10. Preaction
• Continuously monitored
by compressed air
• Require fire detection
system
11. Single Interlock
• Water charge in system
piping upon operation
of alarm device
12. Double Interlock
• Water charge in system
piping upon operation
of alarm device and
sprinkler opening
13. Preaction sprinkler
• Upright sprinkler
• Dry sprinkler
• Pendent sprinkler in
return bends and
branch lines are above
4C
• Horizontal sidewall
sprinkler installed so
that water is not
trapped
14. Required Information
• As-Built drawings
• AHJ additional
requirements
• Calculation sheets
• Data sheets
• User Manual
• Maintenance Manual
15. Inspection
• Occupancy
classification
• Protected area
• Discharge area
• System demand
• Flow at most
remote
sprinkler
• Flow at system
riser
16. Inspection
• Location and
quantity of
equipments
• Pipe size and
routing
• Sprinkler
obstructions
– Pattern
development
obstruction
– Water distribution
obstruction
17. Inspection
Sprinkler obstructions
• Pattern development
• Water distribution
21. Hydrostatic test
• 200 psi (13.8
bar) without
loss for 2 hours
• Test pressure
shall be read
from a gauge
located at the
low elevation
point of the
system
22. Air test (Preaction)
• 40 psi (2.8 bar) with less
than 1-1/2 psi (0.1 bar)
in 24 hours
23. Operational test
• Open Inspector’s
test connection
• Alarm expected
within 5 minutes
Preaction
• Activate alarm
device
• Open Inspector’s
test connection
• Water discharge
expected within 1
minute
24. Operational test
• Open main drain valve
and leave open until
pressure stabilized
• Close and open each
control valves under
system water pressure
• Open and flow test all
pressure reducing valve
27. Required Information
• As-Built drawings
• AHJ additional
requirements
• Calculation sheets
• Data sheets
• User Manual
• Maintenance Manual
28. Inspection
• Protected hazard
• Design density
• Protected area
• System demand
29. Inspection
• Location and
quantity of
equipments
• Nozzle pattern
and location
• Pipe size and
routing
30. Hydrostatic test
• 200 psi (13.8
bar) without loss
for 2 hours
• Test pressure
shall be read
from a gauge
located at the
low elevation
point of the
system
31. Operational test
• Test system actuation as
per manufacturer’s
manual
• Discharge test
(Automatic, Manual, Em
ergency)
33. Clean Agent System
• Normally empty pipe
• 10 seconds – 60
seconds discharge
• Require Automatic
detection and control
34. Carbon Dioxide
• Stored in liquid or
superheated gas state
• No pressure gauge
• Quantity check only by
weighing
• Flow in two phases
• Very low temperature
discharge
• Nominal 60 seconds
discharge
35. Inert Gas
• Stored in high pressure
compressed gas state
• Pressure gauge
represent gas quantity
• Flow in gas state
• Nominal 60 seconds
discharge
36. Synthetic Gas
• Stored in liquid state
under Nitrogen propellant
• Pressure gauge represent
propellant quantity
• Weighing or liquid level
measuring for agent
quantity
• Discharge within 10
seconds to prevent
decomposition products
37. Required Information
• As-Built drawings
• AHJ additional
requirements
• Calculation sheets
• Data sheets
• User Manual
• Maintenance Manual
39. Inspection
• Location and
quantity of
equipments
• Cylinder fills
• Propellant pressure
level (if available)
• Cylinders are
secured as per the
design
• Nozzle pattern and
location
• Pipe size and routing
• Protected area
dimensions
40. Inspection
• Location of control
panel
• Location of field
devices
• Location of interface
control panel
• Location of field
devices
• Wiring gauge and
conduit size
• Dedicated power
source
• Standby power source
or integral battery
41. Inspection
Carbon Dioxide
• Lock out valve MUST be
provided in each
protected volume
• NO Abort switch
Inert and Synthetic Gas
• Maintenance lockout
switch shall be provided
• Abort switch shall be
provided
42. Hydrostatic test
Carbon dioxide
• Not required
Inert or Synthetic Gas
• 40 psi (2.7 bar) with no
more than 20% for 10
minute
43. Discharge test (Carbon Dioxide)
• Oxygen sensor with
data logger
• Less than 10% Oxygen
concentration
• 10 minute retention
time
ต้องใช้ As-built drawings และ Equipment data sheetsห้องจะต้องมีลักษณะและปริมาตรตรงกับในแบบ
Check against drawingsAll field devices shall be practically accessibleSmoke detector shall be properly installedManual release device shall not be covered or obstructed
Safety reason for Carbon Dioxide. Environmental reason for Clean agent.Manual release shall be double action type.Abort switch shall be dead man type and located within the protected area.