A Theory of Stakeholder Identification and SalienceRonald K. Mitchell, Bradley R. AgleDonna J. Wood
Outline 
•Introduction 
•Definitions 
•Stakeholder attributes 
•Stakeholder classes 
•Case analysis 
•Conclusion
Stakeholder 
Employees 
Manager 
Owners 
Society Suppliers Government 
Creditors 
Shareholders 
customers 
Company
Focus on…. 
Who are the stakeholders of a firm? 
•Normative (- Logic to consider certain classes as stakeholders 
To whom do managers pay attention? 
•Descriptive )- conditions to identify stakeholders
Broad v/s Narrow definition 
•Broad view-The empirical reality 
Who can affect the organisation-Influencers 
Who are affected by the organisation- Claimants 
•Narrow view-Pragmatic reality that managers can‟t and don‟t consider all stakeholder claims(risk factor) 
Voluntary and involuntary stakeholders
Stakeholder 
Any group or individual who can affect or is affected by the achievement of the organisation‟sobjectives 
(Freeman, 1984)
What is a stake? 
•The things that you loose or gain by taking the risk. 
Eg: Monetary share in a business 
Internal stakeholders 
•Stake may go beyond ownership 
Eg:-Environmental hazards for public 
External stakeholders
1. Power 
“ A relationship among social actors in which one social actor A, can get another social actor B, to do something that B would not otherwise have done”(Dahl et al, 1957) 
“to influence the firm” 
STAKEHOLDER ATTRIBUTES
Types of Power 
1. Coercive Power : Based on the physical resources of force, violence or restraint 
2. Utilitarian Power: Based on material or financial resources 
3. Normative Power: Based on symbolic resources
A generalized perception or assumption that the actions of an entity are desirable, proper or appropriate within some socially constructed system of norms, values and beliefs (Suchman, 1995) 
1.Individual 
2.Organisational 
3.Societal 
“It is the legitimacy of the relationship in terms of desirability or appropriateness with the firm” 
2. Legitimacy
Urgency is defined as the degree to which stakeholder claims for immediate attention (Mitchell et. al, 1997) 
The degree depends on 
A) When a relationship or claim is of time sensitive 
B) How critical/ important is the claim to the stakeholder 
“ Calling for immediate attention or pressing” 
3. Urgency
SALIENCE 
The degree to which managers give priority to competing stakeholder claims. 
•The morethe attributesthe morethe salience
•They are group of stakeholders who enter into a contractual relationship with all other stakeholders 
•Direct control over the decision-making apparatus of the firm (Hill & Jones, 1992) 
•They determine which stakeholders are salientand to whom they should pay attention. 
Role of manager?
Stakeholder salience will be positively related to the cumulative number of stakeholder attributes – power, legitimacy, and urgency –perceived by managers to be present. 
Threeclasses 
1.Low Salient Class (Latent) 
2.Moderate Salient Class (Expectant) 
3.High Salient Class 
Stakeholder Classes
Stakeholder Classes 
DormantDiscretionary 
Demanding 
Power 
Legitimacy 
Urgency 
Dependent 
Definitive
Class I-Latent Stakeholders 
•Only one of three attributes & Low salience 
•No attention from managers 
1. Dormant 
2. Discretionary 
3. Demanding 
1. Dormant 
•Little or no interaction/involvement 
Eg: Those who spend a lot of money 
Dormant 
Discretionary 
Demanding 
Power 
Urgency 
Legitimacy
2. Discretionary Stakeholders 
•Likely to be recipients of corporate philanthropy 
•No pressure on managers 
•Eg. –Beneficiaries of charity, 
Schools and hospitals 
DormantDiscretionary 
Demanding 
Power 
Urgency 
Legitimacy
3. Demanding Stakeholders 
•Those with urgent claims but no legitimacy or power 
•Irritants for management but not worth considering 
Eg:-People with unjustified grudges, serial complainers 
Dormant 
Discretionary 
Demanding 
Power 
Urgency 
Legitimacy
Class 2 -Expectant Stakeholders 
•2 Attributes & Moderate Salience 
•Active rather than Passive 
1. Dominant 
2. Dependent 
3. Dangerous 
1. Dominant Stakeholders 
Only stakeholders of an organisation/formal 
Possess Power + Legitimacy 
Eg:-Board of Directors, HR Dept.
2. Dangerous Stakeholders 
•Those with powerfuland urgentclaims 
•Coerciveand Violent 
Eg:-strikers and terrorists
3. Dependent Stakeholders 
•Dependent on other bodies to carry out their will 
•Lack the power to enforce their stake 
Eg: –Residents & animals impacted by incidents like Oil Spill, Mining etc.
Class 3 -Definitive Stakeholders 
•Possess the three attributes 
•Top priority by the managers 
Eg:-Democratic legitimacy achieved by a „Dangerous‟ nationalist party by winning national elections
DYNAMISM in RELATIONS 
•A stakeholder can increase/decrease their salience by acquiring or losing one of the attributes: power, legitimacy or urgency 
•Example: When DB receives a complaint, it moves from being a expectant to a definitive stakeholder 
Non- stakeholder 
Latent 
Expectant 
Definitive
•Stakeholders possess combination of three critical attributes-power, legitimacy and urgency 
•Salienceof a stakeholder is low when one attribute, moderate when two attributes and high when all three attributes 
•As there is change in these variable-dynamic model 
•Attributes are not objective, but based on human perception.
Case:- 
•Multinational oil & gas company 
•Upstream segment -oil and natural gas exploration, field development and production. 
•Downstream segment -product and service-led arm of focused on fuels, lubricants and petrochemicals. 
•Shareholder-driven company (bottom-line) 
•Attempted to gain higher stock values through higher profits at the expense of safety concerns
Stakeholders of BP
Deepwater Horizon oil Spill 
•20 April 2010 
•Gas release and explosion 
•Macondoexploration well for BP in the Gulf of Mexico 
Deep Water Horizon Oil Spill
Deepwater Horizon Oil Spill 
•Biggest hit for BP and its public relations that had a direct impact on its share prices 
•Killed 11 people and injured many others 
•Environmental, health & economic consequences. 
•Most importantly, it was not the first disaster linked to the BP brand.
Failed in stakeholder identification and prioritisation! 
1.Undermined the extent of the damage! 
2.No empathy with those affected! 
3.It was too late to take moral responsibility before dealing with legal liabilities 
4.Given priority to the company‟s shareholders and managers after those of the environment and the communities affected by the spill! 
5.Denied various claims made by researchers
Stakeholders of BP Identified 
Government(federal and state) 
Employees 
Shareholders 
Environmentalists 
Businesses along the coast 
Coastal Residents 
Customers
Activity (as on 31 December 2013) 
Funding 
Response and clean-up 
$14 billion+ 
Claims, advances and settlements 
$12.5 billion 
Funding for the natural resource damage assessment process 
$1 billion+ 
Early restoration projects 
(Reflects projects that BP and the trusteeshave reached agreement or agreement in principle) 
$698 million 
State-led tourism campaigns 
$178 million 
State-led seafood marketing programmes 
$47 million 
State-led seafood testing 
$24 million 
BP's payments related to Gulf Coast recovery
Stakeholders and their Classes for BP 
Stakeholders 
Attributes 
Power Legitimacy Urgency 
Stakeholder class 
Government 
Definitive 
Employees 
Expectant (Dependent) 
Shareholders 
Expectant (Dominant) 
Environmentalists 
Expectant (Dangerous) 
Businesses alongthe coast 
Expectant (Dependent) 
Coastal Residents 
Expectant(Dependent) 
Customers 
Latent (Discretionary) 
* 
* 
* 
- 
* 
* 
* 
* 
- 
* 
- 
* 
- 
* 
* 
- 
* 
* 
- 
* 
-
•Managers should never forget that stakeholders change in salience, requiring different degrees and types of attention(Eg: ANC) 
•This stakeholder approach can improve upon existing theories, which emphasize on power and interests 
•Enables a more systematic classes of stakeholder-manager relationships 
Conclusion
Thank you 
RaghavanSathyanArchana 
PhD student 
Agricultural Economics 
JLU, Giessen.

More Related Content

What's hot

Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder AnalysisSteve Raybould
 
Stakeholder analysis
Stakeholder analysisStakeholder analysis
Stakeholder analysisamanda_chu
 
Chap 4 Defining A Project
Chap 4 Defining A ProjectChap 4 Defining A Project
Chap 4 Defining A Projectproject management
 
Project Stakeholder Engagement
Project Stakeholder EngagementProject Stakeholder Engagement
Project Stakeholder EngagementMark Ritchie
 
Stakeholder analysis
Stakeholder analysisStakeholder analysis
Stakeholder analysisStefan Csosz
 
The consulting process models
The consulting process modelsThe consulting process models
The consulting process modelsSandhya Johnson
 
Stakeholder management _1
Stakeholder management _1Stakeholder management _1
Stakeholder management _1ABINASH TRIPATHY
 
Stakeholder analysis
Stakeholder analysisStakeholder analysis
Stakeholder analysisKeisha Hill-Grey
 
Stakeholder engagement and management
Stakeholder engagement and managementStakeholder engagement and management
Stakeholder engagement and managementAndre Knipe
 
Project Organization and Structure
Project Organization and StructureProject Organization and Structure
Project Organization and Structureharoldtaylor1113
 
1 1 stakeholder_analysis_11_01_05
1 1 stakeholder_analysis_11_01_051 1 stakeholder_analysis_11_01_05
1 1 stakeholder_analysis_11_01_05Mohammadsadegh1365
 
Stakeholder engagement and management
Stakeholder engagement and managementStakeholder engagement and management
Stakeholder engagement and managementSimon Misiewicz
 
Project stakeholder management
Project stakeholder managementProject stakeholder management
Project stakeholder managementSaad Al Jabri
 
Stakeholder Engagement
Stakeholder EngagementStakeholder Engagement
Stakeholder EngagementAnand Subramaniam
 
Project stakeholder management by Nelson Mandela Anyomi
Project stakeholder management by Nelson Mandela AnyomiProject stakeholder management by Nelson Mandela Anyomi
Project stakeholder management by Nelson Mandela AnyomiNelson Mandela Anyomi
 

What's hot (20)

Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder Analysis
 
Project stakeholder Management PMBOK Sixth
Project stakeholder Management PMBOK SixthProject stakeholder Management PMBOK Sixth
Project stakeholder Management PMBOK Sixth
 
PMP_Project Stakeholder Management
PMP_Project Stakeholder ManagementPMP_Project Stakeholder Management
PMP_Project Stakeholder Management
 
Stakeholder analysis
Stakeholder analysisStakeholder analysis
Stakeholder analysis
 
Stakeholder Mapping
Stakeholder MappingStakeholder Mapping
Stakeholder Mapping
 
Chap 4 Defining A Project
Chap 4 Defining A ProjectChap 4 Defining A Project
Chap 4 Defining A Project
 
Project Stakeholder Engagement
Project Stakeholder EngagementProject Stakeholder Engagement
Project Stakeholder Engagement
 
Project Planning, Design and Management
Project Planning, Design and ManagementProject Planning, Design and Management
Project Planning, Design and Management
 
Stakeholder analysis
Stakeholder analysisStakeholder analysis
Stakeholder analysis
 
The consulting process models
The consulting process modelsThe consulting process models
The consulting process models
 
Stakeholder management _1
Stakeholder management _1Stakeholder management _1
Stakeholder management _1
 
Stakeholder analysis
Stakeholder analysisStakeholder analysis
Stakeholder analysis
 
Stakeholder engagement and management
Stakeholder engagement and managementStakeholder engagement and management
Stakeholder engagement and management
 
Project Organization and Structure
Project Organization and StructureProject Organization and Structure
Project Organization and Structure
 
1 1 stakeholder_analysis_11_01_05
1 1 stakeholder_analysis_11_01_051 1 stakeholder_analysis_11_01_05
1 1 stakeholder_analysis_11_01_05
 
project management essentials
project management essentialsproject management essentials
project management essentials
 
Stakeholder engagement and management
Stakeholder engagement and managementStakeholder engagement and management
Stakeholder engagement and management
 
Project stakeholder management
Project stakeholder managementProject stakeholder management
Project stakeholder management
 
Stakeholder Engagement
Stakeholder EngagementStakeholder Engagement
Stakeholder Engagement
 
Project stakeholder management by Nelson Mandela Anyomi
Project stakeholder management by Nelson Mandela AnyomiProject stakeholder management by Nelson Mandela Anyomi
Project stakeholder management by Nelson Mandela Anyomi
 

Viewers also liked

CSR Presentation by Group 3 - Stakeholder theory
CSR Presentation by  Group 3 - Stakeholder theoryCSR Presentation by  Group 3 - Stakeholder theory
CSR Presentation by Group 3 - Stakeholder theoryGautam Mahesh
 
Introduction to Stakeholder Analysis
Introduction to Stakeholder AnalysisIntroduction to Stakeholder Analysis
Introduction to Stakeholder AnalysisEndeavor Management
 
An Introduction To Stakeholder Theory
An Introduction To Stakeholder TheoryAn Introduction To Stakeholder Theory
An Introduction To Stakeholder Theorynturnbull
 
Ethics part ii 2014 by Dr CC Tan (drcctan@yahoo.com)
Ethics part ii  2014 by Dr CC Tan (drcctan@yahoo.com)Ethics part ii  2014 by Dr CC Tan (drcctan@yahoo.com)
Ethics part ii 2014 by Dr CC Tan (drcctan@yahoo.com)C.C. Dr. Tan
 
Esty airbus boeing
Esty airbus boeingEsty airbus boeing
Esty airbus boeingJonah Pardillo
 
Top 5 project management tips for product managers.
Top 5 project management tips for product managers.Top 5 project management tips for product managers.
Top 5 project management tips for product managers.Pinkesh Shah
 
Airbus A3XX: Developing the World’s Largest Commercial Jet
Airbus A3XX: Developing the World’s Largest Commercial Jet Airbus A3XX: Developing the World’s Largest Commercial Jet
Airbus A3XX: Developing the World’s Largest Commercial Jet Rishi Bajaj
 
Airbus Boeing 23[1].
Airbus Boeing 23[1].Airbus Boeing 23[1].
Airbus Boeing 23[1].zeddem
 
Carroll's pyramid of Corporate Social Responsibility
Carroll's pyramid of Corporate Social ResponsibilityCarroll's pyramid of Corporate Social Responsibility
Carroll's pyramid of Corporate Social ResponsibilitySyed Hasnain Ahmed
 
New product development Airbus A380
New product development  Airbus A380New product development  Airbus A380
New product development Airbus A380Sameer Bonde
 
Coca-Cola Company Background Information, Suppliers, Stakeholders and Busines...
Coca-Cola Company Background Information, Suppliers, Stakeholders and Busines...Coca-Cola Company Background Information, Suppliers, Stakeholders and Busines...
Coca-Cola Company Background Information, Suppliers, Stakeholders and Busines...PATRICK MAELO
 
Boieng and airbus.
Boieng and airbus.Boieng and airbus.
Boieng and airbus.samoraah2008
 
Social Responsibility + Profits - Friedman
Social Responsibility + Profits - FriedmanSocial Responsibility + Profits - Friedman
Social Responsibility + Profits - FriedmanLisaLisa10
 
Public Relations Management Session 2 Corporate Communications And Pr Com...
Public Relations Management   Session 2   Corporate Communications And Pr Com...Public Relations Management   Session 2   Corporate Communications And Pr Com...
Public Relations Management Session 2 Corporate Communications And Pr Com...Moksh Juneja
 
Criticism on Carroll's Model
Criticism on Carroll's ModelCriticism on Carroll's Model
Criticism on Carroll's ModelTaimur Khan
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder AnalysisMurhaf Ashi
 
Airline industry analysis - Boeing & Airbus
Airline industry analysis - Boeing & AirbusAirline industry analysis - Boeing & Airbus
Airline industry analysis - Boeing & AirbusTaposh Roy
 

Viewers also liked (20)

CSR Presentation by Group 3 - Stakeholder theory
CSR Presentation by  Group 3 - Stakeholder theoryCSR Presentation by  Group 3 - Stakeholder theory
CSR Presentation by Group 3 - Stakeholder theory
 
Introduction to Stakeholder Analysis
Introduction to Stakeholder AnalysisIntroduction to Stakeholder Analysis
Introduction to Stakeholder Analysis
 
An Introduction To Stakeholder Theory
An Introduction To Stakeholder TheoryAn Introduction To Stakeholder Theory
An Introduction To Stakeholder Theory
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder Analysis
 
Stakeholders
StakeholdersStakeholders
Stakeholders
 
Ethics part ii 2014 by Dr CC Tan (drcctan@yahoo.com)
Ethics part ii  2014 by Dr CC Tan (drcctan@yahoo.com)Ethics part ii  2014 by Dr CC Tan (drcctan@yahoo.com)
Ethics part ii 2014 by Dr CC Tan (drcctan@yahoo.com)
 
Esty airbus boeing
Esty airbus boeingEsty airbus boeing
Esty airbus boeing
 
Starbucks
StarbucksStarbucks
Starbucks
 
Top 5 project management tips for product managers.
Top 5 project management tips for product managers.Top 5 project management tips for product managers.
Top 5 project management tips for product managers.
 
Airbus A3XX: Developing the World’s Largest Commercial Jet
Airbus A3XX: Developing the World’s Largest Commercial Jet Airbus A3XX: Developing the World’s Largest Commercial Jet
Airbus A3XX: Developing the World’s Largest Commercial Jet
 
Airbus Boeing 23[1].
Airbus Boeing 23[1].Airbus Boeing 23[1].
Airbus Boeing 23[1].
 
Carroll's pyramid of Corporate Social Responsibility
Carroll's pyramid of Corporate Social ResponsibilityCarroll's pyramid of Corporate Social Responsibility
Carroll's pyramid of Corporate Social Responsibility
 
New product development Airbus A380
New product development  Airbus A380New product development  Airbus A380
New product development Airbus A380
 
Coca-Cola Company Background Information, Suppliers, Stakeholders and Busines...
Coca-Cola Company Background Information, Suppliers, Stakeholders and Busines...Coca-Cola Company Background Information, Suppliers, Stakeholders and Busines...
Coca-Cola Company Background Information, Suppliers, Stakeholders and Busines...
 
Boieng and airbus.
Boieng and airbus.Boieng and airbus.
Boieng and airbus.
 
Social Responsibility + Profits - Friedman
Social Responsibility + Profits - FriedmanSocial Responsibility + Profits - Friedman
Social Responsibility + Profits - Friedman
 
Public Relations Management Session 2 Corporate Communications And Pr Com...
Public Relations Management   Session 2   Corporate Communications And Pr Com...Public Relations Management   Session 2   Corporate Communications And Pr Com...
Public Relations Management Session 2 Corporate Communications And Pr Com...
 
Criticism on Carroll's Model
Criticism on Carroll's ModelCriticism on Carroll's Model
Criticism on Carroll's Model
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder Analysis
 
Airline industry analysis - Boeing & Airbus
Airline industry analysis - Boeing & AirbusAirline industry analysis - Boeing & Airbus
Airline industry analysis - Boeing & Airbus
 

Similar to Salience Model-Supply Chain Management

Chapter 3
Chapter 3Chapter 3
Chapter 3Shahid Jnu
 
Bcu msc cg week 6 stakeholders
Bcu msc cg week 6 stakeholdersBcu msc cg week 6 stakeholders
Bcu msc cg week 6 stakeholdersStephen Ong
 
Chapter 1 -_intro_to_project_stakeholder_management[1]
Chapter 1 -_intro_to_project_stakeholder_management[1]Chapter 1 -_intro_to_project_stakeholder_management[1]
Chapter 1 -_intro_to_project_stakeholder_management[1]Saddan Juhari
 
Mba1034 cg law ethics week 4 cg accountability 2013
Mba1034 cg law ethics week 4 cg accountability 2013Mba1034 cg law ethics week 4 cg accountability 2013
Mba1034 cg law ethics week 4 cg accountability 2013Stephen Ong
 
Sr of busi. stakeholders
Sr of busi. stakeholdersSr of busi. stakeholders
Sr of busi. stakeholdersLalit Pawar
 
business ethics Ch.2 by ferrell
business ethics Ch.2 by ferrellbusiness ethics Ch.2 by ferrell
business ethics Ch.2 by ferrellHassan Janjua
 
Stakeholders Analysis
Stakeholders AnalysisStakeholders Analysis
Stakeholders AnalysisBasudev Sharma
 
Business environment
Business environment Business environment
Business environment kulbirsingh100
 
Include a diagram supported by a detailed discussion explaining whic.pdf
Include a diagram supported by a detailed discussion explaining whic.pdfInclude a diagram supported by a detailed discussion explaining whic.pdf
Include a diagram supported by a detailed discussion explaining whic.pdfartimagein
 
Health Systems Identifying and Managing Stakeholders
Health Systems Identifying and Managing Stakeholders Health Systems Identifying and Managing Stakeholders
Health Systems Identifying and Managing Stakeholders Alaa Hamed
 
Business & its stakeholders
Business & its stakeholdersBusiness & its stakeholders
Business & its stakeholdersRajThakuri
 
Corporate Sustainability - Stakeholder and Stewardship Theory
Corporate Sustainability - Stakeholder and Stewardship TheoryCorporate Sustainability - Stakeholder and Stewardship Theory
Corporate Sustainability - Stakeholder and Stewardship TheoryDayana Mastura FCCA CA
 
Project PC Lecture-7 Project Stakeholder Planning.pptx
Project PC Lecture-7   Project Stakeholder Planning.pptxProject PC Lecture-7   Project Stakeholder Planning.pptx
Project PC Lecture-7 Project Stakeholder Planning.pptxNasreenAkhtar49
 
Best_Practices_Managing_Stakeholder_Expectations
Best_Practices_Managing_Stakeholder_ExpectationsBest_Practices_Managing_Stakeholder_Expectations
Best_Practices_Managing_Stakeholder_ExpectationsPatricia J. Williams, PMP
 
The Stakeholder approach to Business , society, and Ethics
The Stakeholder approach to Business , society, and EthicsThe Stakeholder approach to Business , society, and Ethics
The Stakeholder approach to Business , society, and EthicsIsmail Hossain
 
Stakeholdersinbusiness 130117062720-phpapp02
Stakeholdersinbusiness 130117062720-phpapp02Stakeholdersinbusiness 130117062720-phpapp02
Stakeholdersinbusiness 130117062720-phpapp02Vc1980
 
Stakeholder Relationships, Social Responsibility and Corporate Governance
Stakeholder Relationships, Social Responsibility and Corporate GovernanceStakeholder Relationships, Social Responsibility and Corporate Governance
Stakeholder Relationships, Social Responsibility and Corporate GovernanceSheila Faycan
 
Strategic Management
Strategic ManagementStrategic Management
Strategic ManagementVardha Mago
 

Similar to Salience Model-Supply Chain Management (20)

Chapter 3
Chapter 3Chapter 3
Chapter 3
 
Bcu msc cg week 6 stakeholders
Bcu msc cg week 6 stakeholdersBcu msc cg week 6 stakeholders
Bcu msc cg week 6 stakeholders
 
Chapter 1 -_intro_to_project_stakeholder_management[1]
Chapter 1 -_intro_to_project_stakeholder_management[1]Chapter 1 -_intro_to_project_stakeholder_management[1]
Chapter 1 -_intro_to_project_stakeholder_management[1]
 
Mba1034 cg law ethics week 4 cg accountability 2013
Mba1034 cg law ethics week 4 cg accountability 2013Mba1034 cg law ethics week 4 cg accountability 2013
Mba1034 cg law ethics week 4 cg accountability 2013
 
etika-bisnis-2.ppt
etika-bisnis-2.pptetika-bisnis-2.ppt
etika-bisnis-2.ppt
 
Sr of busi. stakeholders
Sr of busi. stakeholdersSr of busi. stakeholders
Sr of busi. stakeholders
 
business ethics Ch.2 by ferrell
business ethics Ch.2 by ferrellbusiness ethics Ch.2 by ferrell
business ethics Ch.2 by ferrell
 
Stakeholders Analysis
Stakeholders AnalysisStakeholders Analysis
Stakeholders Analysis
 
Business environment
Business environment Business environment
Business environment
 
Include a diagram supported by a detailed discussion explaining whic.pdf
Include a diagram supported by a detailed discussion explaining whic.pdfInclude a diagram supported by a detailed discussion explaining whic.pdf
Include a diagram supported by a detailed discussion explaining whic.pdf
 
Health Systems Identifying and Managing Stakeholders
Health Systems Identifying and Managing Stakeholders Health Systems Identifying and Managing Stakeholders
Health Systems Identifying and Managing Stakeholders
 
Business & its stakeholders
Business & its stakeholdersBusiness & its stakeholders
Business & its stakeholders
 
Corporate Sustainability - Stakeholder and Stewardship Theory
Corporate Sustainability - Stakeholder and Stewardship TheoryCorporate Sustainability - Stakeholder and Stewardship Theory
Corporate Sustainability - Stakeholder and Stewardship Theory
 
Project PC Lecture-7 Project Stakeholder Planning.pptx
Project PC Lecture-7   Project Stakeholder Planning.pptxProject PC Lecture-7   Project Stakeholder Planning.pptx
Project PC Lecture-7 Project Stakeholder Planning.pptx
 
Best_Practices_Managing_Stakeholder_Expectations
Best_Practices_Managing_Stakeholder_ExpectationsBest_Practices_Managing_Stakeholder_Expectations
Best_Practices_Managing_Stakeholder_Expectations
 
The Stakeholder approach to Business , society, and Ethics
The Stakeholder approach to Business , society, and EthicsThe Stakeholder approach to Business , society, and Ethics
The Stakeholder approach to Business , society, and Ethics
 
Stakeholdersinbusiness 130117062720-phpapp02
Stakeholdersinbusiness 130117062720-phpapp02Stakeholdersinbusiness 130117062720-phpapp02
Stakeholdersinbusiness 130117062720-phpapp02
 
Stakeholder Relationships, Social Responsibility and Corporate Governance
Stakeholder Relationships, Social Responsibility and Corporate GovernanceStakeholder Relationships, Social Responsibility and Corporate Governance
Stakeholder Relationships, Social Responsibility and Corporate Governance
 
Strategic Management
Strategic ManagementStrategic Management
Strategic Management
 
Stakeholders
StakeholdersStakeholders
Stakeholders
 

Recently uploaded

Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure serviceCall US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure servicePooja Nehwal
 
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...Call Girls in Nagpur High Profile
 
Log your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignLog your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignHenry Tapper
 
The Economic History of the U.S. Lecture 26.pdf
The Economic History of the U.S. Lecture 26.pdfThe Economic History of the U.S. Lecture 26.pdf
The Economic History of the U.S. Lecture 26.pdfGale Pooley
 
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Pooja Nehwal
 
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home DeliveryPooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home DeliveryPooja Nehwal
 
The Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfThe Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfGale Pooley
 
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
The Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdfThe Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdfGale Pooley
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...Call Girls in Nagpur High Profile
 
The Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdfThe Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdfGale Pooley
 
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceanilsa9823
 
Basic concepts related to Financial modelling
Basic concepts related to Financial modellingBasic concepts related to Financial modelling
Basic concepts related to Financial modellingbaijup5
 
00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptxFinTech Belgium
 
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptxFinTech Belgium
 

Recently uploaded (20)

Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure serviceCall US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
 
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
 
Log your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignLog your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaign
 
The Economic History of the U.S. Lecture 26.pdf
The Economic History of the U.S. Lecture 26.pdfThe Economic History of the U.S. Lecture 26.pdf
The Economic History of the U.S. Lecture 26.pdf
 
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
 
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home DeliveryPooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
 
The Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfThe Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdf
 
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
The Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdfThe Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdf
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...
 
The Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdfThe Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdf
 
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
 
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
 
Veritas Interim Report 1 January–31 March 2024
Veritas Interim Report 1 January–31 March 2024Veritas Interim Report 1 January–31 March 2024
Veritas Interim Report 1 January–31 March 2024
 
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
 
Basic concepts related to Financial modelling
Basic concepts related to Financial modellingBasic concepts related to Financial modelling
Basic concepts related to Financial modelling
 
00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx
 
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx
 

Salience Model-Supply Chain Management

  • 1. A Theory of Stakeholder Identification and SalienceRonald K. Mitchell, Bradley R. AgleDonna J. Wood
  • 2. Outline •Introduction •Definitions •Stakeholder attributes •Stakeholder classes •Case analysis •Conclusion
  • 3. Stakeholder Employees Manager Owners Society Suppliers Government Creditors Shareholders customers Company
  • 4. Focus on…. Who are the stakeholders of a firm? •Normative (- Logic to consider certain classes as stakeholders To whom do managers pay attention? •Descriptive )- conditions to identify stakeholders
  • 5. Broad v/s Narrow definition •Broad view-The empirical reality Who can affect the organisation-Influencers Who are affected by the organisation- Claimants •Narrow view-Pragmatic reality that managers can‟t and don‟t consider all stakeholder claims(risk factor) Voluntary and involuntary stakeholders
  • 6. Stakeholder Any group or individual who can affect or is affected by the achievement of the organisation‟sobjectives (Freeman, 1984)
  • 7. What is a stake? •The things that you loose or gain by taking the risk. Eg: Monetary share in a business Internal stakeholders •Stake may go beyond ownership Eg:-Environmental hazards for public External stakeholders
  • 8. 1. Power “ A relationship among social actors in which one social actor A, can get another social actor B, to do something that B would not otherwise have done”(Dahl et al, 1957) “to influence the firm” STAKEHOLDER ATTRIBUTES
  • 9. Types of Power 1. Coercive Power : Based on the physical resources of force, violence or restraint 2. Utilitarian Power: Based on material or financial resources 3. Normative Power: Based on symbolic resources
  • 10. A generalized perception or assumption that the actions of an entity are desirable, proper or appropriate within some socially constructed system of norms, values and beliefs (Suchman, 1995) 1.Individual 2.Organisational 3.Societal “It is the legitimacy of the relationship in terms of desirability or appropriateness with the firm” 2. Legitimacy
  • 11. Urgency is defined as the degree to which stakeholder claims for immediate attention (Mitchell et. al, 1997) The degree depends on A) When a relationship or claim is of time sensitive B) How critical/ important is the claim to the stakeholder “ Calling for immediate attention or pressing” 3. Urgency
  • 12. SALIENCE The degree to which managers give priority to competing stakeholder claims. •The morethe attributesthe morethe salience
  • 13. •They are group of stakeholders who enter into a contractual relationship with all other stakeholders •Direct control over the decision-making apparatus of the firm (Hill & Jones, 1992) •They determine which stakeholders are salientand to whom they should pay attention. Role of manager?
  • 14. Stakeholder salience will be positively related to the cumulative number of stakeholder attributes – power, legitimacy, and urgency –perceived by managers to be present. Threeclasses 1.Low Salient Class (Latent) 2.Moderate Salient Class (Expectant) 3.High Salient Class Stakeholder Classes
  • 15. Stakeholder Classes DormantDiscretionary Demanding Power Legitimacy Urgency Dependent Definitive
  • 16. Class I-Latent Stakeholders •Only one of three attributes & Low salience •No attention from managers 1. Dormant 2. Discretionary 3. Demanding 1. Dormant •Little or no interaction/involvement Eg: Those who spend a lot of money Dormant Discretionary Demanding Power Urgency Legitimacy
  • 17. 2. Discretionary Stakeholders •Likely to be recipients of corporate philanthropy •No pressure on managers •Eg. –Beneficiaries of charity, Schools and hospitals DormantDiscretionary Demanding Power Urgency Legitimacy
  • 18. 3. Demanding Stakeholders •Those with urgent claims but no legitimacy or power •Irritants for management but not worth considering Eg:-People with unjustified grudges, serial complainers Dormant Discretionary Demanding Power Urgency Legitimacy
  • 19. Class 2 -Expectant Stakeholders •2 Attributes & Moderate Salience •Active rather than Passive 1. Dominant 2. Dependent 3. Dangerous 1. Dominant Stakeholders Only stakeholders of an organisation/formal Possess Power + Legitimacy Eg:-Board of Directors, HR Dept.
  • 20. 2. Dangerous Stakeholders •Those with powerfuland urgentclaims •Coerciveand Violent Eg:-strikers and terrorists
  • 21. 3. Dependent Stakeholders •Dependent on other bodies to carry out their will •Lack the power to enforce their stake Eg: –Residents & animals impacted by incidents like Oil Spill, Mining etc.
  • 22. Class 3 -Definitive Stakeholders •Possess the three attributes •Top priority by the managers Eg:-Democratic legitimacy achieved by a „Dangerous‟ nationalist party by winning national elections
  • 23.
  • 24. DYNAMISM in RELATIONS •A stakeholder can increase/decrease their salience by acquiring or losing one of the attributes: power, legitimacy or urgency •Example: When DB receives a complaint, it moves from being a expectant to a definitive stakeholder Non- stakeholder Latent Expectant Definitive
  • 25. •Stakeholders possess combination of three critical attributes-power, legitimacy and urgency •Salienceof a stakeholder is low when one attribute, moderate when two attributes and high when all three attributes •As there is change in these variable-dynamic model •Attributes are not objective, but based on human perception.
  • 26. Case:- •Multinational oil & gas company •Upstream segment -oil and natural gas exploration, field development and production. •Downstream segment -product and service-led arm of focused on fuels, lubricants and petrochemicals. •Shareholder-driven company (bottom-line) •Attempted to gain higher stock values through higher profits at the expense of safety concerns
  • 28. Deepwater Horizon oil Spill •20 April 2010 •Gas release and explosion •Macondoexploration well for BP in the Gulf of Mexico Deep Water Horizon Oil Spill
  • 29. Deepwater Horizon Oil Spill •Biggest hit for BP and its public relations that had a direct impact on its share prices •Killed 11 people and injured many others •Environmental, health & economic consequences. •Most importantly, it was not the first disaster linked to the BP brand.
  • 30. Failed in stakeholder identification and prioritisation! 1.Undermined the extent of the damage! 2.No empathy with those affected! 3.It was too late to take moral responsibility before dealing with legal liabilities 4.Given priority to the company‟s shareholders and managers after those of the environment and the communities affected by the spill! 5.Denied various claims made by researchers
  • 31. Stakeholders of BP Identified Government(federal and state) Employees Shareholders Environmentalists Businesses along the coast Coastal Residents Customers
  • 32. Activity (as on 31 December 2013) Funding Response and clean-up $14 billion+ Claims, advances and settlements $12.5 billion Funding for the natural resource damage assessment process $1 billion+ Early restoration projects (Reflects projects that BP and the trusteeshave reached agreement or agreement in principle) $698 million State-led tourism campaigns $178 million State-led seafood marketing programmes $47 million State-led seafood testing $24 million BP's payments related to Gulf Coast recovery
  • 33. Stakeholders and their Classes for BP Stakeholders Attributes Power Legitimacy Urgency Stakeholder class Government Definitive Employees Expectant (Dependent) Shareholders Expectant (Dominant) Environmentalists Expectant (Dangerous) Businesses alongthe coast Expectant (Dependent) Coastal Residents Expectant(Dependent) Customers Latent (Discretionary) * * * - * * * * - * - * - * * - * * - * -
  • 34. •Managers should never forget that stakeholders change in salience, requiring different degrees and types of attention(Eg: ANC) •This stakeholder approach can improve upon existing theories, which emphasize on power and interests •Enables a more systematic classes of stakeholder-manager relationships Conclusion