SlideShare a Scribd company logo
1 of 16
Muda, Mura & Muri

Why elimination of the "3 mu" is at
       the heart of kaizen?

       Anand Subramaniam
“The greatest wastes are unused talents and
               untried ideas..”

                              - Unknown Source




                                             2
3 MU

        Muri                    Muda                   Mura




                                                • Unevenness
• Unreasonableness       • Unusefulness
                                                • Shifts in demand
• A process, system,     • An activity within
                                                  or delivery that
  or facility designed     a process that
                                                  lead to a service
  beyond the physical      does not add
                                                  or support
  capacities of            value, from the
                                                  process being
  employees /              perspective of the
                                                  sped up or slowed
  equipment                customer
                                                  down (unsteady)



                                                                      3
Taiichi Ohno


 The Father of Toyota
  Production System,
  JIT, and Lean
  Manufacturing

 Identified the 7 types
  of Muda


                                 4
What is Waste ?


Waste is “anything other than the minimum
 amount of equipment, materials, parts,
  space, and worker’s time which are
 absolutely essential to add value to the
                 product.”

                               Shoichiro Toyoda
                               President, Toyota

                                               5
Why Look @ Waste Reduction




                             6
Waste - Root Causes
   WOMBAT = Waste of Money, Brains And Time




Inflexibility               Variability          Redundancy




                 Schedule                 Task


                                                              7
Waste Types
                    Transport
      Motion                     Rework



Overproducing                         Inventory
                   Waste Types

  Overprocessing
                     Intellect



                                              8
Waste Types (Contd.)

 Transport
   Movement of product that does not add value


 Inventory
   Ties up capital, takes valuable space,
    requires moving, difficulty in finding material,
    obsolescence, losses due to damage
   Reduces customer responsiveness and
    multiplies quality problems
                                                       9
Waste Types (Contd.)
 Motion
    Movement of people that does not add value


 Waiting
    Idle time created when material, information, people,
     or equipment is not ready


 Under utilising talent
    Under utilising employees’ potential (their creative
     ideas)
                                                             10
Waste Types (Contd.)

 Over processing
   Effort that adds no value from the customer’s
    viewpoint


 Defect
   Work that contains errors, rework, mistakes or
    lacks something necessary
   Creating / correcting defects robs resources,
    “chokes” flow
                                                    11
Waste Types (Contd.)

 Overproduction
   Producing more than the customer needs
    right now
   Consumes valuable resources not
    immediately needed
   Hides other process problems (bad quality,
    poor scheduling, poor delivery)
   Builds inventory not needed


                                                 12
Waste Hierarchy
 By Reducing waste,
  we minimise the load
  on landfill and
  transport

 By sorting our wastes,
  we make it easier to
  Reuse and Recycle



                                13
Lean Tool to remove Waste
Input       Waste                 Lean Tool
Man          Motion               Standard Work
             Walking              5 S’s
             Waiting              3P (Product Preparation
             Searching             Process)

Machine      Motion               3P
             Setup/Change over    Setup Reduction
             Breakdown            TPM

Material     Inventory            Pull System

Method       Batch production     Flow Production
             Transportation       One Piece Flow

                                                              14
“It has been my observation that most
  people get ahead during the time that
             others waste.”

                                - Henry Ford




                                          15
Good Luck
http://www.linkedin.com/in/anandsubramaniam




                                              16

More Related Content

What's hot

SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)Chris Cummins
 
Total Productive Maintenance (TPM) for EVERTS 20Aug2018
Total Productive Maintenance (TPM) for EVERTS  20Aug2018Total Productive Maintenance (TPM) for EVERTS  20Aug2018
Total Productive Maintenance (TPM) for EVERTS 20Aug2018Timothy Wooi
 
Lean Manufacturing Tools
Lean Manufacturing ToolsLean Manufacturing Tools
Lean Manufacturing ToolsJagriti Prasad
 
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping ProcessAnand Subramaniam
 
Lean Manufacturing
Lean Manufacturing Lean Manufacturing
Lean Manufacturing Marico Ltd.
 
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma TrainingThe 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma TrainingAnkit Sharma
 
Lean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarLean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarMichael E. Parker
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive MaintenanceAnand Subramaniam
 
Types of waste - lean Concept Krishna Heda
Types of waste - lean Concept Krishna HedaTypes of waste - lean Concept Krishna Heda
Types of waste - lean Concept Krishna Hedakrishnaheda
 

What's hot (20)

SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)
 
7 waste in the production
7 waste in the production7 waste in the production
7 waste in the production
 
Total Productive Maintenance (TPM) for EVERTS 20Aug2018
Total Productive Maintenance (TPM) for EVERTS  20Aug2018Total Productive Maintenance (TPM) for EVERTS  20Aug2018
Total Productive Maintenance (TPM) for EVERTS 20Aug2018
 
Lean Manufacturing Tools
Lean Manufacturing ToolsLean Manufacturing Tools
Lean Manufacturing Tools
 
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping Process
 
Waste in production
Waste in productionWaste in production
Waste in production
 
Tpm Sample
Tpm SampleTpm Sample
Tpm Sample
 
Identifying Lean Waste
Identifying Lean WasteIdentifying Lean Waste
Identifying Lean Waste
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 
Lean Manufacturing
Lean Manufacturing Lean Manufacturing
Lean Manufacturing
 
Muda mura muri
Muda mura muriMuda mura muri
Muda mura muri
 
TPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
TPM: Autonomous Maintenance (Jishu Hozen) Framework PosterTPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
TPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
 
Lean Tools
Lean ToolsLean Tools
Lean Tools
 
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma TrainingThe 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
 
Lean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarLean Fundamentals Overview Webinar
Lean Fundamentals Overview Webinar
 
Lean Manufacturing - An Overview
Lean Manufacturing - An OverviewLean Manufacturing - An Overview
Lean Manufacturing - An Overview
 
OEE
OEEOEE
OEE
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
Types of waste - lean Concept Krishna Heda
Types of waste - lean Concept Krishna HedaTypes of waste - lean Concept Krishna Heda
Types of waste - lean Concept Krishna Heda
 
8 Wastes
8 Wastes8 Wastes
8 Wastes
 

Viewers also liked

Viewers also liked (20)

Project Execution & Control Checklist
Project Execution & Control ChecklistProject Execution & Control Checklist
Project Execution & Control Checklist
 
Professional Services (Ps) Excellence
Professional Services (Ps) ExcellenceProfessional Services (Ps) Excellence
Professional Services (Ps) Excellence
 
C & E matrix
C & E matrixC & E matrix
C & E matrix
 
Change Management
Change ManagementChange Management
Change Management
 
Lesson Learned Report
Lesson Learned ReportLesson Learned Report
Lesson Learned Report
 
Enterprise Performance Management (EPM)
Enterprise Performance Management (EPM)Enterprise Performance Management (EPM)
Enterprise Performance Management (EPM)
 
Optimise & Integrate WCM & SCM
Optimise & Integrate   WCM & SCMOptimise & Integrate   WCM & SCM
Optimise & Integrate WCM & SCM
 
CMMI & Six Sigma Integration
CMMI & Six Sigma IntegrationCMMI & Six Sigma Integration
CMMI & Six Sigma Integration
 
Your Organisation
Your OrganisationYour Organisation
Your Organisation
 
Project Initiation Checklist
Project Initiation ChecklistProject Initiation Checklist
Project Initiation Checklist
 
Ninbennoaru Jidoka
Ninbennoaru JidokaNinbennoaru Jidoka
Ninbennoaru Jidoka
 
Content Management System
Content Management SystemContent Management System
Content Management System
 
LSS Idea Generation to Project Execution
LSS Idea Generation to Project ExecutionLSS Idea Generation to Project Execution
LSS Idea Generation to Project Execution
 
Cause & Effect
Cause & EffectCause & Effect
Cause & Effect
 
FMEA Analysis Cycle
FMEA Analysis CycleFMEA Analysis Cycle
FMEA Analysis Cycle
 
Sales Performance Measures
Sales Performance MeasuresSales Performance Measures
Sales Performance Measures
 
Performance Improvement Culture
Performance Improvement CulturePerformance Improvement Culture
Performance Improvement Culture
 
Lean Transformation ~ A Journey
Lean Transformation ~ A JourneyLean Transformation ~ A Journey
Lean Transformation ~ A Journey
 
Customer Service Strategy & Customer Experience
Customer Service Strategy & Customer ExperienceCustomer Service Strategy & Customer Experience
Customer Service Strategy & Customer Experience
 
TPM Implementation Strategy
TPM Implementation StrategyTPM Implementation Strategy
TPM Implementation Strategy
 

Similar to 3 MU

The Seven Wastes
The Seven WastesThe Seven Wastes
The Seven WastesJorge Ros
 
Lean waste presentation slide
Lean waste presentation slideLean waste presentation slide
Lean waste presentation slideMGMAV
 
Don't improve work, remove waste
Don't improve work, remove wasteDon't improve work, remove waste
Don't improve work, remove wastePaul Brink
 
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...SN Panigrahi, PMP
 
Book Review: The Toyota Way by Harish Verma
Book Review: The Toyota Way  by Harish VermaBook Review: The Toyota Way  by Harish Verma
Book Review: The Toyota Way by Harish Vermaopepiimraipur
 
Identifying and managing waste in software product development
Identifying and managing waste in software product developmentIdentifying and managing waste in software product development
Identifying and managing waste in software product developmentKen Power
 
Module 4_Session 6.pptx_Operations Management
Module 4_Session 6.pptx_Operations ManagementModule 4_Session 6.pptx_Operations Management
Module 4_Session 6.pptx_Operations ManagementAnushreeSingh49
 
Timwoods- Lean Manufacturing
Timwoods- Lean ManufacturingTimwoods- Lean Manufacturing
Timwoods- Lean Manufacturinglakshya bhardwaj
 
Industrial Training Presentation
Industrial Training PresentationIndustrial Training Presentation
Industrial Training PresentationChirag Alawat
 

Similar to 3 MU (20)

8 deadly waste
8 deadly waste8 deadly waste
8 deadly waste
 
The Seven Wastes
The Seven WastesThe Seven Wastes
The Seven Wastes
 
Muda in service industries
Muda in service industriesMuda in service industries
Muda in service industries
 
The Eight Wastes
The Eight WastesThe Eight Wastes
The Eight Wastes
 
WASTE MINIMIZATION.pptx
WASTE MINIMIZATION.pptxWASTE MINIMIZATION.pptx
WASTE MINIMIZATION.pptx
 
Lean Project Management
Lean Project ManagementLean Project Management
Lean Project Management
 
Lean waste presentation slide
Lean waste presentation slideLean waste presentation slide
Lean waste presentation slide
 
Don't improve work, remove waste
Don't improve work, remove wasteDon't improve work, remove waste
Don't improve work, remove waste
 
Kaizen_ presentation
Kaizen_ presentationKaizen_ presentation
Kaizen_ presentation
 
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
 
Book Review: The Toyota Way by Harish Verma
Book Review: The Toyota Way  by Harish VermaBook Review: The Toyota Way  by Harish Verma
Book Review: The Toyota Way by Harish Verma
 
Lean Six Sigma: 8 Wastes
Lean Six Sigma: 8 WastesLean Six Sigma: 8 Wastes
Lean Six Sigma: 8 Wastes
 
Identifying and managing waste in software product development
Identifying and managing waste in software product developmentIdentifying and managing waste in software product development
Identifying and managing waste in software product development
 
Lean Mangement
Lean MangementLean Mangement
Lean Mangement
 
Module 4_Session 6.pptx_Operations Management
Module 4_Session 6.pptx_Operations ManagementModule 4_Session 6.pptx_Operations Management
Module 4_Session 6.pptx_Operations Management
 
Timwoods- Lean Manufacturing
Timwoods- Lean ManufacturingTimwoods- Lean Manufacturing
Timwoods- Lean Manufacturing
 
Industrial Training Presentation
Industrial Training PresentationIndustrial Training Presentation
Industrial Training Presentation
 
Industrial engineer
Industrial engineerIndustrial engineer
Industrial engineer
 
Perceiving Muda
Perceiving MudaPerceiving Muda
Perceiving Muda
 
Waste management
Waste managementWaste management
Waste management
 

More from Anand Subramaniam (20)

Lean transformation
Lean transformationLean transformation
Lean transformation
 
Lean principles
Lean principlesLean principles
Lean principles
 
Lean thinking
Lean thinkingLean thinking
Lean thinking
 
Anand dossier 2
Anand dossier 2Anand dossier 2
Anand dossier 2
 
Anand short dossier
Anand short dossierAnand short dossier
Anand short dossier
 
Set up reduction
Set up reductionSet up reduction
Set up reduction
 
Waste Walk ~ Audit
Waste Walk ~ AuditWaste Walk ~ Audit
Waste Walk ~ Audit
 
Defects Vs. Errors
Defects Vs. ErrorsDefects Vs. Errors
Defects Vs. Errors
 
Gemba kaizen
Gemba kaizenGemba kaizen
Gemba kaizen
 
LSS - 5 Year Strategy
LSS -  5 Year StrategyLSS -  5 Year Strategy
LSS - 5 Year Strategy
 
Lean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy LinkageLean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy Linkage
 
CMMI Capability Maturity Model Integration
CMMI   Capability Maturity Model Integration CMMI   Capability Maturity Model Integration
CMMI Capability Maturity Model Integration
 
8 D – Problem Solving Process
8 D – Problem Solving Process8 D – Problem Solving Process
8 D – Problem Solving Process
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
Autonomous Maintenance
Autonomous MaintenanceAutonomous Maintenance
Autonomous Maintenance
 
VSM – Current & Future
VSM – Current & FutureVSM – Current & Future
VSM – Current & Future
 
Material Handling
Material Handling Material Handling
Material Handling
 
Service / Product Innovation
Service / Product InnovationService / Product Innovation
Service / Product Innovation
 
Innovation Assessment & Tools
Innovation Assessment & ToolsInnovation Assessment & Tools
Innovation Assessment & Tools
 
Innovation & Change Management
Innovation & Change ManagementInnovation & Change Management
Innovation & Change Management
 

Recently uploaded

Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Doge Mining Website
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 

Recently uploaded (20)

Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 

3 MU

  • 1. Muda, Mura & Muri Why elimination of the "3 mu" is at the heart of kaizen? Anand Subramaniam
  • 2. “The greatest wastes are unused talents and untried ideas..” - Unknown Source 2
  • 3. 3 MU Muri Muda Mura • Unevenness • Unreasonableness • Unusefulness • Shifts in demand • A process, system, • An activity within or delivery that or facility designed a process that lead to a service beyond the physical does not add or support capacities of value, from the process being employees / perspective of the sped up or slowed equipment customer down (unsteady) 3
  • 4. Taiichi Ohno  The Father of Toyota Production System, JIT, and Lean Manufacturing  Identified the 7 types of Muda 4
  • 5. What is Waste ? Waste is “anything other than the minimum amount of equipment, materials, parts, space, and worker’s time which are absolutely essential to add value to the product.” Shoichiro Toyoda President, Toyota 5
  • 6. Why Look @ Waste Reduction 6
  • 7. Waste - Root Causes WOMBAT = Waste of Money, Brains And Time Inflexibility Variability Redundancy Schedule Task 7
  • 8. Waste Types Transport Motion Rework Overproducing Inventory Waste Types Overprocessing Intellect 8
  • 9. Waste Types (Contd.)  Transport  Movement of product that does not add value  Inventory  Ties up capital, takes valuable space, requires moving, difficulty in finding material, obsolescence, losses due to damage  Reduces customer responsiveness and multiplies quality problems 9
  • 10. Waste Types (Contd.)  Motion  Movement of people that does not add value  Waiting  Idle time created when material, information, people, or equipment is not ready  Under utilising talent  Under utilising employees’ potential (their creative ideas) 10
  • 11. Waste Types (Contd.)  Over processing  Effort that adds no value from the customer’s viewpoint  Defect  Work that contains errors, rework, mistakes or lacks something necessary  Creating / correcting defects robs resources, “chokes” flow 11
  • 12. Waste Types (Contd.)  Overproduction  Producing more than the customer needs right now  Consumes valuable resources not immediately needed  Hides other process problems (bad quality, poor scheduling, poor delivery)  Builds inventory not needed 12
  • 13. Waste Hierarchy  By Reducing waste, we minimise the load on landfill and transport  By sorting our wastes, we make it easier to Reuse and Recycle 13
  • 14. Lean Tool to remove Waste Input Waste Lean Tool Man  Motion  Standard Work  Walking  5 S’s  Waiting  3P (Product Preparation  Searching Process) Machine  Motion  3P  Setup/Change over  Setup Reduction  Breakdown  TPM Material  Inventory  Pull System Method  Batch production  Flow Production  Transportation  One Piece Flow 14
  • 15. “It has been my observation that most people get ahead during the time that others waste.” - Henry Ford 15