SlideShare a Scribd company logo
1 of 2
Download to read offline
Madawalabu
University
College of Engineering,
Dept. of Construction Technology & Management Bale Robe, Ethiopia
COURSE OUTLINE
Procurement Management & Contract Administration
CoTM4242
Credit hours: 3
Contact hours: 3hrs lecture, 5hrs home study
Semester: 2nd
, 2016/2017
Consulting time: “open door policy”
Pre-requisite: CoTM 4241
Lecture Room No.: Computer Lab Bldg
Instructor: Andualem Endris Yadeta (M.Sc)
E-mail: andu0117@yahoo.com
Tell: +251-913116477
Course Description
Tendering: definition, Purpose, Types, Preparation of tender, Pre-qualification: invitations,
instructions, Opening and evaluation; Statistical approach in tendering to bidders; Tender
evaluation. Post qualification tender documents. Contracting: definitions, Types, awarding of
contract, Contract agreement, Conditions of contract, Technical specifications, Bill of quantities
and drawings, Forms formats and schedules: Tender form, Bonds and guaranties, Bid bond,
Performance bond, Advance payment guaranty, Retention money guaranty. Insurance and
indemnification, Claim administration: Types, Causes, Contractual provisions, Time related
claims, Cost related claims, Quality related claims, and Stakeholders satisfaction related claims,
Arbitration, litigation.
1. Introduction
1.1. Definitions
1.2. History of Contract
2. Tendering
2.1. Definition
2.2. Purpose of Tendering
2.3. Types of Tendering
2.4. Preparation of Tender
2.5. Pre-qualification of Tender
2.6.Post-qualification of Tender Documents
3. Project Delivery Methods and Types of Contract
3.1. Project Delivery Methods
3.1.1. Design-Build Method
3.1.2. Design-Bid-Build Method
Madawalabu
University
College of Engineering,
Dept. of Construction Technology & Management Bale Robe, Ethiopia
3.1.3. Turnkey Method
3.2. Types of Contract
3.2.1. Lump sum Contract
3.2.2. Admeasurements Contract
3.2.3. Cost plus Contract
4. Bonds and Insurances
4.1. Bonds
4.2. Guarantees
4.3. Insurances
5. Construction Claims
5.1. Causes of Claims
5.2. Types of Claims
5.3. Claim Management
References
1. PPA (2006). User’s Guide for Standard Bidding Document for the procurement of works.
Public Procurement Agency, MoFED, Addis Ababa.
2. MUDC (1994). Standard Condition of Contract for Construction of Civil Works Project,
Ministry of Urban Development and Construction, Addis Ababa.
3. FIDIC (1999). Conditions of Contract for Construction. International Federation of
Consulting Engineers. For Buildings and Engineering Works Designed by the Employer.
4. Federal Negarit Gazeta (2009). Ethiopian Government Procurement and Property
Administration Proclamation: Proclamation No. 649/2009, Addis Ababa.
5. Ribeiro, Robert (1996). Engineering Contracts: A Management Guide. Elsevier
Butterworth Heinemann, England
6. Murdoch, John and Hughes, Will (2000). Construction Contracts: Law and Management,
3rd ed. Spon Press, London.
7. Horgan, M.O’C. and Roulston, F.R. (2005). The Foundations of Engineering Contracts. E.
& F.N. Spon Ltd.
Evaluation Criteria
Assignments: 20%
Quizzes 10%
Reports 10%
Semester Project: 20%
Final Exam: 40%
Attendance: 90% during the lecture session is compulsory.

More Related Content

What's hot

CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPES
Pundlik Rathod
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contract
guestdb5e498
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
AYM1979
 

What's hot (20)

Construction contract
Construction contractConstruction contract
Construction contract
 
Chapter 5 [compatibility mode]
Chapter 5 [compatibility mode]Chapter 5 [compatibility mode]
Chapter 5 [compatibility mode]
 
Lecture 4 - selection of contract forms
Lecture 4 - selection of contract formsLecture 4 - selection of contract forms
Lecture 4 - selection of contract forms
 
Unit 1-Contract Documents & Byelaws
Unit 1-Contract Documents & ByelawsUnit 1-Contract Documents & Byelaws
Unit 1-Contract Documents & Byelaws
 
Types of contracts
Types of contractsTypes of contracts
Types of contracts
 
Construction contracts
Construction contractsConstruction contracts
Construction contracts
 
Types and forms of contracts
Types and forms of contracts Types and forms of contracts
Types and forms of contracts
 
Design & Build contracts - key points for a main contractor with technology a...
Design & Build contracts - key points for a main contractor with technology a...Design & Build contracts - key points for a main contractor with technology a...
Design & Build contracts - key points for a main contractor with technology a...
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPES
 
Construction contract
Construction contract Construction contract
Construction contract
 
Chapter 3 [compatibility mode]
Chapter 3 [compatibility mode]Chapter 3 [compatibility mode]
Chapter 3 [compatibility mode]
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contract
 
Civil tenders and contracts spce
Civil tenders and contracts spceCivil tenders and contracts spce
Civil tenders and contracts spce
 
Effective contract administration may 2014
Effective contract administration may 2014Effective contract administration may 2014
Effective contract administration may 2014
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 
Contractors
ContractorsContractors
Contractors
 
Contracts in professional practice
Contracts in professional practiceContracts in professional practice
Contracts in professional practice
 
rate contract
rate contractrate contract
rate contract
 
Types of contract
Types of contractTypes of contract
Types of contract
 
Chapter 4 [compatibility mode]
Chapter 4 [compatibility mode]Chapter 4 [compatibility mode]
Chapter 4 [compatibility mode]
 

Similar to Outline cotm4242

Fidic flow charts final
Fidic flow charts finalFidic flow charts final
Fidic flow charts final
FitBlar Mit
 
Procurement CV (1)
Procurement CV (1)Procurement CV (1)
Procurement CV (1)
Pratap Kumar
 
Man hour based strategy
Man hour based strategyMan hour based strategy
Man hour based strategy
Dheeraj Sehgal
 

Similar to Outline cotm4242 (20)

Outline cotm4241
Outline cotm4241Outline cotm4241
Outline cotm4241
 
ESSAM SAYED CV
ESSAM SAYED CVESSAM SAYED CV
ESSAM SAYED CV
 
ESSAM SAYED CV
ESSAM SAYED CVESSAM SAYED CV
ESSAM SAYED CV
 
Sem6
Sem6Sem6
Sem6
 
Fidic
FidicFidic
Fidic
 
Fidic flow charts final
Fidic flow charts finalFidic flow charts final
Fidic flow charts final
 
Tendering documentation
Tendering documentationTendering documentation
Tendering documentation
 
Construction Safety Training_Session 01_Overview of the Construction Industry
Construction Safety Training_Session 01_Overview of the Construction IndustryConstruction Safety Training_Session 01_Overview of the Construction Industry
Construction Safety Training_Session 01_Overview of the Construction Industry
 
Chapter one new.pptx
Chapter one new.pptxChapter one new.pptx
Chapter one new.pptx
 
Ijciet 10 01_088
Ijciet 10 01_088Ijciet 10 01_088
Ijciet 10 01_088
 
Chapter 2 [compatibility mode]
Chapter 2 [compatibility mode]Chapter 2 [compatibility mode]
Chapter 2 [compatibility mode]
 
Chapter 2 [compatibility mode]
Chapter 2 [compatibility mode]Chapter 2 [compatibility mode]
Chapter 2 [compatibility mode]
 
Chapter 2- Contract Management
Chapter 2- Contract ManagementChapter 2- Contract Management
Chapter 2- Contract Management
 
Fundamentals of Construction Contracts - English, ver. 2021
Fundamentals of Construction Contracts - English, ver. 2021Fundamentals of Construction Contracts - English, ver. 2021
Fundamentals of Construction Contracts - English, ver. 2021
 
IJSRED-V2I3P74
IJSRED-V2I3P74IJSRED-V2I3P74
IJSRED-V2I3P74
 
Procurement CV (1)
Procurement CV (1)Procurement CV (1)
Procurement CV (1)
 
Man hour based strategy
Man hour based strategyMan hour based strategy
Man hour based strategy
 
Quality Related Professional Practice
Quality Related Professional PracticeQuality Related Professional Practice
Quality Related Professional Practice
 
contract_management.ppt
contract_management.pptcontract_management.ppt
contract_management.ppt
 
Youssef Amin CV
Youssef Amin CVYoussef Amin CV
Youssef Amin CV
 

More from Delhi Technological University

More from Delhi Technological University (20)

Chapter 6- Contract Management
Chapter 6- Contract ManagementChapter 6- Contract Management
Chapter 6- Contract Management
 
Chapter 5- Contract Management
Chapter 5- Contract ManagementChapter 5- Contract Management
Chapter 5- Contract Management
 
Chapter 4- Contract Management
Chapter 4- Contract ManagementChapter 4- Contract Management
Chapter 4- Contract Management
 
Chapter 3- Contract Management
Chapter 3- Contract ManagementChapter 3- Contract Management
Chapter 3- Contract Management
 
Chapter 1- Procurement management
Chapter 1- Procurement managementChapter 1- Procurement management
Chapter 1- Procurement management
 
Chapter 4
Chapter 4Chapter 4
Chapter 4
 
Chapter 3- Construction Law
Chapter 3- Construction Law Chapter 3- Construction Law
Chapter 3- Construction Law
 
Chapter 2- Construction Law
Chapter 2- Construction Law Chapter 2- Construction Law
Chapter 2- Construction Law
 
Chapter 1-Construction Law
Chapter 1-Construction Law Chapter 1-Construction Law
Chapter 1-Construction Law
 
Chapter 5- Lecture
Chapter 5- LectureChapter 5- Lecture
Chapter 5- Lecture
 
Chapter 4- Lecture
Chapter 4- LectureChapter 4- Lecture
Chapter 4- Lecture
 
Chapter 3- Lecture
Chapter 3- LectureChapter 3- Lecture
Chapter 3- Lecture
 
Chapter 2- Lecture
Chapter 2- LectureChapter 2- Lecture
Chapter 2- Lecture
 
Chapter 1- Lecture
Chapter 1- LectureChapter 1- Lecture
Chapter 1- Lecture
 
Construction equipment management chapter 5
Construction equipment management chapter 5Construction equipment management chapter 5
Construction equipment management chapter 5
 
Construction equipment management chapter 4
Construction equipment management chapter 4Construction equipment management chapter 4
Construction equipment management chapter 4
 
Construction equipment management chapter 3
Construction equipment management chapter 3Construction equipment management chapter 3
Construction equipment management chapter 3
 
Construction equipment management chapter 2
Construction equipment management chapter 2Construction equipment management chapter 2
Construction equipment management chapter 2
 
Construction equipment management chapter 1pdf
Construction equipment management chapter 1pdfConstruction equipment management chapter 1pdf
Construction equipment management chapter 1pdf
 
Chapter 5 [compatibility mode]
Chapter 5 [compatibility mode]Chapter 5 [compatibility mode]
Chapter 5 [compatibility mode]
 

Recently uploaded

Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 

Recently uploaded (20)

DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 

Outline cotm4242

  • 1. Madawalabu University College of Engineering, Dept. of Construction Technology & Management Bale Robe, Ethiopia COURSE OUTLINE Procurement Management & Contract Administration CoTM4242 Credit hours: 3 Contact hours: 3hrs lecture, 5hrs home study Semester: 2nd , 2016/2017 Consulting time: “open door policy” Pre-requisite: CoTM 4241 Lecture Room No.: Computer Lab Bldg Instructor: Andualem Endris Yadeta (M.Sc) E-mail: andu0117@yahoo.com Tell: +251-913116477 Course Description Tendering: definition, Purpose, Types, Preparation of tender, Pre-qualification: invitations, instructions, Opening and evaluation; Statistical approach in tendering to bidders; Tender evaluation. Post qualification tender documents. Contracting: definitions, Types, awarding of contract, Contract agreement, Conditions of contract, Technical specifications, Bill of quantities and drawings, Forms formats and schedules: Tender form, Bonds and guaranties, Bid bond, Performance bond, Advance payment guaranty, Retention money guaranty. Insurance and indemnification, Claim administration: Types, Causes, Contractual provisions, Time related claims, Cost related claims, Quality related claims, and Stakeholders satisfaction related claims, Arbitration, litigation. 1. Introduction 1.1. Definitions 1.2. History of Contract 2. Tendering 2.1. Definition 2.2. Purpose of Tendering 2.3. Types of Tendering 2.4. Preparation of Tender 2.5. Pre-qualification of Tender 2.6.Post-qualification of Tender Documents 3. Project Delivery Methods and Types of Contract 3.1. Project Delivery Methods 3.1.1. Design-Build Method 3.1.2. Design-Bid-Build Method
  • 2. Madawalabu University College of Engineering, Dept. of Construction Technology & Management Bale Robe, Ethiopia 3.1.3. Turnkey Method 3.2. Types of Contract 3.2.1. Lump sum Contract 3.2.2. Admeasurements Contract 3.2.3. Cost plus Contract 4. Bonds and Insurances 4.1. Bonds 4.2. Guarantees 4.3. Insurances 5. Construction Claims 5.1. Causes of Claims 5.2. Types of Claims 5.3. Claim Management References 1. PPA (2006). User’s Guide for Standard Bidding Document for the procurement of works. Public Procurement Agency, MoFED, Addis Ababa. 2. MUDC (1994). Standard Condition of Contract for Construction of Civil Works Project, Ministry of Urban Development and Construction, Addis Ababa. 3. FIDIC (1999). Conditions of Contract for Construction. International Federation of Consulting Engineers. For Buildings and Engineering Works Designed by the Employer. 4. Federal Negarit Gazeta (2009). Ethiopian Government Procurement and Property Administration Proclamation: Proclamation No. 649/2009, Addis Ababa. 5. Ribeiro, Robert (1996). Engineering Contracts: A Management Guide. Elsevier Butterworth Heinemann, England 6. Murdoch, John and Hughes, Will (2000). Construction Contracts: Law and Management, 3rd ed. Spon Press, London. 7. Horgan, M.O’C. and Roulston, F.R. (2005). The Foundations of Engineering Contracts. E. & F.N. Spon Ltd. Evaluation Criteria Assignments: 20% Quizzes 10% Reports 10% Semester Project: 20% Final Exam: 40% Attendance: 90% during the lecture session is compulsory.