MRP I                               MRP II
                                                                                Study Case

                                                           By : Ariyandhi Limpo
                                                                 ERP Consulting Indonesia
                                                                      Specialist : OpenERP or ProintERP




By arilimpo, ERP Consultant : http://id.linkedin.com/pub/ari-limpo/24/450/a66                             1
Definisi

           MRP I - Material Requirement Planning
                   •   Menentukan Produk.
                   •   Menentukan Jumlah
                   •   Mengestimasi kedatangan



           MRP II - Manufacturing Resource Planning

                   •   Mengintegrasikan semua aspek fungsi
                   •   Menterjemahkan rencana operasional menjadi satuan baiya
                   •   Melakukan Simulasim                Suggestion
                   •   Melakukan pengendalian


By arilimpo, ERP Consultant : http://id.linkedin.com/pub/ari-limpo/24/450/a66    2
SWOT Analysis


      Strenght (Kekuatan)                                             Weakness (Kelemahan)

       - Memiliki SDM yang baik                                       -   Tidak tersimpan dengan baik
       - Memiliki Sistem ERP                                          -   Ketergantungan pada Manusia
       - Mudah untuk digunakan                                        -   Keterbatasan berbagi Informasi
                                                                      -   Tidak teintegrasi dengan bagian lain




      Opportunities (Peluang)                                         Threat (Ancaman)


      - Mudah diganti rumusnya                                        - Sistem Pengendalian Pesanan by manual
      - Mudah diganti datanya                                         - Mudah hilang
                                                                      - Tidak efektif untuk perusahaan skala
                                                                        Menengah dan besar
                                                                      - Berpotensi Stock Berlebih
                                                                      - Yield tidak terkontrol


By arilimpo, ERP Consultant : http://id.linkedin.com/pub/ari-limpo/24/450/a66                                    3
Existing System
           Alur Penerimaan Pesanan




                                                                      PPIC                Purchasing
            Customer                                          (Forecast – Temporary     (Purchase Order
                                                                     Order)                Release)




                                             Purchasing
                                           (Purchase Order
            Maklon In                         Release)



                                                                       PPIC               Purchasing
                                                                (Total Summary of     (Create Sales Order)
            Supplier                                                  Order)




By arilimpo, ERP Consultant : http://id.linkedin.com/pub/ari-limpo/24/450/a66                                4
Existing System
            Perencanaan Persediaan & Produksi

                                                                        PPIC                   Purchasing
            Customer                                                 (Forecast –             (Purchase Order
                                                                   Temporary Order)             Release)


                                                   Purchasing
            Maklon In                            (Purchase Order
                                                    Release)


                                                                          PPIC                 Purchasing
            Supplier                                               (Total Summary of       (Create Sales Order)
                                                                         Order)


                                                                      TempO             PO



                                                                  PPIC                 PPIC + Production
                                                              Proses MRP I                  (MPS)


                                                                Purchasing               Production
                                                             (Create & Release         (Create Master
                                                                    PO)                 Schedulling)


By arilimpo, ERP Consultant : http://id.linkedin.com/pub/ari-limpo/24/450/a66                                     5
To Be System

                                                                                MRP I



                                     MRP II



                                                                ERP


                            Report                            Analysis

                                                                                   Suggestion
By arilimpo, ERP Consultant : http://id.linkedin.com/pub/ari-limpo/24/450/a66                   6
Material Requirement Planning (MRP I)

   Inventory (RM)             Forecast                             Customer Orders
    Status Record

      On Hand
      Inventory                                                                        Inventory (FG)
                                                                                        Status Record
      Schedule                           Master Production Schedule
       Receipt                                     (MPS)                                  On Hand
                                                                                          Inventory
     Lead Time
        PO                           BOM                                                 Lead Time
                                                                                          Process
       Lot Size
                                                                                           Lot Size
                                   Material Requirement Planning
     Safety Stock
                                              (MRP I)
                                                                                            WIP

        WIP           Execution Result for Purchase.
                      1. What are products ?                                              Schedule
                      2. How Many ?                                                      Distribution
                      3. When you will receipt ?
   Purchase Order



  ReSchedule Notice                          Plan Order Release



     Work Order

                       By arilimpo, ERP Consultant : http://id.linkedin.com/pub/ari-limpo/24/450/a66    7
17
        Siklus MRP II

  Corporate Strategi,                                           Business Plan
  Bisnis Strategi


  Marketing Strategi,
  Market Plan, Segmentation,                                   Marketing Plan
  diversification


Master
Scheduling
                         Budgeting           Forecast               Customer Orders              Stock
                                                                                                 Level



   Inventory (RM)
    Status Record                                                                       N                 Feed Back
                                                                  Resources
                                       BOM
                                                                    OK ?
       On Hand
       Inventory                                                                                                   Inventory (FG)
                                                                        Y                                           Status Record
       Schedulre
        Receipt                                          Master Production Schedule                                   On Hand
                                                                   (MPS)                                              Inventory
      Lead Time
         PO                                                                                                          Lead Time
                                                                                                                      Process
        Lot Size                              Material Requirement Planning
                                                         (MRP I)                                                      Lot Size
                                 Execution Result for Purchase.
     Safety Stock                    4. What are products ?
                                     5. How Many                                                                        WIP
                                     6. When you will receipt.
          WIP
                                                                                                                     Schedule
                                                                                                                    Distribution
                                                        Requirement Capacity Planning
Work Center, Routing,                                              (RCP)
Capacity, Eficiency, Labour,
Times

                                                                                             Feed Back

     Purchase Order                                               Resources             N
                                                                    OK ?


   ReSchedule Notice                                                     Y

                                                             Plan Order Release
       Work Order


                                                           Monitoring of Execution
        Supplies
  Performance Report

                                                           Production Active Control



                                                                                            Feed Back
                                                         Measurement of Performance                      Control
Terima kasih




By arilimpo, ERP Consultant : http://id.linkedin.com/pub/ari-limpo/24/450/a66      9

More Related Content

What's hot

Stochastic models
Stochastic modelsStochastic models
Stochastic modelsPT Lion Air
 
Product04 customer needs
Product04 customer needsProduct04 customer needs
Product04 customer needsArif Rahman
 
8. MANAJEMEN RANTAI PASOKAN (SUPLLY CHAIN MANAGEMENT).ppt
8. MANAJEMEN RANTAI PASOKAN (SUPLLY CHAIN MANAGEMENT).ppt8. MANAJEMEN RANTAI PASOKAN (SUPLLY CHAIN MANAGEMENT).ppt
8. MANAJEMEN RANTAI PASOKAN (SUPLLY CHAIN MANAGEMENT).pptsudarmono19
 
Pengelolaan persediaan - Pert. 5.pptx
Pengelolaan persediaan - Pert. 5.pptxPengelolaan persediaan - Pert. 5.pptx
Pengelolaan persediaan - Pert. 5.pptxBeritaDunia3
 
Forecasting Peramalan BAB 3 Manajemen Operasi
Forecasting Peramalan BAB 3 Manajemen Operasi Forecasting Peramalan BAB 3 Manajemen Operasi
Forecasting Peramalan BAB 3 Manajemen Operasi Yusnia Rahmah Afianti
 
Penjadwalan Produksi Induk
Penjadwalan Produksi IndukPenjadwalan Produksi Induk
Penjadwalan Produksi IndukAnsar Lawi
 
MRP IN SERVICES & ERP
MRP IN SERVICES & ERPMRP IN SERVICES & ERP
MRP IN SERVICES & ERPMaria AL
 
Modul 8 (Penjad Tenaga Kerja)
Modul 8 (Penjad Tenaga Kerja)Modul 8 (Penjad Tenaga Kerja)
Modul 8 (Penjad Tenaga Kerja)yayan
 
Inventory Control, EOQ & FIFO, LIPO _ Materi Training PPIC
Inventory Control, EOQ & FIFO, LIPO _ Materi Training PPICInventory Control, EOQ & FIFO, LIPO _ Materi Training PPIC
Inventory Control, EOQ & FIFO, LIPO _ Materi Training PPICKanaidi ken
 
Supply Chain Management PPT
Supply Chain Management PPTSupply Chain Management PPT
Supply Chain Management PPTYesica Adicondro
 
Pengembangan metode heuristik silver-meal
Pengembangan metode heuristik silver-mealPengembangan metode heuristik silver-meal
Pengembangan metode heuristik silver-mealMuhammad Irfan Kemal
 
synchronous manufacturing and the theory of constraints
 synchronous manufacturing and the theory of constraints synchronous manufacturing and the theory of constraints
synchronous manufacturing and the theory of constraintsYesica Adicondro
 
Acceptance sampling untuk data variabel
Acceptance sampling untuk data variabelAcceptance sampling untuk data variabel
Acceptance sampling untuk data variabelMahros Darsin
 
Pertemuan ke 2 . lokasi pabrik
Pertemuan ke  2 . lokasi pabrikPertemuan ke  2 . lokasi pabrik
Pertemuan ke 2 . lokasi pabrikZall Zallibeng N
 
Pengendalian Persediaan.ppt
Pengendalian Persediaan.pptPengendalian Persediaan.ppt
Pengendalian Persediaan.pptGagakLumayung3
 
Material Requirement Plan (MRP) _ Materi Training PPIC
Material Requirement Plan (MRP) _ Materi Training PPICMaterial Requirement Plan (MRP) _ Materi Training PPIC
Material Requirement Plan (MRP) _ Materi Training PPICKanaidi ken
 

What's hot (20)

Stochastic models
Stochastic modelsStochastic models
Stochastic models
 
Product04 customer needs
Product04 customer needsProduct04 customer needs
Product04 customer needs
 
8. MANAJEMEN RANTAI PASOKAN (SUPLLY CHAIN MANAGEMENT).ppt
8. MANAJEMEN RANTAI PASOKAN (SUPLLY CHAIN MANAGEMENT).ppt8. MANAJEMEN RANTAI PASOKAN (SUPLLY CHAIN MANAGEMENT).ppt
8. MANAJEMEN RANTAI PASOKAN (SUPLLY CHAIN MANAGEMENT).ppt
 
Pengelolaan persediaan - Pert. 5.pptx
Pengelolaan persediaan - Pert. 5.pptxPengelolaan persediaan - Pert. 5.pptx
Pengelolaan persediaan - Pert. 5.pptx
 
Forecasting Peramalan BAB 3 Manajemen Operasi
Forecasting Peramalan BAB 3 Manajemen Operasi Forecasting Peramalan BAB 3 Manajemen Operasi
Forecasting Peramalan BAB 3 Manajemen Operasi
 
Penjadwalan Produksi Induk
Penjadwalan Produksi IndukPenjadwalan Produksi Induk
Penjadwalan Produksi Induk
 
MRP IN SERVICES & ERP
MRP IN SERVICES & ERPMRP IN SERVICES & ERP
MRP IN SERVICES & ERP
 
Modul 8 (Penjad Tenaga Kerja)
Modul 8 (Penjad Tenaga Kerja)Modul 8 (Penjad Tenaga Kerja)
Modul 8 (Penjad Tenaga Kerja)
 
Process layout
Process layoutProcess layout
Process layout
 
Inventory Control, EOQ & FIFO, LIPO _ Materi Training PPIC
Inventory Control, EOQ & FIFO, LIPO _ Materi Training PPICInventory Control, EOQ & FIFO, LIPO _ Materi Training PPIC
Inventory Control, EOQ & FIFO, LIPO _ Materi Training PPIC
 
Mrp ii
Mrp iiMrp ii
Mrp ii
 
Supply Chain Management PPT
Supply Chain Management PPTSupply Chain Management PPT
Supply Chain Management PPT
 
Pengembangan metode heuristik silver-meal
Pengembangan metode heuristik silver-mealPengembangan metode heuristik silver-meal
Pengembangan metode heuristik silver-meal
 
Makalah_21 Makalah marketing plan kel 4
Makalah_21 Makalah marketing plan kel 4Makalah_21 Makalah marketing plan kel 4
Makalah_21 Makalah marketing plan kel 4
 
Lot Sizing Techniques
Lot Sizing TechniquesLot Sizing Techniques
Lot Sizing Techniques
 
synchronous manufacturing and the theory of constraints
 synchronous manufacturing and the theory of constraints synchronous manufacturing and the theory of constraints
synchronous manufacturing and the theory of constraints
 
Acceptance sampling untuk data variabel
Acceptance sampling untuk data variabelAcceptance sampling untuk data variabel
Acceptance sampling untuk data variabel
 
Pertemuan ke 2 . lokasi pabrik
Pertemuan ke  2 . lokasi pabrikPertemuan ke  2 . lokasi pabrik
Pertemuan ke 2 . lokasi pabrik
 
Pengendalian Persediaan.ppt
Pengendalian Persediaan.pptPengendalian Persediaan.ppt
Pengendalian Persediaan.ppt
 
Material Requirement Plan (MRP) _ Materi Training PPIC
Material Requirement Plan (MRP) _ Materi Training PPICMaterial Requirement Plan (MRP) _ Materi Training PPIC
Material Requirement Plan (MRP) _ Materi Training PPIC
 

Viewers also liked

Material requirement planning (mrp1)
Material requirement planning (mrp1)Material requirement planning (mrp1)
Material requirement planning (mrp1)saleh asgari
 
58262864 09-administracao-financeira-do-estoque
58262864 09-administracao-financeira-do-estoque58262864 09-administracao-financeira-do-estoque
58262864 09-administracao-financeira-do-estoqueTeodosio Junior
 
MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)
MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)
MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)Sidnei Reis
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentationjhanakshah
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity PlanningMOHD ARISH
 

Viewers also liked (9)

Material requirement planning (mrp1)
Material requirement planning (mrp1)Material requirement planning (mrp1)
Material requirement planning (mrp1)
 
58262864 09-administracao-financeira-do-estoque
58262864 09-administracao-financeira-do-estoque58262864 09-administracao-financeira-do-estoque
58262864 09-administracao-financeira-do-estoque
 
MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)
MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)
MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)
 
MRP II
MRP II MRP II
MRP II
 
Aula de mrp
Aula de mrpAula de mrp
Aula de mrp
 
Aula mrp
Aula  mrpAula  mrp
Aula mrp
 
MRP I and MRP II
MRP I and MRP IIMRP I and MRP II
MRP I and MRP II
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity Planning
 

Similar to MRP1 vs MRP2

Similar to MRP1 vs MRP2 (20)

Mrp, mrp 2 n bpr
Mrp, mrp 2 n bprMrp, mrp 2 n bpr
Mrp, mrp 2 n bpr
 
ERP Software
ERP SoftwareERP Software
ERP Software
 
MRP system series 1 - What is MRP?
MRP system series 1 - What is MRP?MRP system series 1 - What is MRP?
MRP system series 1 - What is MRP?
 
ERP 101- Introduction to ERP for Manufacturing & Distribution
ERP 101- Introduction to ERP for Manufacturing & DistributionERP 101- Introduction to ERP for Manufacturing & Distribution
ERP 101- Introduction to ERP for Manufacturing & Distribution
 
IE-007 Erp簡介
IE-007 Erp簡介IE-007 Erp簡介
IE-007 Erp簡介
 
5 MRP-II.pptx
5 MRP-II.pptx5 MRP-II.pptx
5 MRP-II.pptx
 
Erp project
Erp project Erp project
Erp project
 
Group 1 pick 'n pay final presentation
Group 1 pick 'n pay   final presentationGroup 1 pick 'n pay   final presentation
Group 1 pick 'n pay final presentation
 
15 mrp
15 mrp15 mrp
15 mrp
 
15 mrp
15 mrp15 mrp
15 mrp
 
Mrp & crp
Mrp & crp Mrp & crp
Mrp & crp
 
ERP Implementation
ERP ImplementationERP Implementation
ERP Implementation
 
Recent Trends in Inventory Control
Recent Trends in Inventory ControlRecent Trends in Inventory Control
Recent Trends in Inventory Control
 
Manufacturing Resource Planning | Management
Manufacturing Resource Planning | ManagementManufacturing Resource Planning | Management
Manufacturing Resource Planning | Management
 
Quick erp education
Quick  erp educationQuick  erp education
Quick erp education
 
Mrp ii
Mrp iiMrp ii
Mrp ii
 
Resource Planning
Resource PlanningResource Planning
Resource Planning
 
Unit II.pptx
Unit II.pptxUnit II.pptx
Unit II.pptx
 
sappresentation- By Prithwijit
sappresentation- By Prithwijit sappresentation- By Prithwijit
sappresentation- By Prithwijit
 
MRP and Planning Overview
MRP and Planning OverviewMRP and Planning Overview
MRP and Planning Overview
 

Recently uploaded

HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 

Recently uploaded (20)

HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 

MRP1 vs MRP2

  • 1. MRP I MRP II Study Case By : Ariyandhi Limpo ERP Consulting Indonesia Specialist : OpenERP or ProintERP By arilimpo, ERP Consultant : http://id.linkedin.com/pub/ari-limpo/24/450/a66 1
  • 2. Definisi MRP I - Material Requirement Planning • Menentukan Produk. • Menentukan Jumlah • Mengestimasi kedatangan MRP II - Manufacturing Resource Planning • Mengintegrasikan semua aspek fungsi • Menterjemahkan rencana operasional menjadi satuan baiya • Melakukan Simulasim Suggestion • Melakukan pengendalian By arilimpo, ERP Consultant : http://id.linkedin.com/pub/ari-limpo/24/450/a66 2
  • 3. SWOT Analysis Strenght (Kekuatan) Weakness (Kelemahan) - Memiliki SDM yang baik - Tidak tersimpan dengan baik - Memiliki Sistem ERP - Ketergantungan pada Manusia - Mudah untuk digunakan - Keterbatasan berbagi Informasi - Tidak teintegrasi dengan bagian lain Opportunities (Peluang) Threat (Ancaman) - Mudah diganti rumusnya - Sistem Pengendalian Pesanan by manual - Mudah diganti datanya - Mudah hilang - Tidak efektif untuk perusahaan skala Menengah dan besar - Berpotensi Stock Berlebih - Yield tidak terkontrol By arilimpo, ERP Consultant : http://id.linkedin.com/pub/ari-limpo/24/450/a66 3
  • 4. Existing System Alur Penerimaan Pesanan PPIC Purchasing Customer (Forecast – Temporary (Purchase Order Order) Release) Purchasing (Purchase Order Maklon In Release) PPIC Purchasing (Total Summary of (Create Sales Order) Supplier Order) By arilimpo, ERP Consultant : http://id.linkedin.com/pub/ari-limpo/24/450/a66 4
  • 5. Existing System Perencanaan Persediaan & Produksi PPIC Purchasing Customer (Forecast – (Purchase Order Temporary Order) Release) Purchasing Maklon In (Purchase Order Release) PPIC Purchasing Supplier (Total Summary of (Create Sales Order) Order) TempO PO PPIC PPIC + Production Proses MRP I (MPS) Purchasing Production (Create & Release (Create Master PO) Schedulling) By arilimpo, ERP Consultant : http://id.linkedin.com/pub/ari-limpo/24/450/a66 5
  • 6. To Be System MRP I MRP II ERP Report Analysis Suggestion By arilimpo, ERP Consultant : http://id.linkedin.com/pub/ari-limpo/24/450/a66 6
  • 7. Material Requirement Planning (MRP I) Inventory (RM) Forecast Customer Orders Status Record On Hand Inventory Inventory (FG) Status Record Schedule Master Production Schedule Receipt (MPS) On Hand Inventory Lead Time PO BOM Lead Time Process Lot Size Lot Size Material Requirement Planning Safety Stock (MRP I) WIP WIP Execution Result for Purchase. 1. What are products ? Schedule 2. How Many ? Distribution 3. When you will receipt ? Purchase Order ReSchedule Notice Plan Order Release Work Order By arilimpo, ERP Consultant : http://id.linkedin.com/pub/ari-limpo/24/450/a66 7
  • 8. 17 Siklus MRP II Corporate Strategi, Business Plan Bisnis Strategi Marketing Strategi, Market Plan, Segmentation, Marketing Plan diversification Master Scheduling Budgeting Forecast Customer Orders Stock Level Inventory (RM) Status Record N Feed Back Resources BOM OK ? On Hand Inventory Inventory (FG) Y Status Record Schedulre Receipt Master Production Schedule On Hand (MPS) Inventory Lead Time PO Lead Time Process Lot Size Material Requirement Planning (MRP I) Lot Size Execution Result for Purchase. Safety Stock 4. What are products ? 5. How Many WIP 6. When you will receipt. WIP Schedule Distribution Requirement Capacity Planning Work Center, Routing, (RCP) Capacity, Eficiency, Labour, Times Feed Back Purchase Order Resources N OK ? ReSchedule Notice Y Plan Order Release Work Order Monitoring of Execution Supplies Performance Report Production Active Control Feed Back Measurement of Performance Control
  • 9. Terima kasih By arilimpo, ERP Consultant : http://id.linkedin.com/pub/ari-limpo/24/450/a66 9