The document details the installation of a primary spillway pipe for an earthen embankment. It involves laying down over 100 feet of PVC pipe, using a Wacker packer to compact the dirt and create a seal around the pipe, and installing an inlet pipe with a drawdown valve to regulate water flow. Additional pipes are added and the process is repeated to fully install the primary spillway system.