CONTENTS 
 ABOUT NTPC 
 INTRODUCTION TO GAS POWER STATION 
 COMBINED CYCLE 
 HOW DOES A COMBINED-CYCLE POWER PLANTWORK? 
 GAS TURBINE STARTING SYSTEM 
 STEAM TURBINE 
 TRANSMISSION OF GENERATED POWER ONTO THE THE 
GRID TRANSFORMERS 
 SWITCHYARD 
 CONDESOR AND COOLING TOWER 
 NATURAL GAS 
 CONTROL ROOM
ABOUT NTPC 
 NTPC ,the largest power company in india ,was setup in 1975 to accelerate power 
development in country. 
 NTPC Dadri is a unique power plant of NTPC group which has coal based thermal 
plant and gas based thermal plant of 1820 MW ,817 MW and solar based plant 
5MW respectively. 
 NTPC has installed capacity of 29,397MW. 
 It has 15 coal based power station ,7 gas based power stations and 1 solarbased 
power station. 
 It plans to be 75,000MW company by 2017.
INTRODUCTION TO GAS POWER 
STATION 
 The gas turbine has found increasing application due to the 
following potential advantages over competive equipment. 
 • Small size and weight per horsepower 
 • Rapid loading capability 
 • Self-contained packaged unit 
 • Moderate first cost 
 • No cooling water required 
 • Easy maintenance 
 • High reliability 
 • Waste heat available for combined cycle application. 
 • Low Gestation Period 
 • Low Pollution Hazard
COMBINED CYCLE 
 Combined Cycle Power Plants 
GT1 GT2 GT3 GT4 
ST1 ST2 
MODULE 1 MODULE 2 
 Combined Cycle Power Plants integrates two power 
conversion cycles namely. 
1.Brayton Cycle(Gas Turbines) 
2.RankinCycle(Conventional steam power plant) 
with the principal objective of increasing overall plant 
efficiency
Brayton Cycle 
 Gas Turbine plant-operate on Brayton Cycle in which air 
iscompressed this compressed air is heated in the 
combustor by burning fuel combustion produced is 
allowed to expand In theTurbine and the turbine is 
coupled with the generator
RANKINE CYCLE 
 The conversion of heat energy to mechanical energy with the aid of steam is carried 
out through this cycle 
 The initial state of the working fluid is water (point-3) which, at a certain temperature 
is compressed by a pump (process 3-4) and fed to the boiler. 
 In the boiler the compressed water is heated at constant pressure (process 4-5-6-1). 
 Modern steam power plants have steam temperature in the range of 500C to 550C at 
the inlet of the turbine
HOW DOES A COMBINED CYCLE 
POWER PLANT WORK 
POWER GENERATION: 
 Air Inlet 
 The amount of air needed for combustion is800,000 cubic feet per 
minute. 
 This air is drawn though the large air inlet section where it is cleaned, 
cooled and controlled, in order to reduce noise. 
 Turbine-Generators 
 The air then enters the gas turbine where it is compressed, mixed with 
natural gas and ignited , which causes it to expand. The pressure created 
from the expansion spins the turbine blades , which are attached to a 
shaft and a generator , creating electricity. 
 Each gas turbine produces 185 megawatts (MW)of electricity.
 GAS TURBINE STARTING SYSTEM 
 A typical hydraulic starting system for each gas turbine is consist of: 
 Starting motor, electric AC induction motor 
 Hydraulic torque converter 
 Auxiliary Gear 
 Couplings 
 The electric starting motor drives the hydraulic torque generator 
through a coupling. 
 The static frequency converter serves the same 
function of starting, accelerating running at preset speed by 
starting the generator as a synchronous motor by feeding variable 
frequency current drawn from the connected grid.
GAS TURBINE
Steam Turbine 
 The steam turbine is capable of producing upto 240 MW. It is located 
on top of the condenser, across from the cooling tower. 
 Steam enters the turbine with temperatures as high as 1200 degrees C 
and pressure as strong as 2,200 pounds per square inch. The pressure 
of the steam is used to spin turbine blades that are attached to a rotor 
and a generator, producing additional electricity, about100 megawatts 
per HRSG unit. 
 After the steam is spent in the turbine process , the residual steam 
leaves the turbine at low pressure and low heat, about 100 degrees. 
This exhaust steam passes into a condenser, to be turned back into 
water. 
 By using this “combined-cycle” process, two gasturbines and one 
steam turbine, we can producea total of about 600 megawatts of 
electricity
Transmission of Generated Power 
Onto the Grid Transformers 
.
Transmission of Generated Power Onto 
the Grid Transformers 
 The transformers take the generated 13,000 volts and 
“transform” them to 230,000 volts, which is the required 
voltage needed for transmission to the nearby tower that 
sends power to the substation. 
 A small amount of generation is directed to “Auxiliary 
transformers” which “transform” the generated voltage to a 
lower voltage, so it may be used by the plant to power our own 
pumps, fans, and motors. The Metcalf Energy Center requires 
12 – 15 megawatts to operate
Switchyard 
. 
 From each transformer, the power passes underground into our 
switchyard. The power from all of the generators comes together there 
, where it is measured, metered and directed on to the grid. 
 The proximity of the site to a large, existing PG&T substation makes it 
a good place to build a power plant and the nearest transmission 
tower is only about 200 feet away.
Condenser and Cooling Tower 
 The purpose of the condenser is to turn low energy steam back 
into pure water for use in the Heat Recovery Steam Generator. 
 The purpose of the cooling tower is to cool the circulating water 
that passes through the condenser. It consists of ten cells with 
large fan son top, inside the cone-like stacks, and a basin of water 
underneath.
Natural Gas 
 Natural gas fuels the combustion turbines. Each turbine can consume up to 
. 
2,000 MMBTU per hour 
 The pipeline was built 60 feet underground and passed under highways, 
creek, train tracks, and environmentally sensitive areas. 
 The pipeline enters the site just behind the water tanks, where equipment 
regulates and measures the natural gas composition, flow and pressure.
Control Room 
 From the control room, the plant operators monitor and operate the facility, via 
the plant’s “ Distributed Control System”, with the click of a mouse, viewing 
graphic representations of all MEC systems on various screens. 
 The system gives operators both audible and visual signals to keep them 
informed of plant conditions at all times and to determine when preventative 
maintenance is required
NTPC DADRI.

More Related Content

What's hot

NTPC summer training report
NTPC summer training reportNTPC summer training report
NTPC summer training reportsanjeevps12345
 
Summer Training Report on thermal power plant
Summer Training Report on thermal power plantSummer Training Report on thermal power plant
Summer Training Report on thermal power plantMohdAreebQureshi
 
CONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANTCONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANTSubarna Poddar
 
thermal power plant PTTP Parichha
thermal power plant PTTP Parichhathermal power plant PTTP Parichha
thermal power plant PTTP ParichhaGagandeep Maan
 
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')Tejasvi Anant
 
Thermal power station
Thermal power stationThermal power station
Thermal power stationvishal gupta
 
Industrial Training Report on NTPC Faridabad
Industrial Training Report on NTPC FaridabadIndustrial Training Report on NTPC Faridabad
Industrial Training Report on NTPC FaridabadPawan Agrawal
 
thermal power plant NTPC singrauli
thermal power plant NTPC singrauli thermal power plant NTPC singrauli
thermal power plant NTPC singrauli Ram Narayan Shah
 
Ntpc kahalgaon training report
Ntpc kahalgaon training reportNtpc kahalgaon training report
Ntpc kahalgaon training reportravi kant
 
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...Navin Pathak
 
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHALVOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHALMilind Punj
 
Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipatpratikguptateddy
 
Summer training in NTPC ppt
Summer training in NTPC pptSummer training in NTPC ppt
Summer training in NTPC pptkirbadh
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plantViren Patel
 

What's hot (20)

NTPC summer training report
NTPC summer training reportNTPC summer training report
NTPC summer training report
 
Summer Training Report on thermal power plant
Summer Training Report on thermal power plantSummer Training Report on thermal power plant
Summer Training Report on thermal power plant
 
CONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANTCONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANT
 
Power plant
Power plantPower plant
Power plant
 
thermal power plant PTTP Parichha
thermal power plant PTTP Parichhathermal power plant PTTP Parichha
thermal power plant PTTP Parichha
 
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermal power station
Thermal power stationThermal power station
Thermal power station
 
Industrial Training Report on NTPC Faridabad
Industrial Training Report on NTPC FaridabadIndustrial Training Report on NTPC Faridabad
Industrial Training Report on NTPC Faridabad
 
thermal power plant NTPC singrauli
thermal power plant NTPC singrauli thermal power plant NTPC singrauli
thermal power plant NTPC singrauli
 
Ntpc dadri
Ntpc dadriNtpc dadri
Ntpc dadri
 
Ntpc dadri ppt
Ntpc dadri pptNtpc dadri ppt
Ntpc dadri ppt
 
Ntpc kahalgaon training report
Ntpc kahalgaon training reportNtpc kahalgaon training report
Ntpc kahalgaon training report
 
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...
 
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHALVOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
 
Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipat
 
Summer training in NTPC ppt
Summer training in NTPC pptSummer training in NTPC ppt
Summer training in NTPC ppt
 
Ntpc training ppt
Ntpc training pptNtpc training ppt
Ntpc training ppt
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
An Overview of Thermal Power Plant
An Overview of Thermal Power PlantAn Overview of Thermal Power Plant
An Overview of Thermal Power Plant
 

Similar to NTPC DADRI.

Combined Cycle Power Plant
Combined Cycle Power PlantCombined Cycle Power Plant
Combined Cycle Power Plantmustafa hussain
 
Hardware Implementation of Steam Power Plant
Hardware Implementation of Steam Power PlantHardware Implementation of Steam Power Plant
Hardware Implementation of Steam Power PlantIJERDJOURNAL
 
Ppt of internship at dccpp
Ppt of internship at dccppPpt of internship at dccpp
Ppt of internship at dccppDurgSingh
 
IN THE NAME OF ALLAH THE MOST BENIFICIENT AND MOST MERCIFUL
IN THE NAME OF ALLAH THE MOST BENIFICIENT AND MOST  MERCIFULIN THE NAME OF ALLAH THE MOST BENIFICIENT AND MOST  MERCIFUL
IN THE NAME OF ALLAH THE MOST BENIFICIENT AND MOST MERCIFULHafiz M .Hamid
 
Ppt on power generation(thermal), transmission & distribution
Ppt on power generation(thermal), transmission & distributionPpt on power generation(thermal), transmission & distribution
Ppt on power generation(thermal), transmission & distributionSuvamSahu2
 
Internship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plantInternship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plantAbhishek Kumar
 
NTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPTNTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPTShivam Sharma
 
NTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training ReportNTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training ReportAditya Shekhar
 
NTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training ReportNTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training ReportAditya Shekhar
 
Presentation 1 (2).pptx
Presentation 1 (2).pptxPresentation 1 (2).pptx
Presentation 1 (2).pptxNaveenJarwal1
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plantRahul Jalan
 
Mini project ppt on working of steam turbine and its auxiliaries
Mini project ppt on working of steam turbine and its auxiliariesMini project ppt on working of steam turbine and its auxiliaries
Mini project ppt on working of steam turbine and its auxiliariesjyotishmathi college
 
SUMMER TRAINING AT NTPC DADRI GAS SECTION
SUMMER TRAINING AT NTPC DADRI GAS SECTIONSUMMER TRAINING AT NTPC DADRI GAS SECTION
SUMMER TRAINING AT NTPC DADRI GAS SECTIONAMIT KUMAR
 

Similar to NTPC DADRI. (20)

KTPS
KTPSKTPS
KTPS
 
Presentation1
Presentation1Presentation1
Presentation1
 
Combined Cycle Power Plant
Combined Cycle Power PlantCombined Cycle Power Plant
Combined Cycle Power Plant
 
Hardware Implementation of Steam Power Plant
Hardware Implementation of Steam Power PlantHardware Implementation of Steam Power Plant
Hardware Implementation of Steam Power Plant
 
Ppt of internship at dccpp
Ppt of internship at dccppPpt of internship at dccpp
Ppt of internship at dccpp
 
IN THE NAME OF ALLAH THE MOST BENIFICIENT AND MOST MERCIFUL
IN THE NAME OF ALLAH THE MOST BENIFICIENT AND MOST  MERCIFULIN THE NAME OF ALLAH THE MOST BENIFICIENT AND MOST  MERCIFUL
IN THE NAME OF ALLAH THE MOST BENIFICIENT AND MOST MERCIFUL
 
Ppt on power generation(thermal), transmission & distribution
Ppt on power generation(thermal), transmission & distributionPpt on power generation(thermal), transmission & distribution
Ppt on power generation(thermal), transmission & distribution
 
Internship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plantInternship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plant
 
Attachment.doc
Attachment.docAttachment.doc
Attachment.doc
 
kstps training report
kstps training reportkstps training report
kstps training report
 
Micro turbine
Micro turbineMicro turbine
Micro turbine
 
NTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPTNTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPT
 
Harsh ntpc
Harsh ntpcHarsh ntpc
Harsh ntpc
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
NTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training ReportNTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training Report
 
NTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training ReportNTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training Report
 
Presentation 1 (2).pptx
Presentation 1 (2).pptxPresentation 1 (2).pptx
Presentation 1 (2).pptx
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Mini project ppt on working of steam turbine and its auxiliaries
Mini project ppt on working of steam turbine and its auxiliariesMini project ppt on working of steam turbine and its auxiliaries
Mini project ppt on working of steam turbine and its auxiliaries
 
SUMMER TRAINING AT NTPC DADRI GAS SECTION
SUMMER TRAINING AT NTPC DADRI GAS SECTIONSUMMER TRAINING AT NTPC DADRI GAS SECTION
SUMMER TRAINING AT NTPC DADRI GAS SECTION
 

Recently uploaded

2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.elesangwon
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHSneha Padhiar
 
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdfAkritiPradhan2
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书rnrncn29
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfBalamuruganV28
 
OOP concepts -in-Python programming language
OOP concepts -in-Python programming languageOOP concepts -in-Python programming language
OOP concepts -in-Python programming languageSmritiSharma901052
 
Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solidnamansinghjarodiya
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Romil Mishra
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewsandhya757531
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfalene1
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSneha Padhiar
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSsandhya757531
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptxmohitesoham12
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfChristianCDAM
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdfsahilsajad201
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodManicka Mamallan Andavar
 

Recently uploaded (20)

2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
 
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdf
 
OOP concepts -in-Python programming language
OOP concepts -in-Python programming languageOOP concepts -in-Python programming language
OOP concepts -in-Python programming language
 
Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solid
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overview
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptx
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdf
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdf
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument method
 

NTPC DADRI.

  • 1. TRAINING REPORT ON NATIONAL CAPITAL POWER STATION DADRI
  • 2. CONTENTS  ABOUT NTPC  INTRODUCTION TO GAS POWER STATION  COMBINED CYCLE  HOW DOES A COMBINED-CYCLE POWER PLANTWORK?  GAS TURBINE STARTING SYSTEM  STEAM TURBINE  TRANSMISSION OF GENERATED POWER ONTO THE THE GRID TRANSFORMERS  SWITCHYARD  CONDESOR AND COOLING TOWER  NATURAL GAS  CONTROL ROOM
  • 3. ABOUT NTPC  NTPC ,the largest power company in india ,was setup in 1975 to accelerate power development in country.  NTPC Dadri is a unique power plant of NTPC group which has coal based thermal plant and gas based thermal plant of 1820 MW ,817 MW and solar based plant 5MW respectively.  NTPC has installed capacity of 29,397MW.  It has 15 coal based power station ,7 gas based power stations and 1 solarbased power station.  It plans to be 75,000MW company by 2017.
  • 4.
  • 5. INTRODUCTION TO GAS POWER STATION  The gas turbine has found increasing application due to the following potential advantages over competive equipment.  • Small size and weight per horsepower  • Rapid loading capability  • Self-contained packaged unit  • Moderate first cost  • No cooling water required  • Easy maintenance  • High reliability  • Waste heat available for combined cycle application.  • Low Gestation Period  • Low Pollution Hazard
  • 6. COMBINED CYCLE  Combined Cycle Power Plants GT1 GT2 GT3 GT4 ST1 ST2 MODULE 1 MODULE 2  Combined Cycle Power Plants integrates two power conversion cycles namely. 1.Brayton Cycle(Gas Turbines) 2.RankinCycle(Conventional steam power plant) with the principal objective of increasing overall plant efficiency
  • 7. Brayton Cycle  Gas Turbine plant-operate on Brayton Cycle in which air iscompressed this compressed air is heated in the combustor by burning fuel combustion produced is allowed to expand In theTurbine and the turbine is coupled with the generator
  • 8. RANKINE CYCLE  The conversion of heat energy to mechanical energy with the aid of steam is carried out through this cycle  The initial state of the working fluid is water (point-3) which, at a certain temperature is compressed by a pump (process 3-4) and fed to the boiler.  In the boiler the compressed water is heated at constant pressure (process 4-5-6-1).  Modern steam power plants have steam temperature in the range of 500C to 550C at the inlet of the turbine
  • 9. HOW DOES A COMBINED CYCLE POWER PLANT WORK POWER GENERATION:  Air Inlet  The amount of air needed for combustion is800,000 cubic feet per minute.  This air is drawn though the large air inlet section where it is cleaned, cooled and controlled, in order to reduce noise.  Turbine-Generators  The air then enters the gas turbine where it is compressed, mixed with natural gas and ignited , which causes it to expand. The pressure created from the expansion spins the turbine blades , which are attached to a shaft and a generator , creating electricity.  Each gas turbine produces 185 megawatts (MW)of electricity.
  • 10.  GAS TURBINE STARTING SYSTEM  A typical hydraulic starting system for each gas turbine is consist of:  Starting motor, electric AC induction motor  Hydraulic torque converter  Auxiliary Gear  Couplings  The electric starting motor drives the hydraulic torque generator through a coupling.  The static frequency converter serves the same function of starting, accelerating running at preset speed by starting the generator as a synchronous motor by feeding variable frequency current drawn from the connected grid.
  • 12. Steam Turbine  The steam turbine is capable of producing upto 240 MW. It is located on top of the condenser, across from the cooling tower.  Steam enters the turbine with temperatures as high as 1200 degrees C and pressure as strong as 2,200 pounds per square inch. The pressure of the steam is used to spin turbine blades that are attached to a rotor and a generator, producing additional electricity, about100 megawatts per HRSG unit.  After the steam is spent in the turbine process , the residual steam leaves the turbine at low pressure and low heat, about 100 degrees. This exhaust steam passes into a condenser, to be turned back into water.  By using this “combined-cycle” process, two gasturbines and one steam turbine, we can producea total of about 600 megawatts of electricity
  • 13. Transmission of Generated Power Onto the Grid Transformers .
  • 14.
  • 15. Transmission of Generated Power Onto the Grid Transformers  The transformers take the generated 13,000 volts and “transform” them to 230,000 volts, which is the required voltage needed for transmission to the nearby tower that sends power to the substation.  A small amount of generation is directed to “Auxiliary transformers” which “transform” the generated voltage to a lower voltage, so it may be used by the plant to power our own pumps, fans, and motors. The Metcalf Energy Center requires 12 – 15 megawatts to operate
  • 16. Switchyard .  From each transformer, the power passes underground into our switchyard. The power from all of the generators comes together there , where it is measured, metered and directed on to the grid.  The proximity of the site to a large, existing PG&T substation makes it a good place to build a power plant and the nearest transmission tower is only about 200 feet away.
  • 17. Condenser and Cooling Tower  The purpose of the condenser is to turn low energy steam back into pure water for use in the Heat Recovery Steam Generator.  The purpose of the cooling tower is to cool the circulating water that passes through the condenser. It consists of ten cells with large fan son top, inside the cone-like stacks, and a basin of water underneath.
  • 18. Natural Gas  Natural gas fuels the combustion turbines. Each turbine can consume up to . 2,000 MMBTU per hour  The pipeline was built 60 feet underground and passed under highways, creek, train tracks, and environmentally sensitive areas.  The pipeline enters the site just behind the water tanks, where equipment regulates and measures the natural gas composition, flow and pressure.
  • 19. Control Room  From the control room, the plant operators monitor and operate the facility, via the plant’s “ Distributed Control System”, with the click of a mouse, viewing graphic representations of all MEC systems on various screens.  The system gives operators both audible and visual signals to keep them informed of plant conditions at all times and to determine when preventative maintenance is required