OEE: Overall Equipment Effectiveness




              Oh "Equipment Effectiveness", I've heard about that before!

Unfortunately, in many facilities, that's all OEE (Overall Equipment Effectiveness) is to
the personnel. Something they heard of, talked about or read about. Many maintenance
management departments today still do not effectively utilize the OEE tool even though
it's widely used among the world class companies.

     Definition of OEE: Overall Equipment Effectiveness
     The overall performance of a single piece of equipment or even an entire factory, will always
     be governed by the cumulative impact of the three OEE factors: Availability, Performance
     Rate and Quality Rate.

     OEE is a percentage derived by multiplication of the three ratios for the factors mentioned
     above. The OEE percentage is used for analysis and benchmarking.

In speaking with Mike Sondalini (Best Practice Facilitator/Author) about a similar topic - Root Cause
Analysis (RCA), Mike makes a statement I think identifies one of the main barriers to successful OEE
implementation today.

Mike: "I must admit that a lot of people know of RCA and its implications but very few people use it. I
think it's because they aren't able to convince enough of the right people at their work place to try it and
then to stick with it."

In my experience, OEE has had better coverage than the other analysis tools like RCA
or Fault Tree Analysis (FTA). This may be due to the fact that Overall Equipment
Effectiveness is also a benchmarking tool as well as an analysis tool. In an attempt to
grow the numbers who profit from using OEE, I will go over what OEE is, why you
should use OEE, and how to use it.

What is OEE?

OEE = Availability X Performance Rate X Quality Rate

Availability - Percent of scheduled production (to measure reliability) or calendar hours 24/7/365 (to
measure equipment utilization), that equipment is available for production.

Note: measures the percent of time that the equipment can be used (usually total hours
of 24-7-365), divided by the equipment uptime (actual production).

Performance Rate - Percent of parts produced per time frame, of maximum rate OEM rated
production speed at. If OEM specification is not available, use best known production rate.
Note: Performance efficiency is the percentage of available time that the equipment is producing product
at its theoretical speed for individual products. It measures speed losses. (e.g., inefficient batching,
machine jams)

Quality Rate - Percent of good sellable parts out of total parts produced per time frame.

Note: Determining the percent of the total output that is good. (i.e. all products including production,
engineering, rework and scrap.)

Example: 50% Availability (0.5) X 70% Performance Rate (0.7) X 20% Quality Reject
Rate (results in 80%(0.8) acceptable) = 30%OEE (Please see
www.DowntimeCentral.com/OEE_TEEP.htm for a free online calculator to practice
with.)

Why use OEE?

Overall Equipment Effectiveness (OEE) can be used to save companies from making
inappropriate purchases, and help them focus on improving the performance of
machinery and plant equipment they already own. OEE is used to find the greatest
areas of improvement so you start with the area that will provide the greatest return on
asset. The OEE formula will show how improvements in changeovers, quality, machine
reliability improvements, working through breaks and more, will affect your bottom line.

As you strive towards World Class productivity in your facility, this simple formula will
make an excellent benchmarking tool. The derived OEE percentage is easy to
understand and displaying this single number where all facility personnel can view it,
makes for a great motivational technique. By giving your employees an easy way to see
how they are doing in overall equipment utilization, production speed, and quality, they
will strive for a higher number!

I highly recommend using an automated equipment monitoring system with an LCD
display for your OEE in each respective area of your facility so all can monitor. To the
employee in each area, it will become as common to glance at, as the speedometer on
a car. While showing machine speed with such a display helps, machine speed is only a
small percentage of your overall equipment effectiveness - OEE.

How to use OEE?

Implementing the Overall Equipment Effectiveness formula in your facility can take on
many different forms. It can be used as an analysis and benchmarking tool for either
reliability, equipment utilization, or both. Don't let indecision on how to best use OEE
become a barrier that prevents you from using it at all. Start out small if necessary,
picking your bottleneck to collect the OEE metrics on.

Once you see first hand what a valuable tool it is, you can gradually take OEE
measurements on other equipment in your facility. If you work in manufacturing , there
is no substitute for going out to the shop floor and taking some rough measurements of
OEE. You will be surprised by what you find!

While monitoring OEE per equipment brings focus on the equipment itself, it may not
provide true cause of major costs, unless the cause is obvious. For example OEE can
appear improved by actions such as purchasing oversize equipment, providing
redundant supporting systems, and increasing the frequency of overhauls.

To improve your OEE percentage, you will need to use other tools and methodologies
available to you, like TDC, RCA, FTA etc. TDC is a relatively new methodology that
focuses on True Downtime Cost for justification and making better management
decisions. You can learn more about TDC at www.downtimecentral.com/tdc.htm. TDC
overcomes the main implementation barrier for OEE by giving maintenance managers a
tool in which to show actual cost savings in relationship with OEE.

For the ultimate decision making tool, incorporate OEE with TDC.

    Front End: Incorporate TDC into your data collection. (contact me for a free power
    point)

    Back End: Incorporate TDC into your software reporting by requiring it of your
    software vendor.

On a larger scale, you should not only be calculating equipment OEE, you should also
be calculating a production line OEE, and within a corporation, a facility OEE. Factory
automation companies are starting to incorporate OEE into the reports they generate
automatically! There are also a few companies who specialize in providing shop floor
data in automatic easy to read OEE reports. If you would like more information or
recommendations on companies that can get your automated OEE system up and
running, please contact me at bin95 @ bin95.com, I'll be happy to recommend a
service provider.

About the Author: Don Fitchett is President of Business Industrial Network and author
of several manufacturing cost analysis articles published in industry related journals and
websites. Please feel free to copy and pass along this article as long as all credits are
included.

More Related Content

What's hot

Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Brian Thomas
 
Using OEE to Improve Production - Interphex 2012
Using OEE to Improve Production - Interphex 2012Using OEE to Improve Production - Interphex 2012
Using OEE to Improve Production - Interphex 2012Adrian Pask
 
Optimizing and Troubleshooting Process Equipment Advanced Training Course
Optimizing and Troubleshooting Process Equipment Advanced Training CourseOptimizing and Troubleshooting Process Equipment Advanced Training Course
Optimizing and Troubleshooting Process Equipment Advanced Training CourseKarl Kolmetz
 
Innovative Services
Innovative ServicesInnovative Services
Innovative Servicesmktimse
 
Oee on hana overall equipment effectiveness overview aug 2012 (2)
Oee on hana   overall equipment effectiveness overview aug 2012 (2)Oee on hana   overall equipment effectiveness overview aug 2012 (2)
Oee on hana overall equipment effectiveness overview aug 2012 (2)Marco Bueno
 
Oee (overall equipment effectifness)
Oee (overall equipment effectifness)Oee (overall equipment effectifness)
Oee (overall equipment effectifness)Anang Tristianto
 
Automated testing handbook
Automated testing handbookAutomated testing handbook
Automated testing handbookAndrei Hortúa
 
Jvh Lean Presentation For 2009
Jvh Lean Presentation For 2009Jvh Lean Presentation For 2009
Jvh Lean Presentation For 2009guest88801083
 

What's hot (10)

Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)
 
Oee part 2
Oee part  2 Oee part  2
Oee part 2
 
Using OEE to Improve Production - Interphex 2012
Using OEE to Improve Production - Interphex 2012Using OEE to Improve Production - Interphex 2012
Using OEE to Improve Production - Interphex 2012
 
Optimizing and Troubleshooting Process Equipment Advanced Training Course
Optimizing and Troubleshooting Process Equipment Advanced Training CourseOptimizing and Troubleshooting Process Equipment Advanced Training Course
Optimizing and Troubleshooting Process Equipment Advanced Training Course
 
Innovative Services
Innovative ServicesInnovative Services
Innovative Services
 
Oee on hana overall equipment effectiveness overview aug 2012 (2)
Oee on hana   overall equipment effectiveness overview aug 2012 (2)Oee on hana   overall equipment effectiveness overview aug 2012 (2)
Oee on hana overall equipment effectiveness overview aug 2012 (2)
 
Oee (overall equipment effectifness)
Oee (overall equipment effectifness)Oee (overall equipment effectifness)
Oee (overall equipment effectifness)
 
OEE IMPLEMENTATION part 1
OEE IMPLEMENTATION part 1OEE IMPLEMENTATION part 1
OEE IMPLEMENTATION part 1
 
Automated testing handbook
Automated testing handbookAutomated testing handbook
Automated testing handbook
 
Jvh Lean Presentation For 2009
Jvh Lean Presentation For 2009Jvh Lean Presentation For 2009
Jvh Lean Presentation For 2009
 

Viewers also liked

ACCIDENT AVOIDANCE WITH DYNAMIC SPEED GOVERNOR
ACCIDENT AVOIDANCE WITH DYNAMIC SPEED GOVERNORACCIDENT AVOIDANCE WITH DYNAMIC SPEED GOVERNOR
ACCIDENT AVOIDANCE WITH DYNAMIC SPEED GOVERNORakbarsaleemtakkasila
 
ACCIDENT AVOIDANCE WITH DYNAMIC SPEED GOVERNOR
ACCIDENT AVOIDANCE WITH DYNAMIC SPEED GOVERNORACCIDENT AVOIDANCE WITH DYNAMIC SPEED GOVERNOR
ACCIDENT AVOIDANCE WITH DYNAMIC SPEED GOVERNORakbarsaleemtakkasila
 
Remote accident report system for highways using rf
Remote accident report system for highways using rfRemote accident report system for highways using rf
Remote accident report system for highways using rfPRADEEP Cheekatla
 
SOLAR ROADWAYS ~ Ch. Sai Krishna
SOLAR ROADWAYS ~ Ch. Sai Krishna SOLAR ROADWAYS ~ Ch. Sai Krishna
SOLAR ROADWAYS ~ Ch. Sai Krishna Sai Krishna
 
automated highways system
automated highways systemautomated highways system
automated highways systemHarish Naicker
 
Electrical machines I (II-EEE)
Electrical machines I (II-EEE)Electrical machines I (II-EEE)
Electrical machines I (II-EEE)betasam
 

Viewers also liked (8)

ACCIDENT AVOIDANCE WITH DYNAMIC SPEED GOVERNOR
ACCIDENT AVOIDANCE WITH DYNAMIC SPEED GOVERNORACCIDENT AVOIDANCE WITH DYNAMIC SPEED GOVERNOR
ACCIDENT AVOIDANCE WITH DYNAMIC SPEED GOVERNOR
 
ACCIDENT AVOIDANCE WITH DYNAMIC SPEED GOVERNOR
ACCIDENT AVOIDANCE WITH DYNAMIC SPEED GOVERNORACCIDENT AVOIDANCE WITH DYNAMIC SPEED GOVERNOR
ACCIDENT AVOIDANCE WITH DYNAMIC SPEED GOVERNOR
 
Remote accident report system for highways using rf
Remote accident report system for highways using rfRemote accident report system for highways using rf
Remote accident report system for highways using rf
 
SOLAR ROADWAYS ~ Ch. Sai Krishna
SOLAR ROADWAYS ~ Ch. Sai Krishna SOLAR ROADWAYS ~ Ch. Sai Krishna
SOLAR ROADWAYS ~ Ch. Sai Krishna
 
automated highways system
automated highways systemautomated highways system
automated highways system
 
Electrical machines I (II-EEE)
Electrical machines I (II-EEE)Electrical machines I (II-EEE)
Electrical machines I (II-EEE)
 
Solar Roadways PPT
Solar Roadways PPTSolar Roadways PPT
Solar Roadways PPT
 
Electrical Machines Notes
Electrical Machines NotesElectrical Machines Notes
Electrical Machines Notes
 

Similar to Oee

Overall Equipment Effectiveness (OEE).pptx
Overall Equipment Effectiveness (OEE).pptxOverall Equipment Effectiveness (OEE).pptx
Overall Equipment Effectiveness (OEE).pptxNoman khan
 
6 OEE overview
6 OEE overview6 OEE overview
6 OEE overviewWebseology
 
Managing OEE o optimize factory performance
Managing OEE o optimize factory performanceManaging OEE o optimize factory performance
Managing OEE o optimize factory performanceYasmin AbdelAziz
 
The+complete+guide+to+simple+oee
The+complete+guide+to+simple+oeeThe+complete+guide+to+simple+oee
The+complete+guide+to+simple+oeeGalland Tolentino
 
Overall Equipment Efficiency - A Next-Gen KPI for the Manufacturing Industry
Overall Equipment Efficiency - A Next-Gen KPI for the Manufacturing IndustryOverall Equipment Efficiency - A Next-Gen KPI for the Manufacturing Industry
Overall Equipment Efficiency - A Next-Gen KPI for the Manufacturing IndustryInfoStream Solutions
 
Softworx Enterprise Asset Management 101 - Presentation Template
Softworx Enterprise Asset Management 101 - Presentation TemplateSoftworx Enterprise Asset Management 101 - Presentation Template
Softworx Enterprise Asset Management 101 - Presentation TemplateEnterprise Softworx Solutions
 
Maintenance metrics in oee
Maintenance metrics in oeeMaintenance metrics in oee
Maintenance metrics in oeejohnsqms
 
The Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing ProductivityThe Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing ProductivityJason Corder
 
OEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing ProductivityOEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing ProductivityParsec_Automation_Corp
 
The Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing ProductivityThe Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing ProductivityCorey Vodvarka
 
Mellor Consulting Group approach toward a BKM OEE deployment
Mellor Consulting Group approach toward a BKM OEE deployment Mellor Consulting Group approach toward a BKM OEE deployment
Mellor Consulting Group approach toward a BKM OEE deployment Mellor Consulting Group
 
Overall Equipment Effectiveness in Construction Equipments
Overall Equipment Effectiveness in Construction EquipmentsOverall Equipment Effectiveness in Construction Equipments
Overall Equipment Effectiveness in Construction EquipmentsIRJET Journal
 
Total productivity maintenance
Total productivity maintenanceTotal productivity maintenance
Total productivity maintenanceFELIX JONATHAN
 
OEE & MES - Help Food & Beverage Manufacturers 4-2011
OEE & MES - Help Food & Beverage Manufacturers 4-2011OEE & MES - Help Food & Beverage Manufacturers 4-2011
OEE & MES - Help Food & Beverage Manufacturers 4-2011Paul Dengler, BSME, CEA, EIT
 
A Manager's Guide to OEE (Overall Equipment Effectiveness)
A Manager's Guide to OEE (Overall Equipment Effectiveness)A Manager's Guide to OEE (Overall Equipment Effectiveness)
A Manager's Guide to OEE (Overall Equipment Effectiveness)OEEsystems International
 
Performance Analysis using OEE
Performance Analysis using OEEPerformance Analysis using OEE
Performance Analysis using OEEijsrd.com
 
Design and Analysis of Chute System to obtain World Class OEE
Design and Analysis of Chute System to obtain World Class OEEDesign and Analysis of Chute System to obtain World Class OEE
Design and Analysis of Chute System to obtain World Class OEEijsrd.com
 
IMPROVING EQUIPMENT PERFORMANCE
IMPROVING EQUIPMENT PERFORMANCEIMPROVING EQUIPMENT PERFORMANCE
IMPROVING EQUIPMENT PERFORMANCEDrBiz Arikrishnan
 

Similar to Oee (20)

Overall Equipment Effectiveness (OEE).pptx
Overall Equipment Effectiveness (OEE).pptxOverall Equipment Effectiveness (OEE).pptx
Overall Equipment Effectiveness (OEE).pptx
 
6 OEE overview
6 OEE overview6 OEE overview
6 OEE overview
 
Managing OEE o optimize factory performance
Managing OEE o optimize factory performanceManaging OEE o optimize factory performance
Managing OEE o optimize factory performance
 
The+complete+guide+to+simple+oee
The+complete+guide+to+simple+oeeThe+complete+guide+to+simple+oee
The+complete+guide+to+simple+oee
 
Overall Equipment Efficiency - A Next-Gen KPI for the Manufacturing Industry
Overall Equipment Efficiency - A Next-Gen KPI for the Manufacturing IndustryOverall Equipment Efficiency - A Next-Gen KPI for the Manufacturing Industry
Overall Equipment Efficiency - A Next-Gen KPI for the Manufacturing Industry
 
lean & agile
lean & agilelean & agile
lean & agile
 
Softworx Enterprise Asset Management 101 - Presentation Template
Softworx Enterprise Asset Management 101 - Presentation TemplateSoftworx Enterprise Asset Management 101 - Presentation Template
Softworx Enterprise Asset Management 101 - Presentation Template
 
Maintenance metrics in oee
Maintenance metrics in oeeMaintenance metrics in oee
Maintenance metrics in oee
 
The Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing ProductivityThe Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing Productivity
 
OEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing ProductivityOEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing Productivity
 
The Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing ProductivityThe Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing Productivity
 
Mellor Consulting Group approach toward a BKM OEE deployment
Mellor Consulting Group approach toward a BKM OEE deployment Mellor Consulting Group approach toward a BKM OEE deployment
Mellor Consulting Group approach toward a BKM OEE deployment
 
Overall Equipment Effectiveness in Construction Equipments
Overall Equipment Effectiveness in Construction EquipmentsOverall Equipment Effectiveness in Construction Equipments
Overall Equipment Effectiveness in Construction Equipments
 
Total productivity maintenance
Total productivity maintenanceTotal productivity maintenance
Total productivity maintenance
 
Oee Explained
Oee ExplainedOee Explained
Oee Explained
 
OEE & MES - Help Food & Beverage Manufacturers 4-2011
OEE & MES - Help Food & Beverage Manufacturers 4-2011OEE & MES - Help Food & Beverage Manufacturers 4-2011
OEE & MES - Help Food & Beverage Manufacturers 4-2011
 
A Manager's Guide to OEE (Overall Equipment Effectiveness)
A Manager's Guide to OEE (Overall Equipment Effectiveness)A Manager's Guide to OEE (Overall Equipment Effectiveness)
A Manager's Guide to OEE (Overall Equipment Effectiveness)
 
Performance Analysis using OEE
Performance Analysis using OEEPerformance Analysis using OEE
Performance Analysis using OEE
 
Design and Analysis of Chute System to obtain World Class OEE
Design and Analysis of Chute System to obtain World Class OEEDesign and Analysis of Chute System to obtain World Class OEE
Design and Analysis of Chute System to obtain World Class OEE
 
IMPROVING EQUIPMENT PERFORMANCE
IMPROVING EQUIPMENT PERFORMANCEIMPROVING EQUIPMENT PERFORMANCE
IMPROVING EQUIPMENT PERFORMANCE
 

More from Business Industrial Network

More from Business Industrial Network (20)

Rotary Gear Type Pump Whitepaper
Rotary Gear Type Pump WhitepaperRotary Gear Type Pump Whitepaper
Rotary Gear Type Pump Whitepaper
 
Process Hazards Analysis
Process Hazards AnalysisProcess Hazards Analysis
Process Hazards Analysis
 
Machinery Failure Analysis and Troubleshooting
Machinery Failure Analysis and TroubleshootingMachinery Failure Analysis and Troubleshooting
Machinery Failure Analysis and Troubleshooting
 
Total Quality Management TQM
Total Quality Management TQMTotal Quality Management TQM
Total Quality Management TQM
 
Process Risk Management
Process Risk ManagementProcess Risk Management
Process Risk Management
 
Equipment Reliability Example
Equipment Reliability ExampleEquipment Reliability Example
Equipment Reliability Example
 
How to learn SCADA
How to learn SCADAHow to learn SCADA
How to learn SCADA
 
PLC Programming Example - PLC Clock - Answ
PLC Programming Example - PLC Clock - AnswPLC Programming Example - PLC Clock - Answ
PLC Programming Example - PLC Clock - Answ
 
Siemens PLC Programming Example #2
Siemens PLC Programming Example #2Siemens PLC Programming Example #2
Siemens PLC Programming Example #2
 
What is a PLC ?
What is a PLC ?What is a PLC ?
What is a PLC ?
 
Online Infrared Training Center Presentation
Online Infrared Training Center PresentationOnline Infrared Training Center Presentation
Online Infrared Training Center Presentation
 
PLC Networking Basics - Instructor's notes
PLC Networking Basics - Instructor's notesPLC Networking Basics - Instructor's notes
PLC Networking Basics - Instructor's notes
 
Plc networking basics - controllogix
Plc networking basics - controllogixPlc networking basics - controllogix
Plc networking basics - controllogix
 
Best plc-programming
Best plc-programmingBest plc-programming
Best plc-programming
 
PC vs PLC
PC vs PLCPC vs PLC
PC vs PLC
 
Thank You Veterans for your service
Thank You Veterans for your serviceThank You Veterans for your service
Thank You Veterans for your service
 
USA Manufacturing Jobs Analysis
USA Manufacturing Jobs AnalysisUSA Manufacturing Jobs Analysis
USA Manufacturing Jobs Analysis
 
Best Practices in PLC Programming
Best Practices in PLC ProgrammingBest Practices in PLC Programming
Best Practices in PLC Programming
 
Support Workforce Wednesdays
Support Workforce WednesdaysSupport Workforce Wednesdays
Support Workforce Wednesdays
 
Lean TPM Autonomous Maintenance 2
Lean TPM Autonomous Maintenance 2Lean TPM Autonomous Maintenance 2
Lean TPM Autonomous Maintenance 2
 

Recently uploaded

MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotesMuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotesManik S Magar
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsRavi Sanghani
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsNathaniel Shimoni
 
Testing tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesTesting tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesKari Kakkonen
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch TuesdayIvanti
 
A Framework for Development in the AI Age
A Framework for Development in the AI AgeA Framework for Development in the AI Age
A Framework for Development in the AI AgeCprime
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentPim van der Noll
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Mark Goldstein
 
Data governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationData governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationKnoldus Inc.
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 
QCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architecturesQCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architecturesBernd Ruecker
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersNicole Novielli
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Strongerpanagenda
 
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfpanagenda
 
Scale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterScale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterMydbops
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality AssuranceInflectra
 

Recently uploaded (20)

MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotesMuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and Insights
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directions
 
Testing tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesTesting tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examples
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch Tuesday
 
A Framework for Development in the AI Age
A Framework for Development in the AI AgeA Framework for Development in the AI Age
A Framework for Development in the AI Age
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
 
Data governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationData governance with Unity Catalog Presentation
Data governance with Unity Catalog Presentation
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 
QCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architecturesQCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architectures
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software Developers
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
 
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
 
Scale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterScale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL Router
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
 

Oee

  • 1. OEE: Overall Equipment Effectiveness Oh "Equipment Effectiveness", I've heard about that before! Unfortunately, in many facilities, that's all OEE (Overall Equipment Effectiveness) is to the personnel. Something they heard of, talked about or read about. Many maintenance management departments today still do not effectively utilize the OEE tool even though it's widely used among the world class companies. Definition of OEE: Overall Equipment Effectiveness The overall performance of a single piece of equipment or even an entire factory, will always be governed by the cumulative impact of the three OEE factors: Availability, Performance Rate and Quality Rate. OEE is a percentage derived by multiplication of the three ratios for the factors mentioned above. The OEE percentage is used for analysis and benchmarking. In speaking with Mike Sondalini (Best Practice Facilitator/Author) about a similar topic - Root Cause Analysis (RCA), Mike makes a statement I think identifies one of the main barriers to successful OEE implementation today. Mike: "I must admit that a lot of people know of RCA and its implications but very few people use it. I think it's because they aren't able to convince enough of the right people at their work place to try it and then to stick with it." In my experience, OEE has had better coverage than the other analysis tools like RCA or Fault Tree Analysis (FTA). This may be due to the fact that Overall Equipment Effectiveness is also a benchmarking tool as well as an analysis tool. In an attempt to grow the numbers who profit from using OEE, I will go over what OEE is, why you should use OEE, and how to use it. What is OEE? OEE = Availability X Performance Rate X Quality Rate Availability - Percent of scheduled production (to measure reliability) or calendar hours 24/7/365 (to measure equipment utilization), that equipment is available for production. Note: measures the percent of time that the equipment can be used (usually total hours of 24-7-365), divided by the equipment uptime (actual production). Performance Rate - Percent of parts produced per time frame, of maximum rate OEM rated production speed at. If OEM specification is not available, use best known production rate.
  • 2. Note: Performance efficiency is the percentage of available time that the equipment is producing product at its theoretical speed for individual products. It measures speed losses. (e.g., inefficient batching, machine jams) Quality Rate - Percent of good sellable parts out of total parts produced per time frame. Note: Determining the percent of the total output that is good. (i.e. all products including production, engineering, rework and scrap.) Example: 50% Availability (0.5) X 70% Performance Rate (0.7) X 20% Quality Reject Rate (results in 80%(0.8) acceptable) = 30%OEE (Please see www.DowntimeCentral.com/OEE_TEEP.htm for a free online calculator to practice with.) Why use OEE? Overall Equipment Effectiveness (OEE) can be used to save companies from making inappropriate purchases, and help them focus on improving the performance of machinery and plant equipment they already own. OEE is used to find the greatest areas of improvement so you start with the area that will provide the greatest return on asset. The OEE formula will show how improvements in changeovers, quality, machine reliability improvements, working through breaks and more, will affect your bottom line. As you strive towards World Class productivity in your facility, this simple formula will make an excellent benchmarking tool. The derived OEE percentage is easy to understand and displaying this single number where all facility personnel can view it, makes for a great motivational technique. By giving your employees an easy way to see how they are doing in overall equipment utilization, production speed, and quality, they will strive for a higher number! I highly recommend using an automated equipment monitoring system with an LCD display for your OEE in each respective area of your facility so all can monitor. To the employee in each area, it will become as common to glance at, as the speedometer on a car. While showing machine speed with such a display helps, machine speed is only a small percentage of your overall equipment effectiveness - OEE. How to use OEE? Implementing the Overall Equipment Effectiveness formula in your facility can take on many different forms. It can be used as an analysis and benchmarking tool for either reliability, equipment utilization, or both. Don't let indecision on how to best use OEE become a barrier that prevents you from using it at all. Start out small if necessary, picking your bottleneck to collect the OEE metrics on. Once you see first hand what a valuable tool it is, you can gradually take OEE measurements on other equipment in your facility. If you work in manufacturing , there
  • 3. is no substitute for going out to the shop floor and taking some rough measurements of OEE. You will be surprised by what you find! While monitoring OEE per equipment brings focus on the equipment itself, it may not provide true cause of major costs, unless the cause is obvious. For example OEE can appear improved by actions such as purchasing oversize equipment, providing redundant supporting systems, and increasing the frequency of overhauls. To improve your OEE percentage, you will need to use other tools and methodologies available to you, like TDC, RCA, FTA etc. TDC is a relatively new methodology that focuses on True Downtime Cost for justification and making better management decisions. You can learn more about TDC at www.downtimecentral.com/tdc.htm. TDC overcomes the main implementation barrier for OEE by giving maintenance managers a tool in which to show actual cost savings in relationship with OEE. For the ultimate decision making tool, incorporate OEE with TDC. Front End: Incorporate TDC into your data collection. (contact me for a free power point) Back End: Incorporate TDC into your software reporting by requiring it of your software vendor. On a larger scale, you should not only be calculating equipment OEE, you should also be calculating a production line OEE, and within a corporation, a facility OEE. Factory automation companies are starting to incorporate OEE into the reports they generate automatically! There are also a few companies who specialize in providing shop floor data in automatic easy to read OEE reports. If you would like more information or recommendations on companies that can get your automated OEE system up and running, please contact me at bin95 @ bin95.com, I'll be happy to recommend a service provider. About the Author: Don Fitchett is President of Business Industrial Network and author of several manufacturing cost analysis articles published in industry related journals and websites. Please feel free to copy and pass along this article as long as all credits are included.