Flexible flat belts are used on bucket elevators and belt conveyors to carry loose, bulk product. The belt is stretched tight from head drum to tail drum and the friction generated on the turning head drum is used to drive the belt and carry the product. The belt must run true on the end pulleys (drums) and stay within the sides of the equipment structure. If the belt runs off the drums, buckets will be destroyed and belt edges frayed. In the worst cases the belt runs off the pulleys resulting in a breakdown repair. Proper and long-lived tracking of belts is critical for trouble-free operation.
Chikkabanavara Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Tracking belts on elevators conveyors
1. Process, Plant and Equipment UP-TIME
F o r p l a n t o p e r a t o r s a n d m a i n t a i n e r s
From www.feedforward.com.au – Teaching engineering to plant operators and maintainers so they can solve problems and improve reliability.
Tracking belts on elevators and the structure. There are three common methods to join the
ends of bucket belts - overlap, butt and strap and turn-up
conveyors. clamp. Figure No. 1 shows the joining methods.
ABSTRACT
Tracking belts on bucket elevators and short belt conveyors.
Flexible flat belts are used on bucket elevators and belt
conveyors to carry loose, bulk product. The belt is stretched
tight from head drum to tail drum and the friction generated
on the turning head drum is used to drive the belt and carry
the product. The belt must run true on the end pulleys
(drums) and stay within the sides of the equipment structure.
If the belt runs off the drums, buckets will be destroyed and
belt edges frayed. In the worst cases the belt runs off the
pulleys resulting in a breakdown repair. Proper and long-
lived tracking of belts is critical for trouble-free operation.
Keywords: belt alignment,
Head and Tail Pulley Designs Figure No 1. Joining Bucket Elevator Belts.
The head and tail drums on belt bucket elevators and short
Insure joins are square to the running direction of the belt so
conveyors are usually solid steel cylinders. A shaft is
that the belt runs as straight and true as possible.
mounted thorough them at the center and extending outward
long enough to mount bearings on both sides. Often the Drum Crowning
shell is steel pressure pipe and the ends are cut from flat Belt tracking is greatly improved when one of the drums is
plate and welded in place. The shaft can be welded into the crowned. The drive pulley is the one usually crowned
end plates, but for easy repair, it is best mounted in taper though the bottom drum can also be used. Only one of the
locks that are welded to the end plates and the shaft clamped drums is crowned and not both. Crowning allows the natural
into them. The shell length is usually 25 – 40 mm (1” – 1- elasticity of the belt to act like a spring and pull the belt back
1/2”) longer than the belt width down the rise of the crown if it starts to wander to one side.
The height of the crown is 1% to 2% of the belt width.
Where additional friction is required the head pulley can be
lagged in rubber or grooved with a 45o herring bone pattern. Tracking Belts in Place
Once the belt is installed and pulled tight, the distance
On belt bucket elevators carrying powdered or dusty product
between drum shafts is measured on both sides and
the shell on the bottom pulley can be replaced with round
positioned the same distance apart. The belt is run unloaded
bars spaced around the end plates so that the gaps between
and if it wanders the tail pulley is adjusted and made tighter
them allow the product to fall out and the pulley self-cleans.
on the side the belt moves toward. The basic rule is that the
Drum Adjustment and Alignment belt moves toward the slack side and away from the tight
To insure the belt runs central the two pulleys must be side (this is also why crowning one pulley works). Another
aligned center to center. This is done with a string line way to look at it is that the belt goes from the high-energy
stretched from the mid-point on both drums. The distance side (tight) to the low-energy side (loose).
from a straight edge datum on the support structure is
Once the unloaded belt is running true product is then
measured and the position of the shaft bearings adjusted until
introduced onto it. If the belt wanders under load the tail
the string lines up with the straight datum edge.
pulley is further adjusted as was done when set-up unloaded.
The head and tail pulley axes must also initially be aligned
Only tension the belt enough to insure it does not slip under
parallel to each other and in the same plane. Once the drum
full load. Over-tensioning the belt rips the internal fibers
centers are inline the centerline distance on both sides from
and the belt stretches and creeps continuously.
shaft to shaft is measured from a datum line on the support
structure. Bring the drums as close together as possible so All snub rollers, carrying rollers and return rollers must be
that the belt can be later stretched. The drums are now square to the centerline of the belt and parallel to each other.
aligned both horizontally and axially. The belt is then fitted Check this by measuring diagonals, which should be equal.
on the pulleys.
Some times the belt can take on a ‘banana’ shape or
Belt Joining ‘crescent’ camber along its length. Usually this is a sign of
Belts for short conveyors are usually purchased with the uneven internal fibre lengths. In this case the belt wanders
ends joined and are slipped into place over the pulleys. A from side to side during a rotation and little can be done to
splice at 45o to the belt running direction and not square is control it except to get it running as near to center as
preferred. This allows the edge to lead into the scrapper and possible. Depending on the severity of the ‘banana’ it may
lessens the chance of the join catching and ripped. even require that one of the drums be offset from the center-
to-center alignment so that the belt stays on the pulleys. If
The belt for belt bucket elevators can be supplied either with
the camber exceeds 1% of the belt length replace it.
buckets already mounted or without. Once the buckets are
mounted it must be fed into the structure from the top and It can also be useful to install ‘digging’ buckets every tenth
the ends of the belt joined later through a hatch in the wall of bucket. These buckets are slightly oversize in length and
FEED FORWARD PUBLICATIONS, PO Box 578, BENTLEY, West Australia, 6102 Web: www.feedforward.com.au E-mail: info@feedforward.com.au
Because the authors, publisher and resellers do not know the context in which the information presented in the flyer is to be
used they accept no responsibility for the consequences of using the information contained or implied in any articles.
2. depth to the rest of the buckets and act as a scrapper to clear
away any product build-up on the sides of the structure.
Make them of metal or a harder material than the regular
buckets.
Mike Sondalini – Equipment Longevity Engineer
FEED FORWARD PUBLICATIONS, PO Box 578, BENTLEY, West Australia, 6102 Web: www.feedforward.com.au E-mail: info@feedforward.com.au
Because the authors, publisher and resellers do not know the context in which the information presented in the flyer is to be
used they accept no responsibility for the consequences of using the information contained or implied in any articles.