WELCOME TO INDIAN RAILWAYS
RAILWAY ENGINEERING 
The branch of Civil Engineering which 
deals with the design, construction and 
maintenance of the railway tracks for safe 
and efficient movements of trains is called 
Railway Engineering
DIVISIONAL RAILWAY MANAGER OFFICE 
 THE DIVISION IS HEADED BY DIVISIONAL 
RAILWAY MANAGER. (Sushree .Archana Joshi) 
 DRM CONTROL ALL DIVISION. 
 THE KOTA DIVISION COVERS TOTAL 870KM 
IN 3 STATES 
1. 732 KM IN STATE OF RAJASTHAN. 
2. 120 KM IN STATE OF M..P. 
3. 18 KM IN STATE OF U.P
CONTENTS 
1. BALLAST 
2. RAILS 
3. SLEEPERS 
4. POINTS OF CROSSINGS 
5. POINTS OF SWITCH
BALLAST 
Ballast is the granular material usually 
broken stone or bricks single and 
kanker, gravel and sand placed and 
packed and around the sleeper to 
transmit Load from sleeper to 
formation Layer. 
Size = 20mm – 65mm
RAILS 
The rolled steel sections laid 
end to end in two parallel lines 
over sleepers to form a railway 
track are known as RAILS.
TYPES OF RAILS :- 
The rails used in the construction of railway track 
can be divided into the following three types : 
(1) Double Headed Rails (D.H. Rail) 
(2) Flat Footed Rails (F.F. Rail) 
(3) Bull Headed Rails (B.H. Rail)
1. DOUBLE HEADED RAIL :- 
The rails having their head and foot of 
same dimensions are known as double 
headed rail (D.H.).
2. FLAT FOOTED RAILS :- 
The rail section having their foot 
rolled to a flat are known as 
flat footed rails.
3. BULL HEADED RAIL : 
The rails sections having their head of 
more dimension then that of their foot 
are known as bull headed rails (B.H.).
RAIL JOINTS 
1.FISH PLATE JOINT 
2.FASTENERS JOINT 
3.SLIDE CHAIARS JOINT 
4. JUNCTION PLATE JOINT 
5.BEARING PLATE JOINT 
6.CHAIRS
FISH PLATE JOINT
FASTENERS JOINT
SLIDE CHAIARS JOINT
JUNCTION PLATE
Sleepers 
Sleepers are members generally laid transverse 
to the rails, on which the rails are fixed to 
transfer the loads from the rails to the ballast 
and the subgrade.
TYPES OF SLEEPERS 
Wooden Sleepers 
Metal Sleepers 
Concrete Sleepers
W W W . U S T U D Y . I N
CONCRETE SLEEPERS
METAL SLEEPER
POINT OF CROSSING 
Point , crossing , turnout , cross-overs and 
such related terms are arrangement by 
which different routes either parallel are 
connected and offered the means for terms 
to move from one route to another route is 
called POINT OF CROSSING .
COMPONENTS OF SWITCH 
1. A pair of stock rail. 
2. A Pair of tongue rail. 
3. Heel Block. 
4. Stretcher bar. 
5. Slide Chair.
A PAIR OF STOCK RAIL
A PAIR OF TONGUE RAIL
HEEL BLOCK
STRETCHER BAR
POINT OF SWITCH 
A SWITCH Consist of stock 
rail and tongue rail. 
A point is consist of left hand And right 
hand switch
SLIDE CHAIR
QUERY 
????????

More Related Content

What's hot

Railway engineering (CIVIL ENGINEERING)
Railway engineering (CIVIL ENGINEERING)Railway engineering (CIVIL ENGINEERING)
Railway engineering (CIVIL ENGINEERING)comsats
 
Chapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackChapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackKHUSHBU SHAH
 
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of RailsRails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of Railssrinivas2036
 
Rail gauges & rail sections Railway Engineering
Rail gauges & rail sections  Railway EngineeringRail gauges & rail sections  Railway Engineering
Rail gauges & rail sections Railway EngineeringLatif Hyder Wadho
 
Point and crossing of railway
Point and crossing of railwayPoint and crossing of railway
Point and crossing of railwayRAMPRASAD KUMAWAT
 
Coning of Wheels in Railways & Rail Creep
Coning of Wheels in Railways & Rail CreepConing of Wheels in Railways & Rail Creep
Coning of Wheels in Railways & Rail CreepRAMPRASAD KUMAWAT
 
Different types of rail failures
Different types of rail failuresDifferent types of rail failures
Different types of rail failuresSunil Kumar Meena
 
Railway Engineering: Turnouts
Railway Engineering: TurnoutsRailway Engineering: Turnouts
Railway Engineering: TurnoutsVijai Krishnan V
 
Station and Yards in Indian Railway
Station and Yards in Indian RailwayStation and Yards in Indian Railway
Station and Yards in Indian RailwayArbaz Kazi
 
Cross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdfCross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdfTVijayaGowri
 
Different Cross sections of Rail Tracks and Railway Station Layout
Different Cross sections of Rail Tracks and Railway Station LayoutDifferent Cross sections of Rail Tracks and Railway Station Layout
Different Cross sections of Rail Tracks and Railway Station LayoutSunil Kumar Meena
 
Highway development in India
Highway development in IndiaHighway development in India
Highway development in IndiaRAMPRASAD KUMAWAT
 
Presentation on railway construction and maintenance
Presentation on railway construction and maintenancePresentation on railway construction and maintenance
Presentation on railway construction and maintenanceMohd Bakhsh
 
Construction of a New Railway Track
Construction of a New  Railway TrackConstruction of a New  Railway Track
Construction of a New Railway TrackArbaz Kazi
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavementpjainrahul
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)RAMPRASAD KUMAWAT
 
Alignment of railway tracks
Alignment of railway tracksAlignment of railway tracks
Alignment of railway tracksGowtham G
 

What's hot (20)

Railway engineering (CIVIL ENGINEERING)
Railway engineering (CIVIL ENGINEERING)Railway engineering (CIVIL ENGINEERING)
Railway engineering (CIVIL ENGINEERING)
 
Chapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackChapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway track
 
Railway Track Maintenance
Railway Track  MaintenanceRailway Track  Maintenance
Railway Track Maintenance
 
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of RailsRails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
 
Rail gauges & rail sections Railway Engineering
Rail gauges & rail sections  Railway EngineeringRail gauges & rail sections  Railway Engineering
Rail gauges & rail sections Railway Engineering
 
Point and crossing of railway
Point and crossing of railwayPoint and crossing of railway
Point and crossing of railway
 
Coning of Wheels in Railways & Rail Creep
Coning of Wheels in Railways & Rail CreepConing of Wheels in Railways & Rail Creep
Coning of Wheels in Railways & Rail Creep
 
Different types of rail failures
Different types of rail failuresDifferent types of rail failures
Different types of rail failures
 
Railway Gauge
Railway GaugeRailway Gauge
Railway Gauge
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 
Railway Engineering: Turnouts
Railway Engineering: TurnoutsRailway Engineering: Turnouts
Railway Engineering: Turnouts
 
Station and Yards in Indian Railway
Station and Yards in Indian RailwayStation and Yards in Indian Railway
Station and Yards in Indian Railway
 
Cross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdfCross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdf
 
Different Cross sections of Rail Tracks and Railway Station Layout
Different Cross sections of Rail Tracks and Railway Station LayoutDifferent Cross sections of Rail Tracks and Railway Station Layout
Different Cross sections of Rail Tracks and Railway Station Layout
 
Highway development in India
Highway development in IndiaHighway development in India
Highway development in India
 
Presentation on railway construction and maintenance
Presentation on railway construction and maintenancePresentation on railway construction and maintenance
Presentation on railway construction and maintenance
 
Construction of a New Railway Track
Construction of a New  Railway TrackConstruction of a New  Railway Track
Construction of a New Railway Track
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavement
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
 
Alignment of railway tracks
Alignment of railway tracksAlignment of railway tracks
Alignment of railway tracks
 

Viewers also liked

Unit 1. introduction to Railway Engineering
Unit 1. introduction to Railway EngineeringUnit 1. introduction to Railway Engineering
Unit 1. introduction to Railway Engineeringnkocet
 
Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)sharda university
 
railway presentation Ppt
railway presentation Pptrailway presentation Ppt
railway presentation PptSachin Singh
 
History of great indian railways
History of great indian railwaysHistory of great indian railways
History of great indian railwaysAish Warya
 
Presentation on indian railway
Presentation on indian railwayPresentation on indian railway
Presentation on indian railwayKhusro_khan
 
Presentation railways
Presentation railwaysPresentation railways
Presentation railwaysjags_champ
 

Viewers also liked (7)

Unit 1. introduction to Railway Engineering
Unit 1. introduction to Railway EngineeringUnit 1. introduction to Railway Engineering
Unit 1. introduction to Railway Engineering
 
Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)
 
railway presentation Ppt
railway presentation Pptrailway presentation Ppt
railway presentation Ppt
 
History of great indian railways
History of great indian railwaysHistory of great indian railways
History of great indian railways
 
Indian Railways ppt.
Indian Railways ppt.Indian Railways ppt.
Indian Railways ppt.
 
Presentation on indian railway
Presentation on indian railwayPresentation on indian railway
Presentation on indian railway
 
Presentation railways
Presentation railwaysPresentation railways
Presentation railways
 

Similar to railway ppt for civil engg.

Railway engineering copy
Railway engineering   copyRailway engineering   copy
Railway engineering copyKrishna Bhola
 
RAILWAY ENGINEERING
RAILWAY ENGINEERINGRAILWAY ENGINEERING
RAILWAY ENGINEERINGfye7884
 
Railway engineering
Railway engineeringRailway engineering
Railway engineeringjmaghade99
 
Railway engineering.
Railway engineering.Railway engineering.
Railway engineering.Md Khan
 
T M A E S POLYTECHNIC HOSPET BOYS
T M A E S POLYTECHNIC HOSPET BOYST M A E S POLYTECHNIC HOSPET BOYS
T M A E S POLYTECHNIC HOSPET BOYSAnwar Sami
 
3. RAIL TRANSPORTATION (TRE) GTU 3150611
3. RAIL TRANSPORTATION (TRE) GTU 31506113. RAIL TRANSPORTATION (TRE) GTU 3150611
3. RAIL TRANSPORTATION (TRE) GTU 3150611VATSAL PATEL
 
1.Rail ist slide.pdf
1.Rail ist slide.pdf1.Rail ist slide.pdf
1.Rail ist slide.pdfshtanim
 
1. Introduction to Railway engg..pptx
1. Introduction to Railway engg..pptx1. Introduction to Railway engg..pptx
1. Introduction to Railway engg..pptxMayuriPatel90
 
BANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATIONBANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATIONMasudul Robin
 
Introduction railway engineering
Introduction railway engineeringIntroduction railway engineering
Introduction railway engineeringDnyaneshwar More
 
Unit ii railways
Unit ii railwaysUnit ii railways
Unit ii railwaysVipul Naidu
 
Presentation on Indian railway
Presentation on Indian railwayPresentation on Indian railway
Presentation on Indian railwayALOK RAJ
 
Railway and highways, Airways material.pptx
Railway and highways, Airways material.pptxRailway and highways, Airways material.pptx
Railway and highways, Airways material.pptxRajuyadav437367
 

Similar to railway ppt for civil engg. (20)

Railway engineering copy
Railway engineering   copyRailway engineering   copy
Railway engineering copy
 
RAILWAY ENGINEERING
RAILWAY ENGINEERINGRAILWAY ENGINEERING
RAILWAY ENGINEERING
 
Railwayengineering
RailwayengineeringRailwayengineering
Railwayengineering
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Railway engineering.
Railway engineering.Railway engineering.
Railway engineering.
 
T M A E S POLYTECHNIC HOSPET BOYS
T M A E S POLYTECHNIC HOSPET BOYST M A E S POLYTECHNIC HOSPET BOYS
T M A E S POLYTECHNIC HOSPET BOYS
 
P.way
P.wayP.way
P.way
 
3. RAIL TRANSPORTATION (TRE) GTU 3150611
3. RAIL TRANSPORTATION (TRE) GTU 31506113. RAIL TRANSPORTATION (TRE) GTU 3150611
3. RAIL TRANSPORTATION (TRE) GTU 3150611
 
Railway terminology
Railway terminologyRailway terminology
Railway terminology
 
3rd unit
3rd unit3rd unit
3rd unit
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
1.Rail ist slide.pdf
1.Rail ist slide.pdf1.Rail ist slide.pdf
1.Rail ist slide.pdf
 
1. Introduction to Railway engg..pptx
1. Introduction to Railway engg..pptx1. Introduction to Railway engg..pptx
1. Introduction to Railway engg..pptx
 
BANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATIONBANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATION
 
Introduction railway engineering
Introduction railway engineeringIntroduction railway engineering
Introduction railway engineering
 
Unit ii railways
Unit ii railwaysUnit ii railways
Unit ii railways
 
Presentation on Indian railway
Presentation on Indian railwayPresentation on Indian railway
Presentation on Indian railway
 
Rail gauge
Rail gaugeRail gauge
Rail gauge
 
Lecture-1.pptx
Lecture-1.pptxLecture-1.pptx
Lecture-1.pptx
 
Railway and highways, Airways material.pptx
Railway and highways, Airways material.pptxRailway and highways, Airways material.pptx
Railway and highways, Airways material.pptx
 

Recently uploaded

computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction managementMariconPadriquez1
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitterShivangiSharma879191
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 

Recently uploaded (20)

computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction management
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 

railway ppt for civil engg.

  • 1. Submitted by :- ASHRAF MAHMOOD Submitted To:
  • 2. WELCOME TO INDIAN RAILWAYS
  • 3. RAILWAY ENGINEERING The branch of Civil Engineering which deals with the design, construction and maintenance of the railway tracks for safe and efficient movements of trains is called Railway Engineering
  • 4. DIVISIONAL RAILWAY MANAGER OFFICE  THE DIVISION IS HEADED BY DIVISIONAL RAILWAY MANAGER. (Sushree .Archana Joshi)  DRM CONTROL ALL DIVISION.  THE KOTA DIVISION COVERS TOTAL 870KM IN 3 STATES 1. 732 KM IN STATE OF RAJASTHAN. 2. 120 KM IN STATE OF M..P. 3. 18 KM IN STATE OF U.P
  • 5. CONTENTS 1. BALLAST 2. RAILS 3. SLEEPERS 4. POINTS OF CROSSINGS 5. POINTS OF SWITCH
  • 6. BALLAST Ballast is the granular material usually broken stone or bricks single and kanker, gravel and sand placed and packed and around the sleeper to transmit Load from sleeper to formation Layer. Size = 20mm – 65mm
  • 7.
  • 8. RAILS The rolled steel sections laid end to end in two parallel lines over sleepers to form a railway track are known as RAILS.
  • 9. TYPES OF RAILS :- The rails used in the construction of railway track can be divided into the following three types : (1) Double Headed Rails (D.H. Rail) (2) Flat Footed Rails (F.F. Rail) (3) Bull Headed Rails (B.H. Rail)
  • 10. 1. DOUBLE HEADED RAIL :- The rails having their head and foot of same dimensions are known as double headed rail (D.H.).
  • 11.
  • 12. 2. FLAT FOOTED RAILS :- The rail section having their foot rolled to a flat are known as flat footed rails.
  • 13.
  • 14. 3. BULL HEADED RAIL : The rails sections having their head of more dimension then that of their foot are known as bull headed rails (B.H.).
  • 15.
  • 16. RAIL JOINTS 1.FISH PLATE JOINT 2.FASTENERS JOINT 3.SLIDE CHAIARS JOINT 4. JUNCTION PLATE JOINT 5.BEARING PLATE JOINT 6.CHAIRS
  • 21. Sleepers Sleepers are members generally laid transverse to the rails, on which the rails are fixed to transfer the loads from the rails to the ballast and the subgrade.
  • 22. TYPES OF SLEEPERS Wooden Sleepers Metal Sleepers Concrete Sleepers
  • 23. W W W . U S T U D Y . I N
  • 26. POINT OF CROSSING Point , crossing , turnout , cross-overs and such related terms are arrangement by which different routes either parallel are connected and offered the means for terms to move from one route to another route is called POINT OF CROSSING .
  • 27. COMPONENTS OF SWITCH 1. A pair of stock rail. 2. A Pair of tongue rail. 3. Heel Block. 4. Stretcher bar. 5. Slide Chair.
  • 28. A PAIR OF STOCK RAIL
  • 29. A PAIR OF TONGUE RAIL
  • 32. POINT OF SWITCH A SWITCH Consist of stock rail and tongue rail. A point is consist of left hand And right hand switch