OVERVIEW
OF SIX SIGMA (6σ) FOR
PROCESS IMPROVEMENT
Presented by:
Larry Bartkus of
Biosense Webster
and
Matthew Thompson of
FCI Management Solutions
Goals
 Introduction to Six Sigma
– Description
– Philosophies
– Benefits
– Origin
– Myths
 Identify the five steps of DMAIC, the core of Six Sigma, and
the logical flow from step to step.
 List tools and concepts useful in each step.
 Brief introduction to DMADV
Six Sigma
Description
– “… Six Sigma is a quality program that, when all is
said and done , improves your customer’s
experience, lowers your costs, and builds better
leaders.” Jack Welch CEO GE
– Six Sigma is a proven set of tools and tactics used
for process improvement, reduction of defects, and
improved quality
– Six Sigma uses data and statistical analysis to
zero in on root causes
– Six Sigma can be applied to any process
2
3
4
5
6
σ
Defects per
Million
opportunities
308,537
66,807
6,210
233
3.4 .
3σ to 6σ - 20,000 Times Improvement ... A True QFL
Six Sigma
Measurement
Six Sigma: What Does it Mean
30%
6%
.6%
3.8 10,724 1%
2.5 158,686 16%
99.99966% Good (6 Sigma)
•20,000 lost articles of mail per hour
•5,000 incorrect surgical operations
per week
•Two short or long landings at most
major airports each day
•200,000 wrong drug prescriptions
each year
•Seven articles lost per hour
•1.7 incorrect operations per week
•One short or long landing every
five years
•68 wrong prescriptions per year
99% Good (3.8 Sigma)
Six Sigma Performance
Most Businesses Operate at about 3.5 Sigma
Six Sigma
Philosophies
– When defects occur look to the process for the cause.
– Excellent processes will allow average people to consistently
generate superior results.
Benefits
– More loyal and satisfied customers (internal and external)
– Financial savings through improved efficiency and effectiveness
– Resolution of chronic problems
Origin
– The late Bill Smith, a reliability engineer at Motorola, is widely
credited with originating Six Sigma and selling it to Motorola's
legendary CEO, Robert Galvin.
Myths
THE DMAIC METHOD
Overview of the DMAIC Method
IMPROVE
CONTROL
MEASURE
ANALYZE
5
2
3
4
DEFINE
1
Phase 1: Define
Goal
 Define the project’s purpose
and scope and get
background on the process
and customer
Output
 A clear statement of the
intended improvement
and how it is to be
measured
 A high-level map of the
process
 A list of what is important to
the customer
IMPROVE
CONTROL
MEASURE
ANALYZE
5 1
2
3
4
DEFINE
Project Charter
Define
Define Measure Analyze
Improve/
Innovate
Control
Product Flow
SIPOC
Process OutputInput CustomerSupplier
Planning Level Build Plan Doctors
Quality
Engineering
JCIT
Capacity
Requirements
Line Design
Compliance
Issues
Consulting
Improved Cycle
Times /WIP
Reductions
Reduced QNC’s
Improved Efficiency/
Improved Compliance
Shareholders
Quality
Regulatory
Receive
Finished Goods
Trigger
Cut Work Order
to Line
Sequence WO's
Through
Single Prod.
Line
Marketing
Forecast
Sterilize
Release
Product to
Finished Goods
EXISTING PROCESS FLOW
Define Measure Analyze
Improve/
Innovate
Control
VOICE OF THE CUSTOMER
Input from floor associates
Why Not
Campaign
Identify “hidden” non-compliance issues
Floor associate “buy-in” to improving the process
Ease of use
Documentation “mirrors” process
Operations
Rapid
Improvement
Improved
Product Build
Documentation
Consistency between documents
Compliance to procedures
Reduce QNC’s
Eliminate product mix-ups
Simplified
Product Flow
Mitigate opportunity for “near miss” events
Create simplified process flow.
Reduce process related
QNC’s by 50%
Reduce near miss events
from 14 in 2004 to 4
(1 per quarter) in 2005
Reduce near miss events
from 14 in 2004 to 4
(1 per quarter) in 2005
Phase 2: Measure
Goal
 Focus the improvement
effort by gathering
information on the
current situation
Output
 Data that pinpoints
problem location or
occurrence
 Baseline data on current
process sigma
 A more focused problem
statement
IMPROVE
CONTROL
MEASURE
ANALYZE
5
2
3
4
DEFINE
1
D M A I C
• The system to collect information is already
established.
• 100% of Scrap forms from Work Orders for all
products are captured into a Yield Database.
• Scrap form (FORM633) has information as Lot
Number, Date, Shift, Product Number, Defect
Code, Defect Description, Potential Cause, Work
Station ID, Catheter Number, Scrap Quantity, and
is signed by operator and supervisor / engineer.
• Yield Database has information as Product
Number, Date, Lot Number, Description, Lot
Quantity, Reworks, Scrap in Line, and Scrap in QA.
Documentation Time Study
Analyze
Minutes per Work Order
Maximum = 26.5 min per W/O
8
3
2.5 2.5 2.5
2 2 2 2
0
1
2
3
4
5
6
7
8
9
Form
046
Form
335
Form
618
Form
621
Form
617
Form
615
Form
633
Form
616
Form
051
Form
LenthoftimeinMinutes
Burst Tester Gage R&R
AnalyzeMeasure Improve ControlDefine
Percent
Part-to-PartReprodRepeatGage R&R
100
50
0
% Contribution
% Study Var
SampleStDev
6
4
2
_
S=3.447
UCL=5.418
LCL=1.476
Operator 1 Operator 2
SampleMean
100
80
60
__
X=86.10
Operator 1 Operator 2
UCL=88.81
LCL=83.38
Operators
Settings
Operator 2Operator 1
NominalMinimumNominalMinimum
100
75
50
Operators
Operator 2Operator 1
100
75
50
Gage name: Gage R&R for Burst V alues (U niv ersal Tray )
Date of study :
Reported by : J. C han
Tolerance:
M isc:
Components of Variation
S Chart by Operators
Xbar Chart by Operators
Burst By Settings ( Operators )
Burst by Operators
Gage R&R (Nested) for Burst Values
The total Gage Repeatability and Reproducibility is 12.38%, which is well below the acceptance criteria of less than or
equal to 30% of the Total Variation. Measurement system is acceptable.
The Gage R & R study is able to show that the burst tester is capable of detecting different parts being measured as
shown from the data reported by two different operators measuring the samples.
Process Capability-Current
IndividualValue
4321
1.8
1.6
1.4
_
X=1.5955
UCL=1.9437
LCL=1.2472
MovingRange
4321
0.4
0.2
0.0
__
MR=0.1309
UCL=0.4278
LCL=0
Observation
Values
4321
1.68
1.60
1.52
1.81.71.61.51.41.31.2
LSL
Specifications
LSL 1.13
2.11.81.51.2
Within
O v erall
Specs
Within
StDev 0.116076
C p *
C pk 1.34
O v erall
StDev 0.102049
Pp *
Ppk 1.52
C pm *
Process Capability Sixpack of C before
I Chart
Moving Range Chart
Last 4 Observations
Capability Histogram
Normal Prob Plot
A D: 0.350, P: 0.255
Capability Plot
Process Capability Ring 20 – Current Marking Method
0 1 2 3 4 5 6 7 8 9 10
169.70
169.95
170.20
170.45
Xbar and R Chart
Subgr
Mean
Mean=170.1
UCL=170.4
LCL=169.7
0.0
0.3
0.6
0.9
Range
R=0.3515
UCL=0.9050
LCL=0
0 1 2 3 4 5 6 7 8 9 10
Last 10 Subgroups
169.8
170.0
170.2
170.4
Subgroup Number
Values
169.5 170.5
Capability Plot
Process Tolerance
I I I
I I I
I I
Specifications
Within
Overall
169.5 170.0 170.5
Normal Prob Plot
169.6 170.0 170.4
Capability Histogram
Within
StDev:
Cp:
Cpk:
0.207647
0.80
0.70
Overall
StDev:
Pp:
Ppk:
0.191131
0.87
0.76
Process Capability Sixpack for Prod. Ring20
DMAI2
C
Phase 3: Analyze
Goal
 Identify deep root
causes and confirm
them with data
Output
 A theory that has
been tested and
confirmed
IMPROVE
CONTROL
MEASURE
ANALYZE
5
2
3
4
DEFINE
1
D M A I C
D-1237-02-SD-1237-01-S
1.34
1.32
1.30
1.28
1.26
1.24
1.22
1.20
1.18
1.16
PART NUMBER
AverageperWO
1
2
Multi-Vari Chart for Short in Ring
Shif t
D-1237-01-S D-1237-02-S
1.00
1.05
1.10
1.15
1.20
1.25
1.30
1.35
PART NUMBERAverageperWO
1
2
Multi-Vari Chart for No Reading
Shif t
D-1237-01-S D-1237-02-S
0.98
1.08
1.18
1.28
1.38
1.48
1.58
1.68
1.78
PART NUMBER
AverageperWO
1
2
Multi-Vari Chart for Lasso out of Roundness
Shif t
D-1237-02-SD-1237-01-S
1.35
1.30
1.25
1.20
1.15
1.10
1.05
1.00
PART NUMBER
AverageperWO
1
2
Multi-Vari Chart for Damaged Ring
Shif t
D-1237-01-S D-1237-02-S
1.00
1.05
1.10
1.15
1.20
1.25
1.30
1.35
PART NUMBER
AverageperWO
1
2
Multi-Vari Chart for Damaged Spine Cover
Shif t
D-1237-01-S D-1237-02-S
1.0
1.1
1.2
1.3
PART NUMBER
AverageperWO
1
2
Multi-Vari Chart for Tip going Backwards
Shif t
Benchmarking - Internal
StrategicAdvantage
•Advanced Applications
•High Interactivity
e.g. online forms
•Knowledge Mgt hub
•Primary Communications
Vehicle
•Content Rich
Tier 4
Transforming
Features
Tier 1
Basic Presence
Basic
Company
Information
Tier 3
Integrating
•Communities
•Advanced Search
•Value-add tools
•Moderate Interactivity
•Personalisation
•Extensive information
•Basic Search
Tier 2
Searching
Analyze
Regression Analysis
Analyze
Forecasted Demand
08/15/05- 07/15/05
Month
GrandTotal
121086420
40000
39000
38000
37000
36000
35000
34000
33000
32000
31000
S 2661.11
R-Sq 7.0%
R-Sq(adj) 0.0%
Fitted Line Plot
Grand Total = 34329 + 193.1 Month
7% Increase in demand/year
Design of Experiment
AnalyzeMeasure Improve ControlDefine
23 Factorial Design
Factors Low High
Temperature 245 F 260 F
Pressure 55 PSI 90 PSI
Time 2 SEC 3 SEC
Design of Experiment
AnalyzeMeasure Improve ControlDefine
Hi
Lo0.00000
D
New
Cur
d = 0.00000
Maximum
Burst Va
y = 94.6429
2.0
3.0
55.0
90.0
245.0
260.0
Pressure TimeTemp
[245.0] [75.0] [3.0]
Phase 4: Improve
Goal
 Develop, pilot, and
implement solutions
that address root
causes.
Output
 Identification of
planned, tested
actions that should
eliminate or reduce
the impact of the
identified root causes
CONTROL
MEASURE
ANALYZE
5
2
3
DEFINE
1
FMEA
IMPROVE
4
D M A I C
•Improvement team created with members of
Quality, Production, Engineering and R&D areas
to propose and evaluate ideas.
•Brainstorming tool was used to gather ideas on
how to solve the problems identified.
•Ideas were evaluated per following criteria:
feasible, high impact, easy, low cost, and quick.
•Following tables summarizes solutions agreed
by consensus of the improvement team.
D M A I C
PROBLEM BRIEF DESCRIPTION PROPOSED
SOLUTION
Some acceptance criteria
are not clear for
associates.
Rejection of good product
exposes it to damage during
rework operations.
Train associates on
visual acceptance
criteria.
Lasso to tip method.
Defective bonding of
Compression Coil and
Lasso Stem
PU is applied before the
components are in place and
is partially removed during
installation of components.
Add a new hole to
apply PU to bond
components once
they are in place.
Prep. lasso stem method.
Poor burnishing of
Nitinol wire.
Current burnishing method is
not ergonomic causing
associates make defects after
some time.
Design a new
fixture to hold
Nitinol during
burnishing.
Solutions
FMEA
Pilot
Im
plem
en-
tation
Solutions
FMEA
Pilot
Im
plem
en-
tation
RISK 12. Support Plan not in Place
Description IntegWare does not want to put Biosense Webster in a position of being overly reliant for day-to-day
level 1 support of the system after go-live. IntegWare typically suggests that we assume the role of a
second level support for a limited number of hours per month. IntegWare suggests it is typical for
Day-to-Day (level 1) support will be a highly resource consuming task for three-six months after go-
live. To use IntegWare for this might be an ineffective usage of the customer's resources. The
project ownership should be transferred to the customer if at all possible.
It would be a better usage of the customer’s resources to ask IntegWare to implement higher value-
added initiatives in PDM (such as developing PART/BOM configuration management features, JDE
integration, etc.)
MITIGATION To mitigate this risk, we have discussed a support concept at BWI. This will be a combo function
between Doc services (they will handle basic application admin functions) and IM who will handle IT
functions.
Still need to setup support contract for IntegWare to support system.
Celeste has added to the schedule a support contract for level 2 support from IntegWare.
RISK LEVEL HIGH
UPDATED 5/2/03
ASSESSING RISK
An Example:
AnalyzeMeasure Improve/ ControlDefine
Estimated Cost Benefit
100
10
1
CMM vs. Estimated Cost Avoidance
$0
$1
$2
$3
$4
$5
1 2 3 4 5
Millions
Capability Maturity Model (CMM) Level
CumulativeCompliance
Risk($)
Cumulative Risk ($) Compliance Cost
Risk reduction
= $1.7 Million
1.6 2 .5
Pilot/Pilot Plan
AnalyzeMeasureDefine Control
Used Japan Custom line as a pilot
- Medium size production line
- Minimize the production Impact
– Kanbans Cards
– Signals, Lights
– Performance Measures
Improve/
Phase 5: Control
Goal
 Use data to evaluate both the
solutions and the plans
 Validate that all changes adhere to
all operating company change
control, GMP, and compliance
requirements
 Maintain the gains by
standardizing processes
 Outline next steps for on-going
improvement
Output
 Before-and-After analysis
 Monitoring system
 Completed documentation of results,
learnings, and recommendations
IMPROVE
CONTROL
MEASURE
ANALYZE
5
2
3
4
DEFINE
1
D M A I C
•All new tooling, processes, clarifications, and
visual aids documented in PIs.
•Creation of MOPXXX with all the quality criteria
for Variable Lasso Deflection and Contraction
performance.
•MOP003 updated with reference to new created
MOPXXX.
•PU quality criteria documented in WSS001 and
available in QA workbenches.
D M A I C
•Yields Chart is published every week.
Work Orders
Built
Yield
Goal
Scrap
Produced
Yield
Actual
I-MR Charts of Burst Tester
AnalyzeMeasure Improve ControlDefine
Burst Values
IndividualValue
302928272625242322212019181716151413121110987654321
115
110
105
100
_
X=105.88
UCL=113.76
LCL=97.99
Observation
MovingRange
302928272625242322212019181716151413121110987654321
10
5
0
__
MR=2.97
UCL=9.69
LCL=0
Universal Tray Packaging (CA Sealer)
In-H20
Burst Values
IndividualValue
302928272625242322212019181716151413121110987654321
110
105
100
95
_
X=100.72
UCL=109.68
LCL=91.76
Observation
MovingRange
302928272625242322212019181716151413121110987654321
12
8
4
0
__
MR=3.37
UCL=11.01
LCL=0
Universal Tray Packaging (Juarez Sealer)
In-H20
Lessons Learned
• Culture shock
• Resources
• Scope creep / Identifying the critical few
• Management buy-in of change of policies
• Time management & deliverables challenges
• J&J Goals too high for small operating company (CMM
goal of Level 3 per J&J Corp Strategy)
• Difficult to measure compliance
Project Closure
Improvement must be continuous, but individual
initiatives and project teams come to an end.
Learn when it’s time to say goodbye.
Effective project closure weaves together the themes
of:
– Project purpose.
– Improvement methods.
– Team skills and structures.
Develop managerial systems to capture learnings and
enable the organization to address system issues.
Documentation and recognition are two critical aspects
of project team closure.
Celebrate!
DMAIC Pathway
New product Development - DEx Roadmap - DMADV
• DEFINE – Develop the Business Case, Scope & Charter the Project
• MEASURE – Gather & Quantify Design Inputs (Customer, Technical, Business,
Regulatory)
• ANALYZE – Develop and Investigate Conceptual Designs
• DESIGN – Develop Detailed Product/Service/Process Designs
• VERIFY/VALIDATE – Confirm design outputs meet design input requirements and
ensure specifications conform with intended uses and users; Scale-up manufacture and
release the product or scale-up and implement the new process; Finally, transfer to
process owners
Verify/
Validate
DesignAnalyzeMeasureDefine
Opportunity
Define
Measure
Analyze
Design
Verify/Validate
Transfer
DEx Methodology
IDTask Name
1 ID Customers
2 ID Needs
3 ID CCRs
4 Review
5 DevelopConcepts
6 High-Level Design
7 Capability
8 DesignReview
9 DevelopDetails
10Simulation
11Cost Analysis
12DesignReview
13Procurement
14Implementation
SepOctNovDecJanFebMarAprMayJunJulAugSep
Qtr 4, 1999Qtr 1, 2000Qtr 2, 2000Qtr 3, 2000
Business Case
Goal Statement
Project Plan
Opportunity Statement
Project Scope
Team Selection
Team Charter
Generation1Generation2Generation3
Vision
Product/
Service
Generation
Technologies/
Platforms
Theme 1
Need 1 Need 2
Theme 2
Need 3 Need 4
Need 5
Theme 3
Need 7
Need 8
1
Customer
Requirem
ents
(V)
3
Characteristic/Measur
es (how)(I)
Target goals
7
Correlatio
n (I)
2
Cust
omer
Rati
ng
(B)
(V)
4
Relationships
(What vs.
How)
(I)
6
5
Importance(V)
How important
Targets/Spec
s(B)(I)
Technical Evaluation
(B)
Measures
(Hows)
Customerneeds
(Whats)
House
Of
Quality
#1
Critical
processcharacteristics
(Hows)
Measures
(Whats)
House
Of
Quality
#2
Creative Techniques White Red Black Blue Green Yellow
Start With
What You
Know
Get Other
Perspec-
tives
Non-Linear
Thinking
Buildon
Ideas
Combine
Ideas Compare
FAULT TREE
SYSTEM
RELIABILITY PREDICTION
System
Failure
Pump
P1
Fails
Pump
P2
Fails
Pump
V1
Fails
Pump
V2
FailsR = RBil X (1 - (1-Rp)2) x
(1 - (1-Rv)2)
PumpsBilge Valves
P1
P2
V1M
V2M
Bilge
Failure
Pump
Failure
Valve
Failure
Time (t)
HazardRate-
h(t)
Random Failures
Early
Failures
Wearou
t
Failures
Process
2
Process
1
Process
3
Worker 1
Inspector 1
Worker 2
Inspector 2
Worker 3
Inspector 3
Recorder 3
Recorder 2
Recorder 1
Card
Inspect 1
Inspect 2
Inspect 3
Card Drop Shop - Process Model
Recorders
Workers
Inspectors
Develop
Process
Control Plan
Error
Proofing and
Contingency
Planning
Detailed
Design
Review
Prepare Pilot
Test Plans
Act Plan
Check Do
Start
Type
of data
?
Counting
items with an
attribute or counting
occurrences?
Equal
sample
sizes
?
Equal
opportunity
?
Continuous
Yes
No
Yes
Rational
Subgroups
Discrete
Yes
No
No
Do limits
look right?
Try individuals charts
Need to
detect small shifts
quickly?
Individual
measurements
or subgroups
?
Do limits
look right?
YesNo
Either/Or
No
Yes
Individual
measurements
Occurrences
Items with
attribute
p chart
Try transformation to make data normal
no chart u chart c chart X, R or s chart
Individuals
charts
EWMA
chart
Unstable
(Not in control)
Stable
(In control)
Within spec limits
Upper Spec
Lower Spec
Upper Spec
Lower Spec
UCL
LCL
UCL
LCL
Outside spec limits
Upper Spec
Lower Spec
Upper Spec
Lower Spec
UCL
LCL
UCL
LCL
Type of Design
Products
Services
Design-
Production-
Delivery
Processes
Supporting
Processes
Type of Design
Design Elements
Products
Services
Design-
Production-
Delivery
Processes
Supporting
Processes
1. HW Products
2. SW Products
3. Services
4. Analyses
5. Information Systems
6. Processes and Methods
7. Human Resources
8. Site  Facilities
9. Equipment  Tools
10. Materials  Supplies
11. Sales  Marketing
12. Other Non-Technical
Question & Answer

More Related Content

What's hot

six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...Niranjana B
 
Lean six sigma introduction
Lean six sigma   introductionLean six sigma   introduction
Lean six sigma introductionThe Apprentiice
 
Lean Six Sigma methodology
Lean Six Sigma methodologyLean Six Sigma methodology
Lean Six Sigma methodologyRamiro Cid
 
Quality Circle Presentation Template
Quality Circle Presentation TemplateQuality Circle Presentation Template
Quality Circle Presentation TemplateEk Pahla Kadam
 
DMAIC for sharing
DMAIC for sharingDMAIC for sharing
DMAIC for sharingEFQM2010
 
DMAIC-Six sigma process Improvement Approach
DMAIC-Six sigma process Improvement ApproachDMAIC-Six sigma process Improvement Approach
DMAIC-Six sigma process Improvement ApproachConfiz
 
Six Sigma Introduction
Six Sigma IntroductionSix Sigma Introduction
Six Sigma IntroductionAbhishek Kumar
 
Lean Six Sigma project Caponera
Lean Six Sigma project CaponeraLean Six Sigma project Caponera
Lean Six Sigma project CaponeraAnnalisa Caponera
 
Six sigma case study-a good approach with example
Six sigma case study-a good approach with exampleSix sigma case study-a good approach with example
Six sigma case study-a good approach with examplebhanutomar
 
Lean six sigma explained: Beginners training
Lean six sigma explained: Beginners trainingLean six sigma explained: Beginners training
Lean six sigma explained: Beginners trainingQualsys Ltd
 
Lean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete trainingLean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete trainingAnkit Sharma
 

What's hot (20)

Dmaic
DmaicDmaic
Dmaic
 
Lean 6sigma and DMAIC
Lean 6sigma and DMAICLean 6sigma and DMAIC
Lean 6sigma and DMAIC
 
DMAIC Components
DMAIC ComponentsDMAIC Components
DMAIC Components
 
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
 
DMAIC
DMAICDMAIC
DMAIC
 
Lean six sigma introduction
Lean six sigma   introductionLean six sigma   introduction
Lean six sigma introduction
 
Lean Six Sigma methodology
Lean Six Sigma methodologyLean Six Sigma methodology
Lean Six Sigma methodology
 
Lean Six Sigma Green Belt roadmap poster
Lean Six Sigma Green Belt roadmap posterLean Six Sigma Green Belt roadmap poster
Lean Six Sigma Green Belt roadmap poster
 
Quality Circle Presentation Template
Quality Circle Presentation TemplateQuality Circle Presentation Template
Quality Circle Presentation Template
 
DMAIC for sharing
DMAIC for sharingDMAIC for sharing
DMAIC for sharing
 
DMAIC-Six sigma process Improvement Approach
DMAIC-Six sigma process Improvement ApproachDMAIC-Six sigma process Improvement Approach
DMAIC-Six sigma process Improvement Approach
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Six Sigma Introduction
Six Sigma IntroductionSix Sigma Introduction
Six Sigma Introduction
 
DMAIC Methodology
DMAIC MethodologyDMAIC Methodology
DMAIC Methodology
 
Lean Six Sigma project Caponera
Lean Six Sigma project CaponeraLean Six Sigma project Caponera
Lean Six Sigma project Caponera
 
DMAIC Components
DMAIC ComponentsDMAIC Components
DMAIC Components
 
Dmaic model
Dmaic modelDmaic model
Dmaic model
 
Six sigma case study-a good approach with example
Six sigma case study-a good approach with exampleSix sigma case study-a good approach with example
Six sigma case study-a good approach with example
 
Lean six sigma explained: Beginners training
Lean six sigma explained: Beginners trainingLean six sigma explained: Beginners training
Lean six sigma explained: Beginners training
 
Lean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete trainingLean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete training
 

Viewers also liked (20)

Basic Six Sigma Presentation
Basic Six Sigma PresentationBasic Six Sigma Presentation
Basic Six Sigma Presentation
 
Dmaic phases & tools
Dmaic phases & toolsDmaic phases & tools
Dmaic phases & tools
 
Presentation introduction to six sigma
Presentation   introduction to six sigmaPresentation   introduction to six sigma
Presentation introduction to six sigma
 
Six sigma ppt
Six sigma pptSix sigma ppt
Six sigma ppt
 
Six Sigma the best ppt
Six Sigma the best pptSix Sigma the best ppt
Six Sigma the best ppt
 
Proceso DMAIC para la Calidad
Proceso DMAIC para la CalidadProceso DMAIC para la Calidad
Proceso DMAIC para la Calidad
 
Dmaic
DmaicDmaic
Dmaic
 
Metodologia DMAIC
Metodologia DMAICMetodologia DMAIC
Metodologia DMAIC
 
Metodología dmaic ejemplo
Metodología dmaic ejemploMetodología dmaic ejemplo
Metodología dmaic ejemplo
 
Dmaic
DmaicDmaic
Dmaic
 
El método DMAIC en Six Sigma
El método DMAIC en Six SigmaEl método DMAIC en Six Sigma
El método DMAIC en Six Sigma
 
Trabalho de 6 sigmas administração da produção 2
Trabalho de 6 sigmas   administração da produção 2Trabalho de 6 sigmas   administração da produção 2
Trabalho de 6 sigmas administração da produção 2
 
Apresentação Six Sigmas
Apresentação Six SigmasApresentação Six Sigmas
Apresentação Six Sigmas
 
PDCA Cycle
PDCA CyclePDCA Cycle
PDCA Cycle
 
Dmaic
DmaicDmaic
Dmaic
 
Six sigma presentation
Six sigma presentationSix sigma presentation
Six sigma presentation
 
Six Sigma
Six SigmaSix Sigma
Six Sigma
 
Plan do-check-act
Plan do-check-actPlan do-check-act
Plan do-check-act
 
Conducting Kaizen Events
Conducting Kaizen EventsConducting Kaizen Events
Conducting Kaizen Events
 
Kaizen Event Guide
Kaizen Event GuideKaizen Event Guide
Kaizen Event Guide
 

Similar to Dmaic

Lean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesLean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesSteven Bonacorsi
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate templateSteven Bonacorsi
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate templateSteven Bonacorsi
 
Six sigma kavramlari: Gelistirme (DMAIC) ve Dizayn (IDDOV)
Six sigma kavramlari: Gelistirme (DMAIC)  ve Dizayn (IDDOV)Six sigma kavramlari: Gelistirme (DMAIC)  ve Dizayn (IDDOV)
Six sigma kavramlari: Gelistirme (DMAIC) ve Dizayn (IDDOV)Mustafa Said YILDIZ
 
Quality andc apability hand out 091123200010 Phpapp01
Quality andc apability hand out 091123200010 Phpapp01Quality andc apability hand out 091123200010 Phpapp01
Quality andc apability hand out 091123200010 Phpapp01jasonhian
 
Introduction to Six Sigma
Introduction to Six SigmaIntroduction to Six Sigma
Introduction to Six SigmaKanriConsulting
 
Analyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate TemplatesAnalyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate TemplatesSteven Bonacorsi
 
Six sigma-measure-phase2505
Six sigma-measure-phase2505Six sigma-measure-phase2505
Six sigma-measure-phase2505densongco
 
Six Sigma and Its Implementation
Six Sigma and Its ImplementationSix Sigma and Its Implementation
Six Sigma and Its ImplementationAnsar Lawi
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate templateSteven Bonacorsi
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate templateSteven Bonacorsi
 

Similar to Dmaic (20)

Six Sigma
Six SigmaSix Sigma
Six Sigma
 
Lean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesLean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templates
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
 
Six sigma technique
Six sigma techniqueSix sigma technique
Six sigma technique
 
Six sigma training
Six sigma trainingSix sigma training
Six sigma training
 
Six sigma training
Six sigma trainingSix sigma training
Six sigma training
 
Six sigma kavramlari: Gelistirme (DMAIC) ve Dizayn (IDDOV)
Six sigma kavramlari: Gelistirme (DMAIC)  ve Dizayn (IDDOV)Six sigma kavramlari: Gelistirme (DMAIC)  ve Dizayn (IDDOV)
Six sigma kavramlari: Gelistirme (DMAIC) ve Dizayn (IDDOV)
 
Quality andc apability hand out 091123200010 Phpapp01
Quality andc apability hand out 091123200010 Phpapp01Quality andc apability hand out 091123200010 Phpapp01
Quality andc apability hand out 091123200010 Phpapp01
 
Introduction to Six Sigma
Introduction to Six SigmaIntroduction to Six Sigma
Introduction to Six Sigma
 
6sigma
6sigma6sigma
6sigma
 
A012270104
A012270104A012270104
A012270104
 
Analyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate TemplatesAnalyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate Templates
 
yellow belt training
yellow belt trainingyellow belt training
yellow belt training
 
Six sigma-measure-phase2505
Six sigma-measure-phase2505Six sigma-measure-phase2505
Six sigma-measure-phase2505
 
Module iii lec5
Module iii lec5Module iii lec5
Module iii lec5
 
Six Sigma and Its Implementation
Six Sigma and Its ImplementationSix Sigma and Its Implementation
Six Sigma and Its Implementation
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
TQM
TQMTQM
TQM
 

Recently uploaded

(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 

Recently uploaded (20)

(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 

Dmaic

  • 1. OVERVIEW OF SIX SIGMA (6σ) FOR PROCESS IMPROVEMENT Presented by: Larry Bartkus of Biosense Webster and Matthew Thompson of FCI Management Solutions
  • 2. Goals  Introduction to Six Sigma – Description – Philosophies – Benefits – Origin – Myths  Identify the five steps of DMAIC, the core of Six Sigma, and the logical flow from step to step.  List tools and concepts useful in each step.  Brief introduction to DMADV
  • 3. Six Sigma Description – “… Six Sigma is a quality program that, when all is said and done , improves your customer’s experience, lowers your costs, and builds better leaders.” Jack Welch CEO GE – Six Sigma is a proven set of tools and tactics used for process improvement, reduction of defects, and improved quality – Six Sigma uses data and statistical analysis to zero in on root causes – Six Sigma can be applied to any process
  • 4. 2 3 4 5 6 σ Defects per Million opportunities 308,537 66,807 6,210 233 3.4 . 3σ to 6σ - 20,000 Times Improvement ... A True QFL Six Sigma Measurement Six Sigma: What Does it Mean 30% 6% .6% 3.8 10,724 1% 2.5 158,686 16%
  • 5. 99.99966% Good (6 Sigma) •20,000 lost articles of mail per hour •5,000 incorrect surgical operations per week •Two short or long landings at most major airports each day •200,000 wrong drug prescriptions each year •Seven articles lost per hour •1.7 incorrect operations per week •One short or long landing every five years •68 wrong prescriptions per year 99% Good (3.8 Sigma) Six Sigma Performance Most Businesses Operate at about 3.5 Sigma
  • 6. Six Sigma Philosophies – When defects occur look to the process for the cause. – Excellent processes will allow average people to consistently generate superior results. Benefits – More loyal and satisfied customers (internal and external) – Financial savings through improved efficiency and effectiveness – Resolution of chronic problems Origin – The late Bill Smith, a reliability engineer at Motorola, is widely credited with originating Six Sigma and selling it to Motorola's legendary CEO, Robert Galvin. Myths
  • 8. Overview of the DMAIC Method IMPROVE CONTROL MEASURE ANALYZE 5 2 3 4 DEFINE 1
  • 9. Phase 1: Define Goal  Define the project’s purpose and scope and get background on the process and customer Output  A clear statement of the intended improvement and how it is to be measured  A high-level map of the process  A list of what is important to the customer IMPROVE CONTROL MEASURE ANALYZE 5 1 2 3 4 DEFINE
  • 11. Define Measure Analyze Improve/ Innovate Control Product Flow SIPOC Process OutputInput CustomerSupplier Planning Level Build Plan Doctors Quality Engineering JCIT Capacity Requirements Line Design Compliance Issues Consulting Improved Cycle Times /WIP Reductions Reduced QNC’s Improved Efficiency/ Improved Compliance Shareholders Quality Regulatory Receive Finished Goods Trigger Cut Work Order to Line Sequence WO's Through Single Prod. Line Marketing Forecast Sterilize Release Product to Finished Goods EXISTING PROCESS FLOW
  • 12. Define Measure Analyze Improve/ Innovate Control VOICE OF THE CUSTOMER Input from floor associates Why Not Campaign Identify “hidden” non-compliance issues Floor associate “buy-in” to improving the process Ease of use Documentation “mirrors” process Operations Rapid Improvement Improved Product Build Documentation Consistency between documents Compliance to procedures Reduce QNC’s Eliminate product mix-ups Simplified Product Flow Mitigate opportunity for “near miss” events Create simplified process flow. Reduce process related QNC’s by 50% Reduce near miss events from 14 in 2004 to 4 (1 per quarter) in 2005 Reduce near miss events from 14 in 2004 to 4 (1 per quarter) in 2005
  • 13. Phase 2: Measure Goal  Focus the improvement effort by gathering information on the current situation Output  Data that pinpoints problem location or occurrence  Baseline data on current process sigma  A more focused problem statement IMPROVE CONTROL MEASURE ANALYZE 5 2 3 4 DEFINE 1
  • 14. D M A I C • The system to collect information is already established. • 100% of Scrap forms from Work Orders for all products are captured into a Yield Database. • Scrap form (FORM633) has information as Lot Number, Date, Shift, Product Number, Defect Code, Defect Description, Potential Cause, Work Station ID, Catheter Number, Scrap Quantity, and is signed by operator and supervisor / engineer. • Yield Database has information as Product Number, Date, Lot Number, Description, Lot Quantity, Reworks, Scrap in Line, and Scrap in QA.
  • 15. Documentation Time Study Analyze Minutes per Work Order Maximum = 26.5 min per W/O 8 3 2.5 2.5 2.5 2 2 2 2 0 1 2 3 4 5 6 7 8 9 Form 046 Form 335 Form 618 Form 621 Form 617 Form 615 Form 633 Form 616 Form 051 Form LenthoftimeinMinutes
  • 16. Burst Tester Gage R&R AnalyzeMeasure Improve ControlDefine Percent Part-to-PartReprodRepeatGage R&R 100 50 0 % Contribution % Study Var SampleStDev 6 4 2 _ S=3.447 UCL=5.418 LCL=1.476 Operator 1 Operator 2 SampleMean 100 80 60 __ X=86.10 Operator 1 Operator 2 UCL=88.81 LCL=83.38 Operators Settings Operator 2Operator 1 NominalMinimumNominalMinimum 100 75 50 Operators Operator 2Operator 1 100 75 50 Gage name: Gage R&R for Burst V alues (U niv ersal Tray ) Date of study : Reported by : J. C han Tolerance: M isc: Components of Variation S Chart by Operators Xbar Chart by Operators Burst By Settings ( Operators ) Burst by Operators Gage R&R (Nested) for Burst Values The total Gage Repeatability and Reproducibility is 12.38%, which is well below the acceptance criteria of less than or equal to 30% of the Total Variation. Measurement system is acceptable. The Gage R & R study is able to show that the burst tester is capable of detecting different parts being measured as shown from the data reported by two different operators measuring the samples.
  • 17. Process Capability-Current IndividualValue 4321 1.8 1.6 1.4 _ X=1.5955 UCL=1.9437 LCL=1.2472 MovingRange 4321 0.4 0.2 0.0 __ MR=0.1309 UCL=0.4278 LCL=0 Observation Values 4321 1.68 1.60 1.52 1.81.71.61.51.41.31.2 LSL Specifications LSL 1.13 2.11.81.51.2 Within O v erall Specs Within StDev 0.116076 C p * C pk 1.34 O v erall StDev 0.102049 Pp * Ppk 1.52 C pm * Process Capability Sixpack of C before I Chart Moving Range Chart Last 4 Observations Capability Histogram Normal Prob Plot A D: 0.350, P: 0.255 Capability Plot
  • 18. Process Capability Ring 20 – Current Marking Method 0 1 2 3 4 5 6 7 8 9 10 169.70 169.95 170.20 170.45 Xbar and R Chart Subgr Mean Mean=170.1 UCL=170.4 LCL=169.7 0.0 0.3 0.6 0.9 Range R=0.3515 UCL=0.9050 LCL=0 0 1 2 3 4 5 6 7 8 9 10 Last 10 Subgroups 169.8 170.0 170.2 170.4 Subgroup Number Values 169.5 170.5 Capability Plot Process Tolerance I I I I I I I I Specifications Within Overall 169.5 170.0 170.5 Normal Prob Plot 169.6 170.0 170.4 Capability Histogram Within StDev: Cp: Cpk: 0.207647 0.80 0.70 Overall StDev: Pp: Ppk: 0.191131 0.87 0.76 Process Capability Sixpack for Prod. Ring20 DMAI2 C
  • 19. Phase 3: Analyze Goal  Identify deep root causes and confirm them with data Output  A theory that has been tested and confirmed IMPROVE CONTROL MEASURE ANALYZE 5 2 3 4 DEFINE 1
  • 20. D M A I C D-1237-02-SD-1237-01-S 1.34 1.32 1.30 1.28 1.26 1.24 1.22 1.20 1.18 1.16 PART NUMBER AverageperWO 1 2 Multi-Vari Chart for Short in Ring Shif t D-1237-01-S D-1237-02-S 1.00 1.05 1.10 1.15 1.20 1.25 1.30 1.35 PART NUMBERAverageperWO 1 2 Multi-Vari Chart for No Reading Shif t D-1237-01-S D-1237-02-S 0.98 1.08 1.18 1.28 1.38 1.48 1.58 1.68 1.78 PART NUMBER AverageperWO 1 2 Multi-Vari Chart for Lasso out of Roundness Shif t D-1237-02-SD-1237-01-S 1.35 1.30 1.25 1.20 1.15 1.10 1.05 1.00 PART NUMBER AverageperWO 1 2 Multi-Vari Chart for Damaged Ring Shif t D-1237-01-S D-1237-02-S 1.00 1.05 1.10 1.15 1.20 1.25 1.30 1.35 PART NUMBER AverageperWO 1 2 Multi-Vari Chart for Damaged Spine Cover Shif t D-1237-01-S D-1237-02-S 1.0 1.1 1.2 1.3 PART NUMBER AverageperWO 1 2 Multi-Vari Chart for Tip going Backwards Shif t
  • 21. Benchmarking - Internal StrategicAdvantage •Advanced Applications •High Interactivity e.g. online forms •Knowledge Mgt hub •Primary Communications Vehicle •Content Rich Tier 4 Transforming Features Tier 1 Basic Presence Basic Company Information Tier 3 Integrating •Communities •Advanced Search •Value-add tools •Moderate Interactivity •Personalisation •Extensive information •Basic Search Tier 2 Searching Analyze
  • 22. Regression Analysis Analyze Forecasted Demand 08/15/05- 07/15/05 Month GrandTotal 121086420 40000 39000 38000 37000 36000 35000 34000 33000 32000 31000 S 2661.11 R-Sq 7.0% R-Sq(adj) 0.0% Fitted Line Plot Grand Total = 34329 + 193.1 Month 7% Increase in demand/year
  • 23. Design of Experiment AnalyzeMeasure Improve ControlDefine 23 Factorial Design Factors Low High Temperature 245 F 260 F Pressure 55 PSI 90 PSI Time 2 SEC 3 SEC
  • 24. Design of Experiment AnalyzeMeasure Improve ControlDefine Hi Lo0.00000 D New Cur d = 0.00000 Maximum Burst Va y = 94.6429 2.0 3.0 55.0 90.0 245.0 260.0 Pressure TimeTemp [245.0] [75.0] [3.0]
  • 25. Phase 4: Improve Goal  Develop, pilot, and implement solutions that address root causes. Output  Identification of planned, tested actions that should eliminate or reduce the impact of the identified root causes CONTROL MEASURE ANALYZE 5 2 3 DEFINE 1 FMEA IMPROVE 4
  • 26. D M A I C •Improvement team created with members of Quality, Production, Engineering and R&D areas to propose and evaluate ideas. •Brainstorming tool was used to gather ideas on how to solve the problems identified. •Ideas were evaluated per following criteria: feasible, high impact, easy, low cost, and quick. •Following tables summarizes solutions agreed by consensus of the improvement team.
  • 27. D M A I C PROBLEM BRIEF DESCRIPTION PROPOSED SOLUTION Some acceptance criteria are not clear for associates. Rejection of good product exposes it to damage during rework operations. Train associates on visual acceptance criteria. Lasso to tip method. Defective bonding of Compression Coil and Lasso Stem PU is applied before the components are in place and is partially removed during installation of components. Add a new hole to apply PU to bond components once they are in place. Prep. lasso stem method. Poor burnishing of Nitinol wire. Current burnishing method is not ergonomic causing associates make defects after some time. Design a new fixture to hold Nitinol during burnishing.
  • 28. Solutions FMEA Pilot Im plem en- tation Solutions FMEA Pilot Im plem en- tation RISK 12. Support Plan not in Place Description IntegWare does not want to put Biosense Webster in a position of being overly reliant for day-to-day level 1 support of the system after go-live. IntegWare typically suggests that we assume the role of a second level support for a limited number of hours per month. IntegWare suggests it is typical for Day-to-Day (level 1) support will be a highly resource consuming task for three-six months after go- live. To use IntegWare for this might be an ineffective usage of the customer's resources. The project ownership should be transferred to the customer if at all possible. It would be a better usage of the customer’s resources to ask IntegWare to implement higher value- added initiatives in PDM (such as developing PART/BOM configuration management features, JDE integration, etc.) MITIGATION To mitigate this risk, we have discussed a support concept at BWI. This will be a combo function between Doc services (they will handle basic application admin functions) and IM who will handle IT functions. Still need to setup support contract for IntegWare to support system. Celeste has added to the schedule a support contract for level 2 support from IntegWare. RISK LEVEL HIGH UPDATED 5/2/03 ASSESSING RISK An Example:
  • 29. AnalyzeMeasure Improve/ ControlDefine Estimated Cost Benefit 100 10 1 CMM vs. Estimated Cost Avoidance $0 $1 $2 $3 $4 $5 1 2 3 4 5 Millions Capability Maturity Model (CMM) Level CumulativeCompliance Risk($) Cumulative Risk ($) Compliance Cost Risk reduction = $1.7 Million 1.6 2 .5
  • 30. Pilot/Pilot Plan AnalyzeMeasureDefine Control Used Japan Custom line as a pilot - Medium size production line - Minimize the production Impact – Kanbans Cards – Signals, Lights – Performance Measures Improve/
  • 31. Phase 5: Control Goal  Use data to evaluate both the solutions and the plans  Validate that all changes adhere to all operating company change control, GMP, and compliance requirements  Maintain the gains by standardizing processes  Outline next steps for on-going improvement Output  Before-and-After analysis  Monitoring system  Completed documentation of results, learnings, and recommendations IMPROVE CONTROL MEASURE ANALYZE 5 2 3 4 DEFINE 1
  • 32. D M A I C •All new tooling, processes, clarifications, and visual aids documented in PIs. •Creation of MOPXXX with all the quality criteria for Variable Lasso Deflection and Contraction performance. •MOP003 updated with reference to new created MOPXXX. •PU quality criteria documented in WSS001 and available in QA workbenches.
  • 33. D M A I C •Yields Chart is published every week. Work Orders Built Yield Goal Scrap Produced Yield Actual
  • 34. I-MR Charts of Burst Tester AnalyzeMeasure Improve ControlDefine Burst Values IndividualValue 302928272625242322212019181716151413121110987654321 115 110 105 100 _ X=105.88 UCL=113.76 LCL=97.99 Observation MovingRange 302928272625242322212019181716151413121110987654321 10 5 0 __ MR=2.97 UCL=9.69 LCL=0 Universal Tray Packaging (CA Sealer) In-H20 Burst Values IndividualValue 302928272625242322212019181716151413121110987654321 110 105 100 95 _ X=100.72 UCL=109.68 LCL=91.76 Observation MovingRange 302928272625242322212019181716151413121110987654321 12 8 4 0 __ MR=3.37 UCL=11.01 LCL=0 Universal Tray Packaging (Juarez Sealer) In-H20
  • 35. Lessons Learned • Culture shock • Resources • Scope creep / Identifying the critical few • Management buy-in of change of policies • Time management & deliverables challenges • J&J Goals too high for small operating company (CMM goal of Level 3 per J&J Corp Strategy) • Difficult to measure compliance
  • 36. Project Closure Improvement must be continuous, but individual initiatives and project teams come to an end. Learn when it’s time to say goodbye. Effective project closure weaves together the themes of: – Project purpose. – Improvement methods. – Team skills and structures. Develop managerial systems to capture learnings and enable the organization to address system issues. Documentation and recognition are two critical aspects of project team closure. Celebrate!
  • 38. New product Development - DEx Roadmap - DMADV • DEFINE – Develop the Business Case, Scope & Charter the Project • MEASURE – Gather & Quantify Design Inputs (Customer, Technical, Business, Regulatory) • ANALYZE – Develop and Investigate Conceptual Designs • DESIGN – Develop Detailed Product/Service/Process Designs • VERIFY/VALIDATE – Confirm design outputs meet design input requirements and ensure specifications conform with intended uses and users; Scale-up manufacture and release the product or scale-up and implement the new process; Finally, transfer to process owners Verify/ Validate DesignAnalyzeMeasureDefine
  • 39. Opportunity Define Measure Analyze Design Verify/Validate Transfer DEx Methodology IDTask Name 1 ID Customers 2 ID Needs 3 ID CCRs 4 Review 5 DevelopConcepts 6 High-Level Design 7 Capability 8 DesignReview 9 DevelopDetails 10Simulation 11Cost Analysis 12DesignReview 13Procurement 14Implementation SepOctNovDecJanFebMarAprMayJunJulAugSep Qtr 4, 1999Qtr 1, 2000Qtr 2, 2000Qtr 3, 2000 Business Case Goal Statement Project Plan Opportunity Statement Project Scope Team Selection Team Charter Generation1Generation2Generation3 Vision Product/ Service Generation Technologies/ Platforms Theme 1 Need 1 Need 2 Theme 2 Need 3 Need 4 Need 5 Theme 3 Need 7 Need 8 1 Customer Requirem ents (V) 3 Characteristic/Measur es (how)(I) Target goals 7 Correlatio n (I) 2 Cust omer Rati ng (B) (V) 4 Relationships (What vs. How) (I) 6 5 Importance(V) How important Targets/Spec s(B)(I) Technical Evaluation (B) Measures (Hows) Customerneeds (Whats) House Of Quality #1 Critical processcharacteristics (Hows) Measures (Whats) House Of Quality #2 Creative Techniques White Red Black Blue Green Yellow Start With What You Know Get Other Perspec- tives Non-Linear Thinking Buildon Ideas Combine Ideas Compare FAULT TREE SYSTEM RELIABILITY PREDICTION System Failure Pump P1 Fails Pump P2 Fails Pump V1 Fails Pump V2 FailsR = RBil X (1 - (1-Rp)2) x (1 - (1-Rv)2) PumpsBilge Valves P1 P2 V1M V2M Bilge Failure Pump Failure Valve Failure Time (t) HazardRate- h(t) Random Failures Early Failures Wearou t Failures Process 2 Process 1 Process 3 Worker 1 Inspector 1 Worker 2 Inspector 2 Worker 3 Inspector 3 Recorder 3 Recorder 2 Recorder 1 Card Inspect 1 Inspect 2 Inspect 3 Card Drop Shop - Process Model Recorders Workers Inspectors Develop Process Control Plan Error Proofing and Contingency Planning Detailed Design Review Prepare Pilot Test Plans Act Plan Check Do Start Type of data ? Counting items with an attribute or counting occurrences? Equal sample sizes ? Equal opportunity ? Continuous Yes No Yes Rational Subgroups Discrete Yes No No Do limits look right? Try individuals charts Need to detect small shifts quickly? Individual measurements or subgroups ? Do limits look right? YesNo Either/Or No Yes Individual measurements Occurrences Items with attribute p chart Try transformation to make data normal no chart u chart c chart X, R or s chart Individuals charts EWMA chart Unstable (Not in control) Stable (In control) Within spec limits Upper Spec Lower Spec Upper Spec Lower Spec UCL LCL UCL LCL Outside spec limits Upper Spec Lower Spec Upper Spec Lower Spec UCL LCL UCL LCL Type of Design Products Services Design- Production- Delivery Processes Supporting Processes Type of Design Design Elements Products Services Design- Production- Delivery Processes Supporting Processes 1. HW Products 2. SW Products 3. Services 4. Analyses 5. Information Systems 6. Processes and Methods 7. Human Resources 8. Site Facilities 9. Equipment Tools 10. Materials Supplies 11. Sales Marketing 12. Other Non-Technical