ROADMAP
What is scheduling
Examples
Objectives
Elements
Priority Planning
Master Production scheduling (MPS)
Objectives of MPS
Functions of MPS
Problems of sequencing in scheduling
SCHEDULING
 Scheduling is one of the most important elements in
  production planning.

 Scheduling calls for through understanding of all aspects of
  the production process and is an outcome of the integration
  of the efforts of planners in the planning group and the
  people in the shop-floor.

 Scheduling integrates the people, machine, materials,
  customer demands, and quality requirements in finalizing the
  priorities. Scheduling makes it possible by determining
  starting and completion data each of the operations.
EXAMPLES OF SCHEDULING

Timetabling Scheduling of the Computer :A number
 of different courses (tasks) have to be given using the
 PC room(resource)
Workforce scheduling : Assign shifts for nurses and
 doctors in a Hospital
Sports Scheduling
Drug Scheduling
CONT……….

  Scheduling effects from 2 environmental factors that are
 internal and external to the organization.
Internal environment
External environment
OBJECTIVES OF SCHEDULING

Maximize throughput
Be predictable:
Minimize overhead
Balance resource use
Achieve a balance between response and utilization
Avoid indefinite postponement
Enforce Priorities
Give preference to process holding
Degrade gracefully under heavy loads
ELEMENTS OF SCHEDULING


The processors
The tasks
The processing timings
The precedence relations
PRIORITY PLANNING

 Planning is the process by which the elements
 required to perform a task are determined in advance
 of the job start. The process is as follows :
Operations soft constraints
Management policy constraints
Engineering hard constraints
MASTER PRODUCTION SCHEDULING
     Master scheduling is a part of scheduling.

 A Master Production Schedule is a Schedule of the
    completions of the end items and these completions are
    very much planned in nature.

 A MPS is also in management language referred to as the
    master of all the schedules as this schedule provides the
    production, planning, purchasing & top management, the
    most needed information required for planning and
    control of the whole manufacturing process or the
    operation.
OBJECTIVES OF MASTER SCHEDULING



Keeping the inventories
Setting up the due dates for the availability of items
Maintaining the customer service
Setting proper schedules
FUNCTIONS OF MASTER
             SCHEDULING

Specifies planning periods as daily, weekly, or monthly.
Group work order processing
Tracks accuracy of order forecasting as percentage.
Classifies supply into types such as materials, purchased,
 flow, work order, and transfer.
Schedule can be edited, changed, or consolidated.
PROBLEMS OF SEQUENCING IN
        SCHEDULING



SHORTEST PROCESSING TIME (SPT)
WEIGHTED SHORTEST PROCESSING TIME (WSPT)
EXAMPLE:-
 The data about a set of single operation jobs that is to be processed in
  a CNC lathe and the processing times of the jobs in the given set of jobs
  are as given in table.
 Find the optimal sequence which will minimize the mean flow time and
  also obtain the corresponding minimum mean flow time.

                     Job, j                Processing time, tj
                       1                             7
                       2                            18
                       3                             6
                       4                             8
                       5                            12
SOLUTION:-
 For the given problem, the number of jobs is equal to
 5. The jobs are arranged as per the SPT ordering.

             Job, j          Processing time, tj
               3                       6
               1                       7
               4                       8
               5                      12
               2                      18


Therefore, the job sequence which will minimize the
 mean flow time is 3-1-4-5-2.
CONT
The computation of flow time for the optimal sequence
 (3-1-4-5-2).
               COMPUTATION FLOW TIME
            Job, j     Processing time, tj   Completion time, cj(fj)

                3              6                       6

                1              7                       13

                4              8                       21

                5              12                      33

                2              18                      51
CONT
Since the ready time rj is zero for all the values of j, the flow
  time (fj) = cj for all j.
Therefore,
1/5 ∑ Fj = 1/5 (6+13+21+33+51)
              = 1/5 (124)
              = 24.8 hours
Therefore, the optimal mean flow time = 24.8 hours.
WSPT
Example
           Job, j     Processing time, tj   Weight , wj

             1                7                 1
             2                18                2
             3                6                 1
             4                8                 2
             5                12                3

Determine the sequence which will minimize the
 weighted flow time of this problem. Also find the
 corresponding weighted mean flow time.
SOLUTION:-

 The weighted processing times of various jobs are
 summarized by using the formula tj/wj, j = 1,2,3,4, and 5
           Job, j   Processing time,   Weight , wj   Tj/wj
                           tj
             1             7               1          7

             2            18               2          9

             3             6               1          6

             4             8               2          4

             5            12               3          4
CALCULATIONS OF WEIGHTED
        FLOW TIMES
Job, j   Processing time,   Cj (Fj)   Weight , wj   Fjwj
                tj
  4             8             8           2         16
  5            12             20          3         60
  3             6             26          1         26
  1             7             33          1         33
  2            18             51          2         102
scheduling

More Related Content

What's hot (20)

Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Material Resource Planning
Material Resource PlanningMaterial Resource Planning
Material Resource Planning
 
Method study
Method studyMethod study
Method study
 
Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
 
Capacity Requirement Planning
Capacity Requirement PlanningCapacity Requirement Planning
Capacity Requirement Planning
 
Method Study
Method StudyMethod Study
Method Study
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
Scheduling
SchedulingScheduling
Scheduling
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Ppc
PpcPpc
Ppc
 
Job shop scheduling
Job shop schedulingJob shop scheduling
Job shop scheduling
 
Input to MRP
Input to MRPInput to MRP
Input to MRP
 
MRP I and MRP II
MRP I and MRP IIMRP I and MRP II
MRP I and MRP II
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations Scheduling
 
types of production system
types of production systemtypes of production system
types of production system
 
Line balancing
Line balancingLine balancing
Line balancing
 
Time study
Time studyTime study
Time study
 
Assembly line balancing
Assembly line balancingAssembly line balancing
Assembly line balancing
 
Assembly line balancing
Assembly line balancingAssembly line balancing
Assembly line balancing
 

Similar to scheduling

Scheduling production
Scheduling   productionScheduling   production
Scheduling productionAditya Powale
 
Operations Research_18ME735_module 5 sequencing notes.pdf
Operations Research_18ME735_module 5 sequencing notes.pdfOperations Research_18ME735_module 5 sequencing notes.pdf
Operations Research_18ME735_module 5 sequencing notes.pdfRoopaDNDandally
 
Global seek optimization in real time database
Global seek optimization in real time databaseGlobal seek optimization in real time database
Global seek optimization in real time databaseIAEME Publication
 
SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)Chris Cummins
 
Litttle knowledge of lean concept helps
Litttle knowledge of lean  concept helpsLitttle knowledge of lean  concept helps
Litttle knowledge of lean concept helpsSF Lau
 
11.optimal three stage flow shop scheduling in which processing time, set up ...
11.optimal three stage flow shop scheduling in which processing time, set up ...11.optimal three stage flow shop scheduling in which processing time, set up ...
11.optimal three stage flow shop scheduling in which processing time, set up ...Alexander Decker
 
Optimal three stage flow shop scheduling in which processing time, set up tim...
Optimal three stage flow shop scheduling in which processing time, set up tim...Optimal three stage flow shop scheduling in which processing time, set up tim...
Optimal three stage flow shop scheduling in which processing time, set up tim...Alexander Decker
 
11.flow shop scheduling problem, processing time associated with probabilitie...
11.flow shop scheduling problem, processing time associated with probabilitie...11.flow shop scheduling problem, processing time associated with probabilitie...
11.flow shop scheduling problem, processing time associated with probabilitie...Alexander Decker
 
Flow shop scheduling problem, processing time associated with probabilities i...
Flow shop scheduling problem, processing time associated with probabilities i...Flow shop scheduling problem, processing time associated with probabilities i...
Flow shop scheduling problem, processing time associated with probabilities i...Alexander Decker
 
A case study on Machine scheduling and sequencing using Meta heuristics
A case study on Machine scheduling and sequencing using Meta heuristicsA case study on Machine scheduling and sequencing using Meta heuristics
A case study on Machine scheduling and sequencing using Meta heuristicsIJERA Editor
 
A case study on Machine scheduling and sequencing using Meta heuristics
A case study on Machine scheduling and sequencing using Meta heuristicsA case study on Machine scheduling and sequencing using Meta heuristics
A case study on Machine scheduling and sequencing using Meta heuristicsIJERA Editor
 
Job Shop Scheduling.pptx
Job Shop Scheduling.pptxJob Shop Scheduling.pptx
Job Shop Scheduling.pptxSyedAmirIqbal3
 
Application of branch and bound technique for nx3 flow shop scheduling, in wh...
Application of branch and bound technique for nx3 flow shop scheduling, in wh...Application of branch and bound technique for nx3 flow shop scheduling, in wh...
Application of branch and bound technique for nx3 flow shop scheduling, in wh...Alexander Decker
 
Clock driven scheduling
Clock driven schedulingClock driven scheduling
Clock driven schedulingKamal Acharya
 
Machines constrained flow shop scheduling processing time, setup time each as...
Machines constrained flow shop scheduling processing time, setup time each as...Machines constrained flow shop scheduling processing time, setup time each as...
Machines constrained flow shop scheduling processing time, setup time each as...Alexander Decker
 
11.machines constrained flow shop scheduling processing time, setup time each...
11.machines constrained flow shop scheduling processing time, setup time each...11.machines constrained flow shop scheduling processing time, setup time each...
11.machines constrained flow shop scheduling processing time, setup time each...Alexander Decker
 

Similar to scheduling (20)

Scheduling production
Scheduling   productionScheduling   production
Scheduling production
 
Operations Research_18ME735_module 5 sequencing notes.pdf
Operations Research_18ME735_module 5 sequencing notes.pdfOperations Research_18ME735_module 5 sequencing notes.pdf
Operations Research_18ME735_module 5 sequencing notes.pdf
 
Exam110121
Exam110121Exam110121
Exam110121
 
Global seek optimization in real time database
Global seek optimization in real time databaseGlobal seek optimization in real time database
Global seek optimization in real time database
 
Flowshop scheduling
Flowshop schedulingFlowshop scheduling
Flowshop scheduling
 
SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)
 
Litttle knowledge of lean concept helps
Litttle knowledge of lean  concept helpsLitttle knowledge of lean  concept helps
Litttle knowledge of lean concept helps
 
11.optimal three stage flow shop scheduling in which processing time, set up ...
11.optimal three stage flow shop scheduling in which processing time, set up ...11.optimal three stage flow shop scheduling in which processing time, set up ...
11.optimal three stage flow shop scheduling in which processing time, set up ...
 
Optimal three stage flow shop scheduling in which processing time, set up tim...
Optimal three stage flow shop scheduling in which processing time, set up tim...Optimal three stage flow shop scheduling in which processing time, set up tim...
Optimal three stage flow shop scheduling in which processing time, set up tim...
 
R0260950100
R0260950100R0260950100
R0260950100
 
11.flow shop scheduling problem, processing time associated with probabilitie...
11.flow shop scheduling problem, processing time associated with probabilitie...11.flow shop scheduling problem, processing time associated with probabilitie...
11.flow shop scheduling problem, processing time associated with probabilitie...
 
Flow shop scheduling problem, processing time associated with probabilities i...
Flow shop scheduling problem, processing time associated with probabilities i...Flow shop scheduling problem, processing time associated with probabilities i...
Flow shop scheduling problem, processing time associated with probabilities i...
 
A case study on Machine scheduling and sequencing using Meta heuristics
A case study on Machine scheduling and sequencing using Meta heuristicsA case study on Machine scheduling and sequencing using Meta heuristics
A case study on Machine scheduling and sequencing using Meta heuristics
 
A case study on Machine scheduling and sequencing using Meta heuristics
A case study on Machine scheduling and sequencing using Meta heuristicsA case study on Machine scheduling and sequencing using Meta heuristics
A case study on Machine scheduling and sequencing using Meta heuristics
 
Job Shop Scheduling.pptx
Job Shop Scheduling.pptxJob Shop Scheduling.pptx
Job Shop Scheduling.pptx
 
Application of branch and bound technique for nx3 flow shop scheduling, in wh...
Application of branch and bound technique for nx3 flow shop scheduling, in wh...Application of branch and bound technique for nx3 flow shop scheduling, in wh...
Application of branch and bound technique for nx3 flow shop scheduling, in wh...
 
Extlect02
Extlect02Extlect02
Extlect02
 
Clock driven scheduling
Clock driven schedulingClock driven scheduling
Clock driven scheduling
 
Machines constrained flow shop scheduling processing time, setup time each as...
Machines constrained flow shop scheduling processing time, setup time each as...Machines constrained flow shop scheduling processing time, setup time each as...
Machines constrained flow shop scheduling processing time, setup time each as...
 
11.machines constrained flow shop scheduling processing time, setup time each...
11.machines constrained flow shop scheduling processing time, setup time each...11.machines constrained flow shop scheduling processing time, setup time each...
11.machines constrained flow shop scheduling processing time, setup time each...
 

Recently uploaded

MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditNhtLNguyn9
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 

Recently uploaded (20)

MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal audit
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 

scheduling

  • 1. PRESENTATION ON PRODUCTION SCHEDULING PRESENTED BY:- POOJA HEMANGI KIRAN ANURADHA
  • 2. ROADMAP What is scheduling Examples Objectives Elements Priority Planning Master Production scheduling (MPS) Objectives of MPS Functions of MPS Problems of sequencing in scheduling
  • 3. SCHEDULING  Scheduling is one of the most important elements in production planning.  Scheduling calls for through understanding of all aspects of the production process and is an outcome of the integration of the efforts of planners in the planning group and the people in the shop-floor.  Scheduling integrates the people, machine, materials, customer demands, and quality requirements in finalizing the priorities. Scheduling makes it possible by determining starting and completion data each of the operations.
  • 4. EXAMPLES OF SCHEDULING Timetabling Scheduling of the Computer :A number of different courses (tasks) have to be given using the PC room(resource) Workforce scheduling : Assign shifts for nurses and doctors in a Hospital Sports Scheduling Drug Scheduling
  • 5.
  • 6. CONT………. Scheduling effects from 2 environmental factors that are internal and external to the organization. Internal environment External environment
  • 7. OBJECTIVES OF SCHEDULING Maximize throughput Be predictable: Minimize overhead Balance resource use Achieve a balance between response and utilization Avoid indefinite postponement Enforce Priorities Give preference to process holding Degrade gracefully under heavy loads
  • 8. ELEMENTS OF SCHEDULING The processors The tasks The processing timings The precedence relations
  • 9. PRIORITY PLANNING Planning is the process by which the elements required to perform a task are determined in advance of the job start. The process is as follows : Operations soft constraints Management policy constraints Engineering hard constraints
  • 10.
  • 11. MASTER PRODUCTION SCHEDULING  Master scheduling is a part of scheduling.  A Master Production Schedule is a Schedule of the completions of the end items and these completions are very much planned in nature.  A MPS is also in management language referred to as the master of all the schedules as this schedule provides the production, planning, purchasing & top management, the most needed information required for planning and control of the whole manufacturing process or the operation.
  • 12.
  • 13. OBJECTIVES OF MASTER SCHEDULING Keeping the inventories Setting up the due dates for the availability of items Maintaining the customer service Setting proper schedules
  • 14. FUNCTIONS OF MASTER SCHEDULING Specifies planning periods as daily, weekly, or monthly. Group work order processing Tracks accuracy of order forecasting as percentage. Classifies supply into types such as materials, purchased, flow, work order, and transfer. Schedule can be edited, changed, or consolidated.
  • 15. PROBLEMS OF SEQUENCING IN SCHEDULING SHORTEST PROCESSING TIME (SPT) WEIGHTED SHORTEST PROCESSING TIME (WSPT)
  • 16. EXAMPLE:-  The data about a set of single operation jobs that is to be processed in a CNC lathe and the processing times of the jobs in the given set of jobs are as given in table.  Find the optimal sequence which will minimize the mean flow time and also obtain the corresponding minimum mean flow time. Job, j Processing time, tj 1 7 2 18 3 6 4 8 5 12
  • 17. SOLUTION:- For the given problem, the number of jobs is equal to 5. The jobs are arranged as per the SPT ordering. Job, j Processing time, tj 3 6 1 7 4 8 5 12 2 18 Therefore, the job sequence which will minimize the mean flow time is 3-1-4-5-2.
  • 18. CONT The computation of flow time for the optimal sequence (3-1-4-5-2).  COMPUTATION FLOW TIME Job, j Processing time, tj Completion time, cj(fj) 3 6 6 1 7 13 4 8 21 5 12 33 2 18 51
  • 19. CONT Since the ready time rj is zero for all the values of j, the flow time (fj) = cj for all j. Therefore, 1/5 ∑ Fj = 1/5 (6+13+21+33+51) = 1/5 (124) = 24.8 hours Therefore, the optimal mean flow time = 24.8 hours.
  • 20. WSPT Example Job, j Processing time, tj Weight , wj 1 7 1 2 18 2 3 6 1 4 8 2 5 12 3 Determine the sequence which will minimize the weighted flow time of this problem. Also find the corresponding weighted mean flow time.
  • 21. SOLUTION:-  The weighted processing times of various jobs are summarized by using the formula tj/wj, j = 1,2,3,4, and 5 Job, j Processing time, Weight , wj Tj/wj tj 1 7 1 7 2 18 2 9 3 6 1 6 4 8 2 4 5 12 3 4
  • 22. CALCULATIONS OF WEIGHTED FLOW TIMES Job, j Processing time, Cj (Fj) Weight , wj Fjwj tj 4 8 8 2 16 5 12 20 3 60 3 6 26 1 26 1 7 33 1 33 2 18 51 2 102