CASE 1: LEARNING 
CURVE ANALYSIS 
Group 7
Problem #1 
The ABC Company has just been given the 
following production schedule for ski-lift 
gondola cars. This product is considerably 
different from any others the company has 
produced. Historically, the company‘s learning 
rate has been 80% on large projects. The first 
unit took 1,000 hours to produce.
Month Units Cumulative 
1 3 3 
2 7 10 
3 10 20 
4 12 32 
5 4 36 
6 2 38 
a. Estimate how many hours would be 
required to complete the 38th unit.
Solution 
a) a. We use the learning curve formulas to 
calculate the time required for the 38th unit: 
a. Given: L=0.80 T1= 1000 hrs. 
T38 = T1 (N (log L/log 2)) 
= 1000 (38 log 0.80/log 2) 
= 310.04 hrs
• b. If the budget only provides for a maximum 
of 30 direct labor employees in any month and 
a total of 15,000 direct labor hours for the 
entire schedule, will the budget be adequate? 
Assume that each direct labor employee is 
productive for 150 work hours each month.
Cumulative Hours 
Mont 
hs Units 
Cummulative 
Units 
Cumulative 
Average 
Cumulative 
Average Time per 
Unit 
Cumulative Total 
Hours for all Units 
1 3 3 0.834034568 834.034568 2502.103704 
2 7 10 0.631537303 631.5373025 6315.373025 
3 10 20 0.524247142 524.2471422 10484.94284 
4 12 32 0.45870687 458.7068697 14678.61983 
5 4 36 0.443285172 443.2851721 15958.26619 
6 2 38 0.436342826 436.3428259 16581.02738
Number of hours per month. 
Month 
1 2502.103704 - 0 = 2502.103704 hrs 
2 6315.373025-2502.103704= 3813.269321 hrs 
3 10484.94284-6315.373025 = 4169.569815 hrs. 
4 14678.61983-10484.94284= 4193.67699 hrs. 
5 15958.26619-14678.61983= 1279.64636 hrs. 
6 16581.02738-15958.26619= 622.76119 hrs.
Direct Labor Hours 
Month Direct Labor Workers by Month 
1 (2,502.1 hr)/(150 hr) = 16.7, or 17 
2 (3,813.3 hr)/(150 hr) = 25.4, or 26 
3 (4,169.6 hr)/(150 hr) = 27.8, or 28 
4 (4,193.7 hr)/(150 hr) = 27.9, or 28 
5 (1,279.7 hr)/(150 hr) = 8.5, or 9 
6 (622.5 hr)/(150 hr) = 4.2, or 5
Conclusion: 
*The schedule is sufficient in terms of the 
maximum direct labor required in any month because 
it never exceeds 30 employees. However, the total 
cumulative hours are 16,581, which exceeds the 
budgeted amount by 1,581 hours. Therefore, the 
budget will not be adequate.
Problem 2 
XYZ Company has $200,000 in cash, no inventory, and a 90 
percent learning curve. To reduce the complexity of this problem, ignore 
the hiring and training costs associated with dramatically increased 
production. Employees are paid $20 per hour every Friday for that 
week‘s work. XYZ has received an order to build 1,000 oak desks over 
the next 15 weeks. Materials cost $400 per desk. Suppliers make 
deliveries each Monday and insist on cash upon delivery. The first desk 
takes 100 hours of direct labor to build. XYZ will be paid $1,500 per 
desk two weeks after the desks are delivered. Should XYZ take this 
order? 
Additional Assumptions: 
• Products are delivered at the end of each week. 
Cash inflow from sales occurs at the end of the week.
Given: $ 20 per hour 
100 hours per desk 
$ 400 material cost per desk 
$ 20 per hour x 100 hours per desk 
= $ 2000 per desk 
Cost: 
$ 400 material cost per desk + $ 2000 per desk 
= $ 2400 per desk
Week Units Total cost Inflows every after 2 weeks 
1 2 4800 
2 4 9600 
3 8 19200 3000 
4 12 28800 6000 
5 14 33600 12000 
6 24 57600 18000 
7 64 153600 21000 
8 128 307200 36000 
9 128 307200 96000 
10 128 307200 192000 
11 88 211200 192000 
12 100 240000 192000 
13 100 240000 132000 
14 100 240000 150000 
15 100 240000 150000 
150000 
150000 
Cash Outflows & Inflows
350000 
300000 
250000 
200000 
150000 
100000 
50000 
0 
Cash Flow Chart 
0 2 4 6 8 10 12 14 16 
Values 
Weeks 
Total cost Inflows every after 2 weeks
Conclusion: 
The company should not take the 
order, because the total cost exceed the 
cash inflow every after two weeks.

More Related Content

What's hot

Process dsign and facility layout
Process dsign and facility layoutProcess dsign and facility layout
Process dsign and facility layout
NsbmUcd
 
Ch5 process analysis
Ch5 process analysisCh5 process analysis
Ch5 process analysis
videoaakash15
 
SAN MIGUEL CORPORATION HISTORY
SAN MIGUEL CORPORATION HISTORYSAN MIGUEL CORPORATION HISTORY
SAN MIGUEL CORPORATION HISTORY
Edz Gapuz
 
Design of Goods and Services
Design of Goods and ServicesDesign of Goods and Services
Design of Goods and Services
Uly Jr Maniago
 
MBA Operations Management Assignment
MBA Operations Management AssignmentMBA Operations Management Assignment
MBA Operations Management Assignment
bntripathy85
 

What's hot (20)

Operations Management for Competitive Advantage
Operations Management for Competitive AdvantageOperations Management for Competitive Advantage
Operations Management for Competitive Advantage
 
Production and Operation Management
Production and Operation ManagementProduction and Operation Management
Production and Operation Management
 
Process dsign and facility layout
Process dsign and facility layoutProcess dsign and facility layout
Process dsign and facility layout
 
Ch5 process analysis
Ch5 process analysisCh5 process analysis
Ch5 process analysis
 
Strategic Management Case Study - Toyota
Strategic Management Case Study - ToyotaStrategic Management Case Study - Toyota
Strategic Management Case Study - Toyota
 
Assembly Line Balancing -Example
Assembly Line Balancing -ExampleAssembly Line Balancing -Example
Assembly Line Balancing -Example
 
Operations And Productivity
Operations And ProductivityOperations And Productivity
Operations And Productivity
 
SAN MIGUEL CORPORATION HISTORY
SAN MIGUEL CORPORATION HISTORYSAN MIGUEL CORPORATION HISTORY
SAN MIGUEL CORPORATION HISTORY
 
Location Planning and Analysis
Location Planning and AnalysisLocation Planning and Analysis
Location Planning and Analysis
 
Financial Management (Globe Telecom)
Financial Management (Globe Telecom)Financial Management (Globe Telecom)
Financial Management (Globe Telecom)
 
Operations Management - Process Technology
Operations Management - Process TechnologyOperations Management - Process Technology
Operations Management - Process Technology
 
Job Design and Work Measurement
Job Design and Work Measurement Job Design and Work Measurement
Job Design and Work Measurement
 
Product1 [4] capacity planning
Product1 [4]   capacity planningProduct1 [4]   capacity planning
Product1 [4] capacity planning
 
Design of Goods and Services
Design of Goods and ServicesDesign of Goods and Services
Design of Goods and Services
 
Design of Work Systems
Design of Work SystemsDesign of Work Systems
Design of Work Systems
 
MBA Operations Management Assignment
MBA Operations Management AssignmentMBA Operations Management Assignment
MBA Operations Management Assignment
 
Productivity and Quality Tools 1.pptx
Productivity and Quality Tools 1.pptxProductivity and Quality Tools 1.pptx
Productivity and Quality Tools 1.pptx
 
Historical evolution of operations management
Historical evolution of operations managementHistorical evolution of operations management
Historical evolution of operations management
 
Philippine SMEs
Philippine SMEsPhilippine SMEs
Philippine SMEs
 
Operation management, toyota production system
Operation management, toyota production systemOperation management, toyota production system
Operation management, toyota production system
 

Viewers also liked

Operation strategy at galanze
Operation strategy at galanzeOperation strategy at galanze
Operation strategy at galanze
Niilm-Cms
 
Operations strategy and competitiveness
Operations strategy and competitivenessOperations strategy and competitiveness
Operations strategy and competitiveness
Arun Kandukuri
 
Product design and development
Product design and developmentProduct design and development
Product design and development
Vishal Kachhdiya
 

Viewers also liked (20)

Learn curve
Learn curveLearn curve
Learn curve
 
operations strategy and competitiveness
operations strategy and competitivenessoperations strategy and competitiveness
operations strategy and competitiveness
 
Learning curve
Learning curveLearning curve
Learning curve
 
Product design and development ch2
Product design and development ch2Product design and development ch2
Product design and development ch2
 
Product design and development ch3
Product design and development ch3Product design and development ch3
Product design and development ch3
 
MARUTI SUZUKI PRODUCT ANALYSIS REPORT
MARUTI SUZUKI PRODUCT ANALYSIS REPORTMARUTI SUZUKI PRODUCT ANALYSIS REPORT
MARUTI SUZUKI PRODUCT ANALYSIS REPORT
 
C5 process & layout
C5 process & layoutC5 process & layout
C5 process & layout
 
Aggregate planning and mps om
Aggregate planning and mps omAggregate planning and mps om
Aggregate planning and mps om
 
Learning curve
Learning curveLearning curve
Learning curve
 
Operation strategy at galanze
Operation strategy at galanzeOperation strategy at galanze
Operation strategy at galanze
 
Product designing strategy
Product designing strategyProduct designing strategy
Product designing strategy
 
TIME STUDY
TIME STUDYTIME STUDY
TIME STUDY
 
Operations strategy and competitiveness
Operations strategy and competitivenessOperations strategy and competitiveness
Operations strategy and competitiveness
 
Learning Curves in Production Management
Learning Curves in Production ManagementLearning Curves in Production Management
Learning Curves in Production Management
 
Product design and development ch4
Product design and development ch4Product design and development ch4
Product design and development ch4
 
Product design
Product designProduct design
Product design
 
Operations strategy and competitiveness
Operations strategy and competitivenessOperations strategy and competitiveness
Operations strategy and competitiveness
 
Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivity
 
Product design and development
Product design and developmentProduct design and development
Product design and development
 
2.6 & 2.7 & 2.8 Operations Strategy and Competitiveness
2.6 & 2.7 & 2.8 Operations Strategy and Competitiveness2.6 & 2.7 & 2.8 Operations Strategy and Competitiveness
2.6 & 2.7 & 2.8 Operations Strategy and Competitiveness
 

Similar to Learning Curve Sample Problem

Managerial Accounting Presentation, v.3
Managerial Accounting Presentation, v.3Managerial Accounting Presentation, v.3
Managerial Accounting Presentation, v.3
Thana Kittisathanon
 
Contoh Soal Perhitungan Kapasitas Manufaktur
Contoh Soal Perhitungan Kapasitas ManufakturContoh Soal Perhitungan Kapasitas Manufaktur
Contoh Soal Perhitungan Kapasitas Manufaktur
Mahros Darsin
 
ACG 2071 Managerial Accounting Process Costing Systems .docx
ACG 2071 Managerial Accounting Process Costing Systems .docxACG 2071 Managerial Accounting Process Costing Systems .docx
ACG 2071 Managerial Accounting Process Costing Systems .docx
bobbywlane695641
 
Lean Back Offices Project
Lean Back Offices ProjectLean Back Offices Project
Lean Back Offices Project
Parag Kapile
 

Similar to Learning Curve Sample Problem (20)

Cost accounting (Hypothetical problems of labor costing and solution of these...
Cost accounting (Hypothetical problems of labor costing and solution of these...Cost accounting (Hypothetical problems of labor costing and solution of these...
Cost accounting (Hypothetical problems of labor costing and solution of these...
 
Operation management problems
Operation management problemsOperation management problems
Operation management problems
 
BRUSNSWICK MOTORS, INC
BRUSNSWICK MOTORS, INCBRUSNSWICK MOTORS, INC
BRUSNSWICK MOTORS, INC
 
Brunswick motors, inc
Brunswick motors, incBrunswick motors, inc
Brunswick motors, inc
 
Brunswick motors, inc
Brunswick motors, incBrunswick motors, inc
Brunswick motors, inc
 
Production & Operarions Management Compre Review
Production & Operarions Management Compre ReviewProduction & Operarions Management Compre Review
Production & Operarions Management Compre Review
 
Chapter no.9
Chapter no.9Chapter no.9
Chapter no.9
 
Managerial Accounting Presentation, v.3
Managerial Accounting Presentation, v.3Managerial Accounting Presentation, v.3
Managerial Accounting Presentation, v.3
 
Practice topic 9 - answers (1)
Practice   topic 9 - answers (1)Practice   topic 9 - answers (1)
Practice topic 9 - answers (1)
 
Log11 uitwerking opdrachten
Log11 uitwerking opdrachtenLog11 uitwerking opdrachten
Log11 uitwerking opdrachten
 
Contoh Soal Perhitungan Kapasitas Manufaktur
Contoh Soal Perhitungan Kapasitas ManufakturContoh Soal Perhitungan Kapasitas Manufaktur
Contoh Soal Perhitungan Kapasitas Manufaktur
 
Kompilasi bahan-sebelum-uts
Kompilasi bahan-sebelum-utsKompilasi bahan-sebelum-uts
Kompilasi bahan-sebelum-uts
 
Presentation aggregate planning
Presentation aggregate planningPresentation aggregate planning
Presentation aggregate planning
 
ACG 2071 Managerial Accounting Process Costing Systems .docx
ACG 2071 Managerial Accounting Process Costing Systems .docxACG 2071 Managerial Accounting Process Costing Systems .docx
ACG 2071 Managerial Accounting Process Costing Systems .docx
 
Operational Research: LPP.pptx
Operational Research: LPP.pptxOperational Research: LPP.pptx
Operational Research: LPP.pptx
 
Assembly Line Balancing
Assembly Line BalancingAssembly Line Balancing
Assembly Line Balancing
 
Lean Back Offices Project
Lean Back Offices ProjectLean Back Offices Project
Lean Back Offices Project
 
Costing assignment.docx
Costing assignment.docxCosting assignment.docx
Costing assignment.docx
 
Course project ie6560 group 10_presentation
Course project ie6560 group 10_presentationCourse project ie6560 group 10_presentation
Course project ie6560 group 10_presentation
 
Process Costing- Chapter Four
Process Costing- Chapter FourProcess Costing- Chapter Four
Process Costing- Chapter Four
 

Recently uploaded

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 

Recently uploaded (20)

REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 

Learning Curve Sample Problem

  • 1. CASE 1: LEARNING CURVE ANALYSIS Group 7
  • 2. Problem #1 The ABC Company has just been given the following production schedule for ski-lift gondola cars. This product is considerably different from any others the company has produced. Historically, the company‘s learning rate has been 80% on large projects. The first unit took 1,000 hours to produce.
  • 3. Month Units Cumulative 1 3 3 2 7 10 3 10 20 4 12 32 5 4 36 6 2 38 a. Estimate how many hours would be required to complete the 38th unit.
  • 4. Solution a) a. We use the learning curve formulas to calculate the time required for the 38th unit: a. Given: L=0.80 T1= 1000 hrs. T38 = T1 (N (log L/log 2)) = 1000 (38 log 0.80/log 2) = 310.04 hrs
  • 5. • b. If the budget only provides for a maximum of 30 direct labor employees in any month and a total of 15,000 direct labor hours for the entire schedule, will the budget be adequate? Assume that each direct labor employee is productive for 150 work hours each month.
  • 6. Cumulative Hours Mont hs Units Cummulative Units Cumulative Average Cumulative Average Time per Unit Cumulative Total Hours for all Units 1 3 3 0.834034568 834.034568 2502.103704 2 7 10 0.631537303 631.5373025 6315.373025 3 10 20 0.524247142 524.2471422 10484.94284 4 12 32 0.45870687 458.7068697 14678.61983 5 4 36 0.443285172 443.2851721 15958.26619 6 2 38 0.436342826 436.3428259 16581.02738
  • 7. Number of hours per month. Month 1 2502.103704 - 0 = 2502.103704 hrs 2 6315.373025-2502.103704= 3813.269321 hrs 3 10484.94284-6315.373025 = 4169.569815 hrs. 4 14678.61983-10484.94284= 4193.67699 hrs. 5 15958.26619-14678.61983= 1279.64636 hrs. 6 16581.02738-15958.26619= 622.76119 hrs.
  • 8. Direct Labor Hours Month Direct Labor Workers by Month 1 (2,502.1 hr)/(150 hr) = 16.7, or 17 2 (3,813.3 hr)/(150 hr) = 25.4, or 26 3 (4,169.6 hr)/(150 hr) = 27.8, or 28 4 (4,193.7 hr)/(150 hr) = 27.9, or 28 5 (1,279.7 hr)/(150 hr) = 8.5, or 9 6 (622.5 hr)/(150 hr) = 4.2, or 5
  • 9. Conclusion: *The schedule is sufficient in terms of the maximum direct labor required in any month because it never exceeds 30 employees. However, the total cumulative hours are 16,581, which exceeds the budgeted amount by 1,581 hours. Therefore, the budget will not be adequate.
  • 10. Problem 2 XYZ Company has $200,000 in cash, no inventory, and a 90 percent learning curve. To reduce the complexity of this problem, ignore the hiring and training costs associated with dramatically increased production. Employees are paid $20 per hour every Friday for that week‘s work. XYZ has received an order to build 1,000 oak desks over the next 15 weeks. Materials cost $400 per desk. Suppliers make deliveries each Monday and insist on cash upon delivery. The first desk takes 100 hours of direct labor to build. XYZ will be paid $1,500 per desk two weeks after the desks are delivered. Should XYZ take this order? Additional Assumptions: • Products are delivered at the end of each week. Cash inflow from sales occurs at the end of the week.
  • 11. Given: $ 20 per hour 100 hours per desk $ 400 material cost per desk $ 20 per hour x 100 hours per desk = $ 2000 per desk Cost: $ 400 material cost per desk + $ 2000 per desk = $ 2400 per desk
  • 12. Week Units Total cost Inflows every after 2 weeks 1 2 4800 2 4 9600 3 8 19200 3000 4 12 28800 6000 5 14 33600 12000 6 24 57600 18000 7 64 153600 21000 8 128 307200 36000 9 128 307200 96000 10 128 307200 192000 11 88 211200 192000 12 100 240000 192000 13 100 240000 132000 14 100 240000 150000 15 100 240000 150000 150000 150000 Cash Outflows & Inflows
  • 13. 350000 300000 250000 200000 150000 100000 50000 0 Cash Flow Chart 0 2 4 6 8 10 12 14 16 Values Weeks Total cost Inflows every after 2 weeks
  • 14. Conclusion: The company should not take the order, because the total cost exceed the cash inflow every after two weeks.