Project Charter
Project Name:              E-Commerce Business Models (Peer to Peer/B2C)
Focus Area:                Incorporating a combination of two e-commerce business models to
                           create and develop a successful online business.




Prepared By
 Document Owner(s)                                 Project/Organization Role
 Brian Bish                                        Project Manager

 Greg Morris                                       Project Team Member

 Martin Poirier                                    Project Team Member

 Matt Walrath                                      Project Team Member
 Ryan Wilson                                       Project Team Member



Project Charter Version Control
 Version        Date           Author              Change Description
                               PM Brian Bish       Preliminary Scope and Charter Draft
     A            4/3/08




Confidential
ECommerceProjectCharter-123480671182-phpapp02.doc
Last printed on 3/23/2004 7:48:00 a3/p3
Project Charter




TABLE OF CONTENTS

1 PROJECT CHARTER PURPOSE....................................................................................................3

2 PROJECT EXECUTIVE SUMMARY................................................................................................3

3 PROJECT OVERVIEW.....................................................................................................................4

4 PROJECT SCOPE...........................................................................................................................4

      4.1 Goals and Objectives.............................................................................................................4

      4.2 Departmental Statements of Work (SOW).............................................................................4

      4.3 Project Deliverables...............................................................................................................5

      4.4 Project Estimated Costs & Duration.......................................................................................5

5 PROJECT CONDITIONS.................................................................................................................5

      5.1 Project Assumptions..............................................................................................................5

      5.2 Project Risks..........................................................................................................................6

      5.3 Project Constraints.................................................................................................................6

6 PROJECT STRUCTURE APPROACH............................................................................................6

7 PROJECT TEAM ORGANIZATION PLANS....................................................................................6

8 APPROVALS....................................................................................................................................7




Confidential                                                       Page 2                                                           2/16/2009
Project Charter




1    PROJECT CHARTER PURPOSE

       The Project Team will determine and identify the necessary steps for developing an e-
       commerce website that encompasses a combination of business models. Our website will
       illustrate these models throughout our business. We will examine each business model and
       how we can incorporate it into our website. Each Team member will do extensive e-
       commerce research to discover possible solutions for our new e-business. The Project Team
       will become more knowledgeable on how to approach building an e-business from ground
       level. The models that we will explore are the following: Business to Business, Business to
       Consumer, and Peer to Peer.




2 PROJECT EXECUTIVE SUMMARY
       •   Project Goal – Research B2B, B2C, and P2P e-commerce models and apply them to the
           creation of a new e-commerce website that will be very successful and generate
           revenue.
       •   Objectives – To create and maintain a high revenue e-commerce that is one of a kind in
           the Internet business community.
       •   Scope – Deliver a quality e-business site within the time, cost, and project requirements
           defined by our Project Team.
       •   Assumptions – There are many e-commerce business models that are used in today’s
           Internet business world. The e-commerce industry has witnessed major growth within
           the past five years.
       •   Risks – Identify and research possible risks regarding starting up a new e-business.
       •   Costs – Exceeds the estimated or allotted amount of money for the project. Costs would
           be considered for website specifications such as human resources, servers/equipment,
           advertising and any other expenses that arise.
       •   Timeline – Develop a reasonable timeline by doing research on other e-commerce
           businesses. How long does it take other companies to develop and startup an e-
           business website?
       •   Approach – Project manager will conduct weekly project meetings. The PM will be
           responsible for delegating work and assigning project duties. The PM will communicate
           via, email, phone, and conference calls.
       •   Organization – E-commerce Inc. The organizational structure of this project is as follows:
    1. Doug Friend (CEO) PMP Certified
    2. Brian Bish (Project Manager)
    3. Greg Morris (Project Team Member)
    4. Martin Poirier (Project Team Member)
    5. Matt Walrath (Project Team Member)
    6. Ryan Wilson (Project Team Member)




Confidential                                   Page 3                                      2/16/2009
Project Charter



3 PROJECT OVERVIEW
       Our project’s mission is to develop a new and successful e-commerce business using a
       combination of e-commerce business models such as Amazon.com and Craigslist. The site
       will use Peer to Peer, Business to Consumer, and Business to Business Models. We will
       examine the possible ways that these models can be maximized to develop a premier online
       business.




4 PROJECT SCOPE


4.1    Goals and Objectives

         Goals                      Objectives
         Define reasons for         1. What needs to be accomplished? What is the desired
         undertaking the project       end result? (Stakeholder Satisfaction)
                                    2. Research business models and develop a list of
         What specifications do
                                       requirements for our site.
         we need to follow to fit
         our business models for
         our e-business?

                                    3   The Project Team will need to do product research.
         What will the e-business
         offer as products and          What products and services do customers demand?
         services?

                                    4. Define estimated specifications, time, cost, schedule,
         Peer to Peer Model
                                       and personnel to integrate model into our website.
         Business to Consumer       5. Define estimated specifications, time, cost, schedule,
         Model                         and personnel to integrate model into our website.
                                    6. Define estimated specifications, time, cost, schedule,
         Business to Business
                                       and personnel to integrate model into our website.
         Model

         Mix Business models        7. Integrate all models to your website.
         together to get one
         overall result




4.2    Departmental Statements of Work (SOW)

         Departmental SOW            Owner/Prime                    Due Date/Sequence
         Research and Development    Marketing Department           To be determined
         Technical Specifications    ITT Department                 To be determined
         Marketing                   Marketing Department           To be determined


Confidential                                 Page 4                                     2/16/2009
Project Charter


4.3    Project Deliverables

           Milestone                       Deliverable
                                           •
           1. Initiation – Project             Define overall specs for website
              Definition                   •   Research Business Models
                                           •   Research services and products
                                           •   Estimate website costs
                                           •   Estimate time and resources
                                           •
           2. Execution – Utilizes             Applying the business models to the website
              ideas to create the e-       •   Creating the e-commerce site – applying what we
              commerce business                have researched
                                           •   Testing e-commerce website
                                           •
           3. Closing                          Meet stakeholders needs



4.4    Project Estimated Costs & Duration

           Project
           Milestone          Date Estimate      Deliverable(s) Included           Confidence Level
                                                 •     [Define overall specs for
           Project            Not                                                  Medium/High
                                                       website
           Definition         determined
                                                 •     Research Business
                                                       Models
                                                 •     Research services and
                                                       products
                                                 •     Estimate website costs
                                                 •     Estimate time and
                                                       resources
                                                 •     Applying the business
           Execution          Not                                                  Medium/High
                                                       models to the website
                              determined
                                                 •     Creating the e-
                                                       commerce site –
                                                       applying what we have
                                                       researched
                                                 •     Testing e-commerce
                                                       website
           Closing            Not                Meet stakeholder needs            Medium/High
                              determined




5     PROJECT CONDITIONS


5.1    Project Assumptions

       •     Website to integrate Amazon and Craigslist into one e-commerce site.


Confidential                                         Page 5                                   2/16/2009
Project Charter


       •       Apply the P2P e-commerce business model
       •       Apply the B2C e-commerce business model
       •       Apply the B2B e-commerce business model


5.2    Project Risks

           #    Risk Area      Likelihood        Risk Owner      Project Impact-Mitigation Plan
           1    Technology     Medium - High     PM              High – Rethink other technology
                Costs                                            alternatives
           2    Marketing      Medium - High     PM              High
                and
                Advertising
                Costs



5.3    Project Constraints

       •       Budget – Technology Costs and Marketing
       •       Competition – Do you have any competitors that have the same business model for an
               e-commerce site?




6     Project Structure Approach

       •       Project manager will conduct weekly project meetings. The PM will be responsible for
               delegating work and assigning project duties. The PM will communicate via, email,
               phone, and conference calls.




7     Project Team Organization Plans

        Project Team Role                Project Team Member(s)         Responsibilities
        Project Manager                  Brian Bish                     Oversees the entire project
        Project Team Member              Greg Morris                    Multi-Media Web Developer
        Project Team Member              Martin Poirier                 IT Specialist
        Project Team Member              Matt Walrath                   IT Specialist
        Project Team Member              Ryan Wilson                    IT Specialist




Confidential                                      Page 6                                     2/16/2009
Project Charter



8 APPROVALS

Prepared by    __________________________________
               Project Manager

Approved by    __________________________________
               Project Sponsor

               __________________________________
               Executive Sponsor

               __________________________________
               Client Sponsor




Confidential                          Page 7         2/16/2009
Project Charter




Confidential      Page 8         2/16/2009

More Related Content

What's hot

Network Guardians Project Charter Final Ver.
Network Guardians Project Charter Final Ver.Network Guardians Project Charter Final Ver.
Network Guardians Project Charter Final Ver.
Joseph C. Douglas
 
Project Charter Template
Project Charter TemplateProject Charter Template
Project Charter Template
Naseer Muhammud
 
Project charterexample (1) (1)
Project charterexample (1) (1)Project charterexample (1) (1)
Project charterexample (1) (1)
owaishazara
 

What's hot (20)

Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)
 
Project Kickoff Meeting Agenda PowerPoint Presentation Slides
Project Kickoff Meeting Agenda PowerPoint Presentation SlidesProject Kickoff Meeting Agenda PowerPoint Presentation Slides
Project Kickoff Meeting Agenda PowerPoint Presentation Slides
 
Software Project Management: Project Charter
Software Project Management: Project CharterSoftware Project Management: Project Charter
Software Project Management: Project Charter
 
Network Guardians Project Charter Final Ver.
Network Guardians Project Charter Final Ver.Network Guardians Project Charter Final Ver.
Network Guardians Project Charter Final Ver.
 
High level design document template
High level design document templateHigh level design document template
High level design document template
 
Social Media Project Charter Template
Social Media Project Charter TemplateSocial Media Project Charter Template
Social Media Project Charter Template
 
Sample On Project Management By Instant Essay Writing
Sample On Project Management By Instant Essay WritingSample On Project Management By Instant Essay Writing
Sample On Project Management By Instant Essay Writing
 
Project Charter Template
Project Charter TemplateProject Charter Template
Project Charter Template
 
BPM (Business Process Management) Introduction
BPM (Business Process Management) IntroductionBPM (Business Process Management) Introduction
BPM (Business Process Management) Introduction
 
Ignore Project Scope & WBS At Your Own Peril
Ignore Project Scope & WBS At Your Own PerilIgnore Project Scope & WBS At Your Own Peril
Ignore Project Scope & WBS At Your Own Peril
 
Project Charter
Project CharterProject Charter
Project Charter
 
DHL Logistics - Enterprise Architecture
DHL Logistics - Enterprise ArchitectureDHL Logistics - Enterprise Architecture
DHL Logistics - Enterprise Architecture
 
Creating the project charter
Creating the project charterCreating the project charter
Creating the project charter
 
Software Project Management: Project Planning
Software Project Management: Project PlanningSoftware Project Management: Project Planning
Software Project Management: Project Planning
 
New Software Development Proposal PowerPoint Presentation Slides
New Software Development Proposal PowerPoint Presentation SlidesNew Software Development Proposal PowerPoint Presentation Slides
New Software Development Proposal PowerPoint Presentation Slides
 
The Project Management Process - Week 1
The Project Management Process -  Week 1The Project Management Process -  Week 1
The Project Management Process - Week 1
 
Product Requirement Document(PRD)
Product Requirement Document(PRD)Product Requirement Document(PRD)
Product Requirement Document(PRD)
 
site design project charter
site design project chartersite design project charter
site design project charter
 
CRM System RFP Template
CRM System RFP TemplateCRM System RFP Template
CRM System RFP Template
 
Project charterexample (1) (1)
Project charterexample (1) (1)Project charterexample (1) (1)
Project charterexample (1) (1)
 

Similar to E Commerce Project Charter

RUNNING HEAD Customer Care Website Implementation1Customer .docx
RUNNING HEAD Customer Care Website Implementation1Customer .docxRUNNING HEAD Customer Care Website Implementation1Customer .docx
RUNNING HEAD Customer Care Website Implementation1Customer .docx
joellemurphey
 
E-Commerce
E-CommerceE-Commerce
E-Commerce
concoff
 
TechOut_Generalized Workflow
TechOut_Generalized WorkflowTechOut_Generalized Workflow
TechOut_Generalized Workflow
Kabeed Mansur
 
Sabiron PLM Project Methodology.pdf
Sabiron PLM Project Methodology.pdfSabiron PLM Project Methodology.pdf
Sabiron PLM Project Methodology.pdf
Brion Carroll (II)
 
IT Solutions Overview
IT Solutions OverviewIT Solutions Overview
IT Solutions Overview
Mint Tree
 
IT Solutions Overview
IT Solutions OverviewIT Solutions Overview
IT Solutions Overview
Mint Tree
 

Similar to E Commerce Project Charter (20)

Website Planner Workbook
Website Planner WorkbookWebsite Planner Workbook
Website Planner Workbook
 
Free presentation template for web design projects
Free presentation template for web design projectsFree presentation template for web design projects
Free presentation template for web design projects
 
Unit1 Web Technology UPTU UNIT 1
Unit1 Web Technology UPTU UNIT 1 Unit1 Web Technology UPTU UNIT 1
Unit1 Web Technology UPTU UNIT 1
 
Unit1 2
Unit1 2 Unit1 2
Unit1 2
 
RUNNING HEAD Customer Care Website Implementation1Customer .docx
RUNNING HEAD Customer Care Website Implementation1Customer .docxRUNNING HEAD Customer Care Website Implementation1Customer .docx
RUNNING HEAD Customer Care Website Implementation1Customer .docx
 
Open / Drupal Camp Presentation: Brent Bice
Open / Drupal Camp Presentation: Brent BiceOpen / Drupal Camp Presentation: Brent Bice
Open / Drupal Camp Presentation: Brent Bice
 
E-Commerce
E-CommerceE-Commerce
E-Commerce
 
2013 06 04_5806_case_manager_implementation__
2013 06 04_5806_case_manager_implementation__2013 06 04_5806_case_manager_implementation__
2013 06 04_5806_case_manager_implementation__
 
Web Site Development - Project Proposal
Web Site Development - Project ProposalWeb Site Development - Project Proposal
Web Site Development - Project Proposal
 
Webgen Technologies Pvt. Ltd.
Webgen Technologies Pvt. Ltd.Webgen Technologies Pvt. Ltd.
Webgen Technologies Pvt. Ltd.
 
Software Outsourcing: Outsource Your Project or Build a Team
Software Outsourcing: Outsource Your Project or Build a TeamSoftware Outsourcing: Outsource Your Project or Build a Team
Software Outsourcing: Outsource Your Project or Build a Team
 
Architecture ver 1
Architecture ver 1Architecture ver 1
Architecture ver 1
 
TechOut_Generalized Workflow
TechOut_Generalized WorkflowTechOut_Generalized Workflow
TechOut_Generalized Workflow
 
Internship PPT.pptx
Internship PPT.pptxInternship PPT.pptx
Internship PPT.pptx
 
EBE 2020 How METRO & Ciklum built a new B2B marketplace
EBE 2020 How METRO & Ciklum built a new B2B marketplaceEBE 2020 How METRO & Ciklum built a new B2B marketplace
EBE 2020 How METRO & Ciklum built a new B2B marketplace
 
Sabiron PLM Project Methodology.pdf
Sabiron PLM Project Methodology.pdfSabiron PLM Project Methodology.pdf
Sabiron PLM Project Methodology.pdf
 
Senior PM with Real World Experience
Senior PM with Real World ExperienceSenior PM with Real World Experience
Senior PM with Real World Experience
 
IT Solutions Overview
IT Solutions OverviewIT Solutions Overview
IT Solutions Overview
 
IT Solutions Overview
IT Solutions OverviewIT Solutions Overview
IT Solutions Overview
 
Resume
ResumeResume
Resume
 

More from brianbish10795 (9)

Life Of A Chinese Farmer In 2006
Life Of A Chinese Farmer In 2006Life Of A Chinese Farmer In 2006
Life Of A Chinese Farmer In 2006
 
Written Analysis Final Project[1]
Written Analysis Final Project[1]Written Analysis Final Project[1]
Written Analysis Final Project[1]
 
Kitchen Remodel Resource Plan1
Kitchen Remodel Resource Plan1Kitchen Remodel Resource Plan1
Kitchen Remodel Resource Plan1
 
Personal Force Field Analysis
Personal Force Field AnalysisPersonal Force Field Analysis
Personal Force Field Analysis
 
Quality Management Presentation
Quality Management PresentationQuality Management Presentation
Quality Management Presentation
 
VoIP Project Request For Proposal Presentation
VoIP Project Request For Proposal PresentationVoIP Project Request For Proposal Presentation
VoIP Project Request For Proposal Presentation
 
Request For Proposal
Request For ProposalRequest For Proposal
Request For Proposal
 
Communications Management Presentation
Communications Management PresentationCommunications Management Presentation
Communications Management Presentation
 
References
ReferencesReferences
References
 

Recently uploaded

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 

Recently uploaded (20)

Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source Milvus
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 

E Commerce Project Charter

  • 1. Project Charter Project Name: E-Commerce Business Models (Peer to Peer/B2C) Focus Area: Incorporating a combination of two e-commerce business models to create and develop a successful online business. Prepared By Document Owner(s) Project/Organization Role Brian Bish Project Manager Greg Morris Project Team Member Martin Poirier Project Team Member Matt Walrath Project Team Member Ryan Wilson Project Team Member Project Charter Version Control Version Date Author Change Description PM Brian Bish Preliminary Scope and Charter Draft A 4/3/08 Confidential ECommerceProjectCharter-123480671182-phpapp02.doc Last printed on 3/23/2004 7:48:00 a3/p3
  • 2. Project Charter TABLE OF CONTENTS 1 PROJECT CHARTER PURPOSE....................................................................................................3 2 PROJECT EXECUTIVE SUMMARY................................................................................................3 3 PROJECT OVERVIEW.....................................................................................................................4 4 PROJECT SCOPE...........................................................................................................................4 4.1 Goals and Objectives.............................................................................................................4 4.2 Departmental Statements of Work (SOW).............................................................................4 4.3 Project Deliverables...............................................................................................................5 4.4 Project Estimated Costs & Duration.......................................................................................5 5 PROJECT CONDITIONS.................................................................................................................5 5.1 Project Assumptions..............................................................................................................5 5.2 Project Risks..........................................................................................................................6 5.3 Project Constraints.................................................................................................................6 6 PROJECT STRUCTURE APPROACH............................................................................................6 7 PROJECT TEAM ORGANIZATION PLANS....................................................................................6 8 APPROVALS....................................................................................................................................7 Confidential Page 2 2/16/2009
  • 3. Project Charter 1 PROJECT CHARTER PURPOSE The Project Team will determine and identify the necessary steps for developing an e- commerce website that encompasses a combination of business models. Our website will illustrate these models throughout our business. We will examine each business model and how we can incorporate it into our website. Each Team member will do extensive e- commerce research to discover possible solutions for our new e-business. The Project Team will become more knowledgeable on how to approach building an e-business from ground level. The models that we will explore are the following: Business to Business, Business to Consumer, and Peer to Peer. 2 PROJECT EXECUTIVE SUMMARY • Project Goal – Research B2B, B2C, and P2P e-commerce models and apply them to the creation of a new e-commerce website that will be very successful and generate revenue. • Objectives – To create and maintain a high revenue e-commerce that is one of a kind in the Internet business community. • Scope – Deliver a quality e-business site within the time, cost, and project requirements defined by our Project Team. • Assumptions – There are many e-commerce business models that are used in today’s Internet business world. The e-commerce industry has witnessed major growth within the past five years. • Risks – Identify and research possible risks regarding starting up a new e-business. • Costs – Exceeds the estimated or allotted amount of money for the project. Costs would be considered for website specifications such as human resources, servers/equipment, advertising and any other expenses that arise. • Timeline – Develop a reasonable timeline by doing research on other e-commerce businesses. How long does it take other companies to develop and startup an e- business website? • Approach – Project manager will conduct weekly project meetings. The PM will be responsible for delegating work and assigning project duties. The PM will communicate via, email, phone, and conference calls. • Organization – E-commerce Inc. The organizational structure of this project is as follows: 1. Doug Friend (CEO) PMP Certified 2. Brian Bish (Project Manager) 3. Greg Morris (Project Team Member) 4. Martin Poirier (Project Team Member) 5. Matt Walrath (Project Team Member) 6. Ryan Wilson (Project Team Member) Confidential Page 3 2/16/2009
  • 4. Project Charter 3 PROJECT OVERVIEW Our project’s mission is to develop a new and successful e-commerce business using a combination of e-commerce business models such as Amazon.com and Craigslist. The site will use Peer to Peer, Business to Consumer, and Business to Business Models. We will examine the possible ways that these models can be maximized to develop a premier online business. 4 PROJECT SCOPE 4.1 Goals and Objectives Goals Objectives Define reasons for 1. What needs to be accomplished? What is the desired undertaking the project end result? (Stakeholder Satisfaction) 2. Research business models and develop a list of What specifications do requirements for our site. we need to follow to fit our business models for our e-business? 3 The Project Team will need to do product research. What will the e-business offer as products and What products and services do customers demand? services? 4. Define estimated specifications, time, cost, schedule, Peer to Peer Model and personnel to integrate model into our website. Business to Consumer 5. Define estimated specifications, time, cost, schedule, Model and personnel to integrate model into our website. 6. Define estimated specifications, time, cost, schedule, Business to Business and personnel to integrate model into our website. Model Mix Business models 7. Integrate all models to your website. together to get one overall result 4.2 Departmental Statements of Work (SOW) Departmental SOW Owner/Prime Due Date/Sequence Research and Development Marketing Department To be determined Technical Specifications ITT Department To be determined Marketing Marketing Department To be determined Confidential Page 4 2/16/2009
  • 5. Project Charter 4.3 Project Deliverables Milestone Deliverable • 1. Initiation – Project Define overall specs for website Definition • Research Business Models • Research services and products • Estimate website costs • Estimate time and resources • 2. Execution – Utilizes Applying the business models to the website ideas to create the e- • Creating the e-commerce site – applying what we commerce business have researched • Testing e-commerce website • 3. Closing Meet stakeholders needs 4.4 Project Estimated Costs & Duration Project Milestone Date Estimate Deliverable(s) Included Confidence Level • [Define overall specs for Project Not Medium/High website Definition determined • Research Business Models • Research services and products • Estimate website costs • Estimate time and resources • Applying the business Execution Not Medium/High models to the website determined • Creating the e- commerce site – applying what we have researched • Testing e-commerce website Closing Not Meet stakeholder needs Medium/High determined 5 PROJECT CONDITIONS 5.1 Project Assumptions • Website to integrate Amazon and Craigslist into one e-commerce site. Confidential Page 5 2/16/2009
  • 6. Project Charter • Apply the P2P e-commerce business model • Apply the B2C e-commerce business model • Apply the B2B e-commerce business model 5.2 Project Risks # Risk Area Likelihood Risk Owner Project Impact-Mitigation Plan 1 Technology Medium - High PM High – Rethink other technology Costs alternatives 2 Marketing Medium - High PM High and Advertising Costs 5.3 Project Constraints • Budget – Technology Costs and Marketing • Competition – Do you have any competitors that have the same business model for an e-commerce site? 6 Project Structure Approach • Project manager will conduct weekly project meetings. The PM will be responsible for delegating work and assigning project duties. The PM will communicate via, email, phone, and conference calls. 7 Project Team Organization Plans Project Team Role Project Team Member(s) Responsibilities Project Manager Brian Bish Oversees the entire project Project Team Member Greg Morris Multi-Media Web Developer Project Team Member Martin Poirier IT Specialist Project Team Member Matt Walrath IT Specialist Project Team Member Ryan Wilson IT Specialist Confidential Page 6 2/16/2009
  • 7. Project Charter 8 APPROVALS Prepared by __________________________________ Project Manager Approved by __________________________________ Project Sponsor __________________________________ Executive Sponsor __________________________________ Client Sponsor Confidential Page 7 2/16/2009
  • 8. Project Charter Confidential Page 8 2/16/2009