An Introduction to Grid-Tied Solar PV Systems
A grid-tied solar PV system is a solar PV system that, as its name suggests, is connected or
“tied” to the grid.
The figure above shows what a grid-tied solar PV system looks like.
 Solar PV modules generate DC electricity.
 The grid-tied solar inverter converts the DC electricity generated by the solar PV
modules into AC and feeds it into the grid. In order to do that, the solar inverter also
has to ensure that its output is in phase with the grid.
 The sell meter (or the export meter) measures the electricity fed by the grid-tied
solar inverter into the grid.
 The purchase mater (or the import meter) measures the electricity drawn from the
grid.
Big, utility scale solar PV plants (> 1 MW in capacity) are also grid-tied solar PV systems.
However, the only difference with respect to the figure above is that there are typically no local
loads which consume electricity. And therefore, there is no purchase meter (or the import meter)
either; there is only one meter and it is the sell meter (or the export meter).
The grid-tied solar PV system shown in the figure above needs support from the state
electricity boards in two ways:
1. The state electricity boards (SEBs) need to give you permission to feed electricity
into the grid.
2. The SEBs need to pay you and pay you well for the electricity fed into the grid.
Otherwise, it is not economically viable/feasible/attractive.
Point no. 1 is significant because the SEBs need to take some action at their end when many
consumers start feeding electricity during the day. To elaborate on it a bit more, consider a city like
Mumbai whose consumption is 3000MW. If many consumers go solar and start feeding 10% of the
total consumption into the grid, it would mean that 300MW is injected into the grid every day (or on
www.cenergymaxpower.com
most days) during a 10 hour period. MSEB would then have to compensate for that and generate
that much less from its other power generation sources during the day. Now imagine that the MSEB
has done that and the next day happens to be very cloudy, which means that the solar electricity will
not be produced at all or not as much as expected. This situation would land MSEB in a big soup and
it would have to scramble to arrange for the required power to cover for the shortfall in solar PV
energy. So, in general, SEBs need to do a lot at their end to allow renewable energy sources (which
are inherently “infirmed”) to feed electricity into the grid and yet ensure that the grid remains stable
and people get power when they want.
As far as point no. 2 and paying consumers is concerned, typically, SEBs calculate the “net”
energy consumed by the consumer (purchase meter reading – sell meter reading) and charge him
for that, which is why it is called “net metering”. This effectively means that the SEBs are buying
electricity from you at the rate at which they are selling to you. That is a god deal in most cases.
If the net consumed by the consumer happens to be negative, which means that the
consumer fed more into the grid than he consumed, then the SEBs pay him at a pre-defined rate.
This rate is Rs.9 per unit (or kWh) in the state of Uttarakhand (at least when its policy was declared)
which is quite good. But some SEBs might not be that generous. In fact, they might not even allow
consumers to feed more into the grid than they consume. For that matter, they might also put an
upper limit on how much consumers could feed into the grid and link it to their monthly
consumption, say 50% for example. In general, a particular SEB can frame its net metering in many
ways and will vary from state to state.
As of now, only a few states have come up with a net metering policy; many states are still
framing their solar and net metering policy. In general, rooftop solar is yet to pick in India in a big
way. But the day that it does, grid stability will become an issue, as it has in the Western countries.
However, despite the fact that net metering policy is not there in most states of India, grid-
tied solar PV systems are popular in India. But they are slightly different as compared to the figure
above; the output of the grid-tied solar inverter is connected to the grid “behind” the purchase
meter. So with respect to the above figure, it implies the following changes:
 Replace the net metering meter with the purchase meter (or the import meter).
 Get rid of the sell meter (or the export meter).
In such systems, the grid-tied solar inverter is sized such that it takes care of 85% of the
minimum loads during the day or less. So the grid-tied solar inverter takes care of the load current
requirement partially; the remaining current is drawn from the grid.
However, even if the inverter sizing is done as described above, after a thorough analysis of
the daily taking all seasonal variation into consideration, the situation where the solar PV modules
produce more electricity than what is required by the loads arises, and it is on holidays or off days.
When this happens:
 The excess electricity produced by the solar PV modules will flow into the grid.
 In states where the net metering policy is not there, this is not allowed, technically
and legally speaking, without taking prior permission from the SEB. That being said,
the SEB wouldn’t mind if they get free electricity. 
www.cenergymaxpower.com
 The meter might do one of the following things:
o It will count backwards. However, it is highly unlikely that states that do not
have a net metering policy will have a bi-directional meter. But this is good
from the consumer’s standpoint.
o It will count forward although you are feeding electricity into the grid. This
might happen if the meter is just a counter and measures the flow of
electricity through it, irrespective of the direction. This is very bad from the
consumer’s standpoint; he is actually feeding electricity into the grid but
getting charged for it! It is good for the SEB though since they are getting
some free electricity.
o It won’t count when feeding electricity into the grid. This is neither good nor
bad for the consumer; he is feeding electricity into the grid for free but isn’t
getting penalized for it. It is good for the SEB though since they are getting
some free electricity.
To avoid this situation, EPC companies implement what is called a “zero export” solution.
 The simplest way to achieve this on off days, when the generation is guaranteed to
be more than the consumption, is to trip the MCBs and disconnect the grid-tied
solar PV system from the grid. However, this is a crude way of doing it. There is no
guarantee that some electricity will not flow into the grid on working days. And on
off days, there could be some non-zero load which could have been fed by the grid-
tied solar PV system but will have to be fed from the grid instead.
 The other way is to implement a sophisticated system which constantly detects if
energy is flowing back into the grid. This can be done with the help of a bidirectional
meter, which is there only to detect reverse flow of energy and not for net metering.
There are two ways of achieving this:
o The output of the inverter can be reduced. However, most inverters in the
market do not have this feature.
o The system can be designed using many smaller sub-systems which can be
connected to the grid or disconnected from it independently using MCBs.
However, this design has cost implications; typically the larger the inverter,
the less expensive it is.
Boon for residential consumers
Grid-tied solar PV systems supported by a net metering policy are essential to bring
residential consumers in the solar PV play because their consumption pattern and the solar PV
electricity generation pattern doesn’t match at all; solar PV electricity generation happens during the
day, i.e. during the sunshine hours from 8 a.m. to 6 p.m., whereas most of the residential
consumption happens in the non-sunshine hours, i.e. before 8 a.m. and after 6 p.m.
If residential consumers had to go solar without support from the SEBs, then they would
necessarily need to go for solar PV systems with battery backup. But that increases the cost of the
www.cenergymaxpower.com
system. Solar PV systems also have to be maintained and incur recurring charges every few years
when the batteries wear out and therefore have to be replaced. Grid-tied solar PV systems, on the
other hand, enables residential consumers to go for solar PV systems without batteries. For them,
the grid acts a “storage” or an “energy bank”, in a manner of speaking; they push power into the grid
during sunshine hours and withdraw it during the non-sunshine hours. Of course, in reality the grid
can’t actually store the energy. As explained earlier in the article, it does so by generating lesser
energy during the sunshine hours.
What happens when the grid fails?
What happens to the grid-tied solar PV systems when the grid fails? Does the grid-tied
inverter keep pushing power into the grid? The short answer to that question is: no. When the grid
fails, the grid-tied does not keep pushing power into the grid. It cannot keep pushing power into the
grid.
This answer is very surprising and counter-intuitive to most people. The first time they hear
it they say, “That doesn’t make any sense. The time when the grid fails is the time when I want my
solar PV system to work the most!”
While that may be right, grid-tied solar inverters cannot do that and here’s why. In the oden
days, the grid and all the generators connected to it were owned by utility companies. When local
generation started, be it from solar, wind, or from other renewable sources, it was decided that
these generators would switch off when the grid failed, which is almost always due to some fault
condition, and it is extremely hazardous to continue to keep feeding power in such conditions. This
behaviour of grid-tied inverters is called anti-islanding protection; the grid-tied inverters are
prohibited from feeding power into the grid when there is a grid fault and they are also prohibited
from feeding the loads in an island separated from the grid. Actually, intentional islanding is allowed,
although with a lot of restrictions; unintentional islands are completely forbidden.
The way grid-tied inverters implement anti-islanding is by continuously monitoring the grid
and detecting one of the following conditions:
1. A sudden change in system voltage magnitude.
2. A sudden change in system frequency.
3. A sudden change in the rate of change of system frequency.
4. A sudden increase in the active output power (kW) well beyond the “normal” level.
5. A sudden increase in the reactive output power (kVAR) well beyond the “normal”
level.
When any one of the above conditions occurs, the grid-tied solar inverters stop pushing
power into the grid. In other words, they go “offline”, and come back online only when the grid is
stable again.
Conclusion
www.cenergymaxpower.com
Grid-tied solar PV systems have become very popular all over the world and are on the verge
of taking off big time in India as well. The SEBs need to do their part by coming up with good net
metering policies. In response, the consumers should go for solar in a big way.

More Related Content

Viewers also liked

GRID INTERCONNECTION OF RENEWABLE ENERGY SOURCES AT DISTRIBUTION LEVEL WITH P...
GRID INTERCONNECTION OF RENEWABLE ENERGY SOURCES AT DISTRIBUTION LEVEL WITH P...GRID INTERCONNECTION OF RENEWABLE ENERGY SOURCES AT DISTRIBUTION LEVEL WITH P...
GRID INTERCONNECTION OF RENEWABLE ENERGY SOURCES AT DISTRIBUTION LEVEL WITH P...Pradeep Avanigadda
 
Energy efficient solar solutions for developing countries
Energy efficient solar solutions for developing countriesEnergy efficient solar solutions for developing countries
Energy efficient solar solutions for developing countriesStatcon Energiaa
 
10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, DesignVignesh Sekar
 
Solar Roof top Project proposal delhi
Solar Roof top Project proposal delhiSolar Roof top Project proposal delhi
Solar Roof top Project proposal delhiTarun Rathore
 
Financial Feasibility of Solar Power Plant in India
Financial Feasibility of Solar Power Plant in IndiaFinancial Feasibility of Solar Power Plant in India
Financial Feasibility of Solar Power Plant in IndiaAkash Jauhari
 
Optimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar ProjectsOptimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar ProjectsGensol Engineering Limited
 
Pre-Commissioning Tests for AC Side of Solar Power Plant
Pre-Commissioning Tests for AC Side of Solar Power PlantPre-Commissioning Tests for AC Side of Solar Power Plant
Pre-Commissioning Tests for AC Side of Solar Power PlantGensol Engineering Limited
 
Drawings & Documents Required for Solar Projects
Drawings & Documents Required for Solar ProjectsDrawings & Documents Required for Solar Projects
Drawings & Documents Required for Solar ProjectsGensol Engineering Limited
 
A solar pv based multistage grid tie inverter
A solar pv based multistage grid tie inverterA solar pv based multistage grid tie inverter
A solar pv based multistage grid tie inverterAlexander Decker
 
Photovoltaic Hybrid systems State Technique
Photovoltaic Hybrid systems State TechniquePhotovoltaic Hybrid systems State Technique
Photovoltaic Hybrid systems State TechniqueVicente Salas
 
Effect of earth on transmission line, bundle conductor & method of gmd
Effect of earth on transmission line, bundle conductor & method of gmdEffect of earth on transmission line, bundle conductor & method of gmd
Effect of earth on transmission line, bundle conductor & method of gmdvishalgohel12195
 
Power loss due to Corona on High Voltage Transmission Lines
Power loss due to Corona on High Voltage Transmission LinesPower loss due to Corona on High Voltage Transmission Lines
Power loss due to Corona on High Voltage Transmission LinesIOSR Journals
 
Modeling the Irradiance and Temperature Dependence of PV Modules in PVsyst
Modeling the Irradiance and Temperature Dependence of PV Modules in PVsystModeling the Irradiance and Temperature Dependence of PV Modules in PVsyst
Modeling the Irradiance and Temperature Dependence of PV Modules in PVsystKenneth J. Sauer
 

Viewers also liked (20)

GRID INTERCONNECTION OF RENEWABLE ENERGY SOURCES AT DISTRIBUTION LEVEL WITH P...
GRID INTERCONNECTION OF RENEWABLE ENERGY SOURCES AT DISTRIBUTION LEVEL WITH P...GRID INTERCONNECTION OF RENEWABLE ENERGY SOURCES AT DISTRIBUTION LEVEL WITH P...
GRID INTERCONNECTION OF RENEWABLE ENERGY SOURCES AT DISTRIBUTION LEVEL WITH P...
 
Energy efficient solar solutions for developing countries
Energy efficient solar solutions for developing countriesEnergy efficient solar solutions for developing countries
Energy efficient solar solutions for developing countries
 
10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design
 
Solar Roof top Project proposal delhi
Solar Roof top Project proposal delhiSolar Roof top Project proposal delhi
Solar Roof top Project proposal delhi
 
Financial Feasibility of Solar Power Plant in India
Financial Feasibility of Solar Power Plant in IndiaFinancial Feasibility of Solar Power Plant in India
Financial Feasibility of Solar Power Plant in India
 
Economics of Solar Park
Economics of Solar ParkEconomics of Solar Park
Economics of Solar Park
 
Optimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar ProjectsOptimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar Projects
 
Pre-Commissioning Tests for AC Side of Solar Power Plant
Pre-Commissioning Tests for AC Side of Solar Power PlantPre-Commissioning Tests for AC Side of Solar Power Plant
Pre-Commissioning Tests for AC Side of Solar Power Plant
 
Drawings & Documents Required for Solar Projects
Drawings & Documents Required for Solar ProjectsDrawings & Documents Required for Solar Projects
Drawings & Documents Required for Solar Projects
 
Solar power.ppt
Solar power.pptSolar power.ppt
Solar power.ppt
 
Solar Energy
Solar EnergySolar Energy
Solar Energy
 
Grid Tie Power Inverters
Grid Tie Power InvertersGrid Tie Power Inverters
Grid Tie Power Inverters
 
A solar pv based multistage grid tie inverter
A solar pv based multistage grid tie inverterA solar pv based multistage grid tie inverter
A solar pv based multistage grid tie inverter
 
Photovoltaic Hybrid systems State Technique
Photovoltaic Hybrid systems State TechniquePhotovoltaic Hybrid systems State Technique
Photovoltaic Hybrid systems State Technique
 
3 mwpv plant
3 mwpv plant3 mwpv plant
3 mwpv plant
 
Dissertation 13208 Final Draft
Dissertation 13208 Final DraftDissertation 13208 Final Draft
Dissertation 13208 Final Draft
 
Effect of earth on transmission line, bundle conductor & method of gmd
Effect of earth on transmission line, bundle conductor & method of gmdEffect of earth on transmission line, bundle conductor & method of gmd
Effect of earth on transmission line, bundle conductor & method of gmd
 
Power loss due to Corona on High Voltage Transmission Lines
Power loss due to Corona on High Voltage Transmission LinesPower loss due to Corona on High Voltage Transmission Lines
Power loss due to Corona on High Voltage Transmission Lines
 
Kirlian Photography
Kirlian PhotographyKirlian Photography
Kirlian Photography
 
Modeling the Irradiance and Temperature Dependence of PV Modules in PVsyst
Modeling the Irradiance and Temperature Dependence of PV Modules in PVsystModeling the Irradiance and Temperature Dependence of PV Modules in PVsyst
Modeling the Irradiance and Temperature Dependence of PV Modules in PVsyst
 

Recently uploaded

signals in triangulation .. ...Surveying
signals in triangulation .. ...Surveyingsignals in triangulation .. ...Surveying
signals in triangulation .. ...Surveyingsapna80328
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSneha Padhiar
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Erbil Polytechnic University
 
OOP concepts -in-Python programming language
OOP concepts -in-Python programming languageOOP concepts -in-Python programming language
OOP concepts -in-Python programming languageSmritiSharma901052
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Sumanth A
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHSneha Padhiar
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Communityprachaibot
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptxmohitesoham12
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfManish Kumar
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsResearcher Researcher
 
Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solidnamansinghjarodiya
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESkarthi keyan
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfBalamuruganV28
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 

Recently uploaded (20)

signals in triangulation .. ...Surveying
signals in triangulation .. ...Surveyingsignals in triangulation .. ...Surveying
signals in triangulation .. ...Surveying
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
 
OOP concepts -in-Python programming language
OOP concepts -in-Python programming languageOOP concepts -in-Python programming language
OOP concepts -in-Python programming language
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Community
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptx
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending Actuators
 
Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solid
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdf
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 

An introduction to grid tied solar PV systems

  • 1. www.cenergymaxpower.com An Introduction to Grid-Tied Solar PV Systems A grid-tied solar PV system is a solar PV system that, as its name suggests, is connected or “tied” to the grid. The figure above shows what a grid-tied solar PV system looks like.  Solar PV modules generate DC electricity.  The grid-tied solar inverter converts the DC electricity generated by the solar PV modules into AC and feeds it into the grid. In order to do that, the solar inverter also has to ensure that its output is in phase with the grid.  The sell meter (or the export meter) measures the electricity fed by the grid-tied solar inverter into the grid.  The purchase mater (or the import meter) measures the electricity drawn from the grid. Big, utility scale solar PV plants (> 1 MW in capacity) are also grid-tied solar PV systems. However, the only difference with respect to the figure above is that there are typically no local loads which consume electricity. And therefore, there is no purchase meter (or the import meter) either; there is only one meter and it is the sell meter (or the export meter). The grid-tied solar PV system shown in the figure above needs support from the state electricity boards in two ways: 1. The state electricity boards (SEBs) need to give you permission to feed electricity into the grid. 2. The SEBs need to pay you and pay you well for the electricity fed into the grid. Otherwise, it is not economically viable/feasible/attractive. Point no. 1 is significant because the SEBs need to take some action at their end when many consumers start feeding electricity during the day. To elaborate on it a bit more, consider a city like Mumbai whose consumption is 3000MW. If many consumers go solar and start feeding 10% of the total consumption into the grid, it would mean that 300MW is injected into the grid every day (or on
  • 2. www.cenergymaxpower.com most days) during a 10 hour period. MSEB would then have to compensate for that and generate that much less from its other power generation sources during the day. Now imagine that the MSEB has done that and the next day happens to be very cloudy, which means that the solar electricity will not be produced at all or not as much as expected. This situation would land MSEB in a big soup and it would have to scramble to arrange for the required power to cover for the shortfall in solar PV energy. So, in general, SEBs need to do a lot at their end to allow renewable energy sources (which are inherently “infirmed”) to feed electricity into the grid and yet ensure that the grid remains stable and people get power when they want. As far as point no. 2 and paying consumers is concerned, typically, SEBs calculate the “net” energy consumed by the consumer (purchase meter reading – sell meter reading) and charge him for that, which is why it is called “net metering”. This effectively means that the SEBs are buying electricity from you at the rate at which they are selling to you. That is a god deal in most cases. If the net consumed by the consumer happens to be negative, which means that the consumer fed more into the grid than he consumed, then the SEBs pay him at a pre-defined rate. This rate is Rs.9 per unit (or kWh) in the state of Uttarakhand (at least when its policy was declared) which is quite good. But some SEBs might not be that generous. In fact, they might not even allow consumers to feed more into the grid than they consume. For that matter, they might also put an upper limit on how much consumers could feed into the grid and link it to their monthly consumption, say 50% for example. In general, a particular SEB can frame its net metering in many ways and will vary from state to state. As of now, only a few states have come up with a net metering policy; many states are still framing their solar and net metering policy. In general, rooftop solar is yet to pick in India in a big way. But the day that it does, grid stability will become an issue, as it has in the Western countries. However, despite the fact that net metering policy is not there in most states of India, grid- tied solar PV systems are popular in India. But they are slightly different as compared to the figure above; the output of the grid-tied solar inverter is connected to the grid “behind” the purchase meter. So with respect to the above figure, it implies the following changes:  Replace the net metering meter with the purchase meter (or the import meter).  Get rid of the sell meter (or the export meter). In such systems, the grid-tied solar inverter is sized such that it takes care of 85% of the minimum loads during the day or less. So the grid-tied solar inverter takes care of the load current requirement partially; the remaining current is drawn from the grid. However, even if the inverter sizing is done as described above, after a thorough analysis of the daily taking all seasonal variation into consideration, the situation where the solar PV modules produce more electricity than what is required by the loads arises, and it is on holidays or off days. When this happens:  The excess electricity produced by the solar PV modules will flow into the grid.  In states where the net metering policy is not there, this is not allowed, technically and legally speaking, without taking prior permission from the SEB. That being said, the SEB wouldn’t mind if they get free electricity. 
  • 3. www.cenergymaxpower.com  The meter might do one of the following things: o It will count backwards. However, it is highly unlikely that states that do not have a net metering policy will have a bi-directional meter. But this is good from the consumer’s standpoint. o It will count forward although you are feeding electricity into the grid. This might happen if the meter is just a counter and measures the flow of electricity through it, irrespective of the direction. This is very bad from the consumer’s standpoint; he is actually feeding electricity into the grid but getting charged for it! It is good for the SEB though since they are getting some free electricity. o It won’t count when feeding electricity into the grid. This is neither good nor bad for the consumer; he is feeding electricity into the grid for free but isn’t getting penalized for it. It is good for the SEB though since they are getting some free electricity. To avoid this situation, EPC companies implement what is called a “zero export” solution.  The simplest way to achieve this on off days, when the generation is guaranteed to be more than the consumption, is to trip the MCBs and disconnect the grid-tied solar PV system from the grid. However, this is a crude way of doing it. There is no guarantee that some electricity will not flow into the grid on working days. And on off days, there could be some non-zero load which could have been fed by the grid- tied solar PV system but will have to be fed from the grid instead.  The other way is to implement a sophisticated system which constantly detects if energy is flowing back into the grid. This can be done with the help of a bidirectional meter, which is there only to detect reverse flow of energy and not for net metering. There are two ways of achieving this: o The output of the inverter can be reduced. However, most inverters in the market do not have this feature. o The system can be designed using many smaller sub-systems which can be connected to the grid or disconnected from it independently using MCBs. However, this design has cost implications; typically the larger the inverter, the less expensive it is. Boon for residential consumers Grid-tied solar PV systems supported by a net metering policy are essential to bring residential consumers in the solar PV play because their consumption pattern and the solar PV electricity generation pattern doesn’t match at all; solar PV electricity generation happens during the day, i.e. during the sunshine hours from 8 a.m. to 6 p.m., whereas most of the residential consumption happens in the non-sunshine hours, i.e. before 8 a.m. and after 6 p.m. If residential consumers had to go solar without support from the SEBs, then they would necessarily need to go for solar PV systems with battery backup. But that increases the cost of the
  • 4. www.cenergymaxpower.com system. Solar PV systems also have to be maintained and incur recurring charges every few years when the batteries wear out and therefore have to be replaced. Grid-tied solar PV systems, on the other hand, enables residential consumers to go for solar PV systems without batteries. For them, the grid acts a “storage” or an “energy bank”, in a manner of speaking; they push power into the grid during sunshine hours and withdraw it during the non-sunshine hours. Of course, in reality the grid can’t actually store the energy. As explained earlier in the article, it does so by generating lesser energy during the sunshine hours. What happens when the grid fails? What happens to the grid-tied solar PV systems when the grid fails? Does the grid-tied inverter keep pushing power into the grid? The short answer to that question is: no. When the grid fails, the grid-tied does not keep pushing power into the grid. It cannot keep pushing power into the grid. This answer is very surprising and counter-intuitive to most people. The first time they hear it they say, “That doesn’t make any sense. The time when the grid fails is the time when I want my solar PV system to work the most!” While that may be right, grid-tied solar inverters cannot do that and here’s why. In the oden days, the grid and all the generators connected to it were owned by utility companies. When local generation started, be it from solar, wind, or from other renewable sources, it was decided that these generators would switch off when the grid failed, which is almost always due to some fault condition, and it is extremely hazardous to continue to keep feeding power in such conditions. This behaviour of grid-tied inverters is called anti-islanding protection; the grid-tied inverters are prohibited from feeding power into the grid when there is a grid fault and they are also prohibited from feeding the loads in an island separated from the grid. Actually, intentional islanding is allowed, although with a lot of restrictions; unintentional islands are completely forbidden. The way grid-tied inverters implement anti-islanding is by continuously monitoring the grid and detecting one of the following conditions: 1. A sudden change in system voltage magnitude. 2. A sudden change in system frequency. 3. A sudden change in the rate of change of system frequency. 4. A sudden increase in the active output power (kW) well beyond the “normal” level. 5. A sudden increase in the reactive output power (kVAR) well beyond the “normal” level. When any one of the above conditions occurs, the grid-tied solar inverters stop pushing power into the grid. In other words, they go “offline”, and come back online only when the grid is stable again. Conclusion
  • 5. www.cenergymaxpower.com Grid-tied solar PV systems have become very popular all over the world and are on the verge of taking off big time in India as well. The SEBs need to do their part by coming up with good net metering policies. In response, the consumers should go for solar in a big way.