Analytical Comparison between (BOT)
(BOOT) and other PPP Projects
Presented By: Presented To:
Bhavin Sharma Dr. Vishakha V Sakhare
2015H130059P (Assistant Professor)
BITS Pilani, Pilani Campus
Content
1. Why PPP??
2. Definition of PPPs in India
3. Objectives of a PPP?
4. Advantages of PPP
5. When should PPP be used?
6. Risk Involved
7. PPP Types
1. BOT
2. BOOT
3. FP
8. Analytical Comparison & Conclusion
9. References
2
BITS Pilani, Pilani Campus
Why PPP in infrastructure?
• Physical infrastructure
– roads
– transportation systems
– water and sanitation networks
• They involve large investments that can put a strain on the public purse. This strain
is especially great for countries, such as India, whose economies are undergoing
rapid development and urbanisation and have a great need for expanded
infrastructure.
• Public-private partnerships (PPPs) are increasingly being used by governments and
public sector authorities throughout the world as a way of increasing access to
infrastructure services for their citizenry and economies at a reduced cost.
3
BITS Pilani, Pilani Campus
Definition of PPPs in India
4
BITS Pilani, Pilani Campus
According to “The Department of Economic
Affairs (DEA), Ministry of Finance (GOI)
An arrangement between a government or statutory entity or government
owned entity on one side and a private sector entity on the other, for the
provision of public assets and/ or related services for public benefit, through
investments being made by and/or management undertaken by the private
sector entity for a specified time period, where there is a substantial risk
sharing with the private sector and the private sector receives performance
linked payments that conform (or are benchmarked) to specified, pre-
determined and measurable performance standards.
5
BITS Pilani, Pilani Campus
Objectives of a PPP in infrastructure
Increase the availability of infrastructure services
To do so with greater efficiency (lower cost for the level of
services provided) than could be achieved using the traditional
public sector approach
6
BITS Pilani, Pilani Campus
Advantages of PPP
• Access to private sector finance
• Efficiency advantages from using private sector skills and from transferring risk to
the private sector
• Potentially increased transparency
• Enlargement of focus from only creating an asset to delivery of a service, including
maintenance of the infrastructure asset during its operating lifetime
• This broadened focus creates incentives to reduce the full life-cycle costs (i.e.,
construction costs and operating costs)
All of these provide strong reasons in favour of using PPPs in India
and elsewhere.
7
BITS Pilani, Pilani Campus
Investments through PPP Models
The following chart shows the increasing trend of investments in infrastructure through PPPs,
during the period 1990 to 2008. 8
BITS Pilani, Pilani Campus
When should PPP be used?
• The public sector environment is suited to supporting PPPs
• The project is suitable to being carried out as a PPP
• The potential barriers to successful project implementation have
been identified and can be overcome
• Given that these conditions are satisfied, the project must be
commercially viable for the private sector and offer value for
money (VFM) for the public sector
9
BITS Pilani, Pilani Campus
Risk - a critical focus of PPP design
• "Risk is the chance of an event occurring which would cause actual
project circumstances to differ from those assumed when forecasting
project benefits and costs”
(Risk Management & Contractual Issues, Partnerships Victoria)
• The parties involved in a project can affect the amount of risk by:
– The level of influence they have over events
– The level of information they have about the present and the future
10
BITS Pilani, Pilani Campus
For e.g. (influence they have over events)
• The Public Sector
It has certain powers and advantages in the process of land acquisition that
mean it is sometimes better suited to this task and taking the associated risks.
• By Private Sector
The private sector is exposed to competitive pressures that force it to
establish improved management practices. It is also often the technology
leader. This means it may be better suited to managing the design and
construction risks.
11
BITS Pilani, Pilani Campus
PPP Options/ Types
12
Full privatization, the private sector assumes
ownership of the infrastructure (design, build,
operation and maintenance and finance)
BITS Pilani, Pilani Campus
Responsibility of Sectors
13
BITS Pilani, Pilani Campus
Build Operate Transfer (BOT)
• In this approach a private party or concessionaire retains a concession for a
fixed period from a public party, called principal (client), for the
development and operation of a public facility
• The development consists of the financing, design and construction of the
facility, managing and maintaining the facility adequately, and making it
sufficiently profitable
• The concessionaire secures return of investment by operating the facility
and, during the concession period, the concessionaire acts as owner. At the
end of the concession period, the concessionaire transfers the ownership of
the facility to the principal at no cost
14
The most common examples are roads, bridges, water and sewer systems,
airports, ports and public buildings
BITS Pilani, Pilani Campus
Stages of BOT Project
Construction
(Built) [B]
Operation
[O]
Transfer
[T]
15
Preliminary
Study
Selection
Process
Project
Implementation
BITS Pilani, Pilani Campus
Advantages and Disadvantages
Advantages Dis-advantages
Utilization of private sector's
investment instead of public sector's
Very complicated from the viewpoint of
technical and financial issues and need
high level experts and consultants
Transferring all the risk to private
sector
Increasing expenditures of users in
operation time
Transferring technical knowledge is
one of the most important benefits
of this method for developing
countries
Contrast between benefits of private
sector with public sector
16
BITS Pilani, Pilani Campus
Build-Own-Operate-Transfer (BOOT)
• It is a founding model and a form of concession in which a public authority
makes an agreement with a private company (concessionaire) to Design Build,
Own and Operate a specific piece of an infrastructure
• such as power, transport, water, and telecom industries, within receiving the
right to achieve income from the facility under a period of time
• (concession period approximately 15-25 years), and later transferring it back
into public ownership through a single organization or consortium (BOOT
provider)
• The earned income can be based on a variety of arrangements, ranging from a
fixed annual fee (flat rate) to the measured quantity supplied (unit rate) and
"Take-or-pay" arrangements are effectively two part tariffs expressed in a
different manner.
17
BITS Pilani, Pilani Campus
Advantages and Disadvantages
18
Advantages Dis-advantages
Strong financial incentives for the
BOOT operator
Higher cost for the end user due to the BOOT
provider accountability of 100 percent
financing and on-going maintenance
Risk mitigation through the
involvement of multiple participants
Time consuming and resource hungry
management and monitoring of the
operating contract with the BOOT operators
Increase the project certainty and
early interest recovering through
involving a BOOT operator
Requirement of a rigorous selection process
in selecting a BOOT partner
Efficient designs, High accountability
BITS Pilani, Pilani Campus
Full Privatization
• It is a service contract between a public authority and a private sector
concessionaire, where the public authority pays the concessionaire to deliver
infrastructure and related services
• Typically, the concessionaire, who builds the infrastructure asset, is financially
responsible for its condition and performance throughout the asset lifetime,
or the duration of the agreement
19
Full privatization, the private sector assumes ownership
of the infrastructure (design, build, operation and
maintenance and finance)
BITS Pilani, Pilani Campus
Advantages and Disadvantages
Advantages Dis-advantages
Engages in a competitive process to
achieve the best project for the best
cost
Government risk
Establishes performance standards and
payment mechanisms
Non-complete contracts and
uncertainty over a long horizon are
other FP challenges
Faster procurement
20
BITS Pilani, Pilani Campus
Analytical Comparison
• BOOT versus BOT
– The definition of BOOT and BOT is very close together and the only
difference is the ownership of facilities in BOOT and because of this, quality
of the work is vital to private
– BOOT is more efficient
– The BOOT contracts have the tendency to work well when the purpose of
the project is to offer a service, but if the aim is to improve a service or
make more efficient a system, this modality is not recommended. These
methodologies increment the complexity of the financial study
21
BITS Pilani, Pilani Campus
• FP versus BOT & BOOT
⁻ In FP, private sector has a role as engineer or constructor, Ownership, operation
and financing
⁻ On the other hand a pure private is responsible for all matter.
⁻ In BOOT final owner is public, but concession for a long period of time (25-30
year) is regarded to private
⁻ The ownership shifts from public to private as we move from FP to BOOT
⁻ Also private sector accepts more risk and preparing capital investment in
BOOT/BOT
22
BITS Pilani, Pilani Campus
• Clear law and regulation and Stable political and economical environment is an
important factor that effect BOOT/BOT project more than FP
• The degree of involvement in BOOT/BOT is restricted
• Advantage of this, is releasing from project jobs
• Disadvantage is low control of government on project
• Britain vs. turkey is a good example
– Crises in political relation of two countries caused the
– British party leave project dam building in turkey because Turkish government was not
involved with project document, they were unable to continue the project
23
BITS Pilani, Pilani Campus
Conclusions
Comparison Aspect
Method Risk Public
support
Duration
period
Involvement Investment Cost for
end user
Efficiency
BOT 90% by
private
sector
Vital Long term
(20-30)
Less public 70-100%
by private
sector
Higher Medium-
high
BOOT 90% by
private
sector
Vital Long term
(30+)
Less public 70-100%
by private
sector
Higher High
FP 90% by
public
sector
Not
important
Short term Nil Lower by
public
sector
Lower -
Higher
High- Low
24
BITS Pilani, Pilani Campus
References
• World Bank Group[US] https://ppiaf.org/
• http://finmin.nic.in/the_ministry/dept_eco_affairs/dea.asp
• Thomas, S. M, measuring the impacts of delivery system on project performance, Construction
Industry Institute, 2003
• Prof. Drs. Ir. Sebastiaan C.M. Menheere, P. S, Case Studies On Build Operate Transfer. Delft, The
Netherlands, Delft University of Technology, 1996
• Verhoeven, L., BOT in Netherlands, university of technology, Delft, Netherlands, 1997
• Menheere, C. P., Case studies on Build, Operation, and Transfer, 1996
• Canada, P. (2010, may-June). P3 Canada Fund. Retrieved May 30, 2010, from public-private
partnerships Canada:
http://www.p3canada.ca/_files/file/P3C_Project_Submission_Guide_Round_Two_EN.pdf
• http://toolkit.pppinindia.com/highways/sitemap-gts%20.php?links=intro1
25
BITS Pilani, Pilani Campus

More Related Content

What's hot

Bot(build operate transfer)
Bot(build operate transfer)Bot(build operate transfer)
Bot(build operate transfer)Satish Kambaliya
 
Build - Operate - Transfer
Build - Operate - TransferBuild - Operate - Transfer
Build - Operate - TransferKshitij Gupta
 
Analytical Comparison between BOT,BOOT and PPP Projects
Analytical Comparison between BOT,BOOT and PPP ProjectsAnalytical Comparison between BOT,BOOT and PPP Projects
Analytical Comparison between BOT,BOOT and PPP ProjectsSugiharto TuPiichai
 
Chapter 13 ( valuation)
Chapter 13 ( valuation)Chapter 13 ( valuation)
Chapter 13 ( valuation)umes manandhar
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction ManagementShahin MB
 
PPP Presentation
PPP PresentationPPP Presentation
PPP PresentationVijay Kumar
 
Construction project delivery methods
Construction project delivery methodsConstruction project delivery methods
Construction project delivery methodsNitin Kumar
 
Modal split analysis
Modal split analysis Modal split analysis
Modal split analysis ashahit
 
Tendering Bidding & Award of Contract Final Draft
Tendering Bidding & Award of Contract Final DraftTendering Bidding & Award of Contract Final Draft
Tendering Bidding & Award of Contract Final DraftMuneesh Methwani
 
Public Private Patnership
Public Private Patnership Public Private Patnership
Public Private Patnership Sagar Srivastava
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.NAVNEET KUMAR JHA
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008AYM1979
 
Construction claims, disputes and project closure
Construction claims, disputes and project closureConstruction claims, disputes and project closure
Construction claims, disputes and project closuresrinivas2036
 
TRANSPORTATION PLANNING
TRANSPORTATION PLANNINGTRANSPORTATION PLANNING
TRANSPORTATION PLANNINGintan fatihah
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contractssrinivas2036
 
Presentation on Cost Overrun ( Project Management)
Presentation on Cost Overrun ( Project Management)Presentation on Cost Overrun ( Project Management)
Presentation on Cost Overrun ( Project Management)FahadHasan36
 

What's hot (20)

Bot(build operate transfer)
Bot(build operate transfer)Bot(build operate transfer)
Bot(build operate transfer)
 
Build - Operate - Transfer
Build - Operate - TransferBuild - Operate - Transfer
Build - Operate - Transfer
 
Valuation
ValuationValuation
Valuation
 
Contracts
ContractsContracts
Contracts
 
Analytical Comparison between BOT,BOOT and PPP Projects
Analytical Comparison between BOT,BOOT and PPP ProjectsAnalytical Comparison between BOT,BOOT and PPP Projects
Analytical Comparison between BOT,BOOT and PPP Projects
 
Chapter 13 ( valuation)
Chapter 13 ( valuation)Chapter 13 ( valuation)
Chapter 13 ( valuation)
 
Detailed project report
Detailed project reportDetailed project report
Detailed project report
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction Management
 
PPP Presentation
PPP PresentationPPP Presentation
PPP Presentation
 
Construction project delivery methods
Construction project delivery methodsConstruction project delivery methods
Construction project delivery methods
 
Modal split analysis
Modal split analysis Modal split analysis
Modal split analysis
 
Tendering Bidding & Award of Contract Final Draft
Tendering Bidding & Award of Contract Final DraftTendering Bidding & Award of Contract Final Draft
Tendering Bidding & Award of Contract Final Draft
 
Public Private Patnership
Public Private Patnership Public Private Patnership
Public Private Patnership
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 
Construction claims, disputes and project closure
Construction claims, disputes and project closureConstruction claims, disputes and project closure
Construction claims, disputes and project closure
 
Construction contracts
Construction contractsConstruction contracts
Construction contracts
 
TRANSPORTATION PLANNING
TRANSPORTATION PLANNINGTRANSPORTATION PLANNING
TRANSPORTATION PLANNING
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contracts
 
Presentation on Cost Overrun ( Project Management)
Presentation on Cost Overrun ( Project Management)Presentation on Cost Overrun ( Project Management)
Presentation on Cost Overrun ( Project Management)
 

Similar to Analytical comparision of BOT,BOOT and PPP models

What is ppp and when to use ppp
What is ppp and when to use pppWhat is ppp and when to use ppp
What is ppp and when to use pppcec9
 
Introduction to Public Private Partnerships (PPP’s) - June 2010
Introduction to Public Private Partnerships (PPP’s) - June 2010Introduction to Public Private Partnerships (PPP’s) - June 2010
Introduction to Public Private Partnerships (PPP’s) - June 2010Loay Ghazaleh MBA, BSc Civil Eng.
 
Pgpm14 infrastructure development
Pgpm14 infrastructure developmentPgpm14 infrastructure development
Pgpm14 infrastructure developmentsakariya88
 
UNDERSTANDING_PPPs.pdf
UNDERSTANDING_PPPs.pdfUNDERSTANDING_PPPs.pdf
UNDERSTANDING_PPPs.pdfAlkaPandya5
 
IRJET- Significance of Public Private Partnerships in INDIA
IRJET- Significance of Public Private Partnerships in INDIAIRJET- Significance of Public Private Partnerships in INDIA
IRJET- Significance of Public Private Partnerships in INDIAIRJET Journal
 
Social equity in infrastructure
Social equity in infrastructureSocial equity in infrastructure
Social equity in infrastructureParth Joshi
 
Study of Different Public-Private Partnership (PPP) Model for the Road Infras...
Study of Different Public-Private Partnership (PPP) Model for the Road Infras...Study of Different Public-Private Partnership (PPP) Model for the Road Infras...
Study of Different Public-Private Partnership (PPP) Model for the Road Infras...IRJET Journal
 
Aurecon_IndII IRF Presentation Nov 2014 Expressway Development - LinkedIn
Aurecon_IndII IRF Presentation Nov 2014 Expressway Development - LinkedInAurecon_IndII IRF Presentation Nov 2014 Expressway Development - LinkedIn
Aurecon_IndII IRF Presentation Nov 2014 Expressway Development - LinkedInSteve Richards
 
A national investment infrastructure bank {nib} presentation 1 11-11(01)
A national investment infrastructure bank {nib} presentation 1 11-11(01)A national investment infrastructure bank {nib} presentation 1 11-11(01)
A national investment infrastructure bank {nib} presentation 1 11-11(01)Nigel Campbell
 
projectfinancingandpublicprivatepartnershipppp-191120191032.pdf
projectfinancingandpublicprivatepartnershipppp-191120191032.pdfprojectfinancingandpublicprivatepartnershipppp-191120191032.pdf
projectfinancingandpublicprivatepartnershipppp-191120191032.pdfSeshukumar53
 
Project financing and public private partnership (ppp)
Project financing and public private partnership (ppp)Project financing and public private partnership (ppp)
Project financing and public private partnership (ppp)M. Asim U Khan
 
THE SIMPLE MICROECONOMICS OF PUBLIC-PRIVATE PARTNERSHIPS.pdf
THE SIMPLE MICROECONOMICS OF PUBLIC-PRIVATE PARTNERSHIPS.pdfTHE SIMPLE MICROECONOMICS OF PUBLIC-PRIVATE PARTNERSHIPS.pdf
THE SIMPLE MICROECONOMICS OF PUBLIC-PRIVATE PARTNERSHIPS.pdfDeepak Jha
 
Successfully Delivering PPP Tolled Bridges and Highway Projects
Successfully Delivering PPP Tolled Bridges and Highway ProjectsSuccessfully Delivering PPP Tolled Bridges and Highway Projects
Successfully Delivering PPP Tolled Bridges and Highway ProjectsLoay Ghazaleh MBA, BSc Civil Eng.
 
Public Private Partnerships in India - A Review
Public Private Partnerships in India - A ReviewPublic Private Partnerships in India - A Review
Public Private Partnerships in India - A Reviewgeoffrey-cip
 
Chapter19 financinginfrastructureprojects
Chapter19 financinginfrastructureprojectsChapter19 financinginfrastructureprojects
Chapter19 financinginfrastructureprojectsAKSHAYA0000
 
Investing and Financing Options & Risk Mitigation Framework for Infrastructur...
Investing and Financing Options & Risk Mitigation Framework for Infrastructur...Investing and Financing Options & Risk Mitigation Framework for Infrastructur...
Investing and Financing Options & Risk Mitigation Framework for Infrastructur...Dr. Oliver Massmann
 
Troy Univ Ppp 15 Apr10
Troy Univ Ppp 15 Apr10Troy Univ Ppp 15 Apr10
Troy Univ Ppp 15 Apr10steveallen
 

Similar to Analytical comparision of BOT,BOOT and PPP models (20)

What is ppp and when to use ppp
What is ppp and when to use pppWhat is ppp and when to use ppp
What is ppp and when to use ppp
 
Introduction to Public Private Partnerships (PPP’s) - June 2010
Introduction to Public Private Partnerships (PPP’s) - June 2010Introduction to Public Private Partnerships (PPP’s) - June 2010
Introduction to Public Private Partnerships (PPP’s) - June 2010
 
Pgpm14 infrastructure development
Pgpm14 infrastructure developmentPgpm14 infrastructure development
Pgpm14 infrastructure development
 
UNDERSTANDING_PPPs.pdf
UNDERSTANDING_PPPs.pdfUNDERSTANDING_PPPs.pdf
UNDERSTANDING_PPPs.pdf
 
IRJET- Significance of Public Private Partnerships in INDIA
IRJET- Significance of Public Private Partnerships in INDIAIRJET- Significance of Public Private Partnerships in INDIA
IRJET- Significance of Public Private Partnerships in INDIA
 
Social equity in infrastructure
Social equity in infrastructureSocial equity in infrastructure
Social equity in infrastructure
 
Study of Different Public-Private Partnership (PPP) Model for the Road Infras...
Study of Different Public-Private Partnership (PPP) Model for the Road Infras...Study of Different Public-Private Partnership (PPP) Model for the Road Infras...
Study of Different Public-Private Partnership (PPP) Model for the Road Infras...
 
Ppp
PppPpp
Ppp
 
Aurecon_IndII IRF Presentation Nov 2014 Expressway Development - LinkedIn
Aurecon_IndII IRF Presentation Nov 2014 Expressway Development - LinkedInAurecon_IndII IRF Presentation Nov 2014 Expressway Development - LinkedIn
Aurecon_IndII IRF Presentation Nov 2014 Expressway Development - LinkedIn
 
public private partnership
 public private partnership public private partnership
public private partnership
 
A national investment infrastructure bank {nib} presentation 1 11-11(01)
A national investment infrastructure bank {nib} presentation 1 11-11(01)A national investment infrastructure bank {nib} presentation 1 11-11(01)
A national investment infrastructure bank {nib} presentation 1 11-11(01)
 
projectfinancingandpublicprivatepartnershipppp-191120191032.pdf
projectfinancingandpublicprivatepartnershipppp-191120191032.pdfprojectfinancingandpublicprivatepartnershipppp-191120191032.pdf
projectfinancingandpublicprivatepartnershipppp-191120191032.pdf
 
Project financing and public private partnership (ppp)
Project financing and public private partnership (ppp)Project financing and public private partnership (ppp)
Project financing and public private partnership (ppp)
 
THE SIMPLE MICROECONOMICS OF PUBLIC-PRIVATE PARTNERSHIPS.pdf
THE SIMPLE MICROECONOMICS OF PUBLIC-PRIVATE PARTNERSHIPS.pdfTHE SIMPLE MICROECONOMICS OF PUBLIC-PRIVATE PARTNERSHIPS.pdf
THE SIMPLE MICROECONOMICS OF PUBLIC-PRIVATE PARTNERSHIPS.pdf
 
Successfully Delivering PPP Tolled Bridges and Highway Projects
Successfully Delivering PPP Tolled Bridges and Highway ProjectsSuccessfully Delivering PPP Tolled Bridges and Highway Projects
Successfully Delivering PPP Tolled Bridges and Highway Projects
 
Public Private Partnerships in India - A Review
Public Private Partnerships in India - A ReviewPublic Private Partnerships in India - A Review
Public Private Partnerships in India - A Review
 
Chapter19 financinginfrastructureprojects
Chapter19 financinginfrastructureprojectsChapter19 financinginfrastructureprojects
Chapter19 financinginfrastructureprojects
 
Investing and Financing Options & Risk Mitigation Framework for Infrastructur...
Investing and Financing Options & Risk Mitigation Framework for Infrastructur...Investing and Financing Options & Risk Mitigation Framework for Infrastructur...
Investing and Financing Options & Risk Mitigation Framework for Infrastructur...
 
PPP models.pptx
 PPP models.pptx PPP models.pptx
PPP models.pptx
 
Troy Univ Ppp 15 Apr10
Troy Univ Ppp 15 Apr10Troy Univ Ppp 15 Apr10
Troy Univ Ppp 15 Apr10
 

Recently uploaded

OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptxOAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptxhiddenlevers
 
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Instant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School DesignsInstant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School Designsegoetzinger
 
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...shivangimorya083
 
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )Pooja Nehwal
 
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
The Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdfThe Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdfGale Pooley
 
The Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfThe Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfGale Pooley
 
The Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfThe Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfGale Pooley
 
The Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfThe Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfGale Pooley
 
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...Suhani Kapoor
 
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Pooja Nehwal
 
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Roomdivyansh0kumar0
 
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure serviceCall US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure servicePooja Nehwal
 
VIP Kolkata Call Girl Serampore 👉 8250192130 Available With Room
VIP Kolkata Call Girl Serampore 👉 8250192130  Available With RoomVIP Kolkata Call Girl Serampore 👉 8250192130  Available With Room
VIP Kolkata Call Girl Serampore 👉 8250192130 Available With Roomdivyansh0kumar0
 
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...ssifa0344
 

Recently uploaded (20)

OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptxOAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
 
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
 
Instant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School DesignsInstant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School Designs
 
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...
 
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
 
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
 
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
The Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdfThe Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdf
 
The Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfThe Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdf
 
The Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfThe Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdf
 
The Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfThe Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdf
 
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
 
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
 
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Room
 
Commercial Bank Economic Capsule - April 2024
Commercial Bank Economic Capsule - April 2024Commercial Bank Economic Capsule - April 2024
Commercial Bank Economic Capsule - April 2024
 
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure serviceCall US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
 
VIP Kolkata Call Girl Serampore 👉 8250192130 Available With Room
VIP Kolkata Call Girl Serampore 👉 8250192130  Available With RoomVIP Kolkata Call Girl Serampore 👉 8250192130  Available With Room
VIP Kolkata Call Girl Serampore 👉 8250192130 Available With Room
 
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
 

Analytical comparision of BOT,BOOT and PPP models

  • 1. BITS Pilani, Pilani Campus Analytical Comparison between (BOT) (BOOT) and other PPP Projects Presented By: Presented To: Bhavin Sharma Dr. Vishakha V Sakhare 2015H130059P (Assistant Professor)
  • 2. BITS Pilani, Pilani Campus Content 1. Why PPP?? 2. Definition of PPPs in India 3. Objectives of a PPP? 4. Advantages of PPP 5. When should PPP be used? 6. Risk Involved 7. PPP Types 1. BOT 2. BOOT 3. FP 8. Analytical Comparison & Conclusion 9. References 2
  • 3. BITS Pilani, Pilani Campus Why PPP in infrastructure? • Physical infrastructure – roads – transportation systems – water and sanitation networks • They involve large investments that can put a strain on the public purse. This strain is especially great for countries, such as India, whose economies are undergoing rapid development and urbanisation and have a great need for expanded infrastructure. • Public-private partnerships (PPPs) are increasingly being used by governments and public sector authorities throughout the world as a way of increasing access to infrastructure services for their citizenry and economies at a reduced cost. 3
  • 4. BITS Pilani, Pilani Campus Definition of PPPs in India 4
  • 5. BITS Pilani, Pilani Campus According to “The Department of Economic Affairs (DEA), Ministry of Finance (GOI) An arrangement between a government or statutory entity or government owned entity on one side and a private sector entity on the other, for the provision of public assets and/ or related services for public benefit, through investments being made by and/or management undertaken by the private sector entity for a specified time period, where there is a substantial risk sharing with the private sector and the private sector receives performance linked payments that conform (or are benchmarked) to specified, pre- determined and measurable performance standards. 5
  • 6. BITS Pilani, Pilani Campus Objectives of a PPP in infrastructure Increase the availability of infrastructure services To do so with greater efficiency (lower cost for the level of services provided) than could be achieved using the traditional public sector approach 6
  • 7. BITS Pilani, Pilani Campus Advantages of PPP • Access to private sector finance • Efficiency advantages from using private sector skills and from transferring risk to the private sector • Potentially increased transparency • Enlargement of focus from only creating an asset to delivery of a service, including maintenance of the infrastructure asset during its operating lifetime • This broadened focus creates incentives to reduce the full life-cycle costs (i.e., construction costs and operating costs) All of these provide strong reasons in favour of using PPPs in India and elsewhere. 7
  • 8. BITS Pilani, Pilani Campus Investments through PPP Models The following chart shows the increasing trend of investments in infrastructure through PPPs, during the period 1990 to 2008. 8
  • 9. BITS Pilani, Pilani Campus When should PPP be used? • The public sector environment is suited to supporting PPPs • The project is suitable to being carried out as a PPP • The potential barriers to successful project implementation have been identified and can be overcome • Given that these conditions are satisfied, the project must be commercially viable for the private sector and offer value for money (VFM) for the public sector 9
  • 10. BITS Pilani, Pilani Campus Risk - a critical focus of PPP design • "Risk is the chance of an event occurring which would cause actual project circumstances to differ from those assumed when forecasting project benefits and costs” (Risk Management & Contractual Issues, Partnerships Victoria) • The parties involved in a project can affect the amount of risk by: – The level of influence they have over events – The level of information they have about the present and the future 10
  • 11. BITS Pilani, Pilani Campus For e.g. (influence they have over events) • The Public Sector It has certain powers and advantages in the process of land acquisition that mean it is sometimes better suited to this task and taking the associated risks. • By Private Sector The private sector is exposed to competitive pressures that force it to establish improved management practices. It is also often the technology leader. This means it may be better suited to managing the design and construction risks. 11
  • 12. BITS Pilani, Pilani Campus PPP Options/ Types 12 Full privatization, the private sector assumes ownership of the infrastructure (design, build, operation and maintenance and finance)
  • 13. BITS Pilani, Pilani Campus Responsibility of Sectors 13
  • 14. BITS Pilani, Pilani Campus Build Operate Transfer (BOT) • In this approach a private party or concessionaire retains a concession for a fixed period from a public party, called principal (client), for the development and operation of a public facility • The development consists of the financing, design and construction of the facility, managing and maintaining the facility adequately, and making it sufficiently profitable • The concessionaire secures return of investment by operating the facility and, during the concession period, the concessionaire acts as owner. At the end of the concession period, the concessionaire transfers the ownership of the facility to the principal at no cost 14 The most common examples are roads, bridges, water and sewer systems, airports, ports and public buildings
  • 15. BITS Pilani, Pilani Campus Stages of BOT Project Construction (Built) [B] Operation [O] Transfer [T] 15 Preliminary Study Selection Process Project Implementation
  • 16. BITS Pilani, Pilani Campus Advantages and Disadvantages Advantages Dis-advantages Utilization of private sector's investment instead of public sector's Very complicated from the viewpoint of technical and financial issues and need high level experts and consultants Transferring all the risk to private sector Increasing expenditures of users in operation time Transferring technical knowledge is one of the most important benefits of this method for developing countries Contrast between benefits of private sector with public sector 16
  • 17. BITS Pilani, Pilani Campus Build-Own-Operate-Transfer (BOOT) • It is a founding model and a form of concession in which a public authority makes an agreement with a private company (concessionaire) to Design Build, Own and Operate a specific piece of an infrastructure • such as power, transport, water, and telecom industries, within receiving the right to achieve income from the facility under a period of time • (concession period approximately 15-25 years), and later transferring it back into public ownership through a single organization or consortium (BOOT provider) • The earned income can be based on a variety of arrangements, ranging from a fixed annual fee (flat rate) to the measured quantity supplied (unit rate) and "Take-or-pay" arrangements are effectively two part tariffs expressed in a different manner. 17
  • 18. BITS Pilani, Pilani Campus Advantages and Disadvantages 18 Advantages Dis-advantages Strong financial incentives for the BOOT operator Higher cost for the end user due to the BOOT provider accountability of 100 percent financing and on-going maintenance Risk mitigation through the involvement of multiple participants Time consuming and resource hungry management and monitoring of the operating contract with the BOOT operators Increase the project certainty and early interest recovering through involving a BOOT operator Requirement of a rigorous selection process in selecting a BOOT partner Efficient designs, High accountability
  • 19. BITS Pilani, Pilani Campus Full Privatization • It is a service contract between a public authority and a private sector concessionaire, where the public authority pays the concessionaire to deliver infrastructure and related services • Typically, the concessionaire, who builds the infrastructure asset, is financially responsible for its condition and performance throughout the asset lifetime, or the duration of the agreement 19 Full privatization, the private sector assumes ownership of the infrastructure (design, build, operation and maintenance and finance)
  • 20. BITS Pilani, Pilani Campus Advantages and Disadvantages Advantages Dis-advantages Engages in a competitive process to achieve the best project for the best cost Government risk Establishes performance standards and payment mechanisms Non-complete contracts and uncertainty over a long horizon are other FP challenges Faster procurement 20
  • 21. BITS Pilani, Pilani Campus Analytical Comparison • BOOT versus BOT – The definition of BOOT and BOT is very close together and the only difference is the ownership of facilities in BOOT and because of this, quality of the work is vital to private – BOOT is more efficient – The BOOT contracts have the tendency to work well when the purpose of the project is to offer a service, but if the aim is to improve a service or make more efficient a system, this modality is not recommended. These methodologies increment the complexity of the financial study 21
  • 22. BITS Pilani, Pilani Campus • FP versus BOT & BOOT ⁻ In FP, private sector has a role as engineer or constructor, Ownership, operation and financing ⁻ On the other hand a pure private is responsible for all matter. ⁻ In BOOT final owner is public, but concession for a long period of time (25-30 year) is regarded to private ⁻ The ownership shifts from public to private as we move from FP to BOOT ⁻ Also private sector accepts more risk and preparing capital investment in BOOT/BOT 22
  • 23. BITS Pilani, Pilani Campus • Clear law and regulation and Stable political and economical environment is an important factor that effect BOOT/BOT project more than FP • The degree of involvement in BOOT/BOT is restricted • Advantage of this, is releasing from project jobs • Disadvantage is low control of government on project • Britain vs. turkey is a good example – Crises in political relation of two countries caused the – British party leave project dam building in turkey because Turkish government was not involved with project document, they were unable to continue the project 23
  • 24. BITS Pilani, Pilani Campus Conclusions Comparison Aspect Method Risk Public support Duration period Involvement Investment Cost for end user Efficiency BOT 90% by private sector Vital Long term (20-30) Less public 70-100% by private sector Higher Medium- high BOOT 90% by private sector Vital Long term (30+) Less public 70-100% by private sector Higher High FP 90% by public sector Not important Short term Nil Lower by public sector Lower - Higher High- Low 24
  • 25. BITS Pilani, Pilani Campus References • World Bank Group[US] https://ppiaf.org/ • http://finmin.nic.in/the_ministry/dept_eco_affairs/dea.asp • Thomas, S. M, measuring the impacts of delivery system on project performance, Construction Industry Institute, 2003 • Prof. Drs. Ir. Sebastiaan C.M. Menheere, P. S, Case Studies On Build Operate Transfer. Delft, The Netherlands, Delft University of Technology, 1996 • Verhoeven, L., BOT in Netherlands, university of technology, Delft, Netherlands, 1997 • Menheere, C. P., Case studies on Build, Operation, and Transfer, 1996 • Canada, P. (2010, may-June). P3 Canada Fund. Retrieved May 30, 2010, from public-private partnerships Canada: http://www.p3canada.ca/_files/file/P3C_Project_Submission_Guide_Round_Two_EN.pdf • http://toolkit.pppinindia.com/highways/sitemap-gts%20.php?links=intro1 25