

Viewers also liked

Viewers also liked (19)

PMP Chap 7 - Project Cost Management - Part 2
PMP Chap 7 - Project Cost Management - Part 2PMP Chap 7 - Project Cost Management - Part 2
PMP Chap 7 - Project Cost Management - Part 2
 
PMP Chap9 - Project Human Resource management
PMP Chap9 - Project Human Resource managementPMP Chap9 - Project Human Resource management
PMP Chap9 - Project Human Resource management
 
PMP Key-exam-concepts-QA-QC-VS-VS
PMP Key-exam-concepts-QA-QC-VS-VSPMP Key-exam-concepts-QA-QC-VS-VS
PMP Key-exam-concepts-QA-QC-VS-VS
 
PMP Application form
PMP Application formPMP Application form
PMP Application form
 
PMP 47 process definitions
PMP 47 process definitionsPMP 47 process definitions
PMP 47 process definitions
 
PMP chap 1 - PMP Introduction (PMBOK 6)
PMP chap 1 - PMP  Introduction (PMBOK 6)PMP chap 1 - PMP  Introduction (PMBOK 6)
PMP chap 1 - PMP Introduction (PMBOK 6)
 
PMP Chap 12 - Project Procurement Management Details - Part 1
PMP   Chap 12 - Project Procurement Management Details - Part 1PMP   Chap 12 - Project Procurement Management Details - Part 1
PMP Chap 12 - Project Procurement Management Details - Part 1
 
Pmp chap13 - project stakeholder management details
Pmp chap13 - project stakeholder management detailsPmp chap13 - project stakeholder management details
Pmp chap13 - project stakeholder management details
 
Dr. APJ Abdul Kalam's Inspiring Quotes
Dr. APJ Abdul Kalam's Inspiring QuotesDr. APJ Abdul Kalam's Inspiring Quotes
Dr. APJ Abdul Kalam's Inspiring Quotes
 
PMP Chap 12 - Project Procurement Management Details - Part2
PMP   Chap 12 - Project Procurement Management Details - Part2PMP   Chap 12 - Project Procurement Management Details - Part2
PMP Chap 12 - Project Procurement Management Details - Part2
 
Pmp chap 11 - project risk management v0.1
Pmp   chap 11 - project risk management v0.1Pmp   chap 11 - project risk management v0.1
Pmp chap 11 - project risk management v0.1
 
Pmp chap 11 - project risk management - Part 2
Pmp   chap 11 - project risk management - Part 2Pmp   chap 11 - project risk management - Part 2
Pmp chap 11 - project risk management - Part 2
 
PMP Chap 2- Org. Influence and Project Life Cycle
PMP Chap 2- Org. Influence and Project Life CyclePMP Chap 2- Org. Influence and Project Life Cycle
PMP Chap 2- Org. Influence and Project Life Cycle
 
PMP Chap 6 - Project Time management - Part2
PMP Chap 6 - Project Time management - Part2PMP Chap 6 - Project Time management - Part2
PMP Chap 6 - Project Time management - Part2
 
PMP Chap 7 - Project Cost Management - Part 1
PMP Chap 7 - Project Cost Management - Part 1PMP Chap 7 - Project Cost Management - Part 1
PMP Chap 7 - Project Cost Management - Part 1
 
PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1
 
PMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementPMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality Management
 
PMP PMbok 5th CH1 - CH2
PMP PMbok 5th CH1 - CH2PMP PMbok 5th CH1 - CH2
PMP PMbok 5th CH1 - CH2
 
PMP Chap 13 - Project stakeholder management Overview
PMP Chap 13 - Project stakeholder management OverviewPMP Chap 13 - Project stakeholder management Overview
PMP Chap 13 - Project stakeholder management Overview
 

Similar to PMP Exam Changes

C. Burcham - Project Closure Report
C. Burcham - Project Closure ReportC. Burcham - Project Closure Report
C. Burcham - Project Closure Report
Cheryl Burcham
 
Lean Six Sigma Awareness Handouts
Lean Six Sigma Awareness HandoutsLean Six Sigma Awareness Handouts
Lean Six Sigma Awareness Handouts
guest0981f4
 
LSS Intro
LSS IntroLSS Intro
LSS Intro
evansjr
 
Sapbpc nw 10.0 bpf how to guide by satya
Sapbpc nw 10.0   bpf how to guide by satyaSapbpc nw 10.0   bpf how to guide by satya
Sapbpc nw 10.0 bpf how to guide by satya
Satya
 
Project-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptx
Project-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptxProject-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptx
Project-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptx
PhngPhmTrung
 

Similar to PMP Exam Changes (20)

UPDATE: PMP Exam Changes From Jan 11, 2016. What You Need To Know?
UPDATE: PMP Exam Changes From Jan 11, 2016. What You Need To Know?UPDATE: PMP Exam Changes From Jan 11, 2016. What You Need To Know?
UPDATE: PMP Exam Changes From Jan 11, 2016. What You Need To Know?
 
UPDATE: PMP Exam Changes From Jan 11, 2016. What You Need To Know?
UPDATE: PMP Exam Changes From Jan 11, 2016. What You Need To Know?UPDATE: PMP Exam Changes From Jan 11, 2016. What You Need To Know?
UPDATE: PMP Exam Changes From Jan 11, 2016. What You Need To Know?
 
PMP : Change is Coming - Know how it affects you
PMP : Change is Coming - Know how it affects youPMP : Change is Coming - Know how it affects you
PMP : Change is Coming - Know how it affects you
 
Oscar Padilla, PMP
Oscar Padilla, PMPOscar Padilla, PMP
Oscar Padilla, PMP
 
Blackbaud project kick off summary
Blackbaud project kick off summaryBlackbaud project kick off summary
Blackbaud project kick off summary
 
C. Burcham - Project Closure Report
C. Burcham - Project Closure ReportC. Burcham - Project Closure Report
C. Burcham - Project Closure Report
 
Pmp exam changes march 2021) webinar
Pmp exam changes march 2021) webinarPmp exam changes march 2021) webinar
Pmp exam changes march 2021) webinar
 
Matthew Week 3 Feedback & Project
Matthew Week 3 Feedback & Project Matthew Week 3 Feedback & Project
Matthew Week 3 Feedback & Project
 
Presentation Moscow December 2014
Presentation Moscow December 2014Presentation Moscow December 2014
Presentation Moscow December 2014
 
Thomas Walenta, PgMP, PMP, PMI Fellow. Projects & Programs are two different ...
Thomas Walenta, PgMP, PMP, PMI Fellow. Projects & Programs are two different ...Thomas Walenta, PgMP, PMP, PMI Fellow. Projects & Programs are two different ...
Thomas Walenta, PgMP, PMP, PMI Fellow. Projects & Programs are two different ...
 
Project Management Project Assignment - Project Schedule & Resource Allocatio...
Project Management Project Assignment - Project Schedule & Resource Allocatio...Project Management Project Assignment - Project Schedule & Resource Allocatio...
Project Management Project Assignment - Project Schedule & Resource Allocatio...
 
Lean Six Sigma Awareness Handouts
Lean Six Sigma Awareness HandoutsLean Six Sigma Awareness Handouts
Lean Six Sigma Awareness Handouts
 
LSS Intro
LSS IntroLSS Intro
LSS Intro
 
Lean Six Sigma Awareness Handouts
Lean Six Sigma Awareness HandoutsLean Six Sigma Awareness Handouts
Lean Six Sigma Awareness Handouts
 
Blaine Portfolio
Blaine PortfolioBlaine Portfolio
Blaine Portfolio
 
Sapbpc nw 10.0 bpf how to guide by satya
Sapbpc nw 10.0   bpf how to guide by satyaSapbpc nw 10.0   bpf how to guide by satya
Sapbpc nw 10.0 bpf how to guide by satya
 
2. grantseeking creating a program logic model
2. grantseeking   creating a program logic model2. grantseeking   creating a program logic model
2. grantseeking creating a program logic model
 
Project-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptx
Project-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptxProject-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptx
Project-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptx
 
PM&E Guideline
PM&E GuidelinePM&E Guideline
PM&E Guideline
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management Framework
 

More from Anand Bobade

PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
Anand Bobade
 

More from Anand Bobade (20)

PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
 
Chap 12.3 Control Procurement
Chap 12.3 Control ProcurementChap 12.3 Control Procurement
Chap 12.3 Control Procurement
 
Chap 12.2 Conduct Procurement
Chap 12.2 Conduct ProcurementChap 12.2 Conduct Procurement
Chap 12.2 Conduct Procurement
 
Chap 12.1 Plan Procurement Management
Chap 12.1 Plan Procurement ManagementChap 12.1 Plan Procurement Management
Chap 12.1 Plan Procurement Management
 
Chap 12.0 Procurement Management overview
Chap 12.0   Procurement Management overviewChap 12.0   Procurement Management overview
Chap 12.0 Procurement Management overview
 
Chap 11.2 Identify Risks
Chap 11.2 Identify RisksChap 11.2 Identify Risks
Chap 11.2 Identify Risks
 
Chap 10.3 Monitor Communication
Chap 10.3 Monitor CommunicationChap 10.3 Monitor Communication
Chap 10.3 Monitor Communication
 
Chap 10.2 Manage Communication
Chap 10.2  Manage CommunicationChap 10.2  Manage Communication
Chap 10.2 Manage Communication
 
Chap 10.1 Plan Communication Management
Chap 10.1  Plan Communication ManagementChap 10.1  Plan Communication Management
Chap 10.1 Plan Communication Management
 
Chap 9.6 Control Resources
Chap 9.6  Control ResourcesChap 9.6  Control Resources
Chap 9.6 Control Resources
 
Chap 9.5 Manage Team
Chap 9.5  Manage TeamChap 9.5  Manage Team
Chap 9.5 Manage Team
 
Chap 9.4 Develop Team
Chap 9.4  Develop TeamChap 9.4  Develop Team
Chap 9.4 Develop Team
 
Chap 9.3 Acquire Resources
Chap 9.3   Acquire ResourcesChap 9.3   Acquire Resources
Chap 9.3 Acquire Resources
 
Chap 9.2 Estimate Activity Resource
Chap 9.2   Estimate Activity ResourceChap 9.2   Estimate Activity Resource
Chap 9.2 Estimate Activity Resource
 
Chap 9.1 Pan Resource Management
Chap 9.1   Pan Resource ManagementChap 9.1   Pan Resource Management
Chap 9.1 Pan Resource Management
 
Chap 9.0 Project Resource Management overview
Chap 9.0   Project Resource Management overviewChap 9.0   Project Resource Management overview
Chap 9.0 Project Resource Management overview
 
Chap 7.2 Estimate Cost
Chap 7.2 Estimate CostChap 7.2 Estimate Cost
Chap 7.2 Estimate Cost
 
Chap 7.3 Determine budget
Chap 7.3   Determine budgetChap 7.3   Determine budget
Chap 7.3 Determine budget
 
Chap 7.1 Plan Cost Management
Chap 7.1  Plan Cost ManagementChap 7.1  Plan Cost Management
Chap 7.1 Plan Cost Management
 
Chap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management OverviewChap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management Overview
 

Recently uploaded

Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
Nimot Muili
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Riyadh +966572737505 get cytotec
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
alinstan901
 

Recently uploaded (15)

International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
 
Strategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal AnalsysisStrategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal Analsysis
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic management
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 

PMP Exam Changes

  • 1. PMP Exam Changes - 2016 What You Need To Know? By: Anand Bobade (nmbobade@gmail.com)
  • 2. Highlights PMI has changed the examination content as a result of a Role Delineation Study New and reworded tasks within the domains. This will be introduced Nov 2016. The end result will be new set of questions to fit these new/revised tasks.
  • 3. What is Changed? Initiating 13% Planning 24% Executing 31% Monitoring & Controlling 25% Closing 7% Exam Weightage Per Domain The task within each domain have new additions (Initiating, Planning, Execution) the required knowledge and skills, and tools and techniques must be in place to support these tasks.
  • 4. Domain – Task addition/Changes Initiating 13% 3 Tasks Added Task 2 - Identify Key Deliverables Task 7 - Conduct Benefit Analysis Task 8 - Inform Stakeholders
  • 5. Domain – Task addition/Changes Initiating 13% 1 Task added Task 13 - Develop Stakeholder Management Plan Planning 24
  • 6. Domain – Task addition/Changes Executing 31% 2 Tasks Added Task 6 - Manage Flood of Information Task 7 - Maintain Stakeholders Relationship
  • 7. Domain – Task addition/Changes Monitoring & Controlling 25% 2 Tasks Added Task 6 - Capture, analysis & Manage lesson learned Task 7 - Monitor Procurement Activity
  • 8. By: Anand Bobade (nmbobade@gmail.com) Visit Slide Share website & you will find other Knowledge area presentation… Please share!!