PMIS
INTRODUCTION TO PROJECT MANAGEMENT
INFORMATION SYSTEM
 A PMIS is typically a computer-
driven system to aid a project
manager in the development of the
project.
 A PMIS can calculate schedules,
costs, expectations, and likely
results.
 The goal of a PMIS is to automate,
organize, and provide control of the
project management processes
ELEMENTS OF A TYPICAL PMIS
 A typical PMIS software system has:
 WBS creation tools
 Calendaring features
 Scheduling abilities
 Work authorization tools
 EVM controls
 Quality control charts, PERT charts, Gantt charts,
and other charting features
 Calculations for the critical path, EVM, target
dates based on the project schedule, and more
 Resource tracking and leveling
 Reporting functionality
PROJECT MANAGEMENT INFORMATION
SYSTEM
 Project Management Information System
(PMIS) are system tools and techniques used in
project management to deliver information
 Project managers use the techniques and tools
to collect, combine and distribute information
through electronic and manual means.
 Project Management Information System
(PMIS) is used by upper and lower
management to communicate with each other.
PROJECT MANAGEMENT INFORMATION
SYSTEM
 It is an automated system to quickly create,
manage, and streamline the project
management processes.
 In the develop portion of the project, the PMIS
can be used to help the project management
team create the schedule, estimates, and risk
assessments, and to gather feedback from
stakeholders.
PROJECT MANAGEMENT INFORMATION
SYSTEM
 The PMIS also includes a configuration management
system.
 Configuration management is an approach for
tracking all approved changes, versions of project
plans, blueprints, software numbering, and
sequencing.
 A configuration management system aims to
manage all of the following:
 Functional and physical characteristics of the project
deliverables
 Control, track, and manage any changes to the project
deliverables
 Track any changes within the project
 Allow the project management team to audit the project
deliverables to confirm conformance to defined criteria for
acceptance
PROJECT MANAGEMENT INFORMATION
SYSTEM
 Project Management Information System (PMIS) help
plan, execute and close project management goals.
 During the planning process, project managers use
PMIS for budget framework such as estimating costs.
The Project Management Information System is also
used to create a specific schedule and define the scope
baseline
 At the execution of the project management goals, the
project management team collects information into one
database. The PMIS is used to compare
the baseline with the actual accomplishment of
each activity, manage materials, collect financial data,
and keep a record for reporting purposes.
 During the close of the project, the Project
Management Information System is used to
review the goals to check if the tasks were
accomplished. Then, it is used to create a
final report of the project close.
 To conclude, the project management
information system (PMIS) is used to plan
schedules, budget and execute work to be
accomplished in project management.
 Project Management Information System is a
tool used to document and store the
project management plan, subsidiary plans
and other documents / work products
relevant for the project.
 It could be manual or automated and should
support the change control procedures
defined in the project.
PROJECT MANAGEMENT INFORMATION
SYSTEM - IMPORTANCE
 The monitoring and control system of a project needs
the support of a suitable Project Management
Information System (PMIS). Usually, the use of a PMIS
for all information about a project and regularly updating
this information based on the actual status: helps in
successful monitoring and control.
 A comprehensive PMIS would cover the complete life-
cycle of a project and would provide the necessary
support for decision making.
 One important purpose of this information system is to
receive the actual data about the status of a project at
pre-determined intervals, process this information to
evaluate the impact of these outcomes and project these
impacts in terms of an expected date of completion and
an expected cost of completion. These processed
information are then made available to the Project
manager and his team who would then use this to decide
the necessary corrective actions and execute them.

PROJECT MANAGEMENT INFORMATION
SYSTEM – IMPORTANCE CONTD…
 PMISs have capabilities that assist project managers
in planning, budgeting, and resource allocation.
 Many PMISs additionally perform assorted analyses
such as variance, performance, and forecasting
for any level of the WBS and project organization.
 A good PMIS enables facile control of changes to
system configuration and project plans as well. These
PMISs allow for quick review and easy periodic
updating; they filter and reduce data to provide
information on summary, exception, or “what if”
bases.
 With an effective PMIS the project manager does not
have to wait for days or comb through reams of data
to identify problems and determine project status.
PROJECT MANAGEMENT INFORMATION
SYSTEM- OBJECTIVES.
 Record and report relevant information and the status
of various components of the project in such a manner
as to bring the most critical activities directly to the
attention of concerned managers at appropriate level.
 Highlight deviations from the plan, if any, in respect of
every component of the project and also to indicate the
effects of such, deviations on the overall status and
completion of the project as a whole.
 Form the basis of updating of project schedule wherever
necessary.
 Identify and report on critical areas which are
relevant to different levels of management
and to highlight the corrective action that
needs to be taken.
 Sift the information and report on an
exception basis. In other words, emphasis is
focused on those activities that are not going
according the plan.
 Provide a basis for the evaluation of the
performance of the functions of various
managers and departments by regular
comparisons with budgets/plans/schedules.
PROJECT MANAGEMENT INFORMATION
SYSTEM- OBJECTIVES.
TYPICAL FEATURES OF A PMIS
 The following are a list of the kinds of analytical
capabilities, outputs, and other features offered by
various PMI systems
 Scheduling and Network Planning
 Virtually all project software systems do project
scheduling using a network-based procedure.
These systems compute early and late schedule
times, slack times, and the critical path
 Resource Management
 Most project systems also perform resource
loading, leveling, allocation, or multiple
functions, although the analytical sophistication
and quality of reports vary between systems.
TYPICAL OUTPUTS OF A PMIS CONTD..
 Budgeting.
 In many project systems it is possible to associate cost
information with each activity, usually by treating costs as
resources. The ability of a system to handle cost
information and generate budgets is a significant variable
in the system’s usability for both planning and control.
 Cost Control and Performance Analysis
 Here is where project system capabilities differ the most.
The most sophisticated PMIS software “roll up” results and
allow aggregation, analysis, and reporting at all levels of
the WBS. They also permit modification and updating of
existing plans through input of actual start and finish
dates and costs. The most comprehensive PMISs integrate
network, budget, and resource information and allow the
project manager to ask “what if” questions under various
scenarios while the project is underway. They allow the
system user to access, cross-reference, and report
information from multiple sites or databases linked via the
Internet or an intranet.
TYPICAL OUTPUTS OF A PMIS CONTD..
 Reporting, Graphics, and Communication.
 This is an important consideration because it affects
the speed with which PMIS outputs are
communicated and the accuracy of their
interpretation. Many systems provide only tabular
reports or crude schedules; others generate
networks and resource histograms; still others offer
a variety of graphics including pie charts and line
graphs. The main features to consider are the
number, quality, and type of available reports and
graphics
TYPICAL OUTPUTS OF A PMIS CONTD..
 Interface, Flexibility, and Ease of Use.
 Many larger PMISs allow data from different projects
to be pooled so multi project analysis can be
performed. Some systems are compatible with and
can tie into existing databases such as payroll,
purchasing, inventory, MRP, ERP, cost-accounting, or
other PMISs.
 The capability of a PMIS to interface with other
software from which existing data files have been
created is an important selection criterion. Many firms
have had to spend considerable time and money
developing interfaces to link a commercial PM
package with existing data and other PMI systems.
Most small, inexpensive systems are stand-alone and
have limited interface ability
 Flexibility
 Systems also vary widely in flexibility. Many systems
are limited and perform a narrow set of functions
which cannot be modified.
 Others allow the user to develop new applications or
alter existing ones depending on needs.
 Among the potential additional applications and
reports sometimes available are change control,
configuration management, responsibility matrixes,
expenditure reports, cost and technical performance
reports, and technical performance summaries.
 Many software systems utilize Internet technology
and protocols that enable easy access through a
browser to a wide variety of management applications
and databases.
 Ease of Use.
 How easy is it to learn and operate the system? Systems
vary greatly in the style of system documentation,
thoroughness and clarity of tutorials, ease of information
input, clarity of on-screen presentation and report format,
helpfulness of error messages, and the training and
operating support offered by the developer.
BENEFITS OF COMPUTER-BASED PMIS
 The benefits of computer PMISs over manual
systems are speed, capacity, efficiency, economy,
accuracy, and ability to handle complexity.
 The major benefit is speed. Once data have been
collected and entered, practically any
manipulation can be done more rapidly by
computers.
 To create or revise printed plans, schedules, and
budgets takes days or weeks with a manual
system, but seconds or minutes with computers.
 This is especially true of Internet and intranet
project management systems.
 Computer-based PMISs store large amounts of
information that is easily accessed, prioritized,
and summarized.
BENEFITS OF COMPUTER-BASED PMIS
 Manual systems for large projects are tedious to
maintain, difficult to access, and provoke people to try to
work around them or avoid them. They require the
efforts of numerous support personnel to maintain and
use their outputs for analysis.
 In contrast, computer-based PMISs can perform much of
this analysis, reduce the requirement for clerical
personnel, and relieve managers and support personnel
from having to do computations. This frees them to use
analysis results for making decisions.
 The speed, capacity, and efficiency of computers afford
still another benefit: economy. In most cases,
computers offer a significant cost advantage over manual
systems for storing and processing information.
Assuming input data are correct, computers produce
fewer computational errors and reduce the cost of
correcting mistakes.
BENEFITS OF COMPUTER-BASED PMIS
 computer-based PMISs are much better at
handling and integrating complex data
relationships.
 Large projects with thousands of work tasks,
hundreds of organizations, and tens of thousands
of workers cannot be managed efficiently without
computers.
 For managing large projects, a computer-based
PMIS is a virtual necessity, but even in small
projects it simply makes the work easier to
manage.
 Simpler PMISs have limited capability, but they
usually are good at what they can do, and they
can be of tremendous benefit. Also, once
mastered, it is easy to upgrade to more
sophisticated systems.
EXAMPLES OF COMPUTER-BASED PMIS
 Microsoft Project (MS Project)
 Microsoft Project (MS Project) dominates project
management software systems.
 This software system carries its own database and is
compatible with SQL Server or Oracle databases.
 Although it requires installation on every user’s
computer, it is fully compatible with Microsoft Office
so team members can easily save to the database
documents created in any Office application.
 In addition, because it has the same toolbars as MS
Office applications, most users become quickly
familiarized with it.
 MS Project provides the ability to publish to the
Internet or the company intranet.
 There are no limits to the number of tasks or projects
the software can handle.
EXAMPLES OF COMPUTER-BASED PMIS
 Project Scheduler
 Project Scheduler works with an SQL
database and is MS Office compatible.
 Information from multiple projects or
subprojects can be merged or consolidated
to reveal company wide resource utilization.
 The report writer enables a wide range of
standard and customized reports, which can
be output in HTML format.
 Data can be located on shared disk drives
and accessed only by users with the
appropriate password.
EXAMPLES OF COMPUTER-BASED PMIS
 Welcom
 Welcom has three software products: Open Plan,
Cobra, and Spider.
 Open Plan has advanced scheduling and
modeling tools for resource management.
 It integrates company-wide information and enables
information sharing across multiple projects.
 Team members can work on pieces of the project, then
roll-up information for composite reporting.
 Cobra is a cost-management tool designed to
manage and analyze budgets, earned value, and
forecasts.
 Spider is a multiuser, multi project web-based
tool for viewing and updating project data from
Open Plan user Web browsers
EXAMPLES OF COMPUTER-BASED PMIS
 Trakker
 Trakker offers a variety of interesting products
including tools for risk management activity-
based costing, earned value management as well
as the usual planning, budgeting, and tracking
tools.
 These tools interface with commercial accounting
systems and can be Web-enabled for use on the
Internet or intranet with browsers.
EXAMPLES OF COMPUTER-BASED PMIS
 Primavera
 Primavera offers four software products.
 Sure Trak Project Manager.
 This software enables modeling and scheduling of
simultaneous projects of up to 10,000 activities per
project.
 Activities can be inserted or rearranged on Gantt charts
and PERT charts with a mouse click.
 Actual completion dates and costs can be compared with
targets, progress estimated for each activity or for the
entire project, and forecasts produced of resources
necessary to get a project back on track.
 If resources exceed supply, Sure Trak can reassign them
from low-priority activities. Assignments, deadlines, and
status can be shared with project participants at all levels
and locations using the Web publisher
EXAMPLES OF COMPUTER-BASED PMIS
 Primavera
 Primavera Project Planner®, (P3®).
 This program provides for unlimited projects, up to
100,000 activities per project, concurrent, multiuser
accessibility, and scheduling options similar to SureTrak.
 It can create fragments of networks to store for later use
as templates or building blocks for creating other project
plans.
 Also, it supports cost accounts and allows tracking of
costs and exchange of information with cost accounting
systems.
 e-mail addresses can be embedded into the project to
automatically route status information to individuals who
need to know.
 A Web publisher enables team members with Web
browsers to review, update, and return project activity
status data
EXAMPLES OF COMPUTER-BASED PMIS
 Primavera Expedition® Contract Control
Software.
 This software assists in change management and
tracking of contracts and purchase orders.
 It enables users to view the latest submittals and
schedule changes from P3 or SureTrak in real time.
 It ensures that everyone who needs drawing revisions
gets them.
 It also has a change management feature to assess
the impact of changes on costs and schedules, and to
identify where additional equipment is needed and the
contractors affected.
 Italso automatically distributes requisitions and RFPs.
EXAMPLES OF COMPUTER-BASED PMIS
 Webster for Primavera®.
 This software provides access to the project
database, timecard activities, and project
information from SureTrak and P3.
 Team members can see assignments and can
report accomplishments and time needed to
complete assignments.
WEB-BASED PMIS
 A project Web site and Web-based project
software are especially helpful in situations
where project team members are located at
different sites.
 Putting project information on the Internet or
other networks utilizing Internet standards
expedites projects that might ordinarily be
delayed because team members are dispersed.
 Benefits of Web based project management
include immediate availability of project
information, efficiency and accessibility for
communicating with workers, ease of learning
and usage, and reliability and currency of
information because it is entered and
communicated in real time.
WEB-BASED PMIS
 Web-based project management fills the information
needs of project stakeholders at all levels; from
individual teams, team members, and project
managers working on a particular project; to high-
level managers who want information about every
project in the organization.
 With Web-browser integrated project management
software, each team member can have her own
individual web page on which to report progress and
retrieve assignments.
 Web pages for team members at scattered worksites
enable everyone to easily send information to the
project manager, and vice versa.
 The project manager can then aggregate the provided
information to create an overview of the entire
project.
WEB-BASED PMIS
 Web-based tools are easy to learn, understand, and use.
Because the training and learning required for Web-based
tools are minimal, team members can concentrate on their
job rather than spend time in training, or in trying to figure
out the software.
 In most cases, the necessary tools are already at hand. Web-
based software requires one thing: access to a Web browser,
such as Internet Explorer or Netscape, which is available on
any computer with Internet access.
 Internet and intranet networks are easy to use and learn, and
therefore team members are likely to use them more
frequently for status reporting.
 Special Web site administration is unnecessary when team
members, who enter up-to-date information, maintain their
own sites.
 Web based communication not only provides management
with a current view of projects, but it demands low overhead
and frees management from worry associated with system
updates and maintenance.
CRITICAL DECIDING FACTORS
 In designing project management information system,
the following have to be spelt out clearly :
 The objective of each format or report in brief.
 The distribution chart.
 The periodicity of the reports.
 The persons responsible for preparation of the
reports.
 The timing of the reports.
 The sources from which information has to be
gathered in the preparation of reports.
INTEGRATED PROJECT MANAGEMENT
INFORMATION SYSTEM
 Structure of a typical integrated project management
information system is depicted in figure
 It allows total project information to be structured into
a number of data sets which are integrated by the
software. Some of the relevant datasets for a large
project are:
 Network dataset
 Drawing data set
 Cost dataset
 Material dataset
 Vendor dataset
 Job card dataset
 Rates dataset
 Resources dataset
 History dataset, etc
INTEGRATED PROJECT MANAGEMENT
INFORMATION SYSTEM
Structure of a typical integrated project management information
system is depicted in figure
INTEGRATED PROJECT MANAGEMENT
INFORMATION SYSTEM
 Integration of these independent datasets
through various processing modules enables
high control of projects. It permits :
 Horizontal integration between disciplines, e.g.,
cost/schedule integration, or, cost estimates,
cost accounts and project schedule integration
via Work Breakdown Structure:
 Vertical integration. Data can be aggregated
(`rolled up') to any required level to produce
desired summary reports.

More Related Content

What's hot

Project planning and Scheduling
Project planning and SchedulingProject planning and Scheduling
Project planning and Scheduling
saurabmi2
 
An Introduction To Project Management
An Introduction To Project ManagementAn Introduction To Project Management
An Introduction To Project Management
Ashish Mittal
 

What's hot (20)

Project planning and Scheduling
Project planning and SchedulingProject planning and Scheduling
Project planning and Scheduling
 
Project Planning
Project PlanningProject Planning
Project Planning
 
Project management and project life cycle
Project management and project life cycleProject management and project life cycle
Project management and project life cycle
 
Project planning
Project planning Project planning
Project planning
 
An Introduction To Project Management
An Introduction To Project ManagementAn Introduction To Project Management
An Introduction To Project Management
 
Project Management
Project ManagementProject Management
Project Management
 
Project planning and scheduling
Project planning and schedulingProject planning and scheduling
Project planning and scheduling
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.
 
Line of balance in civil engineering
Line of balance in civil engineeringLine of balance in civil engineering
Line of balance in civil engineering
 
Evolution of project management
Evolution of project managementEvolution of project management
Evolution of project management
 
Critical path method
Critical path methodCritical path method
Critical path method
 
Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structure
 
Project management
Project managementProject management
Project management
 
Project management in construction
Project management in constructionProject management in construction
Project management in construction
 
5 phases of project management
5 phases of project management5 phases of project management
5 phases of project management
 
Project monitoring and control & planning for monitoring
Project monitoring and control & planning for monitoringProject monitoring and control & planning for monitoring
Project monitoring and control & planning for monitoring
 
Project management information system (PMIS)
Project management information system (PMIS)Project management information system (PMIS)
Project management information system (PMIS)
 
Critical path method
Critical path methodCritical path method
Critical path method
 
Introduction To Primavera (P6)
Introduction To Primavera (P6)Introduction To Primavera (P6)
Introduction To Primavera (P6)
 
Work breakdown structure in project management ppt by kiran j
Work breakdown structure in project management ppt by kiran jWork breakdown structure in project management ppt by kiran j
Work breakdown structure in project management ppt by kiran j
 

Viewers also liked

Facets of project analysis
Facets of project analysisFacets of project analysis
Facets of project analysis
dmkanchepalya
 
Audit of educational institutions
Audit of educational institutionsAudit of educational institutions
Audit of educational institutions
Drishti Rai
 
Community resource mobilization in Asia (Aid finance session)
Community resource mobilization in Asia (Aid finance session)Community resource mobilization in Asia (Aid finance session)
Community resource mobilization in Asia (Aid finance session)
IIED
 
Educational Management Systems
Educational Management SystemsEducational Management Systems
Educational Management Systems
Intrist
 

Viewers also liked (20)

Building a Project Management Information System with SharePoint
Building a Project Management Information System with SharePointBuilding a Project Management Information System with SharePoint
Building a Project Management Information System with SharePoint
 
Management Information System (MIS)
Management Information System (MIS)Management Information System (MIS)
Management Information System (MIS)
 
Trading profit and loss account
Trading profit  and loss accountTrading profit  and loss account
Trading profit and loss account
 
Time overruns
Time overrunsTime overruns
Time overruns
 
Project selection
Project selection Project selection
Project selection
 
Facets of project analysis
Facets of project analysisFacets of project analysis
Facets of project analysis
 
Technical analysis
Technical analysisTechnical analysis
Technical analysis
 
Audit of educational institutions
Audit of educational institutionsAudit of educational institutions
Audit of educational institutions
 
Android structure
Android structureAndroid structure
Android structure
 
Educational Information Management System (EIMS)
Educational Information Management System (EIMS)Educational Information Management System (EIMS)
Educational Information Management System (EIMS)
 
Lecture 3b: Acquisitions Funds, Budgets, and Accounting
Lecture 3b: Acquisitions Funds, Budgets, and AccountingLecture 3b: Acquisitions Funds, Budgets, and Accounting
Lecture 3b: Acquisitions Funds, Budgets, and Accounting
 
graj (2)
graj (2)graj (2)
graj (2)
 
Fostering Scientific Temper by Santosh Takale
Fostering Scientific Temper by Santosh TakaleFostering Scientific Temper by Santosh Takale
Fostering Scientific Temper by Santosh Takale
 
Finance
FinanceFinance
Finance
 
Community resource mobilization in Asia (Aid finance session)
Community resource mobilization in Asia (Aid finance session)Community resource mobilization in Asia (Aid finance session)
Community resource mobilization in Asia (Aid finance session)
 
Introduction to finance management
Introduction to finance managementIntroduction to finance management
Introduction to finance management
 
Educational Management Systems
Educational Management SystemsEducational Management Systems
Educational Management Systems
 
Management Information System Educational
Management Information System Educational Management Information System Educational
Management Information System Educational
 
Project document management with SharePoint
Project document management with SharePointProject document management with SharePoint
Project document management with SharePoint
 
Project management information system
Project management information systemProject management information system
Project management information system
 

Similar to project management information system

The project management information system
The project management information systemThe project management information system
The project management information system
Davinder Singh
 
The project management information system
The project management information systemThe project management information system
The project management information system
Davinder Singh
 
Project Management Information Systems.docx
Project Management Information  Systems.docxProject Management Information  Systems.docx
Project Management Information Systems.docx
wkyra78
 
KI_res_24_yrs_exp_big_6
KI_res_24_yrs_exp_big_6KI_res_24_yrs_exp_big_6
KI_res_24_yrs_exp_big_6
keith inman
 
Materi 4 Information System Engineering Sim 1223511116853894 8
Materi 4 Information System Engineering Sim 1223511116853894 8Materi 4 Information System Engineering Sim 1223511116853894 8
Materi 4 Information System Engineering Sim 1223511116853894 8
Zidny Nafan
 
CORTAC PPC General
CORTAC PPC GeneralCORTAC PPC General
CORTAC PPC General
Derek Regan
 

Similar to project management information system (20)

Project Management Information System.pptx
Project Management Information System.pptxProject Management Information System.pptx
Project Management Information System.pptx
 
Project Management Information System (VJTI MUMBAI)
Project Management Information System (VJTI MUMBAI)Project Management Information System (VJTI MUMBAI)
Project Management Information System (VJTI MUMBAI)
 
Prajwal Bhattarai - Role and Importance of Project Management Information sys...
Prajwal Bhattarai - Role and Importance of Project Management Information sys...Prajwal Bhattarai - Role and Importance of Project Management Information sys...
Prajwal Bhattarai - Role and Importance of Project Management Information sys...
 
Real Estate Business Review
Real Estate Business Review Real Estate Business Review
Real Estate Business Review
 
Foursite brochure
Foursite brochureFoursite brochure
Foursite brochure
 
The project management information system
The project management information systemThe project management information system
The project management information system
 
The project management information system
The project management information systemThe project management information system
The project management information system
 
MainManager Specifications
MainManager SpecificationsMainManager Specifications
MainManager Specifications
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction management
 
PMIS.ppt
PMIS.pptPMIS.ppt
PMIS.ppt
 
Project Management Information Systems.docx
Project Management Information  Systems.docxProject Management Information  Systems.docx
Project Management Information Systems.docx
 
Primavara
PrimavaraPrimavara
Primavara
 
Flyer ProTrack
Flyer ProTrackFlyer ProTrack
Flyer ProTrack
 
KI_res_24_yrs_exp_big_6
KI_res_24_yrs_exp_big_6KI_res_24_yrs_exp_big_6
KI_res_24_yrs_exp_big_6
 
Asset Management Proposal
Asset Management ProposalAsset Management Proposal
Asset Management Proposal
 
Materi 4 Information System Engineering Sim 1223511116853894 8
Materi 4 Information System Engineering Sim 1223511116853894 8Materi 4 Information System Engineering Sim 1223511116853894 8
Materi 4 Information System Engineering Sim 1223511116853894 8
 
The Gnosis Business Suite 2010
The Gnosis Business Suite 2010The Gnosis Business Suite 2010
The Gnosis Business Suite 2010
 
The Gnosis Business Suite 2010
The Gnosis Business Suite 2010The Gnosis Business Suite 2010
The Gnosis Business Suite 2010
 
Six Data Architecture and IT Infrastructure Governance Mandates for Multinati...
Six Data Architecture and IT Infrastructure Governance Mandates for Multinati...Six Data Architecture and IT Infrastructure Governance Mandates for Multinati...
Six Data Architecture and IT Infrastructure Governance Mandates for Multinati...
 
CORTAC PPC General
CORTAC PPC GeneralCORTAC PPC General
CORTAC PPC General
 

More from Aswin prakash i , Xantus Technologies

More from Aswin prakash i , Xantus Technologies (20)

Statistial tables
Statistial tablesStatistial tables
Statistial tables
 
Simple monopoly
Simple monopolySimple monopoly
Simple monopoly
 
Profit and loss account
Profit and loss accountProfit and loss account
Profit and loss account
 
Oligopoly
OligopolyOligopoly
Oligopoly
 
Monopoly
MonopolyMonopoly
Monopoly
 
Monopolistic competition
Monopolistic competitionMonopolistic competition
Monopolistic competition
 
Microeconomics
MicroeconomicsMicroeconomics
Microeconomics
 
Introduction to accounting
Introduction to accountingIntroduction to accounting
Introduction to accounting
 
business economics
business economicsbusiness economics
business economics
 
Financial accounting
Financial accountingFinancial accounting
Financial accounting
 
Cost benefit
Cost benefit Cost benefit
Cost benefit
 
Cost management for mba
Cost management for mbaCost management for mba
Cost management for mba
 
break-even_analysis
break-even_analysisbreak-even_analysis
break-even_analysis
 
marginal costing
marginal costingmarginal costing
marginal costing
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
Capital budgeting irr arr
Capital budgeting irr arrCapital budgeting irr arr
Capital budgeting irr arr
 
Break even-point
Break even-pointBreak even-point
Break even-point
 
Bitcoin
BitcoinBitcoin
Bitcoin
 
Break even analysis
Break even analysisBreak even analysis
Break even analysis
 
Balance sheet problems
Balance sheet problemsBalance sheet problems
Balance sheet problems
 

Recently uploaded

Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
Nauman Safdar
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
vineshkumarsajnani12
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
ZurliaSoop
 

Recently uploaded (20)

Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 

project management information system

  • 2. INTRODUCTION TO PROJECT MANAGEMENT INFORMATION SYSTEM  A PMIS is typically a computer- driven system to aid a project manager in the development of the project.  A PMIS can calculate schedules, costs, expectations, and likely results.  The goal of a PMIS is to automate, organize, and provide control of the project management processes
  • 3. ELEMENTS OF A TYPICAL PMIS  A typical PMIS software system has:  WBS creation tools  Calendaring features  Scheduling abilities  Work authorization tools  EVM controls  Quality control charts, PERT charts, Gantt charts, and other charting features  Calculations for the critical path, EVM, target dates based on the project schedule, and more  Resource tracking and leveling  Reporting functionality
  • 4. PROJECT MANAGEMENT INFORMATION SYSTEM  Project Management Information System (PMIS) are system tools and techniques used in project management to deliver information  Project managers use the techniques and tools to collect, combine and distribute information through electronic and manual means.  Project Management Information System (PMIS) is used by upper and lower management to communicate with each other.
  • 5. PROJECT MANAGEMENT INFORMATION SYSTEM  It is an automated system to quickly create, manage, and streamline the project management processes.  In the develop portion of the project, the PMIS can be used to help the project management team create the schedule, estimates, and risk assessments, and to gather feedback from stakeholders.
  • 6. PROJECT MANAGEMENT INFORMATION SYSTEM  The PMIS also includes a configuration management system.  Configuration management is an approach for tracking all approved changes, versions of project plans, blueprints, software numbering, and sequencing.  A configuration management system aims to manage all of the following:  Functional and physical characteristics of the project deliverables  Control, track, and manage any changes to the project deliverables  Track any changes within the project  Allow the project management team to audit the project deliverables to confirm conformance to defined criteria for acceptance
  • 7. PROJECT MANAGEMENT INFORMATION SYSTEM  Project Management Information System (PMIS) help plan, execute and close project management goals.  During the planning process, project managers use PMIS for budget framework such as estimating costs. The Project Management Information System is also used to create a specific schedule and define the scope baseline  At the execution of the project management goals, the project management team collects information into one database. The PMIS is used to compare the baseline with the actual accomplishment of each activity, manage materials, collect financial data, and keep a record for reporting purposes.
  • 8.  During the close of the project, the Project Management Information System is used to review the goals to check if the tasks were accomplished. Then, it is used to create a final report of the project close.  To conclude, the project management information system (PMIS) is used to plan schedules, budget and execute work to be accomplished in project management.
  • 9.  Project Management Information System is a tool used to document and store the project management plan, subsidiary plans and other documents / work products relevant for the project.  It could be manual or automated and should support the change control procedures defined in the project.
  • 10. PROJECT MANAGEMENT INFORMATION SYSTEM - IMPORTANCE  The monitoring and control system of a project needs the support of a suitable Project Management Information System (PMIS). Usually, the use of a PMIS for all information about a project and regularly updating this information based on the actual status: helps in successful monitoring and control.  A comprehensive PMIS would cover the complete life- cycle of a project and would provide the necessary support for decision making.  One important purpose of this information system is to receive the actual data about the status of a project at pre-determined intervals, process this information to evaluate the impact of these outcomes and project these impacts in terms of an expected date of completion and an expected cost of completion. These processed information are then made available to the Project manager and his team who would then use this to decide the necessary corrective actions and execute them. 
  • 11. PROJECT MANAGEMENT INFORMATION SYSTEM – IMPORTANCE CONTD…  PMISs have capabilities that assist project managers in planning, budgeting, and resource allocation.  Many PMISs additionally perform assorted analyses such as variance, performance, and forecasting for any level of the WBS and project organization.  A good PMIS enables facile control of changes to system configuration and project plans as well. These PMISs allow for quick review and easy periodic updating; they filter and reduce data to provide information on summary, exception, or “what if” bases.  With an effective PMIS the project manager does not have to wait for days or comb through reams of data to identify problems and determine project status.
  • 12. PROJECT MANAGEMENT INFORMATION SYSTEM- OBJECTIVES.  Record and report relevant information and the status of various components of the project in such a manner as to bring the most critical activities directly to the attention of concerned managers at appropriate level.  Highlight deviations from the plan, if any, in respect of every component of the project and also to indicate the effects of such, deviations on the overall status and completion of the project as a whole.  Form the basis of updating of project schedule wherever necessary.
  • 13.  Identify and report on critical areas which are relevant to different levels of management and to highlight the corrective action that needs to be taken.  Sift the information and report on an exception basis. In other words, emphasis is focused on those activities that are not going according the plan.  Provide a basis for the evaluation of the performance of the functions of various managers and departments by regular comparisons with budgets/plans/schedules. PROJECT MANAGEMENT INFORMATION SYSTEM- OBJECTIVES.
  • 14. TYPICAL FEATURES OF A PMIS  The following are a list of the kinds of analytical capabilities, outputs, and other features offered by various PMI systems  Scheduling and Network Planning  Virtually all project software systems do project scheduling using a network-based procedure. These systems compute early and late schedule times, slack times, and the critical path  Resource Management  Most project systems also perform resource loading, leveling, allocation, or multiple functions, although the analytical sophistication and quality of reports vary between systems.
  • 15. TYPICAL OUTPUTS OF A PMIS CONTD..  Budgeting.  In many project systems it is possible to associate cost information with each activity, usually by treating costs as resources. The ability of a system to handle cost information and generate budgets is a significant variable in the system’s usability for both planning and control.  Cost Control and Performance Analysis  Here is where project system capabilities differ the most. The most sophisticated PMIS software “roll up” results and allow aggregation, analysis, and reporting at all levels of the WBS. They also permit modification and updating of existing plans through input of actual start and finish dates and costs. The most comprehensive PMISs integrate network, budget, and resource information and allow the project manager to ask “what if” questions under various scenarios while the project is underway. They allow the system user to access, cross-reference, and report information from multiple sites or databases linked via the Internet or an intranet.
  • 16. TYPICAL OUTPUTS OF A PMIS CONTD..  Reporting, Graphics, and Communication.  This is an important consideration because it affects the speed with which PMIS outputs are communicated and the accuracy of their interpretation. Many systems provide only tabular reports or crude schedules; others generate networks and resource histograms; still others offer a variety of graphics including pie charts and line graphs. The main features to consider are the number, quality, and type of available reports and graphics
  • 17. TYPICAL OUTPUTS OF A PMIS CONTD..  Interface, Flexibility, and Ease of Use.  Many larger PMISs allow data from different projects to be pooled so multi project analysis can be performed. Some systems are compatible with and can tie into existing databases such as payroll, purchasing, inventory, MRP, ERP, cost-accounting, or other PMISs.  The capability of a PMIS to interface with other software from which existing data files have been created is an important selection criterion. Many firms have had to spend considerable time and money developing interfaces to link a commercial PM package with existing data and other PMI systems. Most small, inexpensive systems are stand-alone and have limited interface ability
  • 18.  Flexibility  Systems also vary widely in flexibility. Many systems are limited and perform a narrow set of functions which cannot be modified.  Others allow the user to develop new applications or alter existing ones depending on needs.  Among the potential additional applications and reports sometimes available are change control, configuration management, responsibility matrixes, expenditure reports, cost and technical performance reports, and technical performance summaries.  Many software systems utilize Internet technology and protocols that enable easy access through a browser to a wide variety of management applications and databases.
  • 19.  Ease of Use.  How easy is it to learn and operate the system? Systems vary greatly in the style of system documentation, thoroughness and clarity of tutorials, ease of information input, clarity of on-screen presentation and report format, helpfulness of error messages, and the training and operating support offered by the developer.
  • 20. BENEFITS OF COMPUTER-BASED PMIS  The benefits of computer PMISs over manual systems are speed, capacity, efficiency, economy, accuracy, and ability to handle complexity.  The major benefit is speed. Once data have been collected and entered, practically any manipulation can be done more rapidly by computers.  To create or revise printed plans, schedules, and budgets takes days or weeks with a manual system, but seconds or minutes with computers.  This is especially true of Internet and intranet project management systems.  Computer-based PMISs store large amounts of information that is easily accessed, prioritized, and summarized.
  • 21. BENEFITS OF COMPUTER-BASED PMIS  Manual systems for large projects are tedious to maintain, difficult to access, and provoke people to try to work around them or avoid them. They require the efforts of numerous support personnel to maintain and use their outputs for analysis.  In contrast, computer-based PMISs can perform much of this analysis, reduce the requirement for clerical personnel, and relieve managers and support personnel from having to do computations. This frees them to use analysis results for making decisions.  The speed, capacity, and efficiency of computers afford still another benefit: economy. In most cases, computers offer a significant cost advantage over manual systems for storing and processing information. Assuming input data are correct, computers produce fewer computational errors and reduce the cost of correcting mistakes.
  • 22. BENEFITS OF COMPUTER-BASED PMIS  computer-based PMISs are much better at handling and integrating complex data relationships.  Large projects with thousands of work tasks, hundreds of organizations, and tens of thousands of workers cannot be managed efficiently without computers.  For managing large projects, a computer-based PMIS is a virtual necessity, but even in small projects it simply makes the work easier to manage.  Simpler PMISs have limited capability, but they usually are good at what they can do, and they can be of tremendous benefit. Also, once mastered, it is easy to upgrade to more sophisticated systems.
  • 23. EXAMPLES OF COMPUTER-BASED PMIS  Microsoft Project (MS Project)  Microsoft Project (MS Project) dominates project management software systems.  This software system carries its own database and is compatible with SQL Server or Oracle databases.  Although it requires installation on every user’s computer, it is fully compatible with Microsoft Office so team members can easily save to the database documents created in any Office application.  In addition, because it has the same toolbars as MS Office applications, most users become quickly familiarized with it.  MS Project provides the ability to publish to the Internet or the company intranet.  There are no limits to the number of tasks or projects the software can handle.
  • 24. EXAMPLES OF COMPUTER-BASED PMIS  Project Scheduler  Project Scheduler works with an SQL database and is MS Office compatible.  Information from multiple projects or subprojects can be merged or consolidated to reveal company wide resource utilization.  The report writer enables a wide range of standard and customized reports, which can be output in HTML format.  Data can be located on shared disk drives and accessed only by users with the appropriate password.
  • 25. EXAMPLES OF COMPUTER-BASED PMIS  Welcom  Welcom has three software products: Open Plan, Cobra, and Spider.  Open Plan has advanced scheduling and modeling tools for resource management.  It integrates company-wide information and enables information sharing across multiple projects.  Team members can work on pieces of the project, then roll-up information for composite reporting.  Cobra is a cost-management tool designed to manage and analyze budgets, earned value, and forecasts.  Spider is a multiuser, multi project web-based tool for viewing and updating project data from Open Plan user Web browsers
  • 26. EXAMPLES OF COMPUTER-BASED PMIS  Trakker  Trakker offers a variety of interesting products including tools for risk management activity- based costing, earned value management as well as the usual planning, budgeting, and tracking tools.  These tools interface with commercial accounting systems and can be Web-enabled for use on the Internet or intranet with browsers.
  • 27. EXAMPLES OF COMPUTER-BASED PMIS  Primavera  Primavera offers four software products.  Sure Trak Project Manager.  This software enables modeling and scheduling of simultaneous projects of up to 10,000 activities per project.  Activities can be inserted or rearranged on Gantt charts and PERT charts with a mouse click.  Actual completion dates and costs can be compared with targets, progress estimated for each activity or for the entire project, and forecasts produced of resources necessary to get a project back on track.  If resources exceed supply, Sure Trak can reassign them from low-priority activities. Assignments, deadlines, and status can be shared with project participants at all levels and locations using the Web publisher
  • 28. EXAMPLES OF COMPUTER-BASED PMIS  Primavera  Primavera Project Planner®, (P3®).  This program provides for unlimited projects, up to 100,000 activities per project, concurrent, multiuser accessibility, and scheduling options similar to SureTrak.  It can create fragments of networks to store for later use as templates or building blocks for creating other project plans.  Also, it supports cost accounts and allows tracking of costs and exchange of information with cost accounting systems.  e-mail addresses can be embedded into the project to automatically route status information to individuals who need to know.  A Web publisher enables team members with Web browsers to review, update, and return project activity status data
  • 29. EXAMPLES OF COMPUTER-BASED PMIS  Primavera Expedition® Contract Control Software.  This software assists in change management and tracking of contracts and purchase orders.  It enables users to view the latest submittals and schedule changes from P3 or SureTrak in real time.  It ensures that everyone who needs drawing revisions gets them.  It also has a change management feature to assess the impact of changes on costs and schedules, and to identify where additional equipment is needed and the contractors affected.  Italso automatically distributes requisitions and RFPs.
  • 30. EXAMPLES OF COMPUTER-BASED PMIS  Webster for Primavera®.  This software provides access to the project database, timecard activities, and project information from SureTrak and P3.  Team members can see assignments and can report accomplishments and time needed to complete assignments.
  • 31. WEB-BASED PMIS  A project Web site and Web-based project software are especially helpful in situations where project team members are located at different sites.  Putting project information on the Internet or other networks utilizing Internet standards expedites projects that might ordinarily be delayed because team members are dispersed.  Benefits of Web based project management include immediate availability of project information, efficiency and accessibility for communicating with workers, ease of learning and usage, and reliability and currency of information because it is entered and communicated in real time.
  • 32. WEB-BASED PMIS  Web-based project management fills the information needs of project stakeholders at all levels; from individual teams, team members, and project managers working on a particular project; to high- level managers who want information about every project in the organization.  With Web-browser integrated project management software, each team member can have her own individual web page on which to report progress and retrieve assignments.  Web pages for team members at scattered worksites enable everyone to easily send information to the project manager, and vice versa.  The project manager can then aggregate the provided information to create an overview of the entire project.
  • 33. WEB-BASED PMIS  Web-based tools are easy to learn, understand, and use. Because the training and learning required for Web-based tools are minimal, team members can concentrate on their job rather than spend time in training, or in trying to figure out the software.  In most cases, the necessary tools are already at hand. Web- based software requires one thing: access to a Web browser, such as Internet Explorer or Netscape, which is available on any computer with Internet access.  Internet and intranet networks are easy to use and learn, and therefore team members are likely to use them more frequently for status reporting.  Special Web site administration is unnecessary when team members, who enter up-to-date information, maintain their own sites.  Web based communication not only provides management with a current view of projects, but it demands low overhead and frees management from worry associated with system updates and maintenance.
  • 34. CRITICAL DECIDING FACTORS  In designing project management information system, the following have to be spelt out clearly :  The objective of each format or report in brief.  The distribution chart.  The periodicity of the reports.  The persons responsible for preparation of the reports.  The timing of the reports.  The sources from which information has to be gathered in the preparation of reports.
  • 35. INTEGRATED PROJECT MANAGEMENT INFORMATION SYSTEM  Structure of a typical integrated project management information system is depicted in figure  It allows total project information to be structured into a number of data sets which are integrated by the software. Some of the relevant datasets for a large project are:  Network dataset  Drawing data set  Cost dataset  Material dataset  Vendor dataset  Job card dataset  Rates dataset  Resources dataset  History dataset, etc
  • 36. INTEGRATED PROJECT MANAGEMENT INFORMATION SYSTEM Structure of a typical integrated project management information system is depicted in figure
  • 37. INTEGRATED PROJECT MANAGEMENT INFORMATION SYSTEM  Integration of these independent datasets through various processing modules enables high control of projects. It permits :  Horizontal integration between disciplines, e.g., cost/schedule integration, or, cost estimates, cost accounts and project schedule integration via Work Breakdown Structure:  Vertical integration. Data can be aggregated (`rolled up') to any required level to produce desired summary reports.