The Costs of Delays & Cancellations
- Analysis & Means for Cost Reductions -
AGIFORS Dubai 2006
m2p Consulting
www.m2p.net • Frankfurt (Germany) • New York (USA) • Dubai (United Arab Emirates) • www.m2p.net
- 2 -Dubai AGIFORS Operations Conference 2006 Mai 06
1
2 Causes & Cost Analysis
Introduction “Delays & Cancellations”
3 Opportunities to Decrease Costs
- 3 -Dubai AGIFORS Operations Conference 2006 Mai 06
In 2004 more than 20% of all scheduled flights in the US
and EU were either delayed or cancelled
According to most transportation reporting statistics (such as those of the US DOT) only flights
that departs or arrives 15+ minutes behind schedule are rated as delayed
- Delays & Cancellations US / EU in 2004 -
Ontime
76,6%
Delayed
21,6%
Cancelled
1,8%
Total Departures: 7,129,270
Delays & Cancellations US 2004 Delays & Cancellations EU 2004
Ontime
79,5%
Delayed
17,5%
Cancelled
3,1%
Total Departures: 3,751,842
* Source: AEA Annual Report 2004* Source: DOT OTP Statistics 2004
- 4 -Dubai AGIFORS Operations Conference 2006 Mai 06
A delay is an event that causes the change in schedule of
a flight and/or aircraft’s planned departure or arrival
122
722
400
002A-PA
A-PY
B-TC
B-TD
123 238 239
Check
- Definition of a Delays -
401
723
1
3
001
4
- Late Arrival / Finish: During an event the finished time will be delayed. In case of a flight event
this is a delayed arrival.
- Late Departure / Start: The start of an event will be delayed. This is in case of a flight event a
delayed departure.
- Schedule Change: The length and/or timing of an event will be changed before it has started. In
respect to change publication constraints this is a schedule change.
- Early Arrival / Finish: A scheduled event will start earlier than scheduled. This happens in case
a flight arrives before schedule.
2
1
2
3
4
now
- 5 -Dubai AGIFORS Operations Conference 2006 Mai 06
According to the delay cause, many delays are outside the
responsibility of the airline
- Delay Causes -
Ground Handling Delayed loading (Passenger, Baggage, Cargo, etc.), cleaning, fuelling etc,
Maintenance Aircraft maintenance issue (defects, late arrival from check etc.)
Weather Enroute weather, weather at departure / arrival station etc.
ATC Enroute traffic congestions, ATFM / ATC capacity restrictions etc.
Connection Departure delay because of late arrival passenger, baggage, cargo etc.
Airport Authorities Mandatory Security (Pax / Bag offload), immigration / customs issues etc.
Rotational Aircraft rotation, flight or cabin crew rotation etc.
Others Other exceptions (Industrial Action within / outside Airline)
DescriptionDelay Group Controllable
Limited
Yes
No
No
Limited
No
Yes
No
- 6 -Dubai AGIFORS Operations Conference 2006 Mai 06
A cancellation describes a particular flight which is the
airline deems or is physically not feasible to operate
- Definition of Cancellations -
A scheduled flight has to be cancelled because …
required resources (Aircraft, Crew etc.) were not
available
environmental conditions are not in-line to operate
the flight according to safety rules (Weather)
external capacity constraints regulated by ATC and /
or Airport authorities
A scheduled flight will be cancelled because …
the ongoing delay of the previous event will cause a
major delay of the scheduled event and could not be
compensated (Lack of reserves)
economical reasons in case of low passenger
bookings
Re-Active Cancellation (Stochastic) Pro-Active Cancellation (Strategic)
Because of rotational dependencies of flight events, a cancellation has an impact on its related
return pair with respect to A/C and crew rotation
- 7 -Dubai AGIFORS Operations Conference 2006 Mai 06
The handling of delays and cancellations are within the
decision making governance of operations control
Decision
Making
Governance
Business Objectives
Airport
Irregularity Reasons
Constraints
ATC Crew
Aircraft Weather …
Rotation
Crew
Rotation
Aircraft
Hub
Capacity
Fleet
Slots
…
Product
Profitability
Regularity
Safety
Punctuality
Interfaces
Commercial
ATC
Engineering
…
Cargo
- 8 -Dubai AGIFORS Operations Conference 2006 Mai 06
1
2 Causes & Cost Analysis
Introduction “Delays & Cancellations”
3 Opportunities to Decrease Costs
- 9 -Dubai AGIFORS Operations Conference 2006 Mai 06
At least 1/3rd of all delays are within the responsibility of
the airlines and / or its suppliers
- Delay Cause Analysis -
Delays Causes US 2004 Delays Causes EU 2004
* Source: FAA Statistics 2004
ATC
37,1%
Airport Authorities
0,2%
Airline Control
30,7%
Connection
28,3%
Weather
3,6%
Total No
of delayed flights: 1,568,439 Total No
of delayed flights: 676,211
* Source: AEA Statistics 2004
Approximately 10% of all Airline related delays are caused by maintenance problems. The
majority is caused by rotational problems (Aircraft, Crew, etc.)
Weather
2%
ATC
25%
Connection
4%
Airline Control
58%
Airport Authorities
11%
- 10 -Dubai AGIFORS Operations Conference 2006 Mai 06
Maintenance delays are not only caused by a poor Aircraft
/ Component reliability
Aircraft Defects during transit or after positioning of
aircraft (AOG)
Maintenance equipment, -facilities, -tools, lack of or
breakdown
Non-scheduled maintenance, special checks and/or
additional work
Lack of spares
Maintenance work execution issues (Shortages of
staff etc).
…
Poor Aircraft & Component Reliability
Insufficient line maintenance process / quality (base
station / outstation) according to operating
requirements
Check cycles / visit plan & work scope with regards
to utilization constraints
Visit plan quality (Level of detail, accuracy, etc.)
Lack of buffers / reserves (Tools, Spares, Staff etc.)
…
Maintenance Delay Reasons Causes Analysis
- Maintenance Delays -
- 11 -Dubai AGIFORS Operations Conference 2006 Mai 06
LG
AY
RO
SN
SK
JU
OK
CYIG AZJKLO LH
AFMA
JP IB
OU
TK
BD
OS KL
BA
LX
FI OA
KM
TP
65,0%
70,0%
75,0%
80,0%
85,0%
90,0%
95,0%
0 100 200 300 400 500 600 700
- European carriers On-Time Performance 2004 -
4 out of 5 Europe’s top carriers are above the calculated OTP average of 82%
Airline departure volume does not automatically indicate
poor on-time performance
On-Time
Performance
No of Departures
Average OTP 82.0%
* Source: AEA Annual Consumer Report 2004
- 12 -Dubai AGIFORS Operations Conference 2006 Mai 06
The analysis of regularity within Europe intends to show
that big carriers cancel more flights than smaller ones
- European carriers Regularity 2004 -
AY
RO
SN
SK
JU
CY
IG
AZ
LO
LH
AF
MAJP
IB
OU
BD
OS
KL
BA
LX
FI
OA
KM
TP
LG
OK
97,8%
98,3%
98,8%
99,3%
99,8%
100,3%
0 100 200 300 400 500 600 700
Regularity
* Source: AEA Annual Consumer Report 2004
Average Regularity 98.7%
No of Departures
- 13 -Dubai AGIFORS Operations Conference 2006 Mai 06
A specific model is used to calculate the overall Profit /
Loss for each single flight event
Salaries
Administration
Insurance
...
Landing Fees
Catering
Fuel
Travel Costs
Flight Deck
ATC charges
...
Version Change
Aircraft Change
Equipment Change
Diversion
Re-Routing
Cancellation
...
Passengers
Cargo
...
Irregularity CostsVariable CostsFixed Costs Revenue
Cost
Profit / Loss
- Profit & Loss Calculation Model for a single flight event -
- 14 -Dubai AGIFORS Operations Conference 2006 Mai 06
The duration of a delay has a major impact on the overall
delay costs of a particular flight event
- Delay Costs according to Delay duration -
$
Jet Fuel
Passenger Re-Bookings
Crew Duty-Time Costs
Aerodrome Surcharges
Snacks / Meals
Crew Per Diem + Acc + Trans
Passenger Acc + Trans
Handling Surcharges
Cargo Rev / GHC / QRT
Airport Services
M&E Repair / Man Hours
NCC Support
M&E Spare Provisioning
t1h 2h 3h 4h 5h 6h 7h 8h
* Source: m2p Delay Cost Analysis
- 15 -Dubai AGIFORS Operations Conference 2006 Mai 06
Maintenance & aircraft ownership costs represent 35% of
the estimated operating delay costs
- Delay Cost Analysis US carriers 2004 -
Distribution of Operating Costs Delay Costs per Minute
* Source: ATA Statistics US Carriers 2004
Jet Fuel $17,05
Crew $16,77
Maintenance $10,16
Ownership $9,74
Other $3,36
Total $57,08
Fuel
30%
Crew
29%
Maintenance
18%
Ownership
17%
Other
6%
In the US a total of 86.5 million ATC delay minutes were recorded in 2004 with an estimated $4.8
billion in direct operating costs
- 16 -Dubai AGIFORS Operations Conference 2006 Mai 06
In addition to Operating Costs the total delay cost should
also include Passenger’s Time
- A320 Delay Cost Example -
Passenger Cost
$57.08
Cost per Minute
Operating Cost
$66.00
Cost Item
Total per Minute $123.08
*1 Source: FAA Statistics
Cost per Passenger / Hour1
Cost per Passenger / Minute
Total Cost / Minute2
$33.25
$0.55
$66.00
2 Cost Calculation based on average A320 capacity of 150 passenger with load factor of 80%
Based on the minimum accountable length of a delay defined by US DOT (15 min) the minimum cost of a delay equals
approximately $1,846
Taking passenger costs into account requires aircraft type specific values
A linear cost figure simplifies the overall cost calculation but does not provide exact costing at any point of time
- 17 -Dubai AGIFORS Operations Conference 2006 Mai 06
1
2 Causes & Cost Analysis
Introduction “Delays & Cancellations”
3 Opportunities to Decrease Costs
- 18 -Dubai AGIFORS Operations Conference 2006 Mai 06
In many cases a more accurate plan could help to avoid
controllable delays and its related costs
Establish Problem / Impact
visibility
Improve organizational
Reactiveness
1 32
Increase Planning
Accuracy
Most of controllable delays are
caused by an unstable plan which
has not sufficient buffers to
compensate minor problems
Planning quality indicators have to
be implemented and measured.
Results have to be feedback into
the planning process
At the point a delay occurs the
impact of an uncontrollable delay is
very often not clear which could
cause additional cost because of
suboptimal decision
Clear visibility on delay impact will
provide baseline for cost efficient
counter-measures
Decrease of uncontrollable delays
through pro-active cancellations
Decrease of controllable delays
and re-active cancellations
Decrease of controllable and
uncontrollable delays
In case of any delay the duration of
the delayed event is a major cost
driver
Processes, Organization and Staff
Skills should be aligned to support
pro-active decision making and
flexible problem solving
- Opportunities to decrease costs -
- 19 -Dubai AGIFORS Operations Conference 2006 Mai 06
Efficient and accurate planning requires aligned key
processes and business objectives
Flight Scheduling & Operation
Business
Objectives
Maintenance Planning & Execution
On-Time
Provisioning
Aircraft
Reliability
Cost
Efficiency
Safety
Business
Objectives
Punctuality Regularity ProfitabilitySafety
Provides Aircraft
Aircraft
Demands Aircraft Demands Aircraft
Provides Aircraft
- Maintenance Planning & Execution -
M&E
Department
Airline
Flight
Operations
1
- 20 -Dubai AGIFORS Operations Conference 2006 Mai 06
A consistent, integrated, and stable planning process
aligns maintenance planning with flight scheduling
Maintenance Planning
Flight Scheduling Operations Control
Maintenance Control
Planning is done to
ensure a stable
production
Business
Objectives
Punctuality Regularity ProfitabilitySafety
Business
Objectives
On-Time
Provisioning
Aircraft
Reliability
Cost
Efficiency
Safety
Planning will be done
across department
borders
Planning in-line with
agreed business
objectives
Integrated
Consistent
Stable
- Recommended Planning Approach -
1
- 21 -Dubai AGIFORS Operations Conference 2006 Mai 06
The planning quality across all planning stages could be
measured with specific Performance Indicators
Flight Scheduling & Operation
Maintenance Planning & Execution
- Establish Measurement Points (KPI’s) -
KPIKPI
KPI
KPI
KPI
KPI
Measure
Productivity
&
Quality of
Service
Maintenance
&
Engineering
Airline /
Flight
Operations
The KPI concept should reflect the relationship between the two core processes Flight Scheduling & Operation as well as
Maintenance Planning & Execution
KPI’s must be defined on well defined interfaces and with clear responsibilities within the organisation structure
The use of industry benchmarks depends on the specific needs and requirements of the respective airline
1
- 22 -Dubai AGIFORS Operations Conference 2006 Mai 06
Through problem visibility all events indirectly impacted
by a delay could be identified
122
722
400
002A-PA
A-PY
B-TC
B-TD
123 238 239
Check
401
723
001
now
- Impact / Problem Visibility -
2
- Direct Impact: A delay has a direct impact on all scheduled events of this particular resource in
case it conflicts with its start / end times. To stay within the plan these events have to be
cancelled or delayed either
- Indirect Impact: A delay has an indirect impact on all scheduled event with inherited
dependencies. These could be related to all types of resources e.g. Passenger, Crew, Aircraft,
Facility etc.
1
2
1
2
2
2
In addition to the operational impact itself all related cost & revenue figures related to the
scheduled event should be provided
- 23 -Dubai AGIFORS Operations Conference 2006 Mai 06
The most efficient recovery decision could be made based
on the identified problem
Ad-hoc Effect
Gradual Recovery
Creeping Effect
Gradual Recovery
Ad-hoc Effect
Ad-hoc Recovery
- Identified Irregularities & Recovery Strategies -
• Without any notification and with immediate effect
• Example: Airport closure due to radar failure
• Plan able / Pre-Announced Reason
• Defined Time Period
• Example: Planned Airport / Airspace closure
• Unexpected deteriorating reasons or unexpected
additional problems
• Example: Deteriorating weather conditions
Irregularity Impact Profile
50%
100%
t
50%
100%
t
Description
50%
100%
t
50%
100%
t
50%
100%
t
50%
100%
t
2
- 24 -Dubai AGIFORS Operations Conference 2006 Mai 06
A centralized planning approach defines the baseline for
decentralized problem solving during production
Maintenance
Flight Scheduling
Crew Management
12 month 6 month 4 weeks
Long-Term
Planning
Operational
Planning
Production /
Ops Control
Tactical
Planning
72 hours
AOG‘s
- Staged Planning Approach & Organizational Responsibilities -
Pre-Planning
Planning Base
Maintenance / EO
Planning Line Maint. &
Ground Events
Detailed Planning
“Frozen Plan”
Planning Activity Irregularity ManagementPlanning Result
Detailed Planning of visits within each production site
3
- 25 -Dubai AGIFORS Operations Conference 2006 Mai 06
All specific measurements to decrease delays depends on
the airlines business model and operating environment
Problem Visibility
A detailed problem assessment will provide a clear picture on current weaknesses and
achievable objectives in respect to the airline specific environment
Optimized Planning
An optimized plan as a result of an integrated planning processes could help to avoid
maintenance delays
Realistic Reserves
Operational Reserves could help to compensate controllable and not controllable delays
but must be in-line with financial constraints
Problem Solving Performance
Organisation, processes and people capabilities should be aligned with the objective to
solve upcoming problems as efficient as possible

More Related Content

What's hot

Chapter 03 Aircraft Familiaration
Chapter 03 Aircraft Familiaration Chapter 03 Aircraft Familiaration
Chapter 03 Aircraft Familiaration Training1PFD
 
Airfoil terminology
Airfoil terminologyAirfoil terminology
Airfoil terminologySmart Vino
 
EASA PART-66 MODULE 8.2 : AERODYNAMICS
EASA PART-66 MODULE 8.2 : AERODYNAMICSEASA PART-66 MODULE 8.2 : AERODYNAMICS
EASA PART-66 MODULE 8.2 : AERODYNAMICSsoulstalker
 
EASA PART-66 MODULE 8.3 : THEORY OF FLIGHT
EASA PART-66 MODULE 8.3 : THEORY OF FLIGHTEASA PART-66 MODULE 8.3 : THEORY OF FLIGHT
EASA PART-66 MODULE 8.3 : THEORY OF FLIGHTsoulstalker
 
flight control surfaces
flight control surfacesflight control surfaces
flight control surfacesswapnil jani
 

What's hot (8)

Chapter 03 Aircraft Familiaration
Chapter 03 Aircraft Familiaration Chapter 03 Aircraft Familiaration
Chapter 03 Aircraft Familiaration
 
Airfoil terminology
Airfoil terminologyAirfoil terminology
Airfoil terminology
 
EASA PART-66 MODULE 8.2 : AERODYNAMICS
EASA PART-66 MODULE 8.2 : AERODYNAMICSEASA PART-66 MODULE 8.2 : AERODYNAMICS
EASA PART-66 MODULE 8.2 : AERODYNAMICS
 
EASA PART-66 MODULE 8.3 : THEORY OF FLIGHT
EASA PART-66 MODULE 8.3 : THEORY OF FLIGHTEASA PART-66 MODULE 8.3 : THEORY OF FLIGHT
EASA PART-66 MODULE 8.3 : THEORY OF FLIGHT
 
flight control surfaces
flight control surfacesflight control surfaces
flight control surfaces
 
مجموعه دم هواپیما
مجموعه دم هواپیمامجموعه دم هواپیما
مجموعه دم هواپیما
 
Aerodynamics
AerodynamicsAerodynamics
Aerodynamics
 
Stall and Spins - Awareness and Avoidance
Stall and Spins - Awareness and AvoidanceStall and Spins - Awareness and Avoidance
Stall and Spins - Awareness and Avoidance
 

Similar to The cost of delays and cancellations

Edto module 6 –flight operations considerations
Edto module  6 –flight operations considerationsEdto module  6 –flight operations considerations
Edto module 6 –flight operations considerationsZhipeng Xu
 
European Airport PerformanceFramework
European Airport PerformanceFrameworkEuropean Airport PerformanceFramework
European Airport PerformanceFrameworkJLGChico
 
Senior Aviation Limited Upload
Senior Aviation Limited UploadSenior Aviation Limited Upload
Senior Aviation Limited UploadJeremy Mitchell
 
Losa Report
Losa ReportLosa Report
Losa ReportBockner
 
17_03_2015_MRO_LECTURE_For_L
17_03_2015_MRO_LECTURE_For_L17_03_2015_MRO_LECTURE_For_L
17_03_2015_MRO_LECTURE_For_LNicolas Osorio
 
Alazen ACDM Overview
Alazen ACDM OverviewAlazen ACDM Overview
Alazen ACDM OverviewNick Fisher
 
Surplus Part Market Overview
Surplus Part Market OverviewSurplus Part Market Overview
Surplus Part Market OverviewICF
 
An Aviation Case Study: Sorting Out Key Factor Leading An Airline Operator Ab...
An Aviation Case Study: Sorting Out Key Factor Leading An Airline Operator Ab...An Aviation Case Study: Sorting Out Key Factor Leading An Airline Operator Ab...
An Aviation Case Study: Sorting Out Key Factor Leading An Airline Operator Ab...iosrjce
 
Simulation_Final_Project_Grp6.pptx
Simulation_Final_Project_Grp6.pptxSimulation_Final_Project_Grp6.pptx
Simulation_Final_Project_Grp6.pptxShivamPandey521834
 
masFlight March 2013 Monthly Performance Report
masFlight March 2013 Monthly Performance ReportmasFlight March 2013 Monthly Performance Report
masFlight March 2013 Monthly Performance ReportJoshua Marks
 
1 Towardsa Global Atm Conceptthe European Contribution Victor Aguado Eurocontrol
1 Towardsa Global Atm Conceptthe European Contribution Victor Aguado Eurocontrol1 Towardsa Global Atm Conceptthe European Contribution Victor Aguado Eurocontrol
1 Towardsa Global Atm Conceptthe European Contribution Victor Aguado EurocontrolÜlger Ahmet
 

Similar to The cost of delays and cancellations (20)

Winners and Losers
Winners and LosersWinners and Losers
Winners and Losers
 
Edto module 6 –flight operations considerations
Edto module  6 –flight operations considerationsEdto module  6 –flight operations considerations
Edto module 6 –flight operations considerations
 
European Airport PerformanceFramework
European Airport PerformanceFrameworkEuropean Airport PerformanceFramework
European Airport PerformanceFramework
 
Senior Aviation Limited Upload
Senior Aviation Limited UploadSenior Aviation Limited Upload
Senior Aviation Limited Upload
 
All520253
All520253All520253
All520253
 
Losa Report
Losa ReportLosa Report
Losa Report
 
Losa Report
Losa ReportLosa Report
Losa Report
 
17_03_2015_MRO_LECTURE_For_L
17_03_2015_MRO_LECTURE_For_L17_03_2015_MRO_LECTURE_For_L
17_03_2015_MRO_LECTURE_For_L
 
Cost of Delay
Cost of DelayCost of Delay
Cost of Delay
 
A guide of Ground Vehicles Operations
A guide of Ground Vehicles OperationsA guide of Ground Vehicles Operations
A guide of Ground Vehicles Operations
 
Reduced Visual Reference Requires Viligance
Reduced Visual Reference Requires ViliganceReduced Visual Reference Requires Viligance
Reduced Visual Reference Requires Viligance
 
Alazen ACDM Overview
Alazen ACDM OverviewAlazen ACDM Overview
Alazen ACDM Overview
 
Surplus Part Market Overview
Surplus Part Market OverviewSurplus Part Market Overview
Surplus Part Market Overview
 
Airport Seminar - Federal Aviation Administration
Airport Seminar - Federal Aviation Administration Airport Seminar - Federal Aviation Administration
Airport Seminar - Federal Aviation Administration
 
Foqa good one
Foqa good oneFoqa good one
Foqa good one
 
An Aviation Case Study: Sorting Out Key Factor Leading An Airline Operator Ab...
An Aviation Case Study: Sorting Out Key Factor Leading An Airline Operator Ab...An Aviation Case Study: Sorting Out Key Factor Leading An Airline Operator Ab...
An Aviation Case Study: Sorting Out Key Factor Leading An Airline Operator Ab...
 
Simulation_Final_Project_Grp6.pptx
Simulation_Final_Project_Grp6.pptxSimulation_Final_Project_Grp6.pptx
Simulation_Final_Project_Grp6.pptx
 
masFlight March 2013 Monthly Performance Report
masFlight March 2013 Monthly Performance ReportmasFlight March 2013 Monthly Performance Report
masFlight March 2013 Monthly Performance Report
 
1 Towardsa Global Atm Conceptthe European Contribution Victor Aguado Eurocontrol
1 Towardsa Global Atm Conceptthe European Contribution Victor Aguado Eurocontrol1 Towardsa Global Atm Conceptthe European Contribution Victor Aguado Eurocontrol
1 Towardsa Global Atm Conceptthe European Contribution Victor Aguado Eurocontrol
 
Sergio Martins - OPERATIONS AND PASSENGERS WORKSHOP - PANEL 2
Sergio Martins - OPERATIONS AND PASSENGERS WORKSHOP - PANEL 2Sergio Martins - OPERATIONS AND PASSENGERS WORKSHOP - PANEL 2
Sergio Martins - OPERATIONS AND PASSENGERS WORKSHOP - PANEL 2
 

Recently uploaded

Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 

Recently uploaded (20)

Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 

The cost of delays and cancellations

  • 1. The Costs of Delays & Cancellations - Analysis & Means for Cost Reductions - AGIFORS Dubai 2006 m2p Consulting www.m2p.net • Frankfurt (Germany) • New York (USA) • Dubai (United Arab Emirates) • www.m2p.net
  • 2. - 2 -Dubai AGIFORS Operations Conference 2006 Mai 06 1 2 Causes & Cost Analysis Introduction “Delays & Cancellations” 3 Opportunities to Decrease Costs
  • 3. - 3 -Dubai AGIFORS Operations Conference 2006 Mai 06 In 2004 more than 20% of all scheduled flights in the US and EU were either delayed or cancelled According to most transportation reporting statistics (such as those of the US DOT) only flights that departs or arrives 15+ minutes behind schedule are rated as delayed - Delays & Cancellations US / EU in 2004 - Ontime 76,6% Delayed 21,6% Cancelled 1,8% Total Departures: 7,129,270 Delays & Cancellations US 2004 Delays & Cancellations EU 2004 Ontime 79,5% Delayed 17,5% Cancelled 3,1% Total Departures: 3,751,842 * Source: AEA Annual Report 2004* Source: DOT OTP Statistics 2004
  • 4. - 4 -Dubai AGIFORS Operations Conference 2006 Mai 06 A delay is an event that causes the change in schedule of a flight and/or aircraft’s planned departure or arrival 122 722 400 002A-PA A-PY B-TC B-TD 123 238 239 Check - Definition of a Delays - 401 723 1 3 001 4 - Late Arrival / Finish: During an event the finished time will be delayed. In case of a flight event this is a delayed arrival. - Late Departure / Start: The start of an event will be delayed. This is in case of a flight event a delayed departure. - Schedule Change: The length and/or timing of an event will be changed before it has started. In respect to change publication constraints this is a schedule change. - Early Arrival / Finish: A scheduled event will start earlier than scheduled. This happens in case a flight arrives before schedule. 2 1 2 3 4 now
  • 5. - 5 -Dubai AGIFORS Operations Conference 2006 Mai 06 According to the delay cause, many delays are outside the responsibility of the airline - Delay Causes - Ground Handling Delayed loading (Passenger, Baggage, Cargo, etc.), cleaning, fuelling etc, Maintenance Aircraft maintenance issue (defects, late arrival from check etc.) Weather Enroute weather, weather at departure / arrival station etc. ATC Enroute traffic congestions, ATFM / ATC capacity restrictions etc. Connection Departure delay because of late arrival passenger, baggage, cargo etc. Airport Authorities Mandatory Security (Pax / Bag offload), immigration / customs issues etc. Rotational Aircraft rotation, flight or cabin crew rotation etc. Others Other exceptions (Industrial Action within / outside Airline) DescriptionDelay Group Controllable Limited Yes No No Limited No Yes No
  • 6. - 6 -Dubai AGIFORS Operations Conference 2006 Mai 06 A cancellation describes a particular flight which is the airline deems or is physically not feasible to operate - Definition of Cancellations - A scheduled flight has to be cancelled because … required resources (Aircraft, Crew etc.) were not available environmental conditions are not in-line to operate the flight according to safety rules (Weather) external capacity constraints regulated by ATC and / or Airport authorities A scheduled flight will be cancelled because … the ongoing delay of the previous event will cause a major delay of the scheduled event and could not be compensated (Lack of reserves) economical reasons in case of low passenger bookings Re-Active Cancellation (Stochastic) Pro-Active Cancellation (Strategic) Because of rotational dependencies of flight events, a cancellation has an impact on its related return pair with respect to A/C and crew rotation
  • 7. - 7 -Dubai AGIFORS Operations Conference 2006 Mai 06 The handling of delays and cancellations are within the decision making governance of operations control Decision Making Governance Business Objectives Airport Irregularity Reasons Constraints ATC Crew Aircraft Weather … Rotation Crew Rotation Aircraft Hub Capacity Fleet Slots … Product Profitability Regularity Safety Punctuality Interfaces Commercial ATC Engineering … Cargo
  • 8. - 8 -Dubai AGIFORS Operations Conference 2006 Mai 06 1 2 Causes & Cost Analysis Introduction “Delays & Cancellations” 3 Opportunities to Decrease Costs
  • 9. - 9 -Dubai AGIFORS Operations Conference 2006 Mai 06 At least 1/3rd of all delays are within the responsibility of the airlines and / or its suppliers - Delay Cause Analysis - Delays Causes US 2004 Delays Causes EU 2004 * Source: FAA Statistics 2004 ATC 37,1% Airport Authorities 0,2% Airline Control 30,7% Connection 28,3% Weather 3,6% Total No of delayed flights: 1,568,439 Total No of delayed flights: 676,211 * Source: AEA Statistics 2004 Approximately 10% of all Airline related delays are caused by maintenance problems. The majority is caused by rotational problems (Aircraft, Crew, etc.) Weather 2% ATC 25% Connection 4% Airline Control 58% Airport Authorities 11%
  • 10. - 10 -Dubai AGIFORS Operations Conference 2006 Mai 06 Maintenance delays are not only caused by a poor Aircraft / Component reliability Aircraft Defects during transit or after positioning of aircraft (AOG) Maintenance equipment, -facilities, -tools, lack of or breakdown Non-scheduled maintenance, special checks and/or additional work Lack of spares Maintenance work execution issues (Shortages of staff etc). … Poor Aircraft & Component Reliability Insufficient line maintenance process / quality (base station / outstation) according to operating requirements Check cycles / visit plan & work scope with regards to utilization constraints Visit plan quality (Level of detail, accuracy, etc.) Lack of buffers / reserves (Tools, Spares, Staff etc.) … Maintenance Delay Reasons Causes Analysis - Maintenance Delays -
  • 11. - 11 -Dubai AGIFORS Operations Conference 2006 Mai 06 LG AY RO SN SK JU OK CYIG AZJKLO LH AFMA JP IB OU TK BD OS KL BA LX FI OA KM TP 65,0% 70,0% 75,0% 80,0% 85,0% 90,0% 95,0% 0 100 200 300 400 500 600 700 - European carriers On-Time Performance 2004 - 4 out of 5 Europe’s top carriers are above the calculated OTP average of 82% Airline departure volume does not automatically indicate poor on-time performance On-Time Performance No of Departures Average OTP 82.0% * Source: AEA Annual Consumer Report 2004
  • 12. - 12 -Dubai AGIFORS Operations Conference 2006 Mai 06 The analysis of regularity within Europe intends to show that big carriers cancel more flights than smaller ones - European carriers Regularity 2004 - AY RO SN SK JU CY IG AZ LO LH AF MAJP IB OU BD OS KL BA LX FI OA KM TP LG OK 97,8% 98,3% 98,8% 99,3% 99,8% 100,3% 0 100 200 300 400 500 600 700 Regularity * Source: AEA Annual Consumer Report 2004 Average Regularity 98.7% No of Departures
  • 13. - 13 -Dubai AGIFORS Operations Conference 2006 Mai 06 A specific model is used to calculate the overall Profit / Loss for each single flight event Salaries Administration Insurance ... Landing Fees Catering Fuel Travel Costs Flight Deck ATC charges ... Version Change Aircraft Change Equipment Change Diversion Re-Routing Cancellation ... Passengers Cargo ... Irregularity CostsVariable CostsFixed Costs Revenue Cost Profit / Loss - Profit & Loss Calculation Model for a single flight event -
  • 14. - 14 -Dubai AGIFORS Operations Conference 2006 Mai 06 The duration of a delay has a major impact on the overall delay costs of a particular flight event - Delay Costs according to Delay duration - $ Jet Fuel Passenger Re-Bookings Crew Duty-Time Costs Aerodrome Surcharges Snacks / Meals Crew Per Diem + Acc + Trans Passenger Acc + Trans Handling Surcharges Cargo Rev / GHC / QRT Airport Services M&E Repair / Man Hours NCC Support M&E Spare Provisioning t1h 2h 3h 4h 5h 6h 7h 8h * Source: m2p Delay Cost Analysis
  • 15. - 15 -Dubai AGIFORS Operations Conference 2006 Mai 06 Maintenance & aircraft ownership costs represent 35% of the estimated operating delay costs - Delay Cost Analysis US carriers 2004 - Distribution of Operating Costs Delay Costs per Minute * Source: ATA Statistics US Carriers 2004 Jet Fuel $17,05 Crew $16,77 Maintenance $10,16 Ownership $9,74 Other $3,36 Total $57,08 Fuel 30% Crew 29% Maintenance 18% Ownership 17% Other 6% In the US a total of 86.5 million ATC delay minutes were recorded in 2004 with an estimated $4.8 billion in direct operating costs
  • 16. - 16 -Dubai AGIFORS Operations Conference 2006 Mai 06 In addition to Operating Costs the total delay cost should also include Passenger’s Time - A320 Delay Cost Example - Passenger Cost $57.08 Cost per Minute Operating Cost $66.00 Cost Item Total per Minute $123.08 *1 Source: FAA Statistics Cost per Passenger / Hour1 Cost per Passenger / Minute Total Cost / Minute2 $33.25 $0.55 $66.00 2 Cost Calculation based on average A320 capacity of 150 passenger with load factor of 80% Based on the minimum accountable length of a delay defined by US DOT (15 min) the minimum cost of a delay equals approximately $1,846 Taking passenger costs into account requires aircraft type specific values A linear cost figure simplifies the overall cost calculation but does not provide exact costing at any point of time
  • 17. - 17 -Dubai AGIFORS Operations Conference 2006 Mai 06 1 2 Causes & Cost Analysis Introduction “Delays & Cancellations” 3 Opportunities to Decrease Costs
  • 18. - 18 -Dubai AGIFORS Operations Conference 2006 Mai 06 In many cases a more accurate plan could help to avoid controllable delays and its related costs Establish Problem / Impact visibility Improve organizational Reactiveness 1 32 Increase Planning Accuracy Most of controllable delays are caused by an unstable plan which has not sufficient buffers to compensate minor problems Planning quality indicators have to be implemented and measured. Results have to be feedback into the planning process At the point a delay occurs the impact of an uncontrollable delay is very often not clear which could cause additional cost because of suboptimal decision Clear visibility on delay impact will provide baseline for cost efficient counter-measures Decrease of uncontrollable delays through pro-active cancellations Decrease of controllable delays and re-active cancellations Decrease of controllable and uncontrollable delays In case of any delay the duration of the delayed event is a major cost driver Processes, Organization and Staff Skills should be aligned to support pro-active decision making and flexible problem solving - Opportunities to decrease costs -
  • 19. - 19 -Dubai AGIFORS Operations Conference 2006 Mai 06 Efficient and accurate planning requires aligned key processes and business objectives Flight Scheduling & Operation Business Objectives Maintenance Planning & Execution On-Time Provisioning Aircraft Reliability Cost Efficiency Safety Business Objectives Punctuality Regularity ProfitabilitySafety Provides Aircraft Aircraft Demands Aircraft Demands Aircraft Provides Aircraft - Maintenance Planning & Execution - M&E Department Airline Flight Operations 1
  • 20. - 20 -Dubai AGIFORS Operations Conference 2006 Mai 06 A consistent, integrated, and stable planning process aligns maintenance planning with flight scheduling Maintenance Planning Flight Scheduling Operations Control Maintenance Control Planning is done to ensure a stable production Business Objectives Punctuality Regularity ProfitabilitySafety Business Objectives On-Time Provisioning Aircraft Reliability Cost Efficiency Safety Planning will be done across department borders Planning in-line with agreed business objectives Integrated Consistent Stable - Recommended Planning Approach - 1
  • 21. - 21 -Dubai AGIFORS Operations Conference 2006 Mai 06 The planning quality across all planning stages could be measured with specific Performance Indicators Flight Scheduling & Operation Maintenance Planning & Execution - Establish Measurement Points (KPI’s) - KPIKPI KPI KPI KPI KPI Measure Productivity & Quality of Service Maintenance & Engineering Airline / Flight Operations The KPI concept should reflect the relationship between the two core processes Flight Scheduling & Operation as well as Maintenance Planning & Execution KPI’s must be defined on well defined interfaces and with clear responsibilities within the organisation structure The use of industry benchmarks depends on the specific needs and requirements of the respective airline 1
  • 22. - 22 -Dubai AGIFORS Operations Conference 2006 Mai 06 Through problem visibility all events indirectly impacted by a delay could be identified 122 722 400 002A-PA A-PY B-TC B-TD 123 238 239 Check 401 723 001 now - Impact / Problem Visibility - 2 - Direct Impact: A delay has a direct impact on all scheduled events of this particular resource in case it conflicts with its start / end times. To stay within the plan these events have to be cancelled or delayed either - Indirect Impact: A delay has an indirect impact on all scheduled event with inherited dependencies. These could be related to all types of resources e.g. Passenger, Crew, Aircraft, Facility etc. 1 2 1 2 2 2 In addition to the operational impact itself all related cost & revenue figures related to the scheduled event should be provided
  • 23. - 23 -Dubai AGIFORS Operations Conference 2006 Mai 06 The most efficient recovery decision could be made based on the identified problem Ad-hoc Effect Gradual Recovery Creeping Effect Gradual Recovery Ad-hoc Effect Ad-hoc Recovery - Identified Irregularities & Recovery Strategies - • Without any notification and with immediate effect • Example: Airport closure due to radar failure • Plan able / Pre-Announced Reason • Defined Time Period • Example: Planned Airport / Airspace closure • Unexpected deteriorating reasons or unexpected additional problems • Example: Deteriorating weather conditions Irregularity Impact Profile 50% 100% t 50% 100% t Description 50% 100% t 50% 100% t 50% 100% t 50% 100% t 2
  • 24. - 24 -Dubai AGIFORS Operations Conference 2006 Mai 06 A centralized planning approach defines the baseline for decentralized problem solving during production Maintenance Flight Scheduling Crew Management 12 month 6 month 4 weeks Long-Term Planning Operational Planning Production / Ops Control Tactical Planning 72 hours AOG‘s - Staged Planning Approach & Organizational Responsibilities - Pre-Planning Planning Base Maintenance / EO Planning Line Maint. & Ground Events Detailed Planning “Frozen Plan” Planning Activity Irregularity ManagementPlanning Result Detailed Planning of visits within each production site 3
  • 25. - 25 -Dubai AGIFORS Operations Conference 2006 Mai 06 All specific measurements to decrease delays depends on the airlines business model and operating environment Problem Visibility A detailed problem assessment will provide a clear picture on current weaknesses and achievable objectives in respect to the airline specific environment Optimized Planning An optimized plan as a result of an integrated planning processes could help to avoid maintenance delays Realistic Reserves Operational Reserves could help to compensate controllable and not controllable delays but must be in-line with financial constraints Problem Solving Performance Organisation, processes and people capabilities should be aligned with the objective to solve upcoming problems as efficient as possible