HAFIZ MUHAMMAD ATIF
Module: Problem Solving
Course: MSc Asset Integrity Management
Robert Gordon University, UK
PSVM FPSO
Flixborough 1974
Grangemouth 1987
Piper Alpha 1988
Deep-water Horizon 2006
 Incompetency
 Inappropriate Design
 No Identification of Barriers
 Absence of Process and Safety Management
 Absence of Integrity Management Strategy
 Absence of MOC process
 Operation outside the limits
 Absence of Reporting, Communication and Information Management
Asset Management
Systematic and Synchronized activities through which
organizations manage their assets optimal and sustainable over
their life cycle to accomplish organizations strategic plans
Asset Integrity Management
To manage the integrity over the life cycle of an asset.
Asset Integrity
Ability of an asset to perform its function effectively and
efficiently though protection the health, safety and
environment.
PRINCIPLES AND ATTRIBUTES OF ASSET MANAGEMENT
Attributes Description
HOLISTIC Emphasizing the functional relation
among all departments of organization
SYSTEMATIC characterized the asset management in
an organized, consistent and planned
manner
SYSTEMIC Affecting the whole system rather than
optimizing individual asset separately
RISK – BASED: Prioritize the assets with respect to risk
(health and safety, environment and cost)
SUSTAINABLE Capable of being maintained over the life
cycle without Loss of containment
OPTIMAL Best value of asset under limits of
performance, cost and risk with relative
to other assets
INTEGRATED Interlinking of above attributes to
achieve successful Asset Management
KEY ELEMENTS OF ASSET INTEGRITY MANAGEMENT
Integrity Management System as per DNV RP 116
Concept
Selection /
Design
DecommissioningOperation
Hook – up
Installation/
Commissioning
Procurement /
Manufacturing / Construction
Integrity Management is a function of Entire Life Cycle
Maintain IntegrityDesign
Integrity
Technical Integrity
PHASES AND STAGES OF ASSET INTEGRITY MANAGEMENT
There are three phases of integrity management
1. Design Integrity
2. Technical Integrity
3. Maintain Integrity
1. Design
2. Procurement/Construction/Manufacturing /
Installation / Hook – up
3. Commissioning
4. Operation
5. Modification
6. Decommissioning
There are six stages of integrity management
Modification
DESIGN INTEGRITY
ESTABBLISHMENT OF PILLARS TO AVOID
MAJOR ACCIDENT HAZARDS

 


Poor material selection, Inadequate Competency, Absence of Safety Studies are the key factors for
Major Accident Hazards and cause threat to Health, Safety and Environment. These can be avoid to
invest money in the design stage to established an Asset Management System which ensures the
facility will be capable to handle any major accident hazard which will not only protect the health
and safety of the personnel's but also control environment and business risk over the life cycle of an
asset. Key documentation are necessary to established the integrity are:.
 Material Selection (ISO 15156; NORSOK D-001; EEMUA 194, Group Practices etc.)
 Corrosion Prediction for their asset life (Multicorp, ECE, Casandra etc.)
 Risk Management (Risk Assessment, Risk Management, Risk Acceptance and
Risk Communication)
 Conducting HAZOP, PHA, PSM, LOPA, SIMOPS
 Developing Safety Case (To make sure facility is enough capacity to handle
Major Accident Hazard)
 Identification of SCEs (Safety Critical Elements), BCEs (Business Critical
Elements) and ICE (Integrity Critical Elements)
 Integrity Management Strategy (Topside, Controls & Umbilical, Subsea
Equipment, Pipelines, Riser, Corrosion, Flow Assurance, follow up with Integrity
Management Plan)
 Robust MOC process
TECHNICAL INTEGRITY
 Manufacturing of Pressure and Non-Pressure equipment as per code and standards
 Construction of the facilities as per Code and Standards
 Robust QA / QC during Construction, Hook-up / Installation
 Third party inspection and verification
 Documentation of Anomaly Register and communicated to Operation
 Ensure performance standards to make sure it conforms the design intent
 Robust MOC process
ESTABBLISHMENT OF PILLARS TO AVOID
MAJOR ACCIDENT HAZARDS
Incompetency, poor methods of manufacturing and installations, lack of communication for
anomalies among the engineering departments and avoidance of third party verification are the
high probable factors for damages at the infant stage of operational asset life which leads to Major
Accident Hazards which can be controlled by:
OPERATIONAL INTEGRITY
 Implementation of Integrity Management Strategy (Implementation of RBI, RCM, IPF and
Corrosion Management to manage the integrity and reliability of assets)
 Adherence to Integrity Operating Windows
 Audit and Review process
 Continual Improvements and Lesson Learnt
 Enhancement of Personnel competency and skills
 Robust MOC process
MAINTANED PILLARS TO AVOID MAJOR
ACCIDENT HAZARDS
Incompetency, Absence of integrity management strategy, lack of communication among
departments , Absence of SMS (Safety Management System) and Non-conformance of operational
procedures are the major causes which leads to Major Accident Hazards which can be prevent
during operational life stage by:

 


PLAN
DO
CHECK
ACT
CONCLUSION
Organization can prevent the Piper Alpha and Deep-water Horizon GoM by establishing
and maintaining the integrity over life cycle of an asset with Organization Commitment,
Organizational Strategic Plans and Robust Asset Management System.
 PAS 55 – 1: 2008, Asset Management, Specification for the optimized
management of physical assets
 PAS 55 – 2: 2008, Asset Management, Guidelines for the application of PAS 55 - 1
 DNV RP F – 116, Integrity Management of Submarine Pipeline System
 Asset Integrity Toolkit, UKOOA
 OGP Asset Integrity – the key to managing major accident risks
 Overview of Asset Integrity Management, Robert Gordon University Document
 Presentation by John Reynolds, Establishing IOWs, Shell Global Solutions, IPEIA
Conference February 2, 2006, Banff, Alberta
 Presentation by Racehl Horne, BP, Integrity Management, Project Awareness and
Basic Application, Angola Development Program
 Slide Images:
1. http://www.bbc.co.uk/news/uk-scotland-22840445
2. http://www.growthaccelerator.com/wp-content/uploads/2013/03/Winning.jpg
3. http://www.chanhassenfitnessrevolution.com/wp-content/uploads/2012/07/6-Steps-to-
Success-Chanhassen-Fitness-Revolution.jpg
4. http://www.alstern-technologies.com/main_images/PLANT_2.jpg
5. http://www.seaphantom.com/images2/Offshore_platform_in_night.jpg
6. http://www.offshore-technology.com/projects/8133/images/199971/large/1l-image.jpg
7. http://static.guim.co.uk/sys-
images/Business/Pix/pictures/2010/10/19/1287476298203/Deepwater-Horizon-006.jpg
8. http://www.genesisoilandgas.com/Pages/default.aspx
REFERENCES

More Related Content

What's hot

A real-world introduction to PSM’s 14 Elements
A real-world introduction to PSM’s 14 ElementsA real-world introduction to PSM’s 14 Elements
A real-world introduction to PSM’s 14 Elements360factors
 
SPE Process Safety Workshop PPT Slides
SPE Process Safety Workshop PPT SlidesSPE Process Safety Workshop PPT Slides
SPE Process Safety Workshop PPT Slidesidell bryan
 
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical IntegrityWebinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical IntegrityStork
 
Bow Tie methodology for Operational Safety & Risk Management
Bow Tie methodology for Operational Safety & Risk ManagementBow Tie methodology for Operational Safety & Risk Management
Bow Tie methodology for Operational Safety & Risk ManagementArthurGroot
 
Process Safety Kpi
Process Safety KpiProcess Safety Kpi
Process Safety KpiArthurGroot
 
Asset Integrity Management for purpose-built FPSOs and subsea system facilities
Asset Integrity Management for purpose-built FPSOs and subsea system facilitiesAsset Integrity Management for purpose-built FPSOs and subsea system facilities
Asset Integrity Management for purpose-built FPSOs and subsea system facilitiesAdvisian
 
fault tree analysis
fault tree analysisfault tree analysis
fault tree analysisSiti Mastura
 
Mechanical Integrity.pdf
Mechanical Integrity.pdfMechanical Integrity.pdf
Mechanical Integrity.pdfaashir14
 
Process Safety Management Fundamentals.pptx
Process Safety Management Fundamentals.pptxProcess Safety Management Fundamentals.pptx
Process Safety Management Fundamentals.pptxImtiazHussain312057
 
Process Safety Management System
Process Safety Management SystemProcess Safety Management System
Process Safety Management SystemACM Facility Safety
 
ISO 45001 – Health & Safety International Standard
ISO 45001 – Health & Safety International StandardISO 45001 – Health & Safety International Standard
ISO 45001 – Health & Safety International StandardPECB
 
HSE Training Presentation for ISO 14001, ISO 45001 Integration
HSE Training Presentation for ISO 14001, ISO 45001 IntegrationHSE Training Presentation for ISO 14001, ISO 45001 Integration
HSE Training Presentation for ISO 14001, ISO 45001 IntegrationGlobal Manager Group
 
Bow Tie Risk Analysis
Bow Tie Risk AnalysisBow Tie Risk Analysis
Bow Tie Risk AnalysisJohn Kingsley
 
Checklist Asset Management for educational purposes - ISO55000
Checklist Asset Management for educational purposes - ISO55000Checklist Asset Management for educational purposes - ISO55000
Checklist Asset Management for educational purposes - ISO55000Cyrus Sorab
 

What's hot (20)

Process safety managment
Process safety managmentProcess safety managment
Process safety managment
 
A real-world introduction to PSM’s 14 Elements
A real-world introduction to PSM’s 14 ElementsA real-world introduction to PSM’s 14 Elements
A real-world introduction to PSM’s 14 Elements
 
SPE Process Safety Workshop PPT Slides
SPE Process Safety Workshop PPT SlidesSPE Process Safety Workshop PPT Slides
SPE Process Safety Workshop PPT Slides
 
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical IntegrityWebinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
 
Bow Tie methodology for Operational Safety & Risk Management
Bow Tie methodology for Operational Safety & Risk ManagementBow Tie methodology for Operational Safety & Risk Management
Bow Tie methodology for Operational Safety & Risk Management
 
Process Safety Kpi
Process Safety KpiProcess Safety Kpi
Process Safety Kpi
 
Asset Integrity Management for purpose-built FPSOs and subsea system facilities
Asset Integrity Management for purpose-built FPSOs and subsea system facilitiesAsset Integrity Management for purpose-built FPSOs and subsea system facilities
Asset Integrity Management for purpose-built FPSOs and subsea system facilities
 
fault tree analysis
fault tree analysisfault tree analysis
fault tree analysis
 
Mechanical Integrity.pdf
Mechanical Integrity.pdfMechanical Integrity.pdf
Mechanical Integrity.pdf
 
Process Safety Management Fundamentals.pptx
Process Safety Management Fundamentals.pptxProcess Safety Management Fundamentals.pptx
Process Safety Management Fundamentals.pptx
 
Process Safety Management System
Process Safety Management SystemProcess Safety Management System
Process Safety Management System
 
Fmea handout
Fmea handoutFmea handout
Fmea handout
 
HAZOP.PPT
HAZOP.PPTHAZOP.PPT
HAZOP.PPT
 
HAZOP and QRA.pptx
HAZOP and QRA.pptxHAZOP and QRA.pptx
HAZOP and QRA.pptx
 
ISO 45001 – Health & Safety International Standard
ISO 45001 – Health & Safety International StandardISO 45001 – Health & Safety International Standard
ISO 45001 – Health & Safety International Standard
 
PFMEA
PFMEA PFMEA
PFMEA
 
HSE Training Presentation for ISO 14001, ISO 45001 Integration
HSE Training Presentation for ISO 14001, ISO 45001 IntegrationHSE Training Presentation for ISO 14001, ISO 45001 Integration
HSE Training Presentation for ISO 14001, ISO 45001 Integration
 
Bow Tie Risk Analysis
Bow Tie Risk AnalysisBow Tie Risk Analysis
Bow Tie Risk Analysis
 
Advanced Pfmea
Advanced PfmeaAdvanced Pfmea
Advanced Pfmea
 
Checklist Asset Management for educational purposes - ISO55000
Checklist Asset Management for educational purposes - ISO55000Checklist Asset Management for educational purposes - ISO55000
Checklist Asset Management for educational purposes - ISO55000
 

Viewers also liked

Implementing an Asset Management System for Safe and Reliable Operations -FINAL
Implementing an Asset Management System for Safe and Reliable Operations -FINALImplementing an Asset Management System for Safe and Reliable Operations -FINAL
Implementing an Asset Management System for Safe and Reliable Operations -FINALMike Poland, CMRP
 
Profissional Ladder Presentation4
Profissional Ladder Presentation4Profissional Ladder Presentation4
Profissional Ladder Presentation4Dr.Abdulla Al Beshr
 
Safety & Asset Integrity Excellence - A Study of Three Mile Island
Safety & Asset Integrity Excellence - A Study of Three Mile IslandSafety & Asset Integrity Excellence - A Study of Three Mile Island
Safety & Asset Integrity Excellence - A Study of Three Mile IslandKienbaum Consultants
 
Building your ISO 55000 Wind Asset Management System - Introduction and Case ...
Building your ISO 55000 Wind Asset Management System - Introduction and Case ...Building your ISO 55000 Wind Asset Management System - Introduction and Case ...
Building your ISO 55000 Wind Asset Management System - Introduction and Case ...OutSmart Independent Wind Asset Experts
 
A holistic approach to Safety and Asset Integrity Excellence
A holistic approach to Safety and Asset Integrity ExcellenceA holistic approach to Safety and Asset Integrity Excellence
A holistic approach to Safety and Asset Integrity ExcellenceKienbaum Consultants
 
Case Study - Safety vs Profitabilty for FPSO Operations
Case Study - Safety vs Profitabilty for FPSO OperationsCase Study - Safety vs Profitabilty for FPSO Operations
Case Study - Safety vs Profitabilty for FPSO OperationsAlvin CJ Chin
 
Integrity Management Plan for Pipeline-G03178 Idzuari Azli
Integrity Management Plan for Pipeline-G03178 Idzuari AzliIntegrity Management Plan for Pipeline-G03178 Idzuari Azli
Integrity Management Plan for Pipeline-G03178 Idzuari AzliIdzuari Azli Bin Kamilan
 
Sgs presentacion
Sgs presentacion Sgs presentacion
Sgs presentacion ameriraa
 
plant layout for services
plant layout for servicesplant layout for services
plant layout for servicesnaveen13safare
 
Safety & Quality Aspects in '3-S' System of Construction
Safety & Quality Aspects in '3-S' System of ConstructionSafety & Quality Aspects in '3-S' System of Construction
Safety & Quality Aspects in '3-S' System of ConstructionSandeep Jain
 
SENTRO - Acoustic Emission Presentation [2016]
SENTRO - Acoustic Emission Presentation [2016]SENTRO - Acoustic Emission Presentation [2016]
SENTRO - Acoustic Emission Presentation [2016]SENTRO TECHNOLOGIES
 
Jaya supermarket presentation 2011 latest
Jaya supermarket presentation 2011 latestJaya supermarket presentation 2011 latest
Jaya supermarket presentation 2011 latestKartini Ibrahim
 

Viewers also liked (16)

Implementing an Asset Management System for Safe and Reliable Operations -FINAL
Implementing an Asset Management System for Safe and Reliable Operations -FINALImplementing an Asset Management System for Safe and Reliable Operations -FINAL
Implementing an Asset Management System for Safe and Reliable Operations -FINAL
 
Embed RBI in your EAM
Embed RBI in your EAMEmbed RBI in your EAM
Embed RBI in your EAM
 
Profissional Ladder Presentation4
Profissional Ladder Presentation4Profissional Ladder Presentation4
Profissional Ladder Presentation4
 
Module1
Module1Module1
Module1
 
Safety & Asset Integrity Excellence - A Study of Three Mile Island
Safety & Asset Integrity Excellence - A Study of Three Mile IslandSafety & Asset Integrity Excellence - A Study of Three Mile Island
Safety & Asset Integrity Excellence - A Study of Three Mile Island
 
Building your ISO 55000 Wind Asset Management System - Introduction and Case ...
Building your ISO 55000 Wind Asset Management System - Introduction and Case ...Building your ISO 55000 Wind Asset Management System - Introduction and Case ...
Building your ISO 55000 Wind Asset Management System - Introduction and Case ...
 
A holistic approach to Safety and Asset Integrity Excellence
A holistic approach to Safety and Asset Integrity ExcellenceA holistic approach to Safety and Asset Integrity Excellence
A holistic approach to Safety and Asset Integrity Excellence
 
management of change
management of changemanagement of change
management of change
 
Case Study - Safety vs Profitabilty for FPSO Operations
Case Study - Safety vs Profitabilty for FPSO OperationsCase Study - Safety vs Profitabilty for FPSO Operations
Case Study - Safety vs Profitabilty for FPSO Operations
 
Integrity Management Plan for Pipeline-G03178 Idzuari Azli
Integrity Management Plan for Pipeline-G03178 Idzuari AzliIntegrity Management Plan for Pipeline-G03178 Idzuari Azli
Integrity Management Plan for Pipeline-G03178 Idzuari Azli
 
Sgs presentacion
Sgs presentacion Sgs presentacion
Sgs presentacion
 
plant layout for services
plant layout for servicesplant layout for services
plant layout for services
 
Safety & Quality Aspects in '3-S' System of Construction
Safety & Quality Aspects in '3-S' System of ConstructionSafety & Quality Aspects in '3-S' System of Construction
Safety & Quality Aspects in '3-S' System of Construction
 
SENTRO - Acoustic Emission Presentation [2016]
SENTRO - Acoustic Emission Presentation [2016]SENTRO - Acoustic Emission Presentation [2016]
SENTRO - Acoustic Emission Presentation [2016]
 
Jaya supermarket presentation 2011 latest
Jaya supermarket presentation 2011 latestJaya supermarket presentation 2011 latest
Jaya supermarket presentation 2011 latest
 
Hse oil and gas management services
Hse oil and gas management servicesHse oil and gas management services
Hse oil and gas management services
 

Similar to Asset Integrity Management

CV_Senior HSEQ Officer_ Ayman Morshed
CV_Senior HSEQ Officer_ Ayman MorshedCV_Senior HSEQ Officer_ Ayman Morshed
CV_Senior HSEQ Officer_ Ayman MorshedAyman Morshed
 
Process Safety Bulletin Sep 2015
Process Safety Bulletin Sep 2015Process Safety Bulletin Sep 2015
Process Safety Bulletin Sep 2015Aamish J. Khan, CSP
 
RiskWatch for Financial Institutions™
RiskWatch for Financial Institutions™RiskWatch for Financial Institutions™
RiskWatch for Financial Institutions™CPaschal
 
Risk management in ILRI
Risk management in ILRI Risk management in ILRI
Risk management in ILRI ILRI
 
Part -1 Chapter 35 ERM at Malaysia’s Media Company Astro Qui.docx
Part -1 Chapter 35 ERM at Malaysia’s Media Company Astro Qui.docxPart -1 Chapter 35 ERM at Malaysia’s Media Company Astro Qui.docx
Part -1 Chapter 35 ERM at Malaysia’s Media Company Astro Qui.docxkarlhennesey
 
Aips guide element 6 process safety knowledge rev 2
Aips guide   element 6 process safety knowledge rev 2Aips guide   element 6 process safety knowledge rev 2
Aips guide element 6 process safety knowledge rev 2bitsgian
 
BLE 1213 MUST.pptx- basics principles of Physical Security
BLE 1213 MUST.pptx- basics  principles of Physical SecurityBLE 1213 MUST.pptx- basics  principles of Physical Security
BLE 1213 MUST.pptx- basics principles of Physical SecurityMajor K. Subramaniam Kmaravehlu
 
SMS Fundamentals Module 1
SMS Fundamentals Module 1SMS Fundamentals Module 1
SMS Fundamentals Module 1Scott McCamish
 
Auditor Training 2023 _ Safety General.pptx
Auditor Training 2023 _ Safety General.pptxAuditor Training 2023 _ Safety General.pptx
Auditor Training 2023 _ Safety General.pptxAngad45
 
Process Safety Booklet 1st issue Dec2014 FINAL
Process Safety Booklet 1st issue Dec2014 FINALProcess Safety Booklet 1st issue Dec2014 FINAL
Process Safety Booklet 1st issue Dec2014 FINALAamish J. Khan, CSP
 

Similar to Asset Integrity Management (20)

Cv HASSAN RIAZ
Cv HASSAN RIAZCv HASSAN RIAZ
Cv HASSAN RIAZ
 
CV_Senior HSEQ Officer_ Ayman Morshed
CV_Senior HSEQ Officer_ Ayman MorshedCV_Senior HSEQ Officer_ Ayman Morshed
CV_Senior HSEQ Officer_ Ayman Morshed
 
2014 resume (2)
2014 resume (2)2014 resume (2)
2014 resume (2)
 
Process Safety Bulletin Sep 2015
Process Safety Bulletin Sep 2015Process Safety Bulletin Sep 2015
Process Safety Bulletin Sep 2015
 
RiskWatch for Financial Institutions™
RiskWatch for Financial Institutions™RiskWatch for Financial Institutions™
RiskWatch for Financial Institutions™
 
Risk management in ILRI
Risk management in ILRI Risk management in ILRI
Risk management in ILRI
 
Maximo Overview
Maximo OverviewMaximo Overview
Maximo Overview
 
Chigozie_HSE Eng_210715
Chigozie_HSE Eng_210715Chigozie_HSE Eng_210715
Chigozie_HSE Eng_210715
 
Part -1 Chapter 35 ERM at Malaysia’s Media Company Astro Qui.docx
Part -1 Chapter 35 ERM at Malaysia’s Media Company Astro Qui.docxPart -1 Chapter 35 ERM at Malaysia’s Media Company Astro Qui.docx
Part -1 Chapter 35 ERM at Malaysia’s Media Company Astro Qui.docx
 
Aips guide element 6 process safety knowledge rev 2
Aips guide   element 6 process safety knowledge rev 2Aips guide   element 6 process safety knowledge rev 2
Aips guide element 6 process safety knowledge rev 2
 
Ism cbt
Ism cbtIsm cbt
Ism cbt
 
Job Description
Job DescriptionJob Description
Job Description
 
risk analysis
risk analysisrisk analysis
risk analysis
 
BLE 1213 MUST.pptx- basics principles of Physical Security
BLE 1213 MUST.pptx- basics  principles of Physical SecurityBLE 1213 MUST.pptx- basics  principles of Physical Security
BLE 1213 MUST.pptx- basics principles of Physical Security
 
SMS Fundamentals Module 1
SMS Fundamentals Module 1SMS Fundamentals Module 1
SMS Fundamentals Module 1
 
Auditor Training 2023 _ Safety General.pptx
Auditor Training 2023 _ Safety General.pptxAuditor Training 2023 _ Safety General.pptx
Auditor Training 2023 _ Safety General.pptx
 
Ca5009
Ca5009Ca5009
Ca5009
 
Psm by Ronak
Psm by RonakPsm by Ronak
Psm by Ronak
 
Process Safety Booklet 1st issue Dec2014 FINAL
Process Safety Booklet 1st issue Dec2014 FINALProcess Safety Booklet 1st issue Dec2014 FINAL
Process Safety Booklet 1st issue Dec2014 FINAL
 
M - Abdo CV
M - Abdo CVM - Abdo CV
M - Abdo CV
 

Asset Integrity Management

  • 1. HAFIZ MUHAMMAD ATIF Module: Problem Solving Course: MSc Asset Integrity Management Robert Gordon University, UK PSVM FPSO
  • 2. Flixborough 1974 Grangemouth 1987 Piper Alpha 1988 Deep-water Horizon 2006
  • 3.  Incompetency  Inappropriate Design  No Identification of Barriers  Absence of Process and Safety Management  Absence of Integrity Management Strategy  Absence of MOC process  Operation outside the limits  Absence of Reporting, Communication and Information Management
  • 4. Asset Management Systematic and Synchronized activities through which organizations manage their assets optimal and sustainable over their life cycle to accomplish organizations strategic plans Asset Integrity Management To manage the integrity over the life cycle of an asset. Asset Integrity Ability of an asset to perform its function effectively and efficiently though protection the health, safety and environment.
  • 5. PRINCIPLES AND ATTRIBUTES OF ASSET MANAGEMENT Attributes Description HOLISTIC Emphasizing the functional relation among all departments of organization SYSTEMATIC characterized the asset management in an organized, consistent and planned manner SYSTEMIC Affecting the whole system rather than optimizing individual asset separately RISK – BASED: Prioritize the assets with respect to risk (health and safety, environment and cost) SUSTAINABLE Capable of being maintained over the life cycle without Loss of containment OPTIMAL Best value of asset under limits of performance, cost and risk with relative to other assets INTEGRATED Interlinking of above attributes to achieve successful Asset Management
  • 6. KEY ELEMENTS OF ASSET INTEGRITY MANAGEMENT Integrity Management System as per DNV RP 116
  • 7. Concept Selection / Design DecommissioningOperation Hook – up Installation/ Commissioning Procurement / Manufacturing / Construction Integrity Management is a function of Entire Life Cycle Maintain IntegrityDesign Integrity Technical Integrity PHASES AND STAGES OF ASSET INTEGRITY MANAGEMENT There are three phases of integrity management 1. Design Integrity 2. Technical Integrity 3. Maintain Integrity 1. Design 2. Procurement/Construction/Manufacturing / Installation / Hook – up 3. Commissioning 4. Operation 5. Modification 6. Decommissioning There are six stages of integrity management Modification
  • 8.
  • 9. DESIGN INTEGRITY ESTABBLISHMENT OF PILLARS TO AVOID MAJOR ACCIDENT HAZARDS      Poor material selection, Inadequate Competency, Absence of Safety Studies are the key factors for Major Accident Hazards and cause threat to Health, Safety and Environment. These can be avoid to invest money in the design stage to established an Asset Management System which ensures the facility will be capable to handle any major accident hazard which will not only protect the health and safety of the personnel's but also control environment and business risk over the life cycle of an asset. Key documentation are necessary to established the integrity are:.  Material Selection (ISO 15156; NORSOK D-001; EEMUA 194, Group Practices etc.)  Corrosion Prediction for their asset life (Multicorp, ECE, Casandra etc.)  Risk Management (Risk Assessment, Risk Management, Risk Acceptance and Risk Communication)  Conducting HAZOP, PHA, PSM, LOPA, SIMOPS  Developing Safety Case (To make sure facility is enough capacity to handle Major Accident Hazard)  Identification of SCEs (Safety Critical Elements), BCEs (Business Critical Elements) and ICE (Integrity Critical Elements)  Integrity Management Strategy (Topside, Controls & Umbilical, Subsea Equipment, Pipelines, Riser, Corrosion, Flow Assurance, follow up with Integrity Management Plan)  Robust MOC process
  • 10. TECHNICAL INTEGRITY  Manufacturing of Pressure and Non-Pressure equipment as per code and standards  Construction of the facilities as per Code and Standards  Robust QA / QC during Construction, Hook-up / Installation  Third party inspection and verification  Documentation of Anomaly Register and communicated to Operation  Ensure performance standards to make sure it conforms the design intent  Robust MOC process ESTABBLISHMENT OF PILLARS TO AVOID MAJOR ACCIDENT HAZARDS Incompetency, poor methods of manufacturing and installations, lack of communication for anomalies among the engineering departments and avoidance of third party verification are the high probable factors for damages at the infant stage of operational asset life which leads to Major Accident Hazards which can be controlled by:
  • 11. OPERATIONAL INTEGRITY  Implementation of Integrity Management Strategy (Implementation of RBI, RCM, IPF and Corrosion Management to manage the integrity and reliability of assets)  Adherence to Integrity Operating Windows  Audit and Review process  Continual Improvements and Lesson Learnt  Enhancement of Personnel competency and skills  Robust MOC process MAINTANED PILLARS TO AVOID MAJOR ACCIDENT HAZARDS Incompetency, Absence of integrity management strategy, lack of communication among departments , Absence of SMS (Safety Management System) and Non-conformance of operational procedures are the major causes which leads to Major Accident Hazards which can be prevent during operational life stage by:      PLAN DO CHECK ACT
  • 12. CONCLUSION Organization can prevent the Piper Alpha and Deep-water Horizon GoM by establishing and maintaining the integrity over life cycle of an asset with Organization Commitment, Organizational Strategic Plans and Robust Asset Management System.
  • 13.  PAS 55 – 1: 2008, Asset Management, Specification for the optimized management of physical assets  PAS 55 – 2: 2008, Asset Management, Guidelines for the application of PAS 55 - 1  DNV RP F – 116, Integrity Management of Submarine Pipeline System  Asset Integrity Toolkit, UKOOA  OGP Asset Integrity – the key to managing major accident risks  Overview of Asset Integrity Management, Robert Gordon University Document  Presentation by John Reynolds, Establishing IOWs, Shell Global Solutions, IPEIA Conference February 2, 2006, Banff, Alberta  Presentation by Racehl Horne, BP, Integrity Management, Project Awareness and Basic Application, Angola Development Program  Slide Images: 1. http://www.bbc.co.uk/news/uk-scotland-22840445 2. http://www.growthaccelerator.com/wp-content/uploads/2013/03/Winning.jpg 3. http://www.chanhassenfitnessrevolution.com/wp-content/uploads/2012/07/6-Steps-to- Success-Chanhassen-Fitness-Revolution.jpg 4. http://www.alstern-technologies.com/main_images/PLANT_2.jpg 5. http://www.seaphantom.com/images2/Offshore_platform_in_night.jpg 6. http://www.offshore-technology.com/projects/8133/images/199971/large/1l-image.jpg 7. http://static.guim.co.uk/sys- images/Business/Pix/pictures/2010/10/19/1287476298203/Deepwater-Horizon-006.jpg 8. http://www.genesisoilandgas.com/Pages/default.aspx REFERENCES