CONTINUOUS MINER


         CHANDAN CHAMAN
U/G vs O/C PRODUCTION

• Over 4970 Mte coal is produced the world
  over
• 60% of world coal production comes from
  underground mines
              Country    UG     OC
        USA              33 %   67 %
        China (approx)   85 %   15 %
        India (10-11)    15 %   85%
        Australia        20%    80%
U/G production & productivity

• The declining trend in underground
  production is continuing
• Use of mechanization (SDL/LHD) and
  reduction of manpower has improved the
  productivity but failed in improving
  production
Technology wise production

                                      Production (Mte)
Mining Technology
                    2001-02   2002-03     2003-04    2004-05     2005-06

Conventional B&P     22.16     19.54       17.02         15.50    13.74

Conventional LW      0.20      0.20         0.15         0.15     0.15
Special Method       0.28      0.20         0.23         0.15     0.35

Mechanised B&P       21.02     25.98       26.99         28.93    30.85

Mechanised LW        2.54      2.10         2.42         1.75     2.06

Continuous Miner               0.40         0.66         0.56     0.70

Total                46.20     48.42       47.47         47.04    47.85
Reserve

• India has around 253 Bt of reserve i.e. about 10% of the
  world reserve
   – Depth wise reserve
      • 0 to 300m           : 155 Bt
      • 300 to 600m         : 66 Bt
      • 600 to 1200m        : 19 Bt
• Presently nearly all the mines are upto 300m depth only
• Around 90 Bt coal i.e 38% untouched virgin reserve lies
  at a depth of more than 300m which can be mined by
  u/g mining only.
• Hence the future production of coal will be from
  underground mining.
Improving U/G production and
          productivity
• How to improve production and productivity of
  u/g mines
  –   Mechanise loading, drilling and conveying system
  –   Increase depillaring
  –   Provide man riding system
  –   Introduce mass production technology, do away with
      blasting technology where feasible
  –   Encourage indigenous manufacturing of mass
      production equipment
  –   Introduce all man all job
  –   Introduce contract labour to overcome shortage
  –   Automation of the systems as far as possible
Mass Production Technology

• For survival of underground mines, it should
  compete with opencast mines
• This is possible by improving the production and
  OMS of U/G mines
• Even though CIL overall OMS has improved
  from 1.86 (1997) to 3.55 (2007) the share of
  manpower cost has remained around 45 to 50%.
• EMS today is around Rs 850, hence low
  productivity will not do.
• Adoption of mass production technology is a
  must
Continuous Miner

 Continuous miner is a mass production technology for
  underground mining that can be used in
    bord & pillar (room & pillar)
    rib pillar and
    shortwall methods.

 Continuous miner has been adopted for bord & pillar
  method in Anjan Hills/ NCPH of SECL and in Tandsi
  Mine of WCL. Adoption in Jhanjra, ECL is under
  process.
 SECL has achieved annual production of more than 0.5
  MTe with CM
 About 20 more mines have been identified for
  introduction of CM in future
Suitable conditions for CM

Though equipments are manufactured to
suit wide range of conditions, some of the
limitations of its use are as follows.
 Seam thickness: 1.8m to 5m
 Seam gradient: 1 in 8 or flatter
 Floor rock: Hard and dry floor condition
  desirable for efficient operation
 Roof condition: Bad roof condition
  adversely affects system performance.
  (RMR at NCPH Old – 55; Tandsi – 36)
Broad specifications of equipments
        being used in CIL
 Continuous        Miner       -    12CM15-10D           (Crawler-
  mounted)
  Operating height range: 2.28 – 4.6m; Cutting drum width: 3.3m;
  Total motor power: 564 kW
 Shuttle Cars - 10SC32B (Tyre-mounted)
  Safe carrying capacity: 13.6 t (It carries 8t of coal in NCPH); Cable
  reel capacity: 200m; Total motor power: 107 kW
 Quad Bolter – RT117 (Crawler-mounted)
  Minimum tram height: 2.15m; Operating height range: 2.4 – 4.775m;
  No. of bolters: 4 (2 per platform); Motor power: 112 kW
 Feeder-breaker – BF-14B-3-7C (Crawler-mounted)
  Throughput: 250 & 500 tph; Breaker Motor: 112 kW
 Load-Haul-Dump (LHD) (Tyre-mounted)
 Load-centre (Trolley-mounted)
Continuous Miner
Shuttle Car
Quad Bolter
Working system of CM
 In this technology, mining takes place by “Place
  Changing System”.
 Five heading panel is optimum. Gallery width should be
  minimum 5m
 The continuous miner cuts and load coal to shuttle car at
  a ‘place’. For developing full width of gallery, CM cuts in
  two passes at a place.
 The shuttle car hauls the load to the feeder-breaker.
 The feeder-breaker feeds sized coal to the gate-belt
  conveyor at a consistent rate when coal is dumped on it.
 After completing a cut of desired length (cut-out length),
  the CM moves out of the ‘place’ and the roof-bolter
  moves in for roof bolting. Resin capsule is used.
 Same sequence of operation is repeated at another
  ‘place’.
Safety factor as per squat formula

• As per squat formula the pillars are over sized
  as per regulation
• Safety factor of 2 and above is considered safe

         Depth        As per   2.5m Ht.    5m Ht
                       Reg        Safety factor

    > 60m             19.5       7.4        4.3
    60m -90m          21.0       5.5        3.0
    90m – 150m        25.5       4.6        2.1
Typical Multi-Pass Continuous Miner
             Operation
A typical cutting sequence for
     development panel
                                     5.0m                       30.0m


                          19    15            20   21             26    23           27   25
            11 14                     12 16             13 22                17 24             18

                        25.0m
            6                         7                 8                    9                 10
    30.0m




                25.0m
  10m




            1                         2                 3                    4                 5
A typical cutting sequence for
      depillaring panel
1                    C

           2


           3


           4




       C



C



Outside Lifts Overall Cut Sequence
8   7       6
C
                                1       3       5


                                    9
                           13               10
                                    4
                           14               11

                           15       2       12




                                            C


                                                    C


    Pocket and Wing Overall Cut Sequence
Twin Entry Development Layout

                                         Continuous
Belt   Feeder-Breaker      Shuttle Car     Miner




                        30 m




                        30 - 70 m
Rib Pillar
BLEEDER HEADINGS


                                        GAS
                                        BLEED




              LARGE STOCKS


                                          VENTILATION



                                                                   BREAKER
                                                                    PROPS
                                      NEXT FENDER

                 15                   NEXT SPLIT    16
                      CONVEYOR ROAD
RETURN ROAD




                                      WONGAWALLI BLOCK
Factors affecting production capacity
    for a given set of equipments
 Size of pillars (centre-to-centre)
 Width of galleries, splits, and slices
 Height of extraction
 Number of pillars in a row
 Maximum permissible cut-out length
 Bolting grid size/ No. of bolts per m2
 Time cycle of different equipment
 Specific gravity of coal
 Recovery percentage
 Available and utilisation hours of the system
 Sub-system capacity, spares, maintenance,
  trained manpower, etc.
Daily production considering
          utilization factor

Development:

Pillar width: 30m
 Extraction           Gallery width (m)
 height (m)     5     5.5          6      6.5
    2.5        1654   1679       1701     1720
     3         1837   1895       1947     1992
    3.5        1930   1985       2033     2075
     4         2006   2058       2103     2143
Daily production considering
         utilisation factor

Depillaring:


Extraction          Gallery width (m)
   height
    (m)        5    5.5          6      6.5
   2.5       2143   2054       1974     1887
    3        2317   2231       2152     2066
   3.5       2460   2377       2300     2216
    4        2583   2500       2426     2344
World Scenario of CM

              CM as % of   Best annual   Aver. annual
Country       total U/G    production    production
              production   from a mine   from a mine

South
              92%          1.44 MTY      0.78 MTY
Africa
USA           49%          1.32 MTY      0.86 MTY

China                      2.6 MTY       0.36 MTY

Australia     15%          0.72 MTY      0.48 MTY
Average production in USA with CM

  Seam Thickness (m)   Average Production
                        per shift (Short Te)
         2.5                   750

         3.0                   835

         3.5                   920

         4.0                   1005
AVERAGE TIME DISTRIBUTION OF VARIOUS ACTIVITIES FOR A DAY (pillar 30m, gallery 5m)
                        Time in
       Activity
                          hr                                                                     Hours

                                     1   2   3   4   5   6   7   8   9   10      11      12      13      14      15      16      17      18      19      20      21      22      23      24
                                      
                              4
Maintenance time                                                                                                                                                                              
                            10.07 
                            (8.44                 
Working of CM & SC           cut)                                                                                                                                                         

Marching,Shifting &         2.61                  
Positioning  time CM                                                                                                                                                                      

Shifting of Feeder-          2.5                  
breaker, belt                                                                                                                                                     

                            1.82                  
Break down of CM                                                                                                                                                                          

Electrical fault, 
outbye transport BD,          3                   
power failure etc                                                                                                                                                                         

                            13.03                 
Bolting time of RB                                                                                                        

                            2.57                  
Marching time of RB                                                                                                                                               
                                                                                                                                                                                          
                            0.14                  
Break down of RB                                                                                                                                                                  

                                                  
LAG TIME                                                                                                                                                                                  
                                                                                                                                                                                          
Further advancement (CM)

•   Continuous miner with satellite bolter
•   Flexible tram conveyor
•   Mobile breaker line support
•   Predictive maintenance
Continuous miner with satellite bolter
Continuous miner with satellite bolter
Man Riding

• Man-riding systems on tracks:
  – By rope haulage:
  – By locomotive (Trolley-wire/ Battery operated/
    Diesel operated)
• Trackless man-riding systems:
  – Belt conveyor
  – Chairlift:
  – Free-steered vehicle
THANKS


   chandanchaman@gmail.com

More Related Content

What's hot

Analysing shovel dumper productivity for coal mine
Analysing shovel dumper productivity for coal mineAnalysing shovel dumper productivity for coal mine
Analysing shovel dumper productivity for coal mineSafdar Ali
 
LHD Load haul dump ppt
LHD Load haul dump pptLHD Load haul dump ppt
LHD Load haul dump pptguru brahmam
 
Mining Machinery Learning Material
Mining Machinery Learning MaterialMining Machinery Learning Material
Mining Machinery Learning MaterialBhaskar Naidu
 
Blast hole drill
Blast hole drillBlast hole drill
Blast hole drillpavan kumar
 
Transportation in underground mines
Transportation  in underground mines Transportation  in underground mines
Transportation in underground mines vanam mareswara rao
 
HIGHWALL MINING-INDIAN SCENARIO (1)
HIGHWALL MINING-INDIAN SCENARIO (1)HIGHWALL MINING-INDIAN SCENARIO (1)
HIGHWALL MINING-INDIAN SCENARIO (1)Pushon Ghosh
 
Design of Bord and Pillar method in coal mines
Design of Bord and Pillar method in coal minesDesign of Bord and Pillar method in coal mines
Design of Bord and Pillar method in coal minesaashutosh chhirolya
 
Armoured face conveyor
Armoured face conveyorArmoured face conveyor
Armoured face conveyorAnkit Narain
 

What's hot (20)

Surface miner
Surface minerSurface miner
Surface miner
 
Analysing shovel dumper productivity for coal mine
Analysing shovel dumper productivity for coal mineAnalysing shovel dumper productivity for coal mine
Analysing shovel dumper productivity for coal mine
 
Highwall mining
Highwall miningHighwall mining
Highwall mining
 
Shuttle car
Shuttle carShuttle car
Shuttle car
 
LHD Load haul dump ppt
LHD Load haul dump pptLHD Load haul dump ppt
LHD Load haul dump ppt
 
Caving Underground Mining Methods (longwall, Sublevel caving, & Block caving)
Caving Underground Mining Methods (longwall, Sublevel caving, &  Block caving)Caving Underground Mining Methods (longwall, Sublevel caving, &  Block caving)
Caving Underground Mining Methods (longwall, Sublevel caving, & Block caving)
 
Continuous miner
Continuous minerContinuous miner
Continuous miner
 
Mining Machinery Learning Material
Mining Machinery Learning MaterialMining Machinery Learning Material
Mining Machinery Learning Material
 
Highwall mining
Highwall miningHighwall mining
Highwall mining
 
Shaft sinking 2
Shaft  sinking 2Shaft  sinking 2
Shaft sinking 2
 
Blast hole drill
Blast hole drillBlast hole drill
Blast hole drill
 
Longwall mining
Longwall miningLongwall mining
Longwall mining
 
Transportation in underground mines
Transportation  in underground mines Transportation  in underground mines
Transportation in underground mines
 
HIGHWALL MINING-INDIAN SCENARIO (1)
HIGHWALL MINING-INDIAN SCENARIO (1)HIGHWALL MINING-INDIAN SCENARIO (1)
HIGHWALL MINING-INDIAN SCENARIO (1)
 
Design of Bord and Pillar method in coal mines
Design of Bord and Pillar method in coal minesDesign of Bord and Pillar method in coal mines
Design of Bord and Pillar method in coal mines
 
Continuous miners
Continuous minersContinuous miners
Continuous miners
 
Blasting Gallery Method
Blasting Gallery MethodBlasting Gallery Method
Blasting Gallery Method
 
Armoured face conveyor
Armoured face conveyorArmoured face conveyor
Armoured face conveyor
 
Highwall mining – a new approach in india
Highwall mining – a new approach in indiaHighwall mining – a new approach in india
Highwall mining – a new approach in india
 
Sublevel stoping..Underground mining methods
Sublevel stoping..Underground mining methodsSublevel stoping..Underground mining methods
Sublevel stoping..Underground mining methods
 

Similar to Continuous miner

Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...Roshan Kumar Patel
 
Working with Dragline
Working with DraglineWorking with Dragline
Working with DraglineVR M
 
Ppt of pre casting yard
Ppt of pre casting yardPpt of pre casting yard
Ppt of pre casting yardRavinder Singh
 
Underground Mining Technology.pptx
Underground Mining Technology.pptxUnderground Mining Technology.pptx
Underground Mining Technology.pptxChandan Chaman
 
Ppt u girder casting by l.k.prasad
Ppt u girder casting by l.k.prasadPpt u girder casting by l.k.prasad
Ppt u girder casting by l.k.prasadLachhmikant. Prasad
 
HIGH WALL MINING at SCCL - A Case Study
HIGH WALL MINING at SCCL - A Case StudyHIGH WALL MINING at SCCL - A Case Study
HIGH WALL MINING at SCCL - A Case Studyknowledge stuff
 
Construction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.pptConstruction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.pptbala506586
 
Project Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, OmanProject Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, OmanDavid H Moloney
 
Anant project work
Anant project workAnant project work
Anant project workRajat Dixit
 
Masafi Powertech Private Limited, Chennai, Electrical Supplies
Masafi Powertech Private Limited, Chennai, Electrical SuppliesMasafi Powertech Private Limited, Chennai, Electrical Supplies
Masafi Powertech Private Limited, Chennai, Electrical SuppliesIndiaMART InterMESH Limited
 
. Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro....
.   Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro.....   Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro....
. Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro....IndraNathMishra2
 
Hard Rock Mine Design Project
Hard Rock Mine Design ProjectHard Rock Mine Design Project
Hard Rock Mine Design ProjectAshishKumar3265
 
Thermitrex Sks Crane Rail Process
Thermitrex Sks Crane Rail ProcessThermitrex Sks Crane Rail Process
Thermitrex Sks Crane Rail ProcessThermitrex
 
The productivity of lhd in underground coal mines
The productivity of   lhd in underground coal minesThe productivity of   lhd in underground coal mines
The productivity of lhd in underground coal minesSafdar Ali
 
Longwall AFC changing - innovation
Longwall AFC changing - innovationLongwall AFC changing - innovation
Longwall AFC changing - innovationVR M
 
Kubota stv36 tractor service repair manual
Kubota stv36 tractor service repair manualKubota stv36 tractor service repair manual
Kubota stv36 tractor service repair manualfjjsjekfkskekme
 
Kubota stv32 tractor service repair manual
Kubota stv32 tractor service repair manualKubota stv32 tractor service repair manual
Kubota stv32 tractor service repair manualjjfjsekksemm
 
Kubota stv32 tractor service repair manual
Kubota stv32 tractor service repair manualKubota stv32 tractor service repair manual
Kubota stv32 tractor service repair manualfjjsjeskkekem
 
Kubota stv32 tractor service repair manual
Kubota stv32 tractor service repair manualKubota stv32 tractor service repair manual
Kubota stv32 tractor service repair manualfhjsekfksemert
 

Similar to Continuous miner (20)

Selection of viable ug technology
Selection of viable ug technologySelection of viable ug technology
Selection of viable ug technology
 
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
 
Working with Dragline
Working with DraglineWorking with Dragline
Working with Dragline
 
Ppt of pre casting yard
Ppt of pre casting yardPpt of pre casting yard
Ppt of pre casting yard
 
Underground Mining Technology.pptx
Underground Mining Technology.pptxUnderground Mining Technology.pptx
Underground Mining Technology.pptx
 
Ppt u girder casting by l.k.prasad
Ppt u girder casting by l.k.prasadPpt u girder casting by l.k.prasad
Ppt u girder casting by l.k.prasad
 
HIGH WALL MINING at SCCL - A Case Study
HIGH WALL MINING at SCCL - A Case StudyHIGH WALL MINING at SCCL - A Case Study
HIGH WALL MINING at SCCL - A Case Study
 
Construction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.pptConstruction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.ppt
 
Project Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, OmanProject Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, Oman
 
Anant project work
Anant project workAnant project work
Anant project work
 
Masafi Powertech Private Limited, Chennai, Electrical Supplies
Masafi Powertech Private Limited, Chennai, Electrical SuppliesMasafi Powertech Private Limited, Chennai, Electrical Supplies
Masafi Powertech Private Limited, Chennai, Electrical Supplies
 
. Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro....
.   Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro.....   Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro....
. Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro....
 
Hard Rock Mine Design Project
Hard Rock Mine Design ProjectHard Rock Mine Design Project
Hard Rock Mine Design Project
 
Thermitrex Sks Crane Rail Process
Thermitrex Sks Crane Rail ProcessThermitrex Sks Crane Rail Process
Thermitrex Sks Crane Rail Process
 
The productivity of lhd in underground coal mines
The productivity of   lhd in underground coal minesThe productivity of   lhd in underground coal mines
The productivity of lhd in underground coal mines
 
Longwall AFC changing - innovation
Longwall AFC changing - innovationLongwall AFC changing - innovation
Longwall AFC changing - innovation
 
Kubota stv36 tractor service repair manual
Kubota stv36 tractor service repair manualKubota stv36 tractor service repair manual
Kubota stv36 tractor service repair manual
 
Kubota stv32 tractor service repair manual
Kubota stv32 tractor service repair manualKubota stv32 tractor service repair manual
Kubota stv32 tractor service repair manual
 
Kubota stv32 tractor service repair manual
Kubota stv32 tractor service repair manualKubota stv32 tractor service repair manual
Kubota stv32 tractor service repair manual
 
Kubota stv32 tractor service repair manual
Kubota stv32 tractor service repair manualKubota stv32 tractor service repair manual
Kubota stv32 tractor service repair manual
 

More from Chandan Chaman

List of central labour laws
List of central labour lawsList of central labour laws
List of central labour lawsChandan Chaman
 
Tyre maintenance in open cast mines
Tyre maintenance in open cast minesTyre maintenance in open cast mines
Tyre maintenance in open cast minesChandan Chaman
 
Trolley assist dumpers
Trolley assist dumpersTrolley assist dumpers
Trolley assist dumpersChandan Chaman
 
COAL BED METHANE & CO2 SEQUESTRATION
COAL BED METHANE & CO2 SEQUESTRATIONCOAL BED METHANE & CO2 SEQUESTRATION
COAL BED METHANE & CO2 SEQUESTRATIONChandan Chaman
 
Clean development mechanism
Clean development mechanismClean development mechanism
Clean development mechanismChandan Chaman
 

More from Chandan Chaman (7)

Railway Siding
Railway SidingRailway Siding
Railway Siding
 
List of central labour laws
List of central labour lawsList of central labour laws
List of central labour laws
 
Tyre maintenance in open cast mines
Tyre maintenance in open cast minesTyre maintenance in open cast mines
Tyre maintenance in open cast mines
 
Trolley assist dumpers
Trolley assist dumpersTrolley assist dumpers
Trolley assist dumpers
 
COAL BED METHANE & CO2 SEQUESTRATION
COAL BED METHANE & CO2 SEQUESTRATIONCOAL BED METHANE & CO2 SEQUESTRATION
COAL BED METHANE & CO2 SEQUESTRATION
 
Clean development mechanism
Clean development mechanismClean development mechanism
Clean development mechanism
 
Surface Miner
Surface MinerSurface Miner
Surface Miner
 

Recently uploaded

DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionDilum Bandara
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 

Recently uploaded (20)

DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An Introduction
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 

Continuous miner

  • 1. CONTINUOUS MINER CHANDAN CHAMAN
  • 2. U/G vs O/C PRODUCTION • Over 4970 Mte coal is produced the world over • 60% of world coal production comes from underground mines Country UG OC USA 33 % 67 % China (approx) 85 % 15 % India (10-11) 15 % 85% Australia 20% 80%
  • 3. U/G production & productivity • The declining trend in underground production is continuing • Use of mechanization (SDL/LHD) and reduction of manpower has improved the productivity but failed in improving production
  • 4. Technology wise production Production (Mte) Mining Technology 2001-02 2002-03 2003-04 2004-05 2005-06 Conventional B&P 22.16 19.54 17.02 15.50 13.74 Conventional LW 0.20 0.20 0.15 0.15 0.15 Special Method 0.28 0.20 0.23 0.15 0.35 Mechanised B&P 21.02 25.98 26.99 28.93 30.85 Mechanised LW 2.54 2.10 2.42 1.75 2.06 Continuous Miner 0.40 0.66 0.56 0.70 Total 46.20 48.42 47.47 47.04 47.85
  • 5. Reserve • India has around 253 Bt of reserve i.e. about 10% of the world reserve – Depth wise reserve • 0 to 300m : 155 Bt • 300 to 600m : 66 Bt • 600 to 1200m : 19 Bt • Presently nearly all the mines are upto 300m depth only • Around 90 Bt coal i.e 38% untouched virgin reserve lies at a depth of more than 300m which can be mined by u/g mining only. • Hence the future production of coal will be from underground mining.
  • 6. Improving U/G production and productivity • How to improve production and productivity of u/g mines – Mechanise loading, drilling and conveying system – Increase depillaring – Provide man riding system – Introduce mass production technology, do away with blasting technology where feasible – Encourage indigenous manufacturing of mass production equipment – Introduce all man all job – Introduce contract labour to overcome shortage – Automation of the systems as far as possible
  • 7. Mass Production Technology • For survival of underground mines, it should compete with opencast mines • This is possible by improving the production and OMS of U/G mines • Even though CIL overall OMS has improved from 1.86 (1997) to 3.55 (2007) the share of manpower cost has remained around 45 to 50%. • EMS today is around Rs 850, hence low productivity will not do. • Adoption of mass production technology is a must
  • 8. Continuous Miner  Continuous miner is a mass production technology for underground mining that can be used in  bord & pillar (room & pillar)  rib pillar and  shortwall methods.  Continuous miner has been adopted for bord & pillar method in Anjan Hills/ NCPH of SECL and in Tandsi Mine of WCL. Adoption in Jhanjra, ECL is under process.  SECL has achieved annual production of more than 0.5 MTe with CM  About 20 more mines have been identified for introduction of CM in future
  • 9. Suitable conditions for CM Though equipments are manufactured to suit wide range of conditions, some of the limitations of its use are as follows.  Seam thickness: 1.8m to 5m  Seam gradient: 1 in 8 or flatter  Floor rock: Hard and dry floor condition desirable for efficient operation  Roof condition: Bad roof condition adversely affects system performance. (RMR at NCPH Old – 55; Tandsi – 36)
  • 10. Broad specifications of equipments being used in CIL  Continuous Miner - 12CM15-10D (Crawler- mounted) Operating height range: 2.28 – 4.6m; Cutting drum width: 3.3m; Total motor power: 564 kW  Shuttle Cars - 10SC32B (Tyre-mounted) Safe carrying capacity: 13.6 t (It carries 8t of coal in NCPH); Cable reel capacity: 200m; Total motor power: 107 kW  Quad Bolter – RT117 (Crawler-mounted) Minimum tram height: 2.15m; Operating height range: 2.4 – 4.775m; No. of bolters: 4 (2 per platform); Motor power: 112 kW  Feeder-breaker – BF-14B-3-7C (Crawler-mounted) Throughput: 250 & 500 tph; Breaker Motor: 112 kW  Load-Haul-Dump (LHD) (Tyre-mounted)  Load-centre (Trolley-mounted)
  • 14. Working system of CM  In this technology, mining takes place by “Place Changing System”.  Five heading panel is optimum. Gallery width should be minimum 5m  The continuous miner cuts and load coal to shuttle car at a ‘place’. For developing full width of gallery, CM cuts in two passes at a place.  The shuttle car hauls the load to the feeder-breaker.  The feeder-breaker feeds sized coal to the gate-belt conveyor at a consistent rate when coal is dumped on it.  After completing a cut of desired length (cut-out length), the CM moves out of the ‘place’ and the roof-bolter moves in for roof bolting. Resin capsule is used.  Same sequence of operation is repeated at another ‘place’.
  • 15. Safety factor as per squat formula • As per squat formula the pillars are over sized as per regulation • Safety factor of 2 and above is considered safe Depth As per 2.5m Ht. 5m Ht Reg Safety factor > 60m 19.5 7.4 4.3 60m -90m 21.0 5.5 3.0 90m – 150m 25.5 4.6 2.1
  • 16.
  • 17. Typical Multi-Pass Continuous Miner Operation
  • 18. A typical cutting sequence for development panel 5.0m 30.0m 19 15 20 21 26 23 27 25 11 14 12 16 13 22 17 24 18 25.0m 6 7 8 9 10 30.0m 25.0m 10m 1 2 3 4 5
  • 19.
  • 20. A typical cutting sequence for depillaring panel
  • 21. 1 C 2 3 4 C C Outside Lifts Overall Cut Sequence
  • 22. 8 7 6 C 1 3 5 9 13 10 4 14 11 15 2 12 C C Pocket and Wing Overall Cut Sequence
  • 23. Twin Entry Development Layout Continuous Belt Feeder-Breaker Shuttle Car Miner 30 m 30 - 70 m
  • 25. BLEEDER HEADINGS GAS BLEED LARGE STOCKS VENTILATION BREAKER PROPS NEXT FENDER 15 NEXT SPLIT 16 CONVEYOR ROAD RETURN ROAD WONGAWALLI BLOCK
  • 26. Factors affecting production capacity for a given set of equipments Size of pillars (centre-to-centre) Width of galleries, splits, and slices Height of extraction Number of pillars in a row Maximum permissible cut-out length Bolting grid size/ No. of bolts per m2 Time cycle of different equipment Specific gravity of coal Recovery percentage Available and utilisation hours of the system Sub-system capacity, spares, maintenance, trained manpower, etc.
  • 27. Daily production considering utilization factor Development: Pillar width: 30m Extraction Gallery width (m) height (m) 5 5.5 6 6.5 2.5 1654 1679 1701 1720 3 1837 1895 1947 1992 3.5 1930 1985 2033 2075 4 2006 2058 2103 2143
  • 28. Daily production considering utilisation factor Depillaring: Extraction Gallery width (m) height (m) 5 5.5 6 6.5 2.5 2143 2054 1974 1887 3 2317 2231 2152 2066 3.5 2460 2377 2300 2216 4 2583 2500 2426 2344
  • 29. World Scenario of CM CM as % of Best annual Aver. annual Country total U/G production production production from a mine from a mine South 92% 1.44 MTY 0.78 MTY Africa USA 49% 1.32 MTY 0.86 MTY China 2.6 MTY 0.36 MTY Australia 15% 0.72 MTY 0.48 MTY
  • 30. Average production in USA with CM Seam Thickness (m) Average Production per shift (Short Te) 2.5 750 3.0 835 3.5 920 4.0 1005
  • 31. AVERAGE TIME DISTRIBUTION OF VARIOUS ACTIVITIES FOR A DAY (pillar 30m, gallery 5m) Time in Activity hr Hours     1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24   4 Maintenance time                                               10.07  (8.44          Working of CM & SC cut)         Marching,Shifting &  2.61         Positioning  time CM                   Shifting of Feeder- 2.5         breaker, belt                                   1.82         Break down of CM                               Electrical fault,  outbye transport BD,  3         power failure etc                               13.03         Bolting time of RB         2.57         Marching time of RB                   0.14         Break down of RB                                                 LAG TIME                                                                                        
  • 32. Further advancement (CM) • Continuous miner with satellite bolter • Flexible tram conveyor • Mobile breaker line support • Predictive maintenance
  • 33. Continuous miner with satellite bolter
  • 34. Continuous miner with satellite bolter
  • 35. Man Riding • Man-riding systems on tracks: – By rope haulage: – By locomotive (Trolley-wire/ Battery operated/ Diesel operated) • Trackless man-riding systems: – Belt conveyor – Chairlift: – Free-steered vehicle
  • 36. THANKS chandanchaman@gmail.com