• The Public Works Department has a glorious history in the
development of the state since pre independence. The
department is entrusted with construction, maintenance of
Roads, Bridges and Govt. buildings.
• It also acts as Technical Advisor to the State Government in
these matters. Initially, Irrigation, Public Health engineering
were units of PWD.
• Since the inception of the Department, it has strived through
its continuous quest for excellence and putting milestones in
the feat of Engineering.
Flyover: - It is a bridge that carries one road or railway line
above another either with or without subsidiary roads, for
communication between the two.
WHAT IS FLYOVER BRIDGE
REASON BEHIND GOING FOR A FLYOVER
• As the traffic on the road goes on increasing and we don’t
have any space left in both the dimensions, then the only
option left will be to go to the third dimension and that is
done through flyover construction.
• The six- lane corridor, which is 1.6 km long, on Ring Road is
expected to cut down commuting time as it will bypass three
major traffic jam intersections at Ashok Vihar, Shalimar Bagh
and Keshav Puram
TYPE OF FLYOVER BRIDGE
Road Crossing
Simple Flyover Cloverleaf Junction
Railway Crossing
MAJOR COMPONENTS OF FLYOVER
• Pile
• Pile cap
• Piers & Abutments
• BridgeDeck
• Pedestal
• Bearing
• Parapets (Bridge Railings)
COMPONENTS OF FLYOVER
FOUNDATION
Since the bridge has to carry a big live load and its dead weight
is also very large so we cannot go for simple foundation but pile
foundation. Pile foundation is one type of deep foundation. It is
used where the good soil is at higher depth (10 or 15m) or soil
having low bearing capacity. Pile is also used for tall structures.
In pile foundation the load coming from the super structure is
taken by pile cap and equally distributed in no of piles, pile
transfers this load into the soil.
DESIGN OF FLYOVER
All roads, flyovers, etc are designed solely to accommodate the
heaviest and tallest vehicle: the fully loaded truck, thus resulting
in a gross over design for cars. The slab of a flyover is designed to
withstand the 20 tonne weight, (dynamic load) of a fully loaded
truck. This results in a slab with box girders that are about 2-
3metres deep. Similarly the clear height of the flyover slab is
based on the requisite 7-9metres clearance for a truck. The
finished slab of the flyover is at +9-12metres. The slope of the
flyover ramp is also calculated on the basis of a 1:20 gradient, on
the basis of a truck. However, a slope of 1:10 would provide
comfortable access for cars. The cost saving alone in the
embankments would be considerable. Similarly, by factoring
segregation of traffic into design for each aspect, there would be
enormous design optimisation and concomitant cost saving.
PLAN SHEET
SALIENT FEATURES
Project Estimated Cost 257cr
Project Total Cost 150cr
Agency PWD
Consultant SIMPLEX PVT.LTD
Date of commencement JUNE,2013
Stipulated date of completion 10 NOV,2015
PHYSICAL FEATURES
Total Length of the Flyover 1.6km
Width of Flyover 21m
Length Of Column 6.5m
Length of Pile 33m
Spine 6.1m
Wing 9.1m
No. of Spans 14
No. of Piles 303
No. of Pile caps 31
No. of Pier and Pier caps 31
Spine Casting 368
Wing Casting 736
Segment Erection 30
Wing Erection 30*2 span
COMPLETE WORK STATUS OF PREMBARI
AZADPUR FLYOVER
SEGMENT
A flyover segment is the roadway surface of the flyover.
These precast units are installed through a Bridge Launcher Machine
PRE-STRESSED CONCRETE
• Prestressed concrete is the one in which there have been
introduced internal stresses of such magnitude and
distribution that the stresses resulting from the external load
are counter balanced to a desired degree.
• Pre stressing can be accomplished in three ways: pre-
tensioned concrete, and bonded or unbonded post-tensioned
concrete.
PRE-TENSIONING
• In this method of prestressing in which tendons are
stretched /tensioned before the placement of concrete.
• Prestress is imparted to concrete through bond
between steel and structure.
POST-TENSIONING
• In this method of pre stressing tension is applied to tendons
after the concrete has been set and hardened. Here the pre-
stress is imparted to concrete through bearing.
Prestress Post Tension Anchor Prestressing Equipments
ROAD WORK
• Sand compaction is an important work in flyover a ramp.
• The sand is get self compacted by sprinkling water over it.
• The compactor machine compacts with 8kN/m2 at the
middle.
• The sides are compacted with 1Kn/m2 by a baby roller or
plate vibrator.
SOME PRECAUTIONS DURING INDUSTRIAL TRAINING
• Always wear a good quality helmet on the site.
• Always wear shoes on the site.
• Wear safety belts if required.
• Safety nets should be provided wherever it is necessary
AZADPUR FLYOVER
THANK YOU

More Related Content

What's hot

INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING Ram1239
 
Bridge engineering
Bridge engineeringBridge engineering
Bridge engineeringPooja Lonare
 
bridge report
bridge reportbridge report
bridge reportabc def
 
Training report done on Bridge Construction
Training report done on Bridge ConstructionTraining report done on Bridge Construction
Training report done on Bridge ConstructionSukhdeep Jat
 
Summer traning report BRPNNL by Amit Raj 14CE10005
Summer traning report BRPNNL by Amit Raj 14CE10005Summer traning report BRPNNL by Amit Raj 14CE10005
Summer traning report BRPNNL by Amit Raj 14CE10005Amit Raj
 
HIGH FLOOD LEVEL BRIDGE CONSTRUCTION
HIGH FLOOD LEVEL BRIDGE CONSTRUCTIONHIGH FLOOD LEVEL BRIDGE CONSTRUCTION
HIGH FLOOD LEVEL BRIDGE CONSTRUCTIONTEJPRAKASH KUMAWAT
 
Box Pushing Technique
Box Pushing TechniqueBox Pushing Technique
Box Pushing TechniqueSeminar Links
 
Bridge inspection,maintenance and repair
Bridge inspection,maintenance and repairBridge inspection,maintenance and repair
Bridge inspection,maintenance and repairKartikSuryawanshi2
 
6. BRIDGE ENGINEERING (RBT) 2160603 GTU
6. BRIDGE ENGINEERING (RBT) 2160603 GTU6. BRIDGE ENGINEERING (RBT) 2160603 GTU
6. BRIDGE ENGINEERING (RBT) 2160603 GTUVATSAL PATEL
 
Training report - RCC Bridge
Training report - RCC BridgeTraining report - RCC Bridge
Training report - RCC BridgePRASUNMANI
 
Pre stressed concrete Bridge
Pre stressed concrete BridgePre stressed concrete Bridge
Pre stressed concrete BridgeShubham Das
 
building consturction training report at cpwd (MNIT)
building consturction training report at cpwd (MNIT)building consturction training report at cpwd (MNIT)
building consturction training report at cpwd (MNIT)rahul jangid
 
final year Project (civil)
final year Project (civil)final year Project (civil)
final year Project (civil)Alankar jaiswal
 
Bridges and its Types & Components by Chetan Bisht
Bridges and its Types & Components by  Chetan BishtBridges and its Types & Components by  Chetan Bisht
Bridges and its Types & Components by Chetan BishtChetanBisht16
 

What's hot (20)

INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
 
Bridge engineering
Bridge engineeringBridge engineering
Bridge engineering
 
bridge report
bridge reportbridge report
bridge report
 
Training report done on Bridge Construction
Training report done on Bridge ConstructionTraining report done on Bridge Construction
Training report done on Bridge Construction
 
Flyover construction
Flyover constructionFlyover construction
Flyover construction
 
Summer traning report BRPNNL by Amit Raj 14CE10005
Summer traning report BRPNNL by Amit Raj 14CE10005Summer traning report BRPNNL by Amit Raj 14CE10005
Summer traning report BRPNNL by Amit Raj 14CE10005
 
Bridge report
Bridge reportBridge report
Bridge report
 
Stress ribbon-bridges
Stress ribbon-bridgesStress ribbon-bridges
Stress ribbon-bridges
 
HIGH FLOOD LEVEL BRIDGE CONSTRUCTION
HIGH FLOOD LEVEL BRIDGE CONSTRUCTIONHIGH FLOOD LEVEL BRIDGE CONSTRUCTION
HIGH FLOOD LEVEL BRIDGE CONSTRUCTION
 
FINAL REPORT
FINAL REPORTFINAL REPORT
FINAL REPORT
 
Box Pushing Technique
Box Pushing TechniqueBox Pushing Technique
Box Pushing Technique
 
Bridge inspection,maintenance and repair
Bridge inspection,maintenance and repairBridge inspection,maintenance and repair
Bridge inspection,maintenance and repair
 
6. BRIDGE ENGINEERING (RBT) 2160603 GTU
6. BRIDGE ENGINEERING (RBT) 2160603 GTU6. BRIDGE ENGINEERING (RBT) 2160603 GTU
6. BRIDGE ENGINEERING (RBT) 2160603 GTU
 
Training report - RCC Bridge
Training report - RCC BridgeTraining report - RCC Bridge
Training report - RCC Bridge
 
Pre stressed concrete Bridge
Pre stressed concrete BridgePre stressed concrete Bridge
Pre stressed concrete Bridge
 
building consturction training report at cpwd (MNIT)
building consturction training report at cpwd (MNIT)building consturction training report at cpwd (MNIT)
building consturction training report at cpwd (MNIT)
 
final year Project (civil)
final year Project (civil)final year Project (civil)
final year Project (civil)
 
Pile foundation ppt
Pile foundation pptPile foundation ppt
Pile foundation ppt
 
Bridges and its Types & Components by Chetan Bisht
Bridges and its Types & Components by  Chetan BishtBridges and its Types & Components by  Chetan Bisht
Bridges and its Types & Components by Chetan Bisht
 
Box culverts
Box culvertsBox culverts
Box culverts
 

Viewers also liked

CONSTRUCTION; A406 FLYOVER
CONSTRUCTION; A406 FLYOVERCONSTRUCTION; A406 FLYOVER
CONSTRUCTION; A406 FLYOVERSyed Rizvi
 
Spaces below flyovers
Spaces below flyoversSpaces below flyovers
Spaces below flyoversAshok Datar
 
89902577 to-examine-the-potential-of-land-use-under-flyover-in-aspect-of-safety
89902577 to-examine-the-potential-of-land-use-under-flyover-in-aspect-of-safety89902577 to-examine-the-potential-of-land-use-under-flyover-in-aspect-of-safety
89902577 to-examine-the-potential-of-land-use-under-flyover-in-aspect-of-safetyhomeworkping4
 
PPT On Bridge Construction
PPT On Bridge ConstructionPPT On Bridge Construction
PPT On Bridge ConstructionRobin Nirwal
 
Basics of bridge construction
Basics of bridge constructionBasics of bridge construction
Basics of bridge constructionsymphonyjo
 
Bridge engineering
Bridge engineeringBridge engineering
Bridge engineeringHalcrow
 
Presentation on CEMENT
Presentation on CEMENTPresentation on CEMENT
Presentation on CEMENTAamir Rasool
 
Resume of Ashwani Tyagi
Resume of Ashwani TyagiResume of Ashwani Tyagi
Resume of Ashwani TyagiAshwani Tyagi
 
The road to breaking bridges and stereotypes
The road to breaking bridges and stereotypesThe road to breaking bridges and stereotypes
The road to breaking bridges and stereotypesEva Lantsoght
 
Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Presentation on Flyover at Aziz Cross on GT Road GujranwalaPresentation on Flyover at Aziz Cross on GT Road Gujranwala
Presentation on Flyover at Aziz Cross on GT Road GujranwalaRubnawaz Bhatti
 
TLS/KVA RiverFIRST Project Criteria, 24-25 May
TLS/KVA RiverFIRST Project Criteria, 24-25 MayTLS/KVA RiverFIRST Project Criteria, 24-25 May
TLS/KVA RiverFIRST Project Criteria, 24-25 MayRiverFirst Initiative
 
RIMS Update - Bridge Data Guidelines for Asset Management of Road Bridges
RIMS Update - Bridge Data Guidelines for Asset Management of Road BridgesRIMS Update - Bridge Data Guidelines for Asset Management of Road Bridges
RIMS Update - Bridge Data Guidelines for Asset Management of Road BridgesSimon Gough
 
J.S. Daniel paper for roads and bridges construction methods & resources
J.S. Daniel paper for roads and bridges construction methods & resourcesJ.S. Daniel paper for roads and bridges construction methods & resources
J.S. Daniel paper for roads and bridges construction methods & resourcesJ.S. Daniel
 

Viewers also liked (20)

Flyover bridge
Flyover bridgeFlyover bridge
Flyover bridge
 
CONSTRUCTION; A406 FLYOVER
CONSTRUCTION; A406 FLYOVERCONSTRUCTION; A406 FLYOVER
CONSTRUCTION; A406 FLYOVER
 
flyover and bridge problems and its solutions
flyover and bridge problems and its solutionsflyover and bridge problems and its solutions
flyover and bridge problems and its solutions
 
Road and flyover planning v2.0
Road and flyover planning v2.0Road and flyover planning v2.0
Road and flyover planning v2.0
 
Aiims flyover presentation
Aiims flyover presentationAiims flyover presentation
Aiims flyover presentation
 
Spaces below flyovers
Spaces below flyoversSpaces below flyovers
Spaces below flyovers
 
Piling of a flyover (AUST 2.2 A)
Piling of a flyover (AUST 2.2 A)Piling of a flyover (AUST 2.2 A)
Piling of a flyover (AUST 2.2 A)
 
89902577 to-examine-the-potential-of-land-use-under-flyover-in-aspect-of-safety
89902577 to-examine-the-potential-of-land-use-under-flyover-in-aspect-of-safety89902577 to-examine-the-potential-of-land-use-under-flyover-in-aspect-of-safety
89902577 to-examine-the-potential-of-land-use-under-flyover-in-aspect-of-safety
 
PPT On Bridge Construction
PPT On Bridge ConstructionPPT On Bridge Construction
PPT On Bridge Construction
 
Basics of bridge construction
Basics of bridge constructionBasics of bridge construction
Basics of bridge construction
 
Bridge engineering
Bridge engineeringBridge engineering
Bridge engineering
 
Training
TrainingTraining
Training
 
The lalit mumbai
The lalit mumbaiThe lalit mumbai
The lalit mumbai
 
Presentation on CEMENT
Presentation on CEMENTPresentation on CEMENT
Presentation on CEMENT
 
Resume of Ashwani Tyagi
Resume of Ashwani TyagiResume of Ashwani Tyagi
Resume of Ashwani Tyagi
 
The road to breaking bridges and stereotypes
The road to breaking bridges and stereotypesThe road to breaking bridges and stereotypes
The road to breaking bridges and stereotypes
 
Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Presentation on Flyover at Aziz Cross on GT Road GujranwalaPresentation on Flyover at Aziz Cross on GT Road Gujranwala
Presentation on Flyover at Aziz Cross on GT Road Gujranwala
 
TLS/KVA RiverFIRST Project Criteria, 24-25 May
TLS/KVA RiverFIRST Project Criteria, 24-25 MayTLS/KVA RiverFIRST Project Criteria, 24-25 May
TLS/KVA RiverFIRST Project Criteria, 24-25 May
 
RIMS Update - Bridge Data Guidelines for Asset Management of Road Bridges
RIMS Update - Bridge Data Guidelines for Asset Management of Road BridgesRIMS Update - Bridge Data Guidelines for Asset Management of Road Bridges
RIMS Update - Bridge Data Guidelines for Asset Management of Road Bridges
 
J.S. Daniel paper for roads and bridges construction methods & resources
J.S. Daniel paper for roads and bridges construction methods & resourcesJ.S. Daniel paper for roads and bridges construction methods & resources
J.S. Daniel paper for roads and bridges construction methods & resources
 

Similar to INDUSTRIAL TRAINING OF FLYOVER CONSTRUCTION

ppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavementppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavementNIWASHISH VISWAS
 
Metro rail segments
Metro rail segmentsMetro rail segments
Metro rail segmentsAxay Sharma
 
CONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADCONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADGLA University
 
Construction of limited height subway/elimination of level crossings
Construction of limited height subway/elimination of level crossingsConstruction of limited height subway/elimination of level crossings
Construction of limited height subway/elimination of level crossingsShivamSharma979
 
Construction of roads, bridges,culverts.pptx
Construction of roads, bridges,culverts.pptxConstruction of roads, bridges,culverts.pptx
Construction of roads, bridges,culverts.pptxSadhana Patil
 
Caledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCaledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCrosstown TO
 
Fresh Concrete Batching, Mixing,.pptx
Fresh Concrete Batching, Mixing,.pptxFresh Concrete Batching, Mixing,.pptx
Fresh Concrete Batching, Mixing,.pptxADCET, Ashta
 
Construction of Road
Construction of RoadConstruction of Road
Construction of RoadAman Shakya
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavementpjainrahul
 
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptxCONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptxJaySinghchib1
 
RMS121_Viaduct_construction_Factsheet_FINAL_print_no_trim
RMS121_Viaduct_construction_Factsheet_FINAL_print_no_trimRMS121_Viaduct_construction_Factsheet_FINAL_print_no_trim
RMS121_Viaduct_construction_Factsheet_FINAL_print_no_trimHudson Bawden
 
Construction of rigid pavement
Construction of rigid pavementConstruction of rigid pavement
Construction of rigid pavementpradip dangar
 
Construction Of A Viaduct/Bridge: An Overview
Construction Of A Viaduct/Bridge: An OverviewConstruction Of A Viaduct/Bridge: An Overview
Construction Of A Viaduct/Bridge: An OverviewSourav Goswami
 
NMRC Civil Construction
NMRC Civil Construction NMRC Civil Construction
NMRC Civil Construction ajinkyaraj
 

Similar to INDUSTRIAL TRAINING OF FLYOVER CONSTRUCTION (20)

training report LMRC
training report LMRCtraining report LMRC
training report LMRC
 
ppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavementppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavement
 
Saurabhk601
Saurabhk601Saurabhk601
Saurabhk601
 
Metro rail segments
Metro rail segmentsMetro rail segments
Metro rail segments
 
CONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADCONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROAD
 
Construction of limited height subway/elimination of level crossings
Construction of limited height subway/elimination of level crossingsConstruction of limited height subway/elimination of level crossings
Construction of limited height subway/elimination of level crossings
 
Construction of roads, bridges,culverts.pptx
Construction of roads, bridges,culverts.pptxConstruction of roads, bridges,culverts.pptx
Construction of roads, bridges,culverts.pptx
 
Caledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCaledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open House
 
HIGHWAY ppt BY SHASHI SHEKHAR DBGI
HIGHWAY  ppt BY SHASHI SHEKHAR DBGIHIGHWAY  ppt BY SHASHI SHEKHAR DBGI
HIGHWAY ppt BY SHASHI SHEKHAR DBGI
 
BOGIBEEL BRIDGE
BOGIBEEL BRIDGEBOGIBEEL BRIDGE
BOGIBEEL BRIDGE
 
Fresh Concrete Batching, Mixing,.pptx
Fresh Concrete Batching, Mixing,.pptxFresh Concrete Batching, Mixing,.pptx
Fresh Concrete Batching, Mixing,.pptx
 
Construction of Road
Construction of RoadConstruction of Road
Construction of Road
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavement
 
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptxCONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
 
RMS121_Viaduct_construction_Factsheet_FINAL_print_no_trim
RMS121_Viaduct_construction_Factsheet_FINAL_print_no_trimRMS121_Viaduct_construction_Factsheet_FINAL_print_no_trim
RMS121_Viaduct_construction_Factsheet_FINAL_print_no_trim
 
Construction of rigid pavement
Construction of rigid pavement Construction of rigid pavement
Construction of rigid pavement
 
Construction of rigid pavement
Construction of rigid pavementConstruction of rigid pavement
Construction of rigid pavement
 
Segmental bridge
Segmental bridgeSegmental bridge
Segmental bridge
 
Construction Of A Viaduct/Bridge: An Overview
Construction Of A Viaduct/Bridge: An OverviewConstruction Of A Viaduct/Bridge: An Overview
Construction Of A Viaduct/Bridge: An Overview
 
NMRC Civil Construction
NMRC Civil Construction NMRC Civil Construction
NMRC Civil Construction
 

Recently uploaded

The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 

Recently uploaded (20)

The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 

INDUSTRIAL TRAINING OF FLYOVER CONSTRUCTION

  • 1. • The Public Works Department has a glorious history in the development of the state since pre independence. The department is entrusted with construction, maintenance of Roads, Bridges and Govt. buildings. • It also acts as Technical Advisor to the State Government in these matters. Initially, Irrigation, Public Health engineering were units of PWD. • Since the inception of the Department, it has strived through its continuous quest for excellence and putting milestones in the feat of Engineering.
  • 2. Flyover: - It is a bridge that carries one road or railway line above another either with or without subsidiary roads, for communication between the two. WHAT IS FLYOVER BRIDGE
  • 3. REASON BEHIND GOING FOR A FLYOVER • As the traffic on the road goes on increasing and we don’t have any space left in both the dimensions, then the only option left will be to go to the third dimension and that is done through flyover construction. • The six- lane corridor, which is 1.6 km long, on Ring Road is expected to cut down commuting time as it will bypass three major traffic jam intersections at Ashok Vihar, Shalimar Bagh and Keshav Puram
  • 4. TYPE OF FLYOVER BRIDGE Road Crossing Simple Flyover Cloverleaf Junction Railway Crossing
  • 5. MAJOR COMPONENTS OF FLYOVER • Pile • Pile cap • Piers & Abutments • BridgeDeck • Pedestal • Bearing • Parapets (Bridge Railings)
  • 7. FOUNDATION Since the bridge has to carry a big live load and its dead weight is also very large so we cannot go for simple foundation but pile foundation. Pile foundation is one type of deep foundation. It is used where the good soil is at higher depth (10 or 15m) or soil having low bearing capacity. Pile is also used for tall structures. In pile foundation the load coming from the super structure is taken by pile cap and equally distributed in no of piles, pile transfers this load into the soil.
  • 8. DESIGN OF FLYOVER All roads, flyovers, etc are designed solely to accommodate the heaviest and tallest vehicle: the fully loaded truck, thus resulting in a gross over design for cars. The slab of a flyover is designed to withstand the 20 tonne weight, (dynamic load) of a fully loaded truck. This results in a slab with box girders that are about 2- 3metres deep. Similarly the clear height of the flyover slab is based on the requisite 7-9metres clearance for a truck. The finished slab of the flyover is at +9-12metres. The slope of the flyover ramp is also calculated on the basis of a 1:20 gradient, on the basis of a truck. However, a slope of 1:10 would provide comfortable access for cars. The cost saving alone in the embankments would be considerable. Similarly, by factoring segregation of traffic into design for each aspect, there would be enormous design optimisation and concomitant cost saving.
  • 10. SALIENT FEATURES Project Estimated Cost 257cr Project Total Cost 150cr Agency PWD Consultant SIMPLEX PVT.LTD Date of commencement JUNE,2013 Stipulated date of completion 10 NOV,2015
  • 11. PHYSICAL FEATURES Total Length of the Flyover 1.6km Width of Flyover 21m Length Of Column 6.5m Length of Pile 33m Spine 6.1m Wing 9.1m
  • 12. No. of Spans 14 No. of Piles 303 No. of Pile caps 31 No. of Pier and Pier caps 31 Spine Casting 368 Wing Casting 736 Segment Erection 30 Wing Erection 30*2 span
  • 13. COMPLETE WORK STATUS OF PREMBARI AZADPUR FLYOVER
  • 14. SEGMENT A flyover segment is the roadway surface of the flyover.
  • 15. These precast units are installed through a Bridge Launcher Machine
  • 16. PRE-STRESSED CONCRETE • Prestressed concrete is the one in which there have been introduced internal stresses of such magnitude and distribution that the stresses resulting from the external load are counter balanced to a desired degree. • Pre stressing can be accomplished in three ways: pre- tensioned concrete, and bonded or unbonded post-tensioned concrete.
  • 17. PRE-TENSIONING • In this method of prestressing in which tendons are stretched /tensioned before the placement of concrete. • Prestress is imparted to concrete through bond between steel and structure.
  • 18. POST-TENSIONING • In this method of pre stressing tension is applied to tendons after the concrete has been set and hardened. Here the pre- stress is imparted to concrete through bearing.
  • 19. Prestress Post Tension Anchor Prestressing Equipments
  • 20. ROAD WORK • Sand compaction is an important work in flyover a ramp. • The sand is get self compacted by sprinkling water over it. • The compactor machine compacts with 8kN/m2 at the middle. • The sides are compacted with 1Kn/m2 by a baby roller or plate vibrator.
  • 21. SOME PRECAUTIONS DURING INDUSTRIAL TRAINING • Always wear a good quality helmet on the site. • Always wear shoes on the site. • Wear safety belts if required. • Safety nets should be provided wherever it is necessary