1) Height of Collimation method
2) Rise and Fall method

Published in: Education
  • Login to see the comments

Site Surveying Report - Traversing

  1. 1. SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN BACHELOR OF QUANTITY SURVEYING (HONOURS) QSB1813 – Site Surveying Field Work Report I Levelling August Semester 2015 Submission Date: 2nd July 2015 Name Student ID Marks Khoo Xin Yee 0316180 Lai Chun Foon 0315150 Hoo Bung Jiat 0314504 Kaligan 0305861
  2. 2. 2 Content Page Cover Page 1 Table of Content 2 1.0 Introduction to Leveling 3 1.1 Definition of Leveling 3 - 4 1.2 Definition of Terms Used in Leveling 4 - 6 1.3 Differential Leveling 7 - 8 1.4 Vertical Control Surveys 9 - 10 1.5 Arithmetical Check 10 2.0 Outline of Apparatus 11 2.1 Automatic Level 11 - 12 2.2 Adjustable Leg-Tripod 13 -14 2.3 Leveling Rod 14 - 15 2.4 Optical Plummet 16 2.5 Bull’s Eye Level 17 3.0 Objectives 18 4.0 Leveling Fieldwork 19 5.0 Field Data 20 - 21 5.1 Rise and Fall Method 20 - 21 6.0 Adjusted Data 22 6.1 Rise and Fall Method 22 7.0 Conclusion 23 8.0 Discussion and Recommendation 24
  3. 3. 3 1.0 Introduction To Leveling 1.1 Definition of Leveling Figure 1.0: Leveling Source: http://www.pebblesrealty.com/images/slide2.jpg Leveling is the process of finding the elevation at a specified location relative to another known elevation. Levelling is the determination of the elevation of a point or difference between points referenced to some datum. The general term applied to any of the various processes by which elevations of points or differences in elevation are determined. It is a vital operation in producing necessary data for mapping, engineering design, and construction. Levelling results are used to: (1) Design highways, railroads, canals, sewers, water supply systems, and other facilities having grade line that best conform to existing topography (2) Lay out construction projects according to planned elevations (3) Calculate volumes of earthwork and other materials (4) Investigate drainage characteristics of an area
  4. 4. 4 (5) Develop maps showing general ground configurations (6) Study earth subsidence and crustal motion 1.2 Definition Of Term Used in Leveling Figure 1.3: Leveling Terms Source: https://buildcivil.files.wordpress.com/2013/12/2.png Level surface: It is any surface parallel to the mean spheroidal surface of the earth e.g. surface of a still lake. Since the earth is an oblate spheroid, a level surface may be regarded as a curved surface, every point on which is equidistant from the center of the earth. It is normal to the plumb line at all points. Level line: It is a line lying in a level surface. It is therefore, normal to the plumb line at all points. Horizontal plane: It is a plane tangential to the level surface at that point. It is perpendicular to direction of gravity (plumb line).
  5. 5. 5 Horizontal line: It is any line lying in the horizontal plane. It is a straight line tangential to a level line. Vertical line: It is a line normal to the level surface through that point e. g. a plumb line. Vertical plane: It is a plane containing a vertical line. Vertical angle: Angle between two intersecting lines in a vertical plane, one of the two lines is commonly taken as horizontal in surveying. Datum surface or line: It is any arbitrarily assumed level surface or line from which vertical distances are measured in India the datum adopted for G.T.S. bench marks is the mean sea level at Karachi now in Pakistan. Elevation: It is vertical distance of a point above or below the datum. It is also known as the reduced level. (R.L.) The elevation of a point is plus or minus according as the point is above or below the datum. Difference in elevation (H): It is the vertical distance between the level surfaces passing through the two different points. Bench-mark (B.M.): It is fixed reference point of known elevation. Temporary benchmark (T.B.M.): A bench-mark set up by the surveyor for his own use for particular task.
  6. 6. 6 The line of collimation: It is the line joining the intersection of cross hairs of the optical center of the object glass. It is also called the line of sight. An axis of the telescope: It is a line joining the optical center of the object glass to the center of the eye piece. Foresight (F.S.): It is also called foresight reading. It is a staff (or rod) reading on a point whose elevation is to be determined or on a change point. It is also termed as minus sight. It is the last staff reading denoting the shifting of the instrument. Intermediate Sight (I. S.): It is any other staff reading taken on appoint of unknown elevation from the same set up of the level. All sights taken between the back sight and the fore sight and the foresight are intermediate sights. Change Point (C. P.) or Turning Point: It is appoint denoting the shifting of the level. It is a point on which is the fore and back sights are taken. Any stable and well defined object such as a boundary stone, curb stone rail, rock etc. is used as a change point. A bench mark may also be taken as a changer point. A Station: It is a point whose elevation is to be determined. It may be noted that it is a point where the staff is held not the point where they leveled is set up. Height of instrument (H. L): It is the elevation (or the R.L.) of the plane of collimation (or plane of sight) when the instrument is correctly leveled. It is also called the height of plane of the collimation.
  7. 7. 7 1.3 Differential Leveling Differential leveling is the process of measuring vertical distances from a known elevation point to determine elevations of unknown points. The most common methods to determine elevation are through the use of:  A compensator type, automatic (engineering level) and level rod(s).  An electronic digital barcode leveling instrument with barcode rod. A thorough knowledge of leveling principles and proper application of methods and equipment will prevent costly delays and generate the needed results and accuracy. Figure: 1.4: Illustration of Differential Level Source: http://onlinemanuals.txdot.gov/txdotmanuals/ess/images/ess_fig4-3_differential_leveling.jpg The method in Figure 1.4 uses the difference in elevation between a known elevation and the height of the instrument, and then the difference in elevation from the height of instrument to an unknown elevation point. A Summary of the Differential Process  A Level is setup between two points, one whose elevation is known. Figure 1.5: Differential Leveling Process Source: http://jerrymahun.com/library/Elev/b.htm#B
  8. 8. 8  A backsight (BS) reading is taken on the known point to determine how far above it the LoS is. Adding the BS reading to the point elevation gives the elevation of the instrument (EI). Figure 1.6: Differential Leveling Process Source: http://jerrymahun.com/library/Elev/b.htm#B  A foresight (FS) reading is taken on the unknown point to determine how far above it the LoS is. Subtracting the FS reading from the instrument elevation gives the point elevation. Figure 1.6: Differential Leveling Process Source: http://jerrymahun.com/library/Elev/b.htm#B  The Level is moved to a position between B and the next point and the process repeated.
  9. 9. 9 1.4 Vertical Control Surveys 1.4.1 Height of Collimation Method As explained earlier, the height of instrument (HI), e.g. the height of line of collimation above BM (station of known level) at every instrument station is determined through adding the backsight of BM station to decreased level of BM. From this height of instrument at a particular instrument station, decreased levels of all the station points on ground are computed through substracting foresight of that particular station from HI, i.e. HI of instrument = RL of Bench mark + BS of BM RL of intermediate point = HI - FS at intermediate station = HI - IS While the instrument is shifted to its second position, height of instrument at new set up station is needed to be determined. This is achieved through correlating the levels of two collimation planes (first and second position) through foresight of change point from first setup station and backsight of same change point from second setup station, as given below: RL of change point C = RL of A + BS at A - FS at C HI (at second station O2) = RL of C + BS at C With instrument set up at second station (say O2), staff readings at new system of intermediate stations are taken before shifting the instrument at next set up station (O3). This process is continuously repeated till the levelling exercise is done, and all the required decreased levels are acquired. 1.4.2 Rise and Fall Method On the other hand of finding the instrument height at a setup station, the difference between consecutive points is obtained from their staff readings with that immediately preceding it. The difference denotes a rise or a fall. The decrease level of each point is then acquired by adding the rise to or
  10. 10. 10 subtracting the fall from the RL of the preceding point. The arithmetic check in this method is as follows: ∑ BS - ∑ FS = ∑ Rise - ∑ Fall = Last RL - First RL 1.5 Arithmetical Check An arithmetical check should be applied either at the end of the operation or the end of each page when entries are carried forward over several pages to avoid any possible error. 1.5.1 Height of collimation method The sum of each collimation height multiplied by the number of reduced levels obtained from it is equal to the sum of all the intermediate sights, foresights and reduced levels excluding the first reduced level. ∑(BS) – ∑(FS) = Last RL – First RL 1.5.2 Rise and fall method The sum of the back-sights minus the sum of the foresight is equal to the sum of the rises minus the sum of the falls and is also equal to the first reduced level minus the last reduced level. ∑(BS) – ∑(FS) = ∑(R) – ∑(F) = Last RL – First RL
  11. 11. 11 2.0 Outline of Apparatus 2.1 Automatic Level Figure 1.7: Automatic Level Source: http://dir.indiamart.com/mumbai/automatic-level-instrument.html Automatic level is designed for surveyors, builders, engineers, and other construction professionals. It is a self-leveling optical instrument for accurately measuring horizontal planes and angles at both long and short distances. Quick to set up and easy to use, an automatic level instrument has a built-in compensator that takes over and precisely levels itself. It gets its name from an internal compensation system which maintains a horizontal LoS automatically if the instrument is disturbed. The compensation system consists of combinations of fixed and free swinging prisms and mirrors. When the instrument is level the LoS is horizontal. The cross-sectional view in Figure 1.7 shows how the incoming horizontal LoS is reflected and refracted and emerges at the eyepiece in a parallel path.
  12. 12. 12 Figure 1.7: Automatic Level Compensator Source: http://jerrymahun.com/library/Elev/b.htm#B If the instrument is disturbed to an out of level condition, the compensator moves to ensure the outgoing LoS is parallel to that of the incoming horizontal LoS, Figure 1.8. Figure 1.8: Compensator Correction Source: http://jerrymahun.com/library/Elev/b.htm#B The instrument is leveled using a circular bubble. The etched circle on the bubble glass is a general indicator of the compensator's operating range. If the bubble is outside the circle, the compensator may be at its physical limit and unable to maintain a horizontal LoS.
  13. 13. 13 2.2 Adjustable Leg-Tripod Figure 1.9: Tripod Source: http://www.allenprecision.com/survey/robotic-total-stations/accessories/tripods A tripod is a three-legged support platform for the level. The tripod's primary material can be wood, metal, fiberglass, or plastic; its legs fixed length or extendable. A tripod usually has a flat top and a mounting screw for instrument attachment. 
 The primary function of the tripod is to ensure a stable instrument setup for reliable measurements. Figure 1.10: Tripod adjustable leg Source: http://www.levelling.uhi.ac.uk/tutorial1_1.html
  14. 14. 14 According to Figure 1.10 above, each leg of a tripod is adjustable for length. The legs are locked by a lever clamp (left) or screw (right). Once the legs have been set to the correct length it is important that the locking lever or screw is tight. Otherwise, the leg may move in use which means the instrument will have to be set up again, and all readings taken again as the instrument height will have changed. 2.3 Leveling Rod Figure 1.11: Level Rod Source: http://www.allenprecision.com/media/catalog/product/cache/2/image/650x/040ec09b1e35df139433887a 97daa66f/c/s/cst_06-X05M.jpg A leveling rod is a surveying tool used to take elevation measurements for the purpose of profiling a section of terrain. There are a number of basic designs available, including versions for optical and digital sighting and record keeping. The rod can be constructed of wood, metal, or fiberglass. Most rods telescope or extend in order to allow large elevation differences yet collapse into a compact form. There are many width and gradation styles depending on application. The most universal design is the Philadelphia rod, a portion of which is shown in Figure 1.11.
  15. 15. 15 Figure 1.12: Philadelphia Rod Source: http://jerrymahun.com/library/Elev/b.htm The red numbers are the full foot readings. The black numbers are the 0.1 ft readings. The bars are each 0.01 ft tall and spaced 0.01 ft apart. The peaks on the bars correspond to the adjacent 0.1 or foot reading. A peak without an adjacent number corresponds to a half-tenth or 0.05 ft. At distances up to about 300 feet, a Philadelphia rod can be read directly to 0.01 ft.
  16. 16. 16 2.4 Tribrach / Optical Plummet Figure 1.13: Tribrach Source: http://www.ebay.com/sch/sis.html?_nkw=leica%20tribrach%20gdf111%201%20with%20optical%20plum met%20for%20total%20station%20surveying&_itemId=140696351530 A tribrach is the detachable base of all automatic level, theodolites, total stations, forced centering targets, and most EDM’s. Tribrachs are equipped with a bulls eye bubble for leveling and optical plummets for setting up precisely on a survey mark. The discussion on tribrachs is conducted in a separate section because they are being used with a wide variety of surveying equipment. The ability to "leapfrog" backsight, instrument point and foresight by using interchangeable tribrachs increases the speed, efficiency and accuracy of the traverse survey. Whenever possible, the tribrach should be detached from the instruments and placed on the tripods for either theodolite or EDM setups. This procedure speeds up the setting up process and protects the instrument from accidents. In some cases, the same tribrach can be used to perform angular or distance measurements, as well as GPS observations from the same survey point.
  17. 17. 17 2.5 Bull’s Eye Level or Horizontal Bubble Level Figure 1.14: Bull’s Eye Level Source: http://www.benchmarkarizona.com/Level_Rods-8-29.html The bull's eye level is used for maintaining both level rods and sighting poles in a vertical position. An out of adjustment bull's eye level can cause accumulative error in level lines. Although the sighting pole is infrequently used for traversing, an out of adjustment bull's eye level used on sighting poles can cause errors in both angle and distance measurements. A simple method for checking for gross error in bull's eye level adjustment is to check it against a previously checked door jamb or other permanent building part. Other, more elaborate, checking procedures can be developed using plumb lines or other devices.
  18. 18. 18 3.0 Objectives  To learn the basic levelling principles, theory and applications and to be able to book and reduce the levelling data.  To enhance the students’ knowledge in the leveling procedure.  To experience the measurement of vertical distance by leveling.  To understand the correct method of setting up automatic level, tripod stand and other instruments.  To take and record back sight (BS), intermediate sight (IS) and fore sight (FS) with the corrected readings.  To understand the bookings in leveling.  To learn and undertake site measurements and calculations using proper equation table.  To determine the error of misclosure in order to determine if the leveling is acceptable.  To identify the reduced level of each staff station.  To plot a longitudinal profile and cross section with a suitable scale.
  19. 19. 19 4.0 Leveling Fieldwork (Taylor’s Univeristy Lakeside Campus Carpark) Figure 1.14: Fieldwork (Carpark) – plan of the checkpoints Source: http://dearasis.blogspot.com/2010/02/taylors-lakeside-campus.html CARPARK AREA
  20. 20. 20 5.0 Field Data 5.1 Rise and Fall Method BS IS FS Rise Fall R.L. Remarks 1.116 100.000 BM 1 3.231 0.974 0.142 100.142 TP 1 1.086 1.159 2.072 102.214 TP 2 1.026 1.189 0.103 102.111 TP 3 1.391 1.059 0.033 102.078 TP 4 0.726 1.094 0.297 102.375 TP 5 1.101 0.979 0.253 102.122 TP 6 1.186 0.904 0.197 102.319 TP 7 1.126 1.234 0.048 102.271 TP 8 0.996 0.969 0.157 102.428 TP 9 0.951 3.359 2.363 100.065 TP 10 0.999 0.048 100.017 BM 1 ∑BS=13.936 ∑FS=13.919 ∑Rise=2.865 ∑Fall=2.848
  21. 21. 21 Arithmetical Check: ∑BS - ∑FS = ∑Rise - ∑Fall = Last Reduced Level Reading - First Reduced Level Reading ∑BS - ∑FS = 13.936 – 13.919 = + 0.017 ∑Rise - ∑Fall = 2.865 - 2.848 = + 0.017 Last Reduced Level Reading - First Reduced Level Reading 100.017 - 100.000 = + 0.017 Acceptable Misclosure = ±12√k K= the number of set-ups ±12√11 = 39.799 mm (* If the error is bigger than 39.799 mm, then the levelling is not acceptable) Therefore, the leveling is acceptable.
  22. 22. 22 6.0 Adjusted Data 6.1 Rise and Fall Method Correction = Cumulative distance ÷ Total distance × Error Correction per set-up = Error of misclosure ÷ Number of set up = (100.0000 - 100.017) ÷ 11 = - 0.0015 m BS IS FS Rise Fall R.L. Adj. Final R.L. Remarks 1.116 100.000 100.000 BM 1 3.231 0.974 0.142 100.142 -0.0015 100.141 TP 1 1.086 1.159 2.072 102.214 -0.0030 102.211 TP 2 1.026 1.189 0.103 102.111 -0.0045 102.066 TP 3 1.391 1.059 0.033 102.078 -0.0060 102.072 TP 4 0.726 1.094 0.297 102.375 -0.0075 102.368 TP 5 1.101 0.979 0.253 102.122 -0.0090 102.113 TP 6 1.186 0.904 0.197 102.319 -0.0105 102.309 TP 7 1.126 1.234 0.048 102.271 -0.0120 102.259 TP 8 0.996 0.969 0.157 102.428 -0.0135 102.415 TP 9 0.951 3.359 2.363 100.065 -0.0150 100.050 TP 10 0.999 0.048 100.017 -0.0170 100.000 BM 1
  23. 23. 23 7.0 Conclusion In this leveling fieldwork, we have learnt the procedure of leveling throughout the car park area. Initially, the given reduced level of Bench Mark 1 (BM 1) is 100.00 m. The leveling process begins with obtaining the backsight (BS) of BM1 and the foresight (FS) of turning point 1 (TP 1). Then we shifted the auto level to obtain the backsight (BS) of turning point (TP 1) and the foresight (FS) of turning point 2 (TP 2). This process is repeated by shifting the auto level to obtain the backsight (BS) and foresight (FS) of the following staff stations. After that we went back to Bench Mark 1 (BM 1) in order to obtain its FS in order to calculate the error of misclosure. After completed the leveling, we decided to use the rise and fall method to calculate the reduced level of each staff station. Our error of collected data misclosure is 0.018 mm. According to the third order of accuracy, the maximum allowable error of closure is ±39.80mm by using the formulae of ±12√k, where k represents the number of set-ups. Thus, our leveling result is acceptable. Hence, the reduced level is able to be equivalent to the benchmark given which is 100.00 m by distributing the error to each set-up. As a future Quantity Surveyor, it is essential for us to learn some of the knowledge of site surveying which is inter-related to the construction process. Surveying is the technique, profession, and science of determining the dimensions and contour of the Earth's surface. Using specialized surveying equipment such as automatic level, leveling rod, tripod and so on, professional surveyors determine land boundaries for a variety of important reasons. One of the most common reasons for a consumer to acquire the assistance of a surveyor is the acquisition of a new piece of land, as it has to be legally determined where one person's property ends and another begins for government issued deeds. Additionally, surveyors work with cartographers to create accurate maps.
  24. 24. 24 8.0 Discussion and Recommendation 1 Avoid taking measurement near magnetic sources such as hand phone, watch, electric cable and etc. 2 Make sure the bubbles are properly level. 3 Triple check with the work and reading. 4 Make sure the plum bob properly centered over the peg.

×