Introduction:
Tunnel is an artificially constructed underground
passage to by- pass obstacles safely without
disturbing the over burden.
Open Cut is an open to sky passage excavated through
huge soil mass of obstacle in required directions to
connect two roads or railways.
Bridge is an over-ground construction to cross over
obstacles without disturbing the natural way below it.
3
Tunnels are underground passages for Road or rail
traffic, Pedestrians, Utilities, Fresh water or sewer
lines.
4
5
6
7
8
Ratio of length to width, in a tunnel , should always
be at least in 2: 1.
A tunnel must be completely enclosed on all sides
along the length.
The types of tunnels are classified based on three
aspects: Based on purpose (road, rail, utilities), Based
on surrounding material (soft clay vs. hard rock ) &
Submerged tunnels.
Egyptians and Babylonians constructed tunnels about
4000 years ago with a length of 910 m , width –of
3600 mm and a height of 4500mm.
9
The Channel Tunnel was constucted by linking
Britain & France way back in 1994. The total length
was about 50 km ; undersea component itself is about
39 km.
The primary objectives of the tunnel alignments are
to:
1. Reduce transit trip times;
2. Increase quality and reliability of service; and
3. Minimize impacts of surface transit operations in
sensitive locations.
10
Economics of Tunnelling depend on:
Nature of Soil/ rock,
Requirements of fill,
Depth of cut > 18m –tunneling.
Tunnelling is desirable when Rapid transport
facilities are required which needs to avoid
acquisition of land for roads.
Tunnels are also erected when shortest route
connection is needed in cities.
Tunnels permit easy gradient & encourage high
speed on strategic routes.
11
Tunnel Design Criteria
Tunnelling requires proper design.
Every tunnel will have its own geometry, design,
alignment, and construction methods.
The tunnel design criteria include the following:
Spatial Requirements;
Alignment;
Underground Stations;
Fire Life Safety; and
Tunnel Systems and Operation.
12
Every tunnel will have its own horizontal and vertical
alignment, Tunnel Ventilation, Tunnel Lighting,
Electrical and Safety Equipment, Drainage, Fire Life
Safety, Security.
The following factors should be taken into
consideration when selecting the method:
- Tunnel dimensions, - Tunnel geometry
- Length of tunnel, total volume to be excavated
- Geological and rock mechanical conditions
- Ground water level and expected water inflow
- Vibration restrictions & - Allowed ground
settlements.
13
Selection of Tunnel alignment depends on
1. Topography of area & points of entrance and exit,
2. Selection of site of tunnel to be made considering
two points.
3. Alignment Restraints
4. Environmental Considerations.
Tunnel portal – the interface point of the open cut
and the cut and cover tunnel.
14
Classification of Tunnels= Based on Alignment
1. Off-Spur tunnels : Short length tunnels to negotiate
minor obstacles.
2. Saddle or base tunnels : tunnels constructed in
valleys along natural slope .
3. Slope tunnels : constructed in steep hills for
economic and safe operation .
4. Spiral Tunnels : constructed in narrow valleys in
form of loops in interior of mountains so as to
increase length of tunnel to avoid steep slopes.
15
Classification of Tunnels=
Based on purpose
Conveyance Tunnels & Traffic Tunnels.
Based on type of material met with in construction
1. Tunnels in Hard Rock
2. Tunnels in Soft materials
3. Tunnels in Water Bearing Soils
Investigations:
Investigations prior to planning
A. Geological Investigations –relation between bed
rock and top soil.
16
B. Morphology, Petrology, Stratigraphy
C. Electrical Resistivity Methods –positions of weak
zones -faults, folds and shear zones
17
Investigations made at time of planning
18
1. Drilling holes by percussion, rotary percussion and
rotary
2. Rotary or Rotary Percussion methods –loose soils
3. Rotary Drilling –rocky soils
4. Spacing –300-500m ; reduced to 50-100 m in
geologically disturbed areas. Lateral Spacing –10-
15m from C/L of tunnel.
5. Depth –20-50 m deeper than proposed invert level
of tunnel. For detailed undisturbed observations,
shafts can be excavated .
19
Shafts –vertical or inclined tunnel excavated to reach
and to get information for the area surrounding
proposed tunnel and tunnel section
6. Section of 3m x 1.5 m to 3 m x 2m. Minimum
depth of excavation. Temporary and Permanent
Shafts
Setting out of a tunnel
1. Setting Out -Making the centre line or alignment of
any construction work on ground
2. Setting out centre line of tunnel by 4 stages:
20
3. Setting out tunnel on ground surface
4. Transfer of Centre line from surface to
underground
5. Underground setting out
6. Underground Leveling
Setting out of the tunnel on the ground surface:
Running an open traverse between two ends of
proposed tunnel.
Curved alignment:
Heading consist of short tangent to curve alignment .
Offsets measured from these tangents.
21
Transfer of centre line from the surface to the
underground:
1. Underground shafts –interval of 500 m along
transverse lines
2. Rectangular Horizontal frame set at proposed
location along AB
3. On two sides of the frame, iron plates are fixed and
screwed down & holes are drilled along A and B at
X & Y
4. Plumb bobs are suspended to define vertical lines
22
Shape of tunnels
D or Segmental Roof Section
1. Suitable for sub-ways or navigation tunnels
2. Additional Floor Space and flat floor for moving
equipment.
23
Circular Section
1. To withstand heavy internal or external radial
pressures
2. Best theoretical section for resisting forces
3. Greatest C/s Area for least perimeter
4. Sewers and water carrying purposes
Rectangular Section
Suitable for hard rocks, Adopted for pedestrian traffic
Costly & difficult to construct
24
Egg shaped Section= Carrying sewage
Effective in resisting external and internal pressures
Horse –shoe Section
1. Semi-circular roof with arched sides and curved
invert
2. Best shape for traffic purposes
3. Most suitable for soft rocks and carrying water or
sewage
4. Most widely used for highway and railway tunnels
25
Size of the Tunnel
1. Determined from utility aspect, Road tunnels –No.
of traffic lanes. Railway tunnels –Gauge & No. of
tracks
2. Thickness of lining. Provision for drainage
facilities
3. Clear opening required for traffic. Nature of traffic
26
Tunnelling methods:
Mechanical methods can be split further to partial
face (e.g. road headers, hammers, excavators) or full
face
(TBM, shield, pipe jacking, micro tunneling).
The drill & blast method is still the most typical
method for medium to hard rock conditions. It can
27
be applied to a wide range of rock conditions. Hard-
rock TBMs can be used in relatively soft to hard rock
conditions, and best when rock fracturing &
weakness zones are predictable. The TBM is most
economical method for longer tunnel lengths.
Drilling and blasting=drilling pattern design:
The drilling pattern ensures the distribution of the
explosive in the rock and desired blasting result.
28
Several factors must be taken into account when
designing the drilling pattern: rock drillability and
blastability, the type of explosives, blast vibration
restrictions and accuracy requirements of the blasted
wall etc.
Excavation of Tunnel:
1. Percussion drills (penetrate rock by impact action
alone)
2. Rotary drills (cut by turning a bit under pressure
against the rock face)
3. Rotary-Percussion drills (combine rotary and
percussion action)
29
4. Abrasion Drills –Shot, Diamond
5. Fusion Piercing
6. Special Drills –Implosion, Explosion
Blasting=Primary blasting vs Secondary blasting.
Types of Explosives= Straight Dynamites, Ammonia
Dynamites, Ammonia -Gelatine. Semi –Gelatine.
Blasting Agents, Slurries (mixture of explosives, gel
and water)
30
Theory of Blasting=Impact, Abrasion, Thermally
Induced Spalling, Fusion and Vaporization, Chemical
Reaction.
31
Nature of substratum=
A. Hard Rock or fully self-supporting
B. Soft Soils –requiring temporary supports during
and after construction.
Tunneling in soft soils:
Challenges, Preventing soil movements=Soil
pressure, Water seepage.
32
Tunnelling Techniques:
A. Cut and Cover( Supporting Beams,Roof lining)
33
34
B. Tunnel Shields
35
Tunnelling in Hard rocks-Influencing Factors
Type of rock, Igneous, Sedimentary,Metamorphic
Rock Hardness, Rock Brittleness.
Extent of existing fractures and planes of weakness.
Tunneling Methods in Hard Rocks:
Heating and quenching (old technique).
Immersed Tube :
A body of water such as a canal, channel, bay, or river
can be crossed using immersed tube tunnel
technology.
36
Tunnel Boring Machine (TBM)
37
38
Other Considerations:
• Protection of Structural Elements
• Fire Detection, Fire Protection (i.e., standpipe, fire
hydrants, water supply, portable fire extinguisher,
fixed waterbase, fire-fighting systems, etc.),
• Communication Systems,
• Traffic Control ,
39
• Tunnel Drainage System
• Emergency Egress,
• Electric, and Emergency response plan.
Tunnel Drainage: imp aspect to be studied.
Tunnel Portals=
Portals and ventilation shafts should satisfy
environmental and air quality.
Tunnel should be hazard free.

More Related Content

What's hot

Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine
mohammadsalikali
 
GEOTECHNICAL INVESTIGATIONS
GEOTECHNICAL INVESTIGATIONSGEOTECHNICAL INVESTIGATIONS
GEOTECHNICAL INVESTIGATIONS
KYI KHIN
 

What's hot (20)

Excavation of Tunnels
Excavation of TunnelsExcavation of Tunnels
Excavation of Tunnels
 
7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING
 
Tunneling
TunnelingTunneling
Tunneling
 
Tunnels concepts
Tunnels conceptsTunnels concepts
Tunnels concepts
 
Geological Considerations - Dam
Geological Considerations - DamGeological Considerations - Dam
Geological Considerations - Dam
 
Tunnel constructions
Tunnel constructionsTunnel constructions
Tunnel constructions
 
Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine
 
Geology of Dams & Reservoirs
Geology of Dams & ReservoirsGeology of Dams & Reservoirs
Geology of Dams & Reservoirs
 
Percussion drilling
Percussion drillingPercussion drilling
Percussion drilling
 
Tunnelling methods
Tunnelling methodsTunnelling methods
Tunnelling methods
 
2 tunnels
2 tunnels2 tunnels
2 tunnels
 
Slope stability
Slope stabilitySlope stability
Slope stability
 
Tunneling in soft ground and hard rock
Tunneling in soft ground and hard rockTunneling in soft ground and hard rock
Tunneling in soft ground and hard rock
 
Tunnelling
TunnellingTunnelling
Tunnelling
 
Rock Mass Classification
Rock Mass ClassificationRock Mass Classification
Rock Mass Classification
 
Tunnels and tunneling (Engineering Geology)
Tunnels and tunneling (Engineering Geology)Tunnels and tunneling (Engineering Geology)
Tunnels and tunneling (Engineering Geology)
 
GEOTECHNICAL INVESTIGATIONS
GEOTECHNICAL INVESTIGATIONSGEOTECHNICAL INVESTIGATIONS
GEOTECHNICAL INVESTIGATIONS
 
Embankment
EmbankmentEmbankment
Embankment
 
Subsurface Investigation
Subsurface InvestigationSubsurface Investigation
Subsurface Investigation
 
Geotechnical investigation
Geotechnical investigationGeotechnical investigation
Geotechnical investigation
 

Similar to Tunnels, types & importance

Tunnelling Methods.pdf
Tunnelling Methods.pdfTunnelling Methods.pdf
Tunnelling Methods.pdf
SuryoNegoro3
 

Similar to Tunnels, types & importance (20)

Tunnel Engineering.pptx
Tunnel Engineering.pptxTunnel Engineering.pptx
Tunnel Engineering.pptx
 
Lecture 6 p
Lecture 6 pLecture 6 p
Lecture 6 p
 
Tunneling exploration
Tunneling explorationTunneling exploration
Tunneling exploration
 
RMT Group5 presentation.pptx
RMT Group5 presentation.pptxRMT Group5 presentation.pptx
RMT Group5 presentation.pptx
 
Study of tunnel engineering
Study of tunnel engineeringStudy of tunnel engineering
Study of tunnel engineering
 
unit-vi-tunnels-alignments-tunneling-methods-highway-tunnels-r-bhagat-2020.ppt
unit-vi-tunnels-alignments-tunneling-methods-highway-tunnels-r-bhagat-2020.pptunit-vi-tunnels-alignments-tunneling-methods-highway-tunnels-r-bhagat-2020.ppt
unit-vi-tunnels-alignments-tunneling-methods-highway-tunnels-r-bhagat-2020.ppt
 
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
 
Megastructures design pdf
Megastructures design pdfMegastructures design pdf
Megastructures design pdf
 
hs chapter 1.pptx
hs chapter 1.pptxhs chapter 1.pptx
hs chapter 1.pptx
 
NATM ppt sumit
NATM ppt sumitNATM ppt sumit
NATM ppt sumit
 
A Review Study on Methods of Tunneling in Hard Rocks
A Review Study on Methods of Tunneling in Hard RocksA Review Study on Methods of Tunneling in Hard Rocks
A Review Study on Methods of Tunneling in Hard Rocks
 
UNDERGROUND-CONSTRUCTION.pptx
UNDERGROUND-CONSTRUCTION.pptxUNDERGROUND-CONSTRUCTION.pptx
UNDERGROUND-CONSTRUCTION.pptx
 
u1t4tunneling.pptx
u1t4tunneling.pptxu1t4tunneling.pptx
u1t4tunneling.pptx
 
Bridge Lecture Slide by Micotol
Bridge Lecture Slide by MicotolBridge Lecture Slide by Micotol
Bridge Lecture Slide by Micotol
 
UNIT-2.pptx
UNIT-2.pptxUNIT-2.pptx
UNIT-2.pptx
 
Advanced tunnel borring machine.ppt
Advanced tunnel borring machine.pptAdvanced tunnel borring machine.ppt
Advanced tunnel borring machine.ppt
 
Tunnelling Methods.pdf
Tunnelling Methods.pdfTunnelling Methods.pdf
Tunnelling Methods.pdf
 
Eurasia tunnel1
Eurasia tunnel1Eurasia tunnel1
Eurasia tunnel1
 
Underground construction
Underground constructionUnderground construction
Underground construction
 
Tunnel boring machines123
Tunnel boring machines123Tunnel boring machines123
Tunnel boring machines123
 

More from Prof. A.Balasubramanian

More from Prof. A.Balasubramanian (20)

E content development theory and practice
E content development theory and practiceE content development theory and practice
E content development theory and practice
 
Pedagogy for online teaching
Pedagogy for online teachingPedagogy for online teaching
Pedagogy for online teaching
 
Tools for conducting Virtual classes
Tools for conducting  Virtual classesTools for conducting  Virtual classes
Tools for conducting Virtual classes
 
Checklist for academic and administrative audit
Checklist for academic and administrative auditChecklist for academic and administrative audit
Checklist for academic and administrative audit
 
Framework for academic and administrative audit
Framework for academic and administrative auditFramework for academic and administrative audit
Framework for academic and administrative audit
 
Kannadada makkalu kavana autosaved
Kannadada makkalu kavana  autosaved Kannadada makkalu kavana  autosaved
Kannadada makkalu kavana autosaved
 
WATCHIT (Water Chemistry Interpretation Techniques) software summary
WATCHIT (Water Chemistry Interpretation Techniques) software summaryWATCHIT (Water Chemistry Interpretation Techniques) software summary
WATCHIT (Water Chemistry Interpretation Techniques) software summary
 
Methods of water conservation
Methods of water conservationMethods of water conservation
Methods of water conservation
 
Modern Trends in Hydrogeology
Modern Trends in HydrogeologyModern Trends in Hydrogeology
Modern Trends in Hydrogeology
 
Climatic extremes
Climatic extremesClimatic extremes
Climatic extremes
 
WATER RESOURCES PLANNING AND MANAGEMENT POSSIBILITIES IN CHAMARAJANAGAR TALUK...
WATER RESOURCES PLANNING AND MANAGEMENT POSSIBILITIES IN CHAMARAJANAGAR TALUK...WATER RESOURCES PLANNING AND MANAGEMENT POSSIBILITIES IN CHAMARAJANAGAR TALUK...
WATER RESOURCES PLANNING AND MANAGEMENT POSSIBILITIES IN CHAMARAJANAGAR TALUK...
 
Basics of Cultural Geography
Basics of Cultural Geography Basics of Cultural Geography
Basics of Cultural Geography
 
Ore bearing fluids
Ore bearing fluidsOre bearing fluids
Ore bearing fluids
 
Ict for teaching learning 2018
Ict for teaching learning 2018Ict for teaching learning 2018
Ict for teaching learning 2018
 
Characteristics of soils
Characteristics of soilsCharacteristics of soils
Characteristics of soils
 
GIS TECHNIQUES IN WATER RESOURCES PLANNING AND MANAGEMENT IN CHAMARAJANAGAR ...
 GIS TECHNIQUES IN WATER RESOURCES PLANNING AND MANAGEMENT IN CHAMARAJANAGAR ... GIS TECHNIQUES IN WATER RESOURCES PLANNING AND MANAGEMENT IN CHAMARAJANAGAR ...
GIS TECHNIQUES IN WATER RESOURCES PLANNING AND MANAGEMENT IN CHAMARAJANAGAR ...
 
POTENTIAL BIOMEDICAL APPLICATIONS OF METALLIC NANOBIOMATERIALS: A REVIEW
 POTENTIAL BIOMEDICAL APPLICATIONS OF METALLIC NANOBIOMATERIALS: A REVIEW POTENTIAL BIOMEDICAL APPLICATIONS OF METALLIC NANOBIOMATERIALS: A REVIEW
POTENTIAL BIOMEDICAL APPLICATIONS OF METALLIC NANOBIOMATERIALS: A REVIEW
 
BIOMEDICAL APPLICATIONS OF CERAMIC NANOMATERIALS: A REVIEW
 BIOMEDICAL APPLICATIONS OF CERAMIC NANOMATERIALS: A REVIEW BIOMEDICAL APPLICATIONS OF CERAMIC NANOMATERIALS: A REVIEW
BIOMEDICAL APPLICATIONS OF CERAMIC NANOMATERIALS: A REVIEW
 
Use of toposheets in civil engineering projects
Use of toposheets in civil engineering projectsUse of toposheets in civil engineering projects
Use of toposheets in civil engineering projects
 
India major forest types
India major forest typesIndia major forest types
India major forest types
 

Recently uploaded

Bacterial Identification and Classifications
Bacterial Identification and ClassificationsBacterial Identification and Classifications
Bacterial Identification and Classifications
Areesha Ahmad
 
Formation of low mass protostars and their circumstellar disks
Formation of low mass protostars and their circumstellar disksFormation of low mass protostars and their circumstellar disks
Formation of low mass protostars and their circumstellar disks
Sérgio Sacani
 
Presentation Vikram Lander by Vedansh Gupta.pptx
Presentation Vikram Lander by Vedansh Gupta.pptxPresentation Vikram Lander by Vedansh Gupta.pptx
Presentation Vikram Lander by Vedansh Gupta.pptx
gindu3009
 
Hubble Asteroid Hunter III. Physical properties of newly found asteroids
Hubble Asteroid Hunter III. Physical properties of newly found asteroidsHubble Asteroid Hunter III. Physical properties of newly found asteroids
Hubble Asteroid Hunter III. Physical properties of newly found asteroids
Sérgio Sacani
 

Recently uploaded (20)

Botany 4th semester series (krishna).pdf
Botany 4th semester series (krishna).pdfBotany 4th semester series (krishna).pdf
Botany 4th semester series (krishna).pdf
 
Isotopic evidence of long-lived volcanism on Io
Isotopic evidence of long-lived volcanism on IoIsotopic evidence of long-lived volcanism on Io
Isotopic evidence of long-lived volcanism on Io
 
GBSN - Microbiology (Unit 1)
GBSN - Microbiology (Unit 1)GBSN - Microbiology (Unit 1)
GBSN - Microbiology (Unit 1)
 
Recombinant DNA technology (Immunological screening)
Recombinant DNA technology (Immunological screening)Recombinant DNA technology (Immunological screening)
Recombinant DNA technology (Immunological screening)
 
9654467111 Call Girls In Raj Nagar Delhi Short 1500 Night 6000
9654467111 Call Girls In Raj Nagar Delhi Short 1500 Night 60009654467111 Call Girls In Raj Nagar Delhi Short 1500 Night 6000
9654467111 Call Girls In Raj Nagar Delhi Short 1500 Night 6000
 
Botany krishna series 2nd semester Only Mcq type questions
Botany krishna series 2nd semester Only Mcq type questionsBotany krishna series 2nd semester Only Mcq type questions
Botany krishna series 2nd semester Only Mcq type questions
 
Bacterial Identification and Classifications
Bacterial Identification and ClassificationsBacterial Identification and Classifications
Bacterial Identification and Classifications
 
Nanoparticles synthesis and characterization​ ​
Nanoparticles synthesis and characterization​  ​Nanoparticles synthesis and characterization​  ​
Nanoparticles synthesis and characterization​ ​
 
Recombination DNA Technology (Nucleic Acid Hybridization )
Recombination DNA Technology (Nucleic Acid Hybridization )Recombination DNA Technology (Nucleic Acid Hybridization )
Recombination DNA Technology (Nucleic Acid Hybridization )
 
Formation of low mass protostars and their circumstellar disks
Formation of low mass protostars and their circumstellar disksFormation of low mass protostars and their circumstellar disks
Formation of low mass protostars and their circumstellar disks
 
Creating and Analyzing Definitive Screening Designs
Creating and Analyzing Definitive Screening DesignsCreating and Analyzing Definitive Screening Designs
Creating and Analyzing Definitive Screening Designs
 
PossibleEoarcheanRecordsoftheGeomagneticFieldPreservedintheIsuaSupracrustalBe...
PossibleEoarcheanRecordsoftheGeomagneticFieldPreservedintheIsuaSupracrustalBe...PossibleEoarcheanRecordsoftheGeomagneticFieldPreservedintheIsuaSupracrustalBe...
PossibleEoarcheanRecordsoftheGeomagneticFieldPreservedintheIsuaSupracrustalBe...
 
CELL -Structural and Functional unit of life.pdf
CELL -Structural and Functional unit of life.pdfCELL -Structural and Functional unit of life.pdf
CELL -Structural and Functional unit of life.pdf
 
Pulmonary drug delivery system M.pharm -2nd sem P'ceutics
Pulmonary drug delivery system M.pharm -2nd sem P'ceuticsPulmonary drug delivery system M.pharm -2nd sem P'ceutics
Pulmonary drug delivery system M.pharm -2nd sem P'ceutics
 
Presentation Vikram Lander by Vedansh Gupta.pptx
Presentation Vikram Lander by Vedansh Gupta.pptxPresentation Vikram Lander by Vedansh Gupta.pptx
Presentation Vikram Lander by Vedansh Gupta.pptx
 
All-domain Anomaly Resolution Office U.S. Department of Defense (U) Case: “Eg...
All-domain Anomaly Resolution Office U.S. Department of Defense (U) Case: “Eg...All-domain Anomaly Resolution Office U.S. Department of Defense (U) Case: “Eg...
All-domain Anomaly Resolution Office U.S. Department of Defense (U) Case: “Eg...
 
Hire 💕 9907093804 Hooghly Call Girls Service Call Girls Agency
Hire 💕 9907093804 Hooghly Call Girls Service Call Girls AgencyHire 💕 9907093804 Hooghly Call Girls Service Call Girls Agency
Hire 💕 9907093804 Hooghly Call Girls Service Call Girls Agency
 
VIRUSES structure and classification ppt by Dr.Prince C P
VIRUSES structure and classification ppt by Dr.Prince C PVIRUSES structure and classification ppt by Dr.Prince C P
VIRUSES structure and classification ppt by Dr.Prince C P
 
Hubble Asteroid Hunter III. Physical properties of newly found asteroids
Hubble Asteroid Hunter III. Physical properties of newly found asteroidsHubble Asteroid Hunter III. Physical properties of newly found asteroids
Hubble Asteroid Hunter III. Physical properties of newly found asteroids
 
Nightside clouds and disequilibrium chemistry on the hot Jupiter WASP-43b
Nightside clouds and disequilibrium chemistry on the hot Jupiter WASP-43bNightside clouds and disequilibrium chemistry on the hot Jupiter WASP-43b
Nightside clouds and disequilibrium chemistry on the hot Jupiter WASP-43b
 

Tunnels, types & importance

  • 1. 1 TUNNELS, TYPES & IMPORTANCE by Prof. A. Balasubramanian Centre for Advanced Studies in Earth Science UNIVERSITY OF MYSORE MYSORE-6
  • 2. 2 Introduction: Tunnel is an artificially constructed underground passage to by- pass obstacles safely without disturbing the over burden. Open Cut is an open to sky passage excavated through huge soil mass of obstacle in required directions to connect two roads or railways. Bridge is an over-ground construction to cross over obstacles without disturbing the natural way below it.
  • 3. 3 Tunnels are underground passages for Road or rail traffic, Pedestrians, Utilities, Fresh water or sewer lines.
  • 4. 4
  • 5. 5
  • 6. 6
  • 7. 7
  • 8. 8 Ratio of length to width, in a tunnel , should always be at least in 2: 1. A tunnel must be completely enclosed on all sides along the length. The types of tunnels are classified based on three aspects: Based on purpose (road, rail, utilities), Based on surrounding material (soft clay vs. hard rock ) & Submerged tunnels. Egyptians and Babylonians constructed tunnels about 4000 years ago with a length of 910 m , width –of 3600 mm and a height of 4500mm.
  • 9. 9 The Channel Tunnel was constucted by linking Britain & France way back in 1994. The total length was about 50 km ; undersea component itself is about 39 km. The primary objectives of the tunnel alignments are to: 1. Reduce transit trip times; 2. Increase quality and reliability of service; and 3. Minimize impacts of surface transit operations in sensitive locations.
  • 10. 10 Economics of Tunnelling depend on: Nature of Soil/ rock, Requirements of fill, Depth of cut > 18m –tunneling. Tunnelling is desirable when Rapid transport facilities are required which needs to avoid acquisition of land for roads. Tunnels are also erected when shortest route connection is needed in cities. Tunnels permit easy gradient & encourage high speed on strategic routes.
  • 11. 11 Tunnel Design Criteria Tunnelling requires proper design. Every tunnel will have its own geometry, design, alignment, and construction methods. The tunnel design criteria include the following: Spatial Requirements; Alignment; Underground Stations; Fire Life Safety; and Tunnel Systems and Operation.
  • 12. 12 Every tunnel will have its own horizontal and vertical alignment, Tunnel Ventilation, Tunnel Lighting, Electrical and Safety Equipment, Drainage, Fire Life Safety, Security. The following factors should be taken into consideration when selecting the method: - Tunnel dimensions, - Tunnel geometry - Length of tunnel, total volume to be excavated - Geological and rock mechanical conditions - Ground water level and expected water inflow - Vibration restrictions & - Allowed ground settlements.
  • 13. 13 Selection of Tunnel alignment depends on 1. Topography of area & points of entrance and exit, 2. Selection of site of tunnel to be made considering two points. 3. Alignment Restraints 4. Environmental Considerations. Tunnel portal – the interface point of the open cut and the cut and cover tunnel.
  • 14. 14 Classification of Tunnels= Based on Alignment 1. Off-Spur tunnels : Short length tunnels to negotiate minor obstacles. 2. Saddle or base tunnels : tunnels constructed in valleys along natural slope . 3. Slope tunnels : constructed in steep hills for economic and safe operation . 4. Spiral Tunnels : constructed in narrow valleys in form of loops in interior of mountains so as to increase length of tunnel to avoid steep slopes.
  • 15. 15 Classification of Tunnels= Based on purpose Conveyance Tunnels & Traffic Tunnels. Based on type of material met with in construction 1. Tunnels in Hard Rock 2. Tunnels in Soft materials 3. Tunnels in Water Bearing Soils Investigations: Investigations prior to planning A. Geological Investigations –relation between bed rock and top soil.
  • 16. 16 B. Morphology, Petrology, Stratigraphy C. Electrical Resistivity Methods –positions of weak zones -faults, folds and shear zones
  • 17. 17 Investigations made at time of planning
  • 18. 18 1. Drilling holes by percussion, rotary percussion and rotary 2. Rotary or Rotary Percussion methods –loose soils 3. Rotary Drilling –rocky soils 4. Spacing –300-500m ; reduced to 50-100 m in geologically disturbed areas. Lateral Spacing –10- 15m from C/L of tunnel. 5. Depth –20-50 m deeper than proposed invert level of tunnel. For detailed undisturbed observations, shafts can be excavated .
  • 19. 19 Shafts –vertical or inclined tunnel excavated to reach and to get information for the area surrounding proposed tunnel and tunnel section 6. Section of 3m x 1.5 m to 3 m x 2m. Minimum depth of excavation. Temporary and Permanent Shafts Setting out of a tunnel 1. Setting Out -Making the centre line or alignment of any construction work on ground 2. Setting out centre line of tunnel by 4 stages:
  • 20. 20 3. Setting out tunnel on ground surface 4. Transfer of Centre line from surface to underground 5. Underground setting out 6. Underground Leveling Setting out of the tunnel on the ground surface: Running an open traverse between two ends of proposed tunnel. Curved alignment: Heading consist of short tangent to curve alignment . Offsets measured from these tangents.
  • 21. 21 Transfer of centre line from the surface to the underground: 1. Underground shafts –interval of 500 m along transverse lines 2. Rectangular Horizontal frame set at proposed location along AB 3. On two sides of the frame, iron plates are fixed and screwed down & holes are drilled along A and B at X & Y 4. Plumb bobs are suspended to define vertical lines
  • 22. 22 Shape of tunnels D or Segmental Roof Section 1. Suitable for sub-ways or navigation tunnels 2. Additional Floor Space and flat floor for moving equipment.
  • 23. 23 Circular Section 1. To withstand heavy internal or external radial pressures 2. Best theoretical section for resisting forces 3. Greatest C/s Area for least perimeter 4. Sewers and water carrying purposes Rectangular Section Suitable for hard rocks, Adopted for pedestrian traffic Costly & difficult to construct
  • 24. 24 Egg shaped Section= Carrying sewage Effective in resisting external and internal pressures Horse –shoe Section 1. Semi-circular roof with arched sides and curved invert 2. Best shape for traffic purposes 3. Most suitable for soft rocks and carrying water or sewage 4. Most widely used for highway and railway tunnels
  • 25. 25 Size of the Tunnel 1. Determined from utility aspect, Road tunnels –No. of traffic lanes. Railway tunnels –Gauge & No. of tracks 2. Thickness of lining. Provision for drainage facilities 3. Clear opening required for traffic. Nature of traffic
  • 26. 26 Tunnelling methods: Mechanical methods can be split further to partial face (e.g. road headers, hammers, excavators) or full face (TBM, shield, pipe jacking, micro tunneling). The drill & blast method is still the most typical method for medium to hard rock conditions. It can
  • 27. 27 be applied to a wide range of rock conditions. Hard- rock TBMs can be used in relatively soft to hard rock conditions, and best when rock fracturing & weakness zones are predictable. The TBM is most economical method for longer tunnel lengths. Drilling and blasting=drilling pattern design: The drilling pattern ensures the distribution of the explosive in the rock and desired blasting result.
  • 28. 28 Several factors must be taken into account when designing the drilling pattern: rock drillability and blastability, the type of explosives, blast vibration restrictions and accuracy requirements of the blasted wall etc. Excavation of Tunnel: 1. Percussion drills (penetrate rock by impact action alone) 2. Rotary drills (cut by turning a bit under pressure against the rock face) 3. Rotary-Percussion drills (combine rotary and percussion action)
  • 29. 29 4. Abrasion Drills –Shot, Diamond 5. Fusion Piercing 6. Special Drills –Implosion, Explosion Blasting=Primary blasting vs Secondary blasting. Types of Explosives= Straight Dynamites, Ammonia Dynamites, Ammonia -Gelatine. Semi –Gelatine. Blasting Agents, Slurries (mixture of explosives, gel and water)
  • 30. 30 Theory of Blasting=Impact, Abrasion, Thermally Induced Spalling, Fusion and Vaporization, Chemical Reaction.
  • 31. 31 Nature of substratum= A. Hard Rock or fully self-supporting B. Soft Soils –requiring temporary supports during and after construction. Tunneling in soft soils: Challenges, Preventing soil movements=Soil pressure, Water seepage.
  • 32. 32 Tunnelling Techniques: A. Cut and Cover( Supporting Beams,Roof lining)
  • 33. 33
  • 35. 35 Tunnelling in Hard rocks-Influencing Factors Type of rock, Igneous, Sedimentary,Metamorphic Rock Hardness, Rock Brittleness. Extent of existing fractures and planes of weakness. Tunneling Methods in Hard Rocks: Heating and quenching (old technique). Immersed Tube : A body of water such as a canal, channel, bay, or river can be crossed using immersed tube tunnel technology.
  • 37. 37
  • 38. 38 Other Considerations: • Protection of Structural Elements • Fire Detection, Fire Protection (i.e., standpipe, fire hydrants, water supply, portable fire extinguisher, fixed waterbase, fire-fighting systems, etc.), • Communication Systems, • Traffic Control ,
  • 39. 39 • Tunnel Drainage System • Emergency Egress, • Electric, and Emergency response plan. Tunnel Drainage: imp aspect to be studied. Tunnel Portals= Portals and ventilation shafts should satisfy environmental and air quality. Tunnel should be hazard free.